CN108334658A - A kind of design method based on mountainous region accumulation sense - Google Patents

A kind of design method based on mountainous region accumulation sense Download PDF

Info

Publication number
CN108334658A
CN108334658A CN201711320675.4A CN201711320675A CN108334658A CN 108334658 A CN108334658 A CN 108334658A CN 201711320675 A CN201711320675 A CN 201711320675A CN 108334658 A CN108334658 A CN 108334658A
Authority
CN
China
Prior art keywords
building
wind
mountainous region
urban
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711320675.4A
Other languages
Chinese (zh)
Inventor
陈航毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Bo Jian Building Planning And Design Co Ltd
Original Assignee
Chongqing Bo Jian Building Planning And Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Bo Jian Building Planning And Design Co Ltd filed Critical Chongqing Bo Jian Building Planning And Design Co Ltd
Priority to CN201711320675.4A priority Critical patent/CN108334658A/en
Publication of CN108334658A publication Critical patent/CN108334658A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Computer Hardware Design (AREA)
  • Economics (AREA)
  • Computational Mathematics (AREA)
  • Civil Engineering (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Mathematical Optimization (AREA)
  • Mathematical Analysis (AREA)
  • Development Economics (AREA)
  • Structural Engineering (AREA)
  • Game Theory and Decision Science (AREA)
  • Pure & Applied Mathematics (AREA)
  • Architecture (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to mask product technical field, it is in particular a kind of based on mountainous region accumulation sense design method, the present invention consider building with natural green land, hillside fields, urban track traffic relationship:Analyze the direction of building, using west to city hillside fields, greenery patches, vertical height difference, the sinuous urban road of connection, before construction by largely investigate the time to around Architectural foundation humiture and wind direction measured in real time, ensure the warming and performance of ventilating that disclosure satisfy that occupant with material of building, according to the cardinal wind of transition season, introduce the use of wind groove, at the initial stage that building scheme determines, in order to ensure to build the smooth of periphery wind environment, the wind environment on building and periphery is simulated by software, more natural winds are allowed to be introduced into building interior, form uniform gentle breeze environment, keep building ventilation good, it is effectively improved indoor and outdoor air environment, making whole building, a light breeze is blowing warm.

