CN108342940A - A kind of bus stop station pavement structure - Google Patents

A kind of bus stop station pavement structure Download PDF

Info

Publication number
CN108342940A
CN108342940A CN201810300333.4A CN201810300333A CN108342940A CN 108342940 A CN108342940 A CN 108342940A CN 201810300333 A CN201810300333 A CN 201810300333A CN 108342940 A CN108342940 A CN 108342940A
Authority
CN
China
Prior art keywords
road surface
parking
cement layer
bus stop
mixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810300333.4A
Other languages
Chinese (zh)
Other versions
CN108342940B (en
Inventor
曹建新
熊勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou City Engineering Design Studies Total Institute
Original Assignee
Guangzhou City Engineering Design Studies Total Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou City Engineering Design Studies Total Institute filed Critical Guangzhou City Engineering Design Studies Total Institute
Priority to CN201810300333.4A priority Critical patent/CN108342940B/en
Publication of CN108342940A publication Critical patent/CN108342940A/en
Application granted granted Critical
Publication of CN108342940B publication Critical patent/CN108342940B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/16Reinforcements
    • E01C11/18Reinforcements for cement concrete pavings
    • E01C11/185Reinforcements for cement concrete pavings the reinforcements extending up to the surface, e.g. anti-slip gratings
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of bus stop station pavement structures, including roadbed, roadbed is equipped with one section of parking road surface and two sections of mixing road surfaces, two sections of mixing road surfaces are respectively at the head and the tail both ends on parking road surface, the height on two mixing road surfaces are concordantly stopped road surface, two mixing road surfaces include cement layer and bitumen layer, parking road surface and each cement layer are armored concrete material, it stops and is equipped with connection net between road surface and each cement layer, each cement layer is higher than the side far from parking road surface close to the side on parking road surface.The position for starting and stopping using parking road surface as bus, parking road surface Rut resistance characteristic and temperature stability is utilized, road surface is mixed as driving road surface, remains the high-comfort advantage of bituminous paving, improved bus parking service life of road surface is long, performance is stable, driving is comfortable.The invention is used for road construction construction applications.

