A kind of construction site paved equipment of ground cement mixing
Technical field
The present invention relates to a kind of Architectural Equipment more particularly to a kind of construction site paved equipment of ground cement mixing.
Background technology
Building is all utilizable materials such as people's soil, stone, wood, steel, glass, reed, plastics, ice cube, is built
Structures.Building is not purpose, and the purpose of building is to obtain building to be formed by " space ".It is people to meet
Social life needs, and utilizes grasped material technology means, and with certain scientific law, geomantic omen theory and aesthetic principle
The artificial environment of creation.
At present when carrying out paved to the cement on the ground of construction site, most of carried out using artificial,
Be exactly using man-hour manually hand-held barrel of cement by cement on the ground, then carry out it is artificial shakeouts, but in this way there are the shortcomings that
It is that the course of work is time-consuming and laborious, and during laying, it is difficult to thoroughly be paved to cement.
Therefore there is an urgent need for researching and developing, a kind of course of work is time saving and energy saving, can use the construction site that cement is thoroughly paved
Ground cement stirs paved equipment, and to overcome, there are the courses of work when carrying out paved to construction site ground cement at present
It is time-consuming and laborious, be difficult the shortcomings that thoroughly being paved to cement.
Invention content
(1)Technical problems to be solved
The present invention in order to overcome at present that there are the courses of work is time-consuming and laborious when carrying out paved to construction site ground cement,
It is difficult to the shortcomings that thoroughly being paved to cement, the technical problem to be solved in the present invention is to provide a kind of time saving provinces of course of work
Power, can be to the construction site paved equipment of ground cement mixing that cement is thoroughly paved.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a construction site paved equipment of ground cement mixing,
Include mounting plate, holder, wheel, support plate, fixed plate, agitator tank, tremie pipe, the first sliding block, the first sliding rail, first movement
Bar, baffle, the second sliding rail, the second sliding block, mounting rod, Electric Motor Wheel, turntable, rocking bar, supporting rod, connecting plate, bearing block, first turn
Bar, the first paddle, first gear, decelerating motor and second gear, two side of mounting plate front and rear sides or so are respectively connected with holder,
It is rotatably connected with wheel below stent outer, through-hole is provided on the right side of mounting plate, left is connected with support plate on the upside of mounting plate, props up
Top is connected with fixed plate on the right side of fagging, and fixed plate right end is connected with agitator tank, tremie pipe, fixed plate are connected on the downside of agitator tank
Downside right is connected with the first sliding block, and slidingtype is connected with the first sliding rail on the downside of the first sliding block, and the is connected on the downside of the first sliding rail
One mobile bar, first movement bar right end are connected with baffle, and baffle blocks tremie pipe, and left is connected with second on rear side of first movement bar
Sliding rail, the second sliding rail inner sliding type are connected with the second sliding block, and support plate lower right-hand side is connected with mounting rod, and mounting rod is located at second
Sliding rail rear, mounting rod front side right are connected with Electric Motor Wheel, turntable are connected on front side of Electric Motor Wheel, rocking bar is connected on the right side of turntable,
Rocking bar is located on rear side of the second sliding rail, and right is hingedly connected on rear side of the second sliding block on front side of rocking bar, and right is connected on the upside of fixed plate
Supporting rod, post upper are connected with connecting plate, and right side is connected with bearing block in connecting plate, and first turn is connected in bearing block
Bar, the first bull stick downside are evenly equipped with the first paddle, and the first paddle is located in agitator tank, and the first bull stick upper end is connected with first
Gear, connecting plate upside left are connected with decelerating motor, and the output shaft on the upside of decelerating motor is connected with second gear, second gear
It is engaged with first gear.
Preferably, further include thering is mobile paving actual load to set, it includes third sliding block, third sliding rail, second that mobile paving actual load, which is set,
Mobile bar, the first rack, connecting rod, paving solid plate, L-shaped bar, third gear, the 4th gear and the second rack, mounting plate downside are left
Side is equipped with mobile paving actual load and sets, and left is connected with third sliding block on the upside of mounting plate, and slidingtype is connected with third cunning on third sliding block
Rail, third sliding rail upside left are connected with the second mobile bar, and the second mobile bar is located on front side of the second sliding rail, on the upside of the second mobile bar
It is connected with the first rack, right is connected with connecting rod on the downside of the second mobile bar, and lower section is connected with paving solid plate on rear side of connecting rod, and paving is real
Plate is located at below mounting plate, L-shaped bar is connected on front side of support plate lower right-hand side, two side rotaries connect L-shaped bar right wall rear side up and down
It connects there are two third gear, downside third gear is engaged with the first rack, and rotating middle part formula is connected with the 4th on rear side of L-shaped bar right wall
Gear, the 4th gear are engaged with two third gears, and front is connected with the second rack on the downside of first movement bar, the second rack with it is upper
Side third gear engagement.