Description

A kind of design method based on mountainous region accumulation sense
Technical field
The present invention relates to architectural design field, specially a kind of design method based on mountainous region accumulation sense.
Background technology
In fast pace, develop on a large scale instantly, builds the organic connections lacked mostly with city, while also lacking original essence God, the homogeneity in the current city of China, has been everybody common recognition, and many buildings have had disengaged from place, function, space, art Attribute, and the feature of product and finance is added, it is produced by massive duplication.In this background, how to have made regional, former Invasive Design Works are the projects that each architect must ponder deeply and persevere, the building in living now It is only a place for living and handling official business in the eye of people, with ecological also the becoming of the development building of society People need the problem of thinking, and in many cities of China due to a varied topography, there are a large amount of hillside fields and mountainous region, buildings Object is all that direct mountainous region of digging is built in building course, has not only broken up ecological environment, and building is made also to become Many deathly still buildings, lose the meaning of building itself, in consideration of it, it is proposed that a kind of based on mountainous region accumulation sense Design method.
Invention content
It is an object of the invention to overcome deficiency mentioned above in the background art, provide a kind of based on mountainous region accumulation sense Design method.
To achieve the above object, the present invention provides the following technical solutions:
A kind of design method based on mountainous region accumulation sense according to the present invention, includes the following steps:
The small-sized mountainous region or hillside fields that step 1, selection integrate with urban road, addressing are not less than three, using unmanned plane into Row is taken photo by plane, and is confirmed real-time landform drawing, is analyzed;
Step 2 is filtered out from multiple preselected locations with a large amount of greenery patchess, and can be with major urban arterial highway or auxiliary arterial highway Integrate with place, determines and confirms addressing place after hillside fields height is not more than 300m with urban pavement difference, and carries out on-the-spot investigation;
Step 3, addressing place after validation the rectangular array distribution setting Temperature Humidity Sensor at 200m, every The temperature regime statistics for carrying out day and night in 1 month, continues 1 year, obtains the diurnal temperature and the temperature difference in each place;
Step 4, addressing place surrounding fixed point after validation place surrounding of the ultrasonic aerovane to addressing place It carries out wind speed and direction to measure, is counted every two weeks, continue 1 year, obtain the side of addressing place all directions four To the wind direction and the wind speed of each period of each period;
Step 5 starts to start building after evaluating and testing temperature and wind direction and wind velocity, starts earth excavation in determining addressing place, After earth excavation, carries out cushion cap brick fetal membrane and build by laying bricks or stones;
Step 6, after accomplishing fluently ground, ground is cleared up it is smooth, with concreting bed course, slopes are done it is levelling, then into Row basis makes construction, and backfilling of earthwork starts the construction of major structure of construction after the completion;
Step 7, basis carry out the temperature value of measurement in advance, select suitable thermal insulation material, building is simulated by software And the wind environment on periphery, wind groove is reserved between main building and attached building, is reserved air inlet from the most frequent side of wind direction, is made wind groove along main Skewed rising before attached building, and open up the air port being connected with wind groove in every floor layer;
Step 8, consider building with natural green land, hillside fields, urban track traffic relationship, analyze the direction of building, utilize Radial city hillside fields, greenery patches, vertical height difference connect urban road, design the walking plank road of connection underground railway track in slope, build The public pedestrian system of vertical city and urban architecture, and provide the distinctive element in hillside fields for the creation of architectural design;
Step 9, basis designs connected outdoor activities platform per between floor layer between main attached building, and in each open air Open up flower bed in movable platform, the flowers and plants plant of local suitable growth, makes building tend to greenization in kind.
Preferably, the model TE200 of the temperature sensor, the model HS1101 of the humidity sensor.
Preferably, the model EC-A1 of the ultrasonic aerovane.
Preferably, the concrete uses clear-water concrete.
Preferably, the clear-water concrete uses disposable plank as concrete blinding.
Preferably, the air port is arranged in every floor road fire-fighting ventilating duct.
Compared with prior art, beneficial effects of the present invention:The present invention considers building and natural green land, hillside fields, city rail The relationship of road traffic:The direction of analysis building connects sinuous city road using west to city hillside fields, greenery patches, vertical height difference Road, before construction by largely investigate the time to around Architectural foundation humiture and wind direction measured in real time, The warming and performance of ventilating that disclosure satisfy that occupant with material for ensuring building is introduced according to the cardinal wind of transition season The use of wind groove was simulated by software and is built to ensure to build the smooth of periphery wind environment at the initial stage that building scheme determines It builds and the wind environment on periphery, allows more natural winds to be introduced into building interior, form uniform gentle breeze environment, keep building ventilation good It is good, it is effectively improved indoor and outdoor air environment, making whole building, a light breeze is blowing warm, and using clear-water concrete, it is mixed to research and develop inexpensive clear water Solidifying soil technology, disposable mould plate technique, by investigating, researching and developing, the non-customized steel form using disposable plank, according to construction skill Art makes a little higher than normal concrete price of its price, forms the faced concrete surface of higher quality, is ensureing concrete quality While it is reasonably cost-effective.