Description

A kind of bus stop station pavement structure
Technical field
The present invention relates to road construction construction applications, more particularly to a kind of bus stop station pavement structure.
Background technology
The advantages of cement pavement is intensity height, long lifespan.But, most of road surface uses bituminous paving in urban road, Conventional way is that a road completely uses same pavement structure form.Because bituminous paving has the following advantages:Pitch Material compressibility is big, can buffer the vertical vibrations of vehicle, has higher comfort;It is such not necessarily like cement pavement, be Increase antiskid performance, in road surface cutting;It is such not necessarily like cement pavement, in order to provide the space stretched for material, Expansion joint is set.Compared to cement pavement, although bituminous paving service life is relatively short, maintenance time is short, when repair It is smaller to the interference of traffic.
Motor vehicle on urban road road divides from function is used, and can substantially be divided into runway and bus stop, wherein public It hands over bus stop just to use bituminous paving always, and there is earlier period damage problem;Because the vehicle of bus stop need to brake and Start, bituminous paving discontinuity and concentrated force.Specifically, it brakes and startup all can generate bigger pressure and drawing is answered Deformation vertically downwards occurs in the case where repeating larger pressure effect, tires out for power, the bituminous paving below bus parking station location wheel Product, which is got up, just forms track;Transverse crack occurs under larger action of pulling stress, water is entered by crack inside pavement structure, During traffic load pressure applies and disappears, flowing pressure is formed, the pitch being adhered on rubble is removed, is damaged It is bad.Here it is the forming processes of the breaking of pitch surface in early stage of bus stop.On the whole, the earlier period damage of bus stop is main It is the damage out of shape such as track, passage.
Invention content
The purpose of the present invention is to provide a kind of new bus stop station pavement structures, make full use of cement pavement and drip The advantages of green road surface, avoids earlier period damage.
The technical solution used in the present invention is:
A kind of bus stop station pavement structure, including roadbed, roadbed are equipped with one section of parking road surface and two sections of mixing roads Face, two sections of mixing road surfaces are respectively at the head and the tail both ends on parking road surface, and the height on two mixing road surfaces are concordantly stopped road surface, two mixing Road surface includes the cement layer in downside and the bitumen layer in upside, and parking road surface and each cement layer are armored concrete Material, stops and is equipped with connection net between road surface and each cement layer, and each cement layer is higher than close to the side on parking road surface far from parking The side on road surface.
As the improvement of said program, each cement layer is ramped shaped.
As the improvement of said program, each cement layer is ladder-like.
As the improvement of said program, connection net includes the spiral of several parallelly distribute ons, and part, which connects net and is in, stops In bus or train route face, part connects net and is in cement layer.
As the improvement of said program, parking road surface is divided into the upper and lower, contains carbon dust in the parking road surface on upper layer.
As the improvement of said program, part connects net and is between the upper and lower on parking road surface.
As the improvement of said program, the length on road surface of stopping is 400~600cm, and the length on two mixing road surfaces is all higher than The length of 300cm, each spiral are 70cm, 25@40 of model φ of each spiral.
Beneficial effects of the present invention:This bus stop station pavement structure as bus starts parking road surface and stop Position, parking road surface Rut resistance characteristic and temperature stability is utilized, mixing road surface remains asphalt road as driving road surface The high-comfort advantage in face, improved bus parking service life of road surface is long, performance is stable, driving is comfortable;Connecting net can be with The bonding strength for increasing parking road surface and mixing road surface avoids the two from detaching;And cement layer from close to parking road surface one end by Gradual change is thin, will not be shaken because of pavement structure suddenly change when bus is gradually driven out to bus station.
Description of the drawings
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the cross-section diagram of bus stop station pavement structure;
Fig. 2 is the vertical view of bus stop station pavement structure.
Specific implementation mode
Referring to Fig.1, the present invention is a kind of bus stop station pavement structure, including roadbed 1, roadbed 1 stop equipped with one section Bus or train route face 2 and two sections of mixing road surfaces 3, two sections of mixing road surfaces 3 are respectively at the head and the tail both ends on parking road surface 2.Two mixing road surfaces 3 The concordant parking road surface 2 of height, it is ensured that evenness of road surface.Two mixing road surfaces 3 include being in the cement layer 5 of downside and in upside Bitumen layer 4, in the present embodiment, parking road surface 2 is identical with material with the structure of cement layer 5, is molded by C30 concretings, For armored concrete.Parking road surface 2 and the thickness for mixing road surface 3 are standard thickness.This bus stop station pavement structure handle stops The position that bus or train route face 2 starts and stops as bus, is utilized parking 2 Rut resistance characteristic of road surface and temperature stability, will not Track is easy tod produce as traditional bituminous paving;Road surface 3 is mixed as driving road surface, it is high-comfort to remain bituminous paving The advantages of, improved bus parking service life of road surface is long, performance is stable, driving is comfortable.Unilateral side is only depicted in attached drawing 1 Parking road surface 2 and mixing road surface 3, should not be construed as the technology limiting to this programme.This composite structure may be also used in vehicle Larger occasion of load-carrying, such as factories and mines road, the interim sidewalk of construction etc..
It stops and is equipped with connection net 6 between road surface 2 and each cement layer 5, parking road surface 2 can be increased and the company that mixes road surface 3 Intensity is connect, the two is avoided to detach.Each cement layer 5 is higher than the side far from parking road surface 2 close to the side on parking road surface 2, there is two Kind embodiment, one of which are that cement layer 5 is ramped shaped, and another kind is that cement layer 5 is ladder-like, after being used in the present embodiment Person;Cement layer 5 is gradually thinning from one end close to parking road surface 2, and bus will not be because of pavement structure when being gradually driven out to bus station Suddenly change and shake.
With reference to Fig. 2, as preferred embodiment, connection net 6 includes the spiral of several parallelly distribute ons, adjacent two spiral shell The spacing of line reinforcing bar is 40cm, and part connects net 6 and is in parking road surface 2, and part connects net 6 and is in cement layer 5.
To solve the problems, such as that concrete and pitch color are skimble-scamble, as preferred embodiment, it is upper that parking road surface 2, which is divided, Carbon dust is contained in the parking road surface 2 on upper layer in layer and lower layer.Because bus stop station is a component part in road, when After bus stop station uses reinforced concrete pavement, the white of concrete and the black of pitch form larger contrast, unfavorable In road landscape.After stating scheme on the implementation, the black of carbon dust makes darkening for concrete, can control the ratio of carbon dust Example, until the appearance of the black close to pitch, final road surface has better uniformity.Normally, carbon dust ratio is not low In 0.4%;And parking road surface 2 is divided for after upper layer and lower layer, on this basis, moreover it is possible to avoid the excessive use of carbon dust, save at This.
Since parking road surface 2 is divided for upper layer and lower layer, part connects net 6 and is between the upper and lower on parking road surface 2. Normally, bilevel thickness is identical.
In the present embodiment, the length on parking road surface 2 is 400~600cm, and the length on two mixing road surfaces 3 is all higher than 300cm, The length of each spiral is 70cm, 25@40 of model φ of each spiral.
Certainly, the design creation is not limited to the above embodiment, and the combination of the various embodiments described above different characteristic also may be used To reach good effect.Those skilled in the art can also make equivalent change under the premise of without prejudice to spirit of that invention Shape or replacement, these equivalent modifications or replacement are all contained in the application claim limited range.