Preferably, further include having fixed link and funnel, right is connected with fixed link, fixed link left side top on the upside of mounting plate
It is connected with funnel, funnel is located in through-hole, and funnel is located at below tremie pipe.
Preferably, further include having two level agitating device, two level agitating device includes the 4th sliding rail, Four-slider, the 5th
Sliding rail, the 5th sliding block, shaft, the second bull stick and the second paddle, agitator tank is interior to be equipped with two level agitating device, and connecting plate downside is right
Side is connected with the 4th sliding rail, and the 4th sliding rail is ellipse, and the center of circle of the 4th sliding rail is located on the first bull stick, sliding in the 4th sliding rail
Formula is connected with Four-slider, and top is connected with the 5th sliding rail on the right side of the first bull stick, and the 5th sliding rail inner sliding type is connected with the 5th cunning
Block, the 5th upper end of slide block are rotatably connected with shaft, and shaft upper end is connected on the downside of Four-slider, and the 5th sliding block lower end is connected with
Second bull stick, the second bull stick downside are evenly equipped with the second paddle, and the second paddle is staggered with the first paddle.
Preferably, further include having oblique ring, agitator tank inner underside is connected with oblique ring.
Operation principle:When user needs the stirring for carrying out cement to the ground in construction site paved, user can be by water
Mud dispensing is placed in agitator tank, and then user can start decelerating motor, and decelerating motor drives second gear rotation, the second tooth
Wheel drives first gear rotation, first gear to drive the rotation of the first bull stick, and the first bull stick drives the rotation of the first paddle, to make
First paddle mixes cement dispensing, and to make cement be molded, after cement is molded, user can not have to close decelerating motor,
The first paddle is set to continue to mix cement, to the solidification for avoiding cement too fast, then user can start Electric Motor Wheel, Electric Motor Wheel
Turntable is driven to rotate clockwise, driven by rotary disc rocking bar rotates clockwise, and rocking bar drives the second sliding block in the second sliding rail to moving down
Dynamic, when the second sliding block is moved to the second sliding rail inner underside, rocking bar will drive the second sliding block to be moved to the left, to drive second to slide
Rail is moved to the left, and the second sliding rail drives first movement bar to be moved to the left, and first movement bar is moved to the left by the first sliding rail, and first
Mobile bar drives baffle to be moved to the left, to make baffle no longer block tremie pipe, to make the cement in agitator tank from tremie pipe
In fall, fallen to the ground by through-hole, when rocking bar drives the second sliding rail and the second sliding block to be located at turntable left, rocking bar is by band
Dynamic second sliding block and the second sliding rail move right, and tremie pipe are blocked to drive baffle to move right, to make in agitator tank
Cement is not fallen out, and then user pushes the device left to move, to be fallen on the different location on ground to cement, when
When the cement resting on the ground is not below mounting plate, user can manually shakeout cement, to realize the laying to cement, when
After the completion of cement is laid with, user can close Electric Motor Wheel and decelerating motor.
Because further including having mobile paving actual load to set, it includes third sliding block, third sliding rail, the second movement that mobile paving actual load, which is set,
Bar, the first rack, connecting rod, paving solid plate, L-shaped bar, third gear, the 4th gear and the second rack, mounting plate downside left are set
There is mobile paving actual load to set, left is connected with third sliding block on the upside of mounting plate, and slidingtype is connected with third sliding rail on third sliding block, the
Left is connected with the second mobile bar on the upside of three sliding rails, and the second mobile bar is located on front side of the second sliding rail, connection on the upside of the second mobile bar
There are the first rack, the second mobile bar downside right to be connected with connecting rod, lower section is connected with paving solid plate, paving solid plate position on rear side of connecting rod
Below mounting plate, L-shaped bar is connected on front side of support plate lower right-hand side, two side rotaries are connected with L-shaped bar right wall rear side up and down
Two third gears, downside third gear are engaged with the first rack, and rotating middle part formula is connected with the 4th tooth on rear side of L-shaped bar right wall
Wheel, the 4th gear are engaged with two third gears, and front is connected with the second rack, the second rack and upside on the downside of first movement bar
Third gear engages, when user needs spread in real time the cement fallen to the ground, when Electric Motor Wheel drives rocking bar and second to slide
When cement when rail is moved to the left, that is, in agitator tank is fallen to the ground, first movement bar will drive the second rack to moving to left
Dynamic, third gear rotates counterclockwise on the upside of the second rack drives, and upside third gear drives the 4th gear to rotate clockwise, and the 4th
Gear drives downside third gear to rotate counterclockwise, and downside third gear drives the first rack to move right, the first rack drives
Second mobile bar moves right, and the second mobile bar drives connecting rod to move right, and connecting rod drives paving solid plate to move right, to
So that paving solid plate is carried out the cement fallen to the ground, paving is real, and user pushes to the right the equipment, comprehensive to be carried out to ground cement
To shakeout paving real, when first movement bar moves right, paving solid plate will be driven to be moved to the left.