Specific implementation mode
To further appreciate that present disclosure, the present invention is described in detail in conjunction with the embodiments.It should be understood that real Apply example be only to the present invention explain and and it is non-limiting.
Embodiment 1
A kind of design method based on mountainous region accumulation sense is present embodiments provided, is included the following steps:
The small-sized mountainous region or hillside fields that step 1, selection integrate with urban road, addressing are not less than three, using unmanned plane into Row is taken photo by plane, and is confirmed real-time landform drawing, is analyzed;
Step 2 is filtered out from multiple preselected locations with a large amount of greenery patchess, and can be with major urban arterial highway or auxiliary arterial highway Integrate with place, determines and confirms addressing place after hillside fields height is not more than 300m with urban pavement difference, and carries out on-the-spot investigation;
Step 3, addressing place after validation the rectangular array distribution setting Temperature Humidity Sensor at 200m, every The temperature regime statistics for carrying out day and night in 1 month, continues 1 year, obtains the diurnal temperature and the temperature difference in each place;
Step 4, addressing place surrounding fixed point after validation place surrounding of the ultrasonic aerovane to addressing place It carries out wind speed and direction to measure, is counted every two weeks, continue 1 year, obtain the side of addressing place all directions four To the wind direction and the wind speed of each period of each period;
Step 5 starts to start building after evaluating and testing temperature and wind direction and wind velocity, starts earth excavation in determining addressing place, After earth excavation, carries out cushion cap brick fetal membrane and build by laying bricks or stones;
Step 6, after accomplishing fluently ground, ground is cleared up it is smooth, with concreting bed course, slopes are done it is levelling, then into Row basis makes construction, and backfilling of earthwork starts the construction of major structure of construction after the completion;
Step 7, basis carry out the temperature value of measurement in advance, select suitable thermal insulation material, building is simulated by software And the wind environment on periphery, wind groove is reserved between main building and attached building, is reserved air inlet from the most frequent side of wind direction, is made wind groove along main Skewed rising before attached building, and open up the air port being connected with wind groove in every floor layer;
Step 8, consider building with natural green land, hillside fields, urban track traffic relationship, analyze the direction of building, utilize Radial city hillside fields, greenery patches, vertical height difference connect urban road, design the walking plank road of connection underground railway track in slope, build The public pedestrian system of vertical city and urban architecture, and provide the distinctive element in hillside fields for the creation of architectural design;
Step 9, basis designs connected outdoor activities platform per between floor layer between main attached building, and in each open air Open up flower bed in movable platform, the flowers and plants plant of local suitable growth, makes building tend to greenization in kind.
In the present embodiment, the model TE200 of temperature sensor, the model HS1101 of the humidity sensor.
In the present embodiment, the model EC-A1 of ultrasonic aerovane.
In the present embodiment, concrete uses clear-water concrete.
In the present embodiment, clear-water concrete is using disposable plank as concrete blinding.
In the present embodiment, air port is arranged in every floor road fire-fighting ventilating duct.
Embodiment 2
A kind of design method based on mountainous region accumulation sense is present embodiments provided, by following components group by weight At:The small-sized mountainous region or hillside fields that step 1, selection integrate with urban road, addressing are not less than three, are navigated using unmanned plane It claps, confirms real-time landform drawing, analyzed;
Step 2 is filtered out from multiple preselected locations with a large amount of greenery patchess, and can be with major urban arterial highway or auxiliary arterial highway Integrate with place, determines and confirms addressing place after hillside fields height is not more than 300m with urban pavement difference, and carries out on-the-spot investigation;
Step 3, addressing place after validation the rectangular array distribution setting Temperature Humidity Sensor at 200m, every The temperature regime statistics for carrying out day and night in 1 month, continues 1 year, obtains the diurnal temperature and the temperature difference in each place;
Step 4, addressing place surrounding fixed point after validation place surrounding of the ultrasonic aerovane to addressing place It carries out wind speed and direction to measure, is counted every two weeks, continue 1 year, obtain the side of addressing place all directions four To the wind direction and the wind speed of each period of each period;
Step 5 starts to start building after evaluating and testing temperature and wind direction and wind velocity, starts earth excavation in determining addressing place, After earth excavation, carries out cushion cap brick fetal membrane and build by laying bricks or stones;
Step 6, after accomplishing fluently ground, ground is cleared up it is smooth, with concreting bed course, slopes are done it is levelling, then into Row basis makes construction, and backfilling of earthwork starts the construction of major structure of construction after the completion;
Step 7, basis carry out the temperature value of measurement in advance, select suitable thermal insulation material, building is simulated by software And the wind environment on periphery, wind groove is reserved between main building and attached building, is reserved air inlet from the most frequent side of wind direction, is made wind groove along main Skewed rising before attached building, and open up the air port being connected with wind groove in every floor layer;
Step 8, consider building with natural green land, hillside fields, urban track traffic relationship, analyze the direction of building, utilize Radial city hillside fields, greenery patches, vertical height difference connect urban road, design the walking plank road of connection underground railway track in slope, build The public pedestrian system of vertical city and urban architecture, and provide the distinctive element in hillside fields for the creation of architectural design;
Step 9, basis designs connected outdoor activities platform per between floor layer between main attached building, and in each open air Open up flower bed in movable platform, the flowers and plants plant of local suitable growth, makes building tend to greenization in kind.
In the present embodiment, the model TE200 of temperature sensor, the model HS1101 of the humidity sensor.
In the present embodiment, the model EC-A1 of ultrasonic aerovane.
In the present embodiment, concrete uses normal concrete.
In the present embodiment, clear-water concrete is using disposable plank as concrete blinding.
In the present embodiment, air port is arranged in every floor road fire-fighting ventilating duct.
Embodiment 3
The small-sized mountainous region or hillside fields that step 1, selection integrate with urban road, addressing are not less than three, using unmanned plane into Row is taken photo by plane, and is confirmed real-time landform drawing, is analyzed;
Step 2 is filtered out from multiple preselected locations with a large amount of greenery patchess, and can be with major urban arterial highway or auxiliary arterial highway Integrate with place, determines and confirms addressing place after hillside fields height is not more than 300m with urban pavement difference, and carries out on-the-spot investigation;
Step 3, addressing place after validation the rectangular array distribution setting Temperature Humidity Sensor at 200m, every The temperature regime statistics for carrying out day and night in 1 month, continues 1 year, obtains the diurnal temperature and the temperature difference in each place;
Step 4, addressing place surrounding fixed point after validation place surrounding of the ultrasonic aerovane to addressing place It carries out wind speed and direction to measure, is counted every two weeks, continue 1 year, obtain the side of addressing place all directions four To the wind direction and the wind speed of each period of each period;
Step 5 starts to start building after evaluating and testing temperature and wind direction and wind velocity, starts earth excavation in determining addressing place, After earth excavation, carries out cushion cap brick fetal membrane and build by laying bricks or stones;
Step 6, after accomplishing fluently ground, ground is cleared up it is smooth, with concreting bed course, slopes are done it is levelling, then into Row basis makes construction, and backfilling of earthwork starts the construction of major structure of construction after the completion;
Step 7, basis carry out the temperature value of measurement in advance, select suitable thermal insulation material, building is simulated by software And the wind environment on periphery, wind groove is reserved between main building and attached building, is reserved air inlet from the most frequent side of wind direction, is made wind groove along main Skewed rising before attached building, and open up the air port being connected with wind groove in every floor layer;
Step 8, consider building with natural green land, hillside fields, urban track traffic relationship, analyze the direction of building, utilize Radial city hillside fields, greenery patches, vertical height difference connect urban road, design the walking plank road of connection underground railway track in slope, build The public pedestrian system of vertical city and urban architecture, and provide the distinctive element in hillside fields for the creation of architectural design;
Step 9, basis designs connected outdoor activities platform per between floor layer between main attached building, and in each open air Open up flower bed in movable platform, the flowers and plants plant of local suitable growth, makes building tend to greenization in kind.
In the present embodiment, the model TE200 of temperature sensor, the model HS1101 of the humidity sensor.
In the present embodiment, the model EC-A1 of ultrasonic aerovane.
In the present embodiment, concrete uses clear-water concrete.
In the present embodiment, clear-water concrete is using customization steel form as concrete blinding.
In the present embodiment, air port is arranged in every floor road fire-fighting ventilating duct.
Cost estimation is carried out to above-described embodiment according to account valuation, as a result such as following table:
Group Cost ratio (%)
Embodiment 1 1
Embodiment 2 0.953
Embodiment 3 1.214
The design in currently preferred range is can be seen that by upper table data, great amount of cost can be saved, is selected excellent Matter concrete also can be significantly cost-effective.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry For personnel it should be appreciated that the present invention is not limited to the above embodiments, described in the above embodiment and specification is only the present invention Preference, be not intended to limit the present invention, without departing from the spirit and scope of the present invention, the present invention also has various Changes and improvements, these changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by institute Attached claims and its equivalent thereof.

Claims (6)

1. a kind of design method based on mountainous region accumulation sense, it is characterised in that:Include the following steps:
The small-sized mountainous region or hillside fields that step 1, selection integrate with urban road, addressing are not less than three, are navigated using unmanned plane It claps, confirms real-time landform drawing, analyzed;
Step 2 is filtered out from multiple preselected locations with a large amount of greenery patchess, and can be integrated with major urban arterial highway or auxiliary arterial highway Place determines and confirms addressing place after hillside fields height is not more than 300m with urban pavement difference, and carries out on-the-spot investigation;
Step 3, addressing place after validation the rectangular array distribution setting Temperature Humidity Sensor at 200m, every 1 The temperature regime statistics for carrying out day and night the moon, continues 1 year, obtains the diurnal temperature and the temperature difference in each place;
Step 4, addressing place surrounding fixed point after validation are placed ultrasonic aerovane and are carried out to the surrounding in addressing place Wind speed and direction measures, and is counted every two weeks, continues 1 year, and it is each to obtain addressing place all directions four direction The wind direction of period and the wind speed of each period;
Step 5 starts to start building after evaluating and testing temperature and wind direction and wind velocity, starts earth excavation, the earthwork in determining addressing place After excavation, carries out cushion cap brick fetal membrane and build by laying bricks or stones;
Step 6 after accomplishing fluently ground, ground is cleared up smooth, with concreting bed course, is done to slopes levelling, is then carried out base Plinth makes construction, and backfilling of earthwork starts the construction of major structure of construction after the completion;
Step 7, basis carry out the temperature value of measurement in advance, select suitable thermal insulation material, building and week are simulated by software The wind environment on side reserves wind groove between main building and attached building, reserves air inlet from the most frequent side of wind direction, makes wind groove along main attached building Skewed rising before, and open up the air port being connected with wind groove in every floor layer;
Step 8, consider building with natural green land, hillside fields, urban track traffic relationship, analyze the direction of building, utilize radial direction City hillside fields, greenery patches, vertical height difference connect urban road, design the walking plank road of connection underground railway track in slope, establish city The public pedestrian system of city and urban architecture, and provide the distinctive element in hillside fields for the creation of architectural design;
Step 9, basis designs connected outdoor activities platform per between floor layer between main attached building, and in each outdoor activities Open up flower bed in platform, the flowers and plants plant of local suitable growth, makes building tend to greenization in kind.
2. the design method according to claim 1 based on mountainous region accumulation sense, it is characterised in that:The temperature sensing The model TE200 of device, the model HS1101 of the humidity sensor.
3. the design method according to claim 1 based on mountainous region accumulation sense, it is characterised in that:The ultrasonic wave wind The model EC-A1 of fast anemoscope.
4. the design method according to claim 1 based on mountainous region accumulation sense, it is characterised in that:The concrete is adopted Use clear-water concrete.
5. the design method according to claim 4 based on mountainous region accumulation sense, it is characterised in that:The clear water coagulation Soil is using disposable plank as concrete blinding.
6. the design method according to claim 1 based on mountainous region accumulation sense, it is characterised in that:The air port setting In every floor road fire-fighting ventilating duct.
CN201711320675.4A 2017-12-12 2017-12-12 A kind of design method based on mountainous region accumulation sense Pending CN108334658A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711320675.4A CN108334658A (en) 2017-12-12 2017-12-12 A kind of design method based on mountainous region accumulation sense

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711320675.4A CN108334658A (en) 2017-12-12 2017-12-12 A kind of design method based on mountainous region accumulation sense

Publications (1)

Publication Number Publication Date
CN108334658A true CN108334658A (en) 2018-07-27

Family

ID=62922607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711320675.4A Pending CN108334658A (en) 2017-12-12 2017-12-12 A kind of design method based on mountainous region accumulation sense

Country Status (1)

Country Link
CN (1) CN108334658A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111581712A (en) * 2020-05-19 2020-08-25 张家口市建筑设计院有限责任公司 Building design technique based on mountain land topography

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102693328A (en) * 2011-03-24 2012-09-26 黄丹丹 Application of ARCVIEW GIS (geographic information system) 3.2 technology in mountainous land building design
CN106032711A (en) * 2015-03-19 2016-10-19 张泓 Building suitable for special terrains and construction method thereof
CN106529185A (en) * 2016-11-24 2017-03-22 西安科技大学 Historic building displacement combined prediction method and system
CN106703438A (en) * 2017-01-12 2017-05-24 重庆大学 Urban spatial layout method applicable to mountain topography

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102693328A (en) * 2011-03-24 2012-09-26 黄丹丹 Application of ARCVIEW GIS (geographic information system) 3.2 technology in mountainous land building design
CN106032711A (en) * 2015-03-19 2016-10-19 张泓 Building suitable for special terrains and construction method thereof
CN106529185A (en) * 2016-11-24 2017-03-22 西安科技大学 Historic building displacement combined prediction method and system
CN106703438A (en) * 2017-01-12 2017-05-24 重庆大学 Urban spatial layout method applicable to mountain topography

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
何凯岳等: "西南山地应对气候的建筑形体设计研究", 《后勤工程学院学报》 *
杨维等: "某小型绿色建筑设计理念及应用实践", 《建筑科学》 *
苏媛等: "北方山地城市物理环境与城市形态的耦合关系研究――以大连市高新区为例", 《城市建筑》 *
陈航毅: "建筑与城市——结合"重庆房子"的设计,阐述原创的体会", 《住宅》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111581712A (en) * 2020-05-19 2020-08-25 张家口市建筑设计院有限责任公司 Building design technique based on mountain land topography

Similar Documents

Publication Publication Date Title
Shafiee et al. Assessment of the effect of living wall systems on the improvement of the urban heat island phenomenon
Duarte et al. The impact of vegetation on urban microclimate to counterbalance built density in a subtropical changing climate
Middel et al. Impact of urban form and design on mid-afternoon microclimate in Phoenix Local Climate Zones
Skoulika et al. On the thermal characteristics and the mitigation potential of a medium size urban park in Athens, Greece
Fahmy et al. LAI based trees selection for mid latitude urban developments: A microclimatic study in Cairo, Egypt
Abaas Impact of development on Baghdad’s urban microclimate and human thermal comfort
Lahme et al. Microclimatic effects of a small urban park in densely built-up areas: measurements and model simulations
Mayer et al. Spatio-temporal variability of moisture conditions within the Urban Canopy Layer
Salvati et al. Urban heat island prediction in the mediterranean context: an evaluation of the urban weather generator model
CN103136432A (en) Building yard design method and system based on microclimate analysis
CN110188323B (en) Water surface rate value range measuring and calculating method suitable for urban water ecological protection
Mohamed et al. Examining the thermal performance of vernacular houses in Asir Region of Saudi Arabia
JP2022553071A (en) Lego (registered trademark) type building block, Lego type building block module, Lego type building block system and construction method, and simulation system therefor
CN110231451B (en) Investigation method for suitable moisture of xerophyte soil
CN108334658A (en) A kind of design method based on mountainous region accumulation sense
Khalaily et al. The New Excavations at Motza: An Architectural Perspective on a Neolithic ‘Megasite’in the Judean Hills
Rajabi The study of vegetation effects on reduction of urban heat Island in Dubai
KR20210048447A (en) Lego type construction block, lego type construction block module, lego type construction block system, and simulation system for the same
Latini et al. Thermal comfort