Claims (7)

1. a kind of bus stop station pavement structure, including roadbed (1), it is characterised in that:The roadbed (1) is stopped equipped with one section Bus or train route face (2) and two sections of mixing road surface (3), two sections of mixing road surface (3) are respectively at the head and the tail both ends of parking road surface (2), two institutes The height for stating mixing road surface (3) is concordantly stopped road surface (2), and two mixing road surface (3) include the cement layer (5) in downside With the bitumen layer (4) in upside, the parking road surface (2) and each cement layer (5) are armored concrete material, the parking Connection net (6) is equipped between road surface (2) and each cement layer (5), each cement layer (5) is high close to the side of parking road surface (2) In the side far from parking road surface (2).
2. bus stop station pavement structure according to claim 1, it is characterised in that:Each cement layer (5) is oblique Ramp shaped.
3. bus stop station pavement structure according to claim 1, it is characterised in that:Each cement layer (5) is rank Scalariform.
4. bus stop station pavement structure described in any one of claim 1 to 3, it is characterised in that:The connection Net (6) includes the spiral of several parallelly distribute ons, and the part connection net (6) is in parking road surface (2), the part company Net (6) is connect to be in cement layer (5).
5. bus stop station pavement structure according to claim 4, it is characterised in that:The parking road surface (2) is divided into The upper and lower, the parking road surface (2) on upper layer is interior to contain carbon dust.
6. bus stop station pavement structure according to claim 5, it is characterised in that:At the connection net (6) of part Between the upper and lower of parking road surface (2).
7. bus stop station pavement structure according to claim 4, it is characterised in that:The length of parking road surface (2) Degree is 400~600cm, and the equal length of two mixing road surface (3) is more than 300cm, and the length of each spiral is 70cm, respectively 25@40 of model φ of the spiral.
CN201810300333.4A 2018-04-04 2018-04-04 Bus stop road surface structure Active CN108342940B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810300333.4A CN108342940B (en) 2018-04-04 2018-04-04 Bus stop road surface structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810300333.4A CN108342940B (en) 2018-04-04 2018-04-04 Bus stop road surface structure

Publications (2)

Publication Number Publication Date
CN108342940A true CN108342940A (en) 2018-07-31
CN108342940B CN108342940B (en) 2024-04-23

Family

ID=62957234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810300333.4A Active CN108342940B (en) 2018-04-04 2018-04-04 Bus stop road surface structure

Country Status (1)

Country Link
CN (1) CN108342940B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110846970A (en) * 2019-11-20 2020-02-28 中国水利水电第四工程局有限公司 Roller compacted concrete and turn-around road structure prepared from same
CN111335106A (en) * 2020-03-25 2020-06-26 广东荣潮拓展建设有限公司 Construction method of asphalt concrete pavement