Because further including having fixed link and funnel, right is connected with fixed link on the upside of mounting plate, and top connects on the left of fixed link
It is connected to funnel, funnel is located in through-hole, and funnel is located at below tremie pipe, and when cement is fallen in tremie pipe, cement will fall on leakage
It on bucket, is then fallen to the ground out of funnel, can fall on not falling to the ground on mounting plate to avoid cement in this way and cause to provide
Source wastes.
Because further including having two level agitating device, two level agitating device includes the 4th sliding rail, Four-slider, the 5th cunning
Rail, the 5th sliding block, shaft, the second bull stick and the second paddle, agitator tank is interior to be equipped with two level agitating device, connecting plate downside right
It is connected with the 4th sliding rail, the 4th sliding rail is ellipse, and the center of circle of the 4th sliding rail is located on the first bull stick, the 4th sliding rail inner sliding type
It is connected with Four-slider, top is connected with the 5th sliding rail on the right side of the first bull stick, and the 5th sliding rail inner sliding type is connected with the 5th sliding block,
5th upper end of slide block is rotatably connected with shaft, and shaft upper end is connected on the downside of Four-slider, and the 5th sliding block lower end is connected with the
Two bull sticks, the second bull stick downside are evenly equipped with the second paddle, and the second paddle is staggered with the first paddle, when user needs quickly
When being stirred to cement, user can will start decelerating motor, and decelerating motor drives the first bull stick and the rotation of the first paddle
The rotation of the 5th sliding rail, the 5th sliding rail will be driven to drive the rotation of the 5th sliding block, the 5th sliding block that will drive the by shaft when turning
Four-slider rotates in the 4th sliding rail, to which the track for making Four-slider pass through the 4th sliding rail drives the 5th sliding block in the 5th sliding rail
It inside moves left and right, to drive the second bull stick to move left and right, to drive the second paddle to move left and right, because Four-slider exists
Rotation in 4th sliding rail will drive the 5th sliding block in the 5th sliding rail at this time when rotating to the different location in the 4th sliding rail
Rotation, can be right to make the second paddle around the mode of the revolution of the first bull stick and rotation to drive the second paddle rotation
Cement is quickly stirred.
Because further including having oblique ring, agitator tank inner underside is connected with oblique ring, when the cement in agitator tank is fallen from tremie pipe
When, oblique ring will avoid cement from remaining in agitator tank, cause the waste of resource.
(3)Advantageous effect
That invention achieves the courses of work is time saving and energy saving, can be to the effect that cement is thoroughly paved, by using first
Paddle and the second paddle rotate jointly the mode being stirred to cement, can make cement on building sites quickly into
Row situ configuration, avoids the configuration manually carried, and the mode that solid plate moves left and right is moved left and right and spread by using baffle, can
Make the uniform intermittent blanking of cement and cement is paved, working hour caused by manually being paved can be avoided long.
Description of the drawings
Fig. 1 is the main structure diagram of the present invention.
Fig. 2 is the mobile main structure diagram for spreading actual load and setting of the present invention.
Fig. 3 is the main structure diagram of funnel of the present invention.
Fig. 4 is the main structure diagram of two level agitating device of the present invention.
Fig. 5 is the overlooking structure diagram of the 4th sliding rail of the invention.
Fig. 6 is the main structure diagram of the oblique ring of the present invention.
Label in attached drawing be:1- mounting plates, 2- holders, 3- wheels, 4- through-holes, 5- support plates, 6- fixed plates, 7- stirrings
Case, 8- tremie pipes, the first sliding blocks of 9-, the first sliding rails of 10-, 11- first movement bars, 12- baffles, the second sliding rails of 13-, 14- second
Sliding block, 15- mounting rods, 16- Electric Motor Wheels, 17- turntables, 18- rocking bars, 19- supporting rods, 20- connecting plates, 21- bearing blocks, 22-
One bull stick, the first paddles of 23-, 24- first gears, 25- decelerating motors, 26- second gears, 30- movement paving actual loads are set, 301-
Third sliding block, 302- third sliding rails, the second mobile bars of 303-, the first racks of 304-, 305- connecting rods, 306- spread solid plate, 307-L
Shape bar, 308- third gears, the 4th gears of 309-, the second racks of 3010-, 3021- fixed links, 3022- funnels, 31- two levels are stirred
Mix device, the 4th sliding rails of 311-, 312- Four-sliders, the 5th sliding rails of 313-, the 5th sliding blocks of 314-, 315- shafts, 316- second
Bull stick, the second paddles of 317-, the oblique rings of 3121-.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of construction site paved equipment of ground cement mixing, as shown in figures 1 to 6, include mounting plate 1, holder 2, wheel 3,
Support plate 5, fixed plate 6, agitator tank 7, tremie pipe 8, the first sliding block 9, the first sliding rail 10, first movement bar 11, baffle 12, second
Sliding rail 13, the second sliding block 14, mounting rod 15, Electric Motor Wheel 16, turntable 17, rocking bar 18, supporting rod 19, connecting plate 20, bearing block 21,
First bull stick 22, the first paddle 23, first gear 24, decelerating motor 25 and second gear 26,1 front and rear sides of mounting plate or so
Two sides are respectively connected with holder 2, and 2 outer side-lower of holder is rotatably connected with wheel 3, and 1 right side of mounting plate is provided with through-hole 4, mounting plate 1
Upside left is connected with support plate 5, and 5 right side top of support plate is connected with fixed plate 6, and 6 right end of fixed plate is connected with agitator tank 7,
7 downside of agitator tank is connected with tremie pipe 8, and 6 downside right of fixed plate is connected with the first sliding block 9, and 9 downside slidingtype of the first sliding block connects
It is connected to the first sliding rail 10,10 downside of the first sliding rail is connected with first movement bar 11, and 11 right end of first movement bar is connected with baffle 12,
Baffle 12 blocks tremie pipe 8, and 11 rear side left of first movement bar is connected with the second sliding rail 13, the connection of 13 inner sliding type of the second sliding rail
There are the second sliding block 14,5 lower right-hand side of support plate to be connected with mounting rod 15, mounting rod 15 is located at 13 rear of the second sliding rail, mounting rod
15 front sides right are connected with Electric Motor Wheel 16, and 16 front side of Electric Motor Wheel is connected with turntable 17, and 17 right side of turntable is connected with rocking bar 18, rocking bar
18 are located at 13 rear side of the second sliding rail, and 18 front side right of rocking bar is hingedly connected to 14 rear side of the second sliding block, and 6 upside right of fixed plate connects
It is connected to supporting rod 19,19 upper end of supporting rod is connected with connecting plate 20, and right side is connected with bearing block 21, bearing block 21 in connecting plate 20
It is inside connected with the first bull stick 22,22 downside of the first bull stick is evenly equipped with the first paddle 23, and the first paddle 23 is located at agitator tank 7
Interior, 22 upper end of the first bull stick is connected with first gear 24, and 20 upside left of connecting plate is connected with decelerating motor 25, decelerating motor 25
The output shaft of upside is connected with second gear 26, and second gear 26 is engaged with first gear 24.
Embodiment 2
A kind of construction site paved equipment of ground cement mixing, as shown in figures 1 to 6, include mounting plate 1, holder 2, wheel 3,
Support plate 5, fixed plate 6, agitator tank 7, tremie pipe 8, the first sliding block 9, the first sliding rail 10, first movement bar 11, baffle 12, second
Sliding rail 13, the second sliding block 14, mounting rod 15, Electric Motor Wheel 16, turntable 17, rocking bar 18, supporting rod 19, connecting plate 20, bearing block 21,
First bull stick 22, the first paddle 23, first gear 24, decelerating motor 25 and second gear 26,1 front and rear sides of mounting plate or so
Two sides are respectively connected with holder 2, and 2 outer side-lower of holder is rotatably connected with wheel 3, and 1 right side of mounting plate is provided with through-hole 4, mounting plate 1
Upside left is connected with support plate 5, and 5 right side top of support plate is connected with fixed plate 6, and 6 right end of fixed plate is connected with agitator tank 7,
7 downside of agitator tank is connected with tremie pipe 8, and 6 downside right of fixed plate is connected with the first sliding block 9, and 9 downside slidingtype of the first sliding block connects
It is connected to the first sliding rail 10,10 downside of the first sliding rail is connected with first movement bar 11, and 11 right end of first movement bar is connected with baffle 12,
Baffle 12 blocks tremie pipe 8, and 11 rear side left of first movement bar is connected with the second sliding rail 13, the connection of 13 inner sliding type of the second sliding rail
There are the second sliding block 14,5 lower right-hand side of support plate to be connected with mounting rod 15, mounting rod 15 is located at 13 rear of the second sliding rail, mounting rod
15 front sides right are connected with Electric Motor Wheel 16, and 16 front side of Electric Motor Wheel is connected with turntable 17, and 17 right side of turntable is connected with rocking bar 18, rocking bar
18 are located at 13 rear side of the second sliding rail, and 18 front side right of rocking bar is hingedly connected to 14 rear side of the second sliding block, and 6 upside right of fixed plate connects
It is connected to supporting rod 19,19 upper end of supporting rod is connected with connecting plate 20, and right side is connected with bearing block 21, bearing block 21 in connecting plate 20
It is inside connected with the first bull stick 22,22 downside of the first bull stick is evenly equipped with the first paddle 23, and the first paddle 23 is located at agitator tank 7
Interior, 22 upper end of the first bull stick is connected with first gear 24, and 20 upside left of connecting plate is connected with decelerating motor 25, decelerating motor 25
The output shaft of upside is connected with second gear 26, and second gear 26 is engaged with first gear 24.
Further include thering is mobile paving actual load to set 30, it includes third sliding block 301, third sliding rail 302, that mobile paving actual load, which sets 30,
Two mobile bars 303, the first rack 304, connecting rod 305, paving solid plate 306, L-shaped bar 307, third gear 308, the 4th gear 309
With the second rack 3010,1 downside left of mounting plate is equipped with mobile paving actual load and sets 30, and 1 upside left of mounting plate is connected with third cunning
Block 301, slidingtype is connected with third sliding rail 302 on third sliding block 301, and 302 upside left of third sliding rail is connected with the second movement
Bar 303, the second mobile bar 303 are located at the front side of the second sliding rail 13, and 303 upside of the second mobile bar is connected with the first rack 304, and second
303 downside right of mobile bar is connected with connecting rod 305, and 305 rear side lower section of connecting rod is connected with paving solid plate 306, spreads solid plate 306
In 1 lower section of mounting plate, L-shaped bar 307, the both sides rotation up and down of 307 right wall of L-shaped bar rear side are connected on front side of 5 lower right-hand side of support plate
There are two third gear 308, downside third gear 308 is engaged with the first rack 304 for formula connection, middle part on rear side of 307 right wall of L-shaped bar
It rotatably is connected with the 4th gear 309, the 4th gear 309 is engaged with two third gears 308,11 downside front of first movement bar
It is connected with the second rack 3010, the second rack 3010 is engaged with upside third gear 308.
Embodiment 3
A kind of construction site paved equipment of ground cement mixing, as shown in figures 1 to 6, include mounting plate 1, holder 2, wheel 3,
Support plate 5, fixed plate 6, agitator tank 7, tremie pipe 8, the first sliding block 9, the first sliding rail 10, first movement bar 11, baffle 12, second
Sliding rail 13, the second sliding block 14, mounting rod 15, Electric Motor Wheel 16, turntable 17, rocking bar 18, supporting rod 19, connecting plate 20, bearing block 21,
First bull stick 22, the first paddle 23, first gear 24, decelerating motor 25 and second gear 26,1 front and rear sides of mounting plate or so
Two sides are respectively connected with holder 2, and 2 outer side-lower of holder is rotatably connected with wheel 3, and 1 right side of mounting plate is provided with through-hole 4, mounting plate 1
Upside left is connected with support plate 5, and 5 right side top of support plate is connected with fixed plate 6, and 6 right end of fixed plate is connected with agitator tank 7,
7 downside of agitator tank is connected with tremie pipe 8, and 6 downside right of fixed plate is connected with the first sliding block 9, and 9 downside slidingtype of the first sliding block connects
It is connected to the first sliding rail 10,10 downside of the first sliding rail is connected with first movement bar 11, and 11 right end of first movement bar is connected with baffle 12,
Baffle 12 blocks tremie pipe 8, and 11 rear side left of first movement bar is connected with the second sliding rail 13, the connection of 13 inner sliding type of the second sliding rail
There are the second sliding block 14,5 lower right-hand side of support plate to be connected with mounting rod 15, mounting rod 15 is located at 13 rear of the second sliding rail, mounting rod
15 front sides right are connected with Electric Motor Wheel 16, and 16 front side of Electric Motor Wheel is connected with turntable 17, and 17 right side of turntable is connected with rocking bar 18, rocking bar
18 are located at 13 rear side of the second sliding rail, and 18 front side right of rocking bar is hingedly connected to 14 rear side of the second sliding block, and 6 upside right of fixed plate connects
It is connected to supporting rod 19,19 upper end of supporting rod is connected with connecting plate 20, and right side is connected with bearing block 21, bearing block 21 in connecting plate 20
It is inside connected with the first bull stick 22,22 downside of the first bull stick is evenly equipped with the first paddle 23, and the first paddle 23 is located at agitator tank 7
Interior, 22 upper end of the first bull stick is connected with first gear 24, and 20 upside left of connecting plate is connected with decelerating motor 25, decelerating motor 25
The output shaft of upside is connected with second gear 26, and second gear 26 is engaged with first gear 24.
Further include thering is mobile paving actual load to set 30, it includes third sliding block 301, third sliding rail 302, that mobile paving actual load, which sets 30,
Two mobile bars 303, the first rack 304, connecting rod 305, paving solid plate 306, L-shaped bar 307, third gear 308, the 4th gear 309
With the second rack 3010,1 downside left of mounting plate is equipped with mobile paving actual load and sets 30, and 1 upside left of mounting plate is connected with third cunning
Block 301, slidingtype is connected with third sliding rail 302 on third sliding block 301, and 302 upside left of third sliding rail is connected with the second movement
Bar 303, the second mobile bar 303 are located at the front side of the second sliding rail 13, and 303 upside of the second mobile bar is connected with the first rack 304, and second
303 downside right of mobile bar is connected with connecting rod 305, and 305 rear side lower section of connecting rod is connected with paving solid plate 306, spreads solid plate 306
In 1 lower section of mounting plate, L-shaped bar 307, the both sides rotation up and down of 307 right wall of L-shaped bar rear side are connected on front side of 5 lower right-hand side of support plate
There are two third gear 308, downside third gear 308 is engaged with the first rack 304 for formula connection, middle part on rear side of 307 right wall of L-shaped bar
It rotatably is connected with the 4th gear 309, the 4th gear 309 is engaged with two third gears 308,11 downside front of first movement bar
It is connected with the second rack 3010, the second rack 3010 is engaged with upside third gear 308.
Further include having fixed link 3021 and funnel 3022,1 upside right of mounting plate is connected with fixed link 3021, fixed link
3021 left sides top are connected with funnel 3022, and funnel 3022 is located in through-hole 4, and funnel 3022 is located at 8 lower section of tremie pipe.
Embodiment 4
A kind of construction site paved equipment of ground cement mixing, as shown in figures 1 to 6, include mounting plate 1, holder 2, wheel 3,
Support plate 5, fixed plate 6, agitator tank 7, tremie pipe 8, the first sliding block 9, the first sliding rail 10, first movement bar 11, baffle 12, second
Sliding rail 13, the second sliding block 14, mounting rod 15, Electric Motor Wheel 16, turntable 17, rocking bar 18, supporting rod 19, connecting plate 20, bearing block 21,
First bull stick 22, the first paddle 23, first gear 24, decelerating motor 25 and second gear 26,1 front and rear sides of mounting plate or so
Two sides are respectively connected with holder 2, and 2 outer side-lower of holder is rotatably connected with wheel 3, and 1 right side of mounting plate is provided with through-hole 4, mounting plate 1
Upside left is connected with support plate 5, and 5 right side top of support plate is connected with fixed plate 6, and 6 right end of fixed plate is connected with agitator tank 7,
7 downside of agitator tank is connected with tremie pipe 8, and 6 downside right of fixed plate is connected with the first sliding block 9, and 9 downside slidingtype of the first sliding block connects
It is connected to the first sliding rail 10,10 downside of the first sliding rail is connected with first movement bar 11, and 11 right end of first movement bar is connected with baffle 12,
Baffle 12 blocks tremie pipe 8, and 11 rear side left of first movement bar is connected with the second sliding rail 13, the connection of 13 inner sliding type of the second sliding rail
There are the second sliding block 14,5 lower right-hand side of support plate to be connected with mounting rod 15, mounting rod 15 is located at 13 rear of the second sliding rail, mounting rod
15 front sides right are connected with Electric Motor Wheel 16, and 16 front side of Electric Motor Wheel is connected with turntable 17, and 17 right side of turntable is connected with rocking bar 18, rocking bar
18 are located at 13 rear side of the second sliding rail, and 18 front side right of rocking bar is hingedly connected to 14 rear side of the second sliding block, and 6 upside right of fixed plate connects
It is connected to supporting rod 19,19 upper end of supporting rod is connected with connecting plate 20, and right side is connected with bearing block 21, bearing block 21 in connecting plate 20
It is inside connected with the first bull stick 22,22 downside of the first bull stick is evenly equipped with the first paddle 23, and the first paddle 23 is located at agitator tank 7
Interior, 22 upper end of the first bull stick is connected with first gear 24, and 20 upside left of connecting plate is connected with decelerating motor 25, decelerating motor 25
The output shaft of upside is connected with second gear 26, and second gear 26 is engaged with first gear 24.
Further include thering is mobile paving actual load to set 30, it includes third sliding block 301, third sliding rail 302, that mobile paving actual load, which sets 30,
Two mobile bars 303, the first rack 304, connecting rod 305, paving solid plate 306, L-shaped bar 307, third gear 308, the 4th gear 309
With the second rack 3010,1 downside left of mounting plate is equipped with mobile paving actual load and sets 30, and 1 upside left of mounting plate is connected with third cunning
Block 301, slidingtype is connected with third sliding rail 302 on third sliding block 301, and 302 upside left of third sliding rail is connected with the second movement
Bar 303, the second mobile bar 303 are located at the front side of the second sliding rail 13, and 303 upside of the second mobile bar is connected with the first rack 304, and second
303 downside right of mobile bar is connected with connecting rod 305, and 305 rear side lower section of connecting rod is connected with paving solid plate 306, spreads solid plate 306
In 1 lower section of mounting plate, L-shaped bar 307, the both sides rotation up and down of 307 right wall of L-shaped bar rear side are connected on front side of 5 lower right-hand side of support plate
There are two third gear 308, downside third gear 308 is engaged with the first rack 304 for formula connection, middle part on rear side of 307 right wall of L-shaped bar
It rotatably is connected with the 4th gear 309, the 4th gear 309 is engaged with two third gears 308,11 downside front of first movement bar
It is connected with the second rack 3010, the second rack 3010 is engaged with upside third gear 308.
Further include having fixed link 3021 and funnel 3022,1 upside right of mounting plate is connected with fixed link 3021, fixed link
3021 left sides top are connected with funnel 3022, and funnel 3022 is located in through-hole 4, and funnel 3022 is located at 8 lower section of tremie pipe.
Further include having two level agitating device 31, two level agitating device 31 includes the 4th sliding rail 311, Four-slider 312,
Five sliding rails 313, the 5th sliding block 314, shaft 315, the second bull stick 316 and the second paddle 317, agitator tank 7 is interior to be stirred equipped with two level
Device 31 is mixed, 20 downside right of connecting plate is connected with the 4th sliding rail 311, and the 4th sliding rail 311 is ellipse, the 4th sliding rail 311
The center of circle is located on the first bull stick 22, and 311 inner sliding type of the 4th sliding rail is connected with Four-slider 312,22 right side top of the first bull stick
It is connected with the 5th sliding rail 313,313 inner sliding type of the 5th sliding rail is connected with the 5th sliding block 314, and 314 upper end of the 5th sliding block is rotary
It is connected with shaft 315,315 upper end of shaft is connected to 312 downside of Four-slider, and 314 lower end of the 5th sliding block is connected with the second bull stick
316,316 downside of the second bull stick is evenly equipped with the second paddle 317, and the second paddle 317 is staggered with the first paddle 23.
Further include having oblique ring 3121,7 inner underside of agitator tank is connected with oblique ring 3121.
Operation principle:When user needs the stirring for carrying out cement to the ground in construction site paved, user can be by water
Mud dispensing is placed in agitator tank 7, and then user can start decelerating motor 25, and decelerating motor 25 drives second gear 26 to revolve
Turn, second gear 26 drives first gear 24 to rotate, and first gear 24 drives the rotation of the first bull stick 22, the first bull stick 22 to drive the
One paddle 23 rotates, to make the first paddle 23 mix cement dispensing, to make cement be molded, and after cement be molded, use
Family can not have to close decelerating motor 25, make the first paddle 23 continue to mix cement, to the solidification for avoiding cement too fast, so
User can start Electric Motor Wheel 16 afterwards, and Electric Motor Wheel 16 drives turntable 17 to rotate clockwise, and turntable 17 drives rocking bar 18 to revolve clockwise
Turn, rocking bar 18 drives the second sliding block 14 to be moved down in the second sliding rail 13, when the second sliding block 14 is moved in the second sliding rail 13
When downside, rocking bar 18 will drive the second sliding block 14 to be moved to the left, to drive the second sliding rail 13 to be moved to the left, 13 band of the second sliding rail
Dynamic first movement bar 11 is moved to the left, and first movement bar 11 is moved to the left by the first sliding rail 10, and first movement bar 11 drives gear
Plate 12 is moved to the left, to make baffle 12 no longer block tremie pipe 8, to make the cement in agitator tank 7 decline from tremie pipe 8
Under, it is fallen to the ground by through-hole 4, when rocking bar 18 drives the second sliding rail 13 and the second sliding block 14 to be located at 17 left of turntable, is shaken
Bar 18 will drive the second sliding block 14 and the second sliding rail 13 to move right, and tremie pipe 8 is blocked to drive baffle 12 to move right, from
And the cement in agitator tank 7 is made not fall out, then user pushes the device left to move, to be fallen on ground to cement
Different location on, when the cement resting on the ground is not below mounting plate 1, user can manually shakeout cement, to real
Now to the laying of cement, after the completion of cement laying, user can close Electric Motor Wheel 16 and decelerating motor 25.
Because further including having mobile paving actual load to set 30, it includes third sliding block 301, third sliding rail that mobile paving actual load, which sets 30,
302, the second mobile bar 303, the first rack 304, connecting rod 305, paving solid plate 306, L-shaped bar 307, third gear 308, the 4th tooth
Wheel 309 and second rack 3010,1 downside left of mounting plate are equipped with mobile paving actual load and set 30, and 1 upside left of mounting plate is connected with the
Three sliding blocks 301, slidingtype is connected with third sliding rail 302 on third sliding block 301, and 302 upside left of third sliding rail is connected with second
Mobile bar 303, the second mobile bar 303 are located at 13 front side of the second sliding rail, and 303 upside of the second mobile bar is connected with the first rack 304,
Second mobile bar, 303 downside right is connected with connecting rod 305, and 305 rear side lower section of connecting rod is connected with paving solid plate 306, spreads solid plate
306 are located at the lower section of mounting plate 1, are connected with L-shaped bar 307 on front side of 5 lower right-hand side of support plate, both sides up and down on rear side of 307 right wall of L-shaped bar
There are two third gear 308, downside third gear 308 is engaged with the first rack 304 for rotary connection, on rear side of 307 right wall of L-shaped bar
Rotating middle part formula is connected with the 4th gear 309, and the 4th gear 309 is engaged with two third gears 308,11 downside of first movement bar
Front is connected with the second rack 3010, and the second rack 3010 is engaged with upside third gear 308, when user needs to falling to the ground
On cement spread in real time, when Electric Motor Wheel 16 drives rocking bar 18 and the second sliding rail 13 to be moved to the left, that is, in agitator tank 7
Cement when falling to the ground, first movement bar 11 will drive the second rack 3010 to be moved to the left, on the second rack 3010 drives
Side third gear 308 rotates counterclockwise, and upside third gear 308 drives the 4th gear 309 to rotate clockwise, the 4th gear 309
Drive the rotation counterclockwise of downside third gear 308, downside third gear 308 that the first rack 304 is driven to move right, the first rack
304 the second mobile bars 303 of drive move right, and the second mobile bar 303 drives connecting rod 305 to move right, and connecting rod 305 drives
Paving solid plate 306 moves right, and to make paving solid plate 306 carry out the cement fallen to the ground, paving is real, and user pushes this to set to the right
It is standby, to comprehensively shakeout paving in fact to ground cement, when first movement bar 11 moves right, solid plate 306 is spread by driving
It is moved to the left.
Because further including having fixed link 3021 and funnel 3022,1 upside right of mounting plate is connected with fixed link 3021, fixed
3021 left side top of bar is connected with funnel 3022, and funnel 3022 is located in through-hole 4, and funnel 3022 is located at 8 lower section of tremie pipe, instantly
When cement is fallen in expects pipe 8, cement will be fallen on funnel 3022, then be fallen to the ground out of funnel 3022, can be kept away in this way
Exempt from cement and fall on mounting plate 1 not fall to the ground to result in waste of resources.
Because further including having two level agitating device 31, two level agitating device 31 includes the 4th sliding rail 311, Four-slider
312, the 5th sliding rail 313, the 5th sliding block 314, shaft 315, the second bull stick 316 and the second paddle 317 are equipped in agitator tank 7
Two level agitating device 31,20 downside right of connecting plate are connected with the 4th sliding rail 311, and the 4th sliding rail 311 is ellipse, the 4th sliding rail
311 center of circle is located on the first bull stick 22, and 311 inner sliding type of the 4th sliding rail is connected with Four-slider 312,22 right side of the first bull stick
Top is connected with the 5th sliding rail 313, and 313 inner sliding type of the 5th sliding rail is connected with the 5th sliding block 314, the rotation of 314 upper end of the 5th sliding block
Rotatable to be connected with shaft 315,315 upper end of shaft is connected to 312 downside of Four-slider, and 314 lower end of the 5th sliding block is connected with second
Bull stick 316,316 downside of the second bull stick are evenly equipped with the second paddle 317, and the second paddle 317 is staggered with the first paddle 23, when
When user needs quickly to be stirred cement, user can will start decelerating motor 25, and decelerating motor 25 drives first turn
The 5th sliding rail 313 will be driven to rotate when bar 22 and the first paddle 23 rotate, the 5th sliding rail 313 drives the 5th sliding block 314
Rotation, the 5th sliding block 314 will drive the rotation in the 4th sliding rail 311 of Four-slider 312 by shaft 315, to make the 4th cunning
Block 312 drives the 5th sliding block 314 to be moved left and right in the 5th sliding rail 313 by the track of the 4th sliding rail 311, to drive second
Bull stick 316 moves left and right, to drive the second paddle 317 to move left and right, because Four-slider 312 is in the 4th sliding rail 311
Rotation, when rotating to the different location in the 4th sliding rail 311, will drive at this time the 5th sliding block 314 in the 5th sliding rail 313 from
Turn, to drive 317 rotation of the second paddle, to make the second paddle 317 revolve round the sun around the first bull stick 22 and the mode of rotation,
Cement can quickly be stirred.
Because further including having oblique ring 3121,7 inner underside of agitator tank is connected with oblique ring 3121, when the cement in agitator tank 7 from
When tremie pipe 8 is fallen, oblique ring 3121 will avoid cement from remaining in agitator tank 7, cause the waste of resource.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.