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110061709A (en) * 2009-12-02 2011-06-10 주식회사 도화엔지니어링 Repair meyhod for asphalt pavement structure
CN203684025U (en) * 2014-01-10 2014-07-02 长安大学 Separate road
CN206503047U (en) * 2016-09-08 2017-09-19 上海市城市建设设计研究总院(集团)有限公司 The road paving structure mated formation suitable for public transportation lane
CN206529665U (en) * 2017-02-10 2017-09-29 武汉市市政建设集团有限公司 A kind of composite road surface structure of suitable urban public transportation lane
CN206858983U (en) * 2017-05-17 2018-01-09 武汉市市政建设集团有限公司 A kind of low noise colour half-flexible pavement structure applied to dedicated bus lanes
CN208219331U (en) * 2018-04-04 2018-12-11 广州市市政工程设计研究总院 A kind of bus stop station pavement structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110061709A (en) * 2009-12-02 2011-06-10 주식회사 도화엔지니어링 Repair meyhod for asphalt pavement structure
CN203684025U (en) * 2014-01-10 2014-07-02 长安大学 Separate road
CN206503047U (en) * 2016-09-08 2017-09-19 上海市城市建设设计研究总院(集团)有限公司 The road paving structure mated formation suitable for public transportation lane
CN206529665U (en) * 2017-02-10 2017-09-29 武汉市市政建设集团有限公司 A kind of composite road surface structure of suitable urban public transportation lane
CN206858983U (en) * 2017-05-17 2018-01-09 武汉市市政建设集团有限公司 A kind of low noise colour half-flexible pavement structure applied to dedicated bus lanes
CN208219331U (en) * 2018-04-04 2018-12-11 广州市市政工程设计研究总院 A kind of bus stop station pavement structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐循初: "《城市道路与交通规划(上册)》", 中国建筑工业出版社, pages: 241 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110846970A (en) * 2019-11-20 2020-02-28 中国水利水电第四工程局有限公司 Roller compacted concrete and turn-around road structure prepared from same
CN111335106A (en) * 2020-03-25 2020-06-26 广东荣潮拓展建设有限公司 Construction method of asphalt concrete pavement
CN111335106B (en) * 2020-03-25 2021-10-22 广东荣潮拓展建设有限公司 Construction method of asphalt concrete pavement

Also Published As

Publication number Publication date
CN108342940B (en) 2024-04-23

Similar Documents

Publication Publication Date Title
KR100687210B1 (en) Precast concrete panel for paving of road and method for preparation thereof
CN208219331U (en) A kind of bus stop station pavement structure
CN108342940A (en) A kind of bus stop station pavement structure
CN103556569B (en) A kind of bridge composite seamless shrinkage joint
CN101096837A (en) Semi-flexible composite road surface structure and building method thereof
KR100984019B1 (en) A prefabricated pedestrian crossing
CN112359669A (en) Road intersection height anti-deformation road surface structure and method
CN107151964A (en) Waterproof anticracking pavement
KR101199916B1 (en) Concrete block and method for manufacturing the same
CN207109496U (en) Waterproof anticracking pavement
AU2004202692B2 (en) Concrete for Paving
JP2007146647A (en) Method of repairing road including curbstone, and road structure including curbstone formed by the repair method
KR100690393B1 (en) Method of paving the outer layer of road with aspalt concrete
CN204509932U (en) The interstitital texture at a kind of rail and pavement joint place
CN209052964U (en) A kind of Rut resistance pavement structure
CN208917615U (en) A kind of regenerated road surface structure
CN216193754U (en) Sponge city permeable pavement restoration structure
CN206070280U (en) The road paving structure of multiple step format construction
CN205676745U (en) A kind of express highway pavement supporting construction preventing from subsiding with crackle
KR100727638B1 (en) Repairing method of the load
KR200202464Y1 (en) Structure of reinforced asphalt pavement
CN217052904U (en) Heavy traffic flow road surface antifatigue structure
CN209703255U (en) Town road local stiffening structure
CN208104951U (en) A kind of town road local stiffening structure
CN209958166U (en) Floating-point type basalt asphalt pavement structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong, Yuexiu District

Applicant after: GUANGZHOU MUNICIPAL ENGINEERING DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Address before: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong

Applicant before: GUANGZHOU MUNICIPAL ENGINEERING DESIGN & Research Institute

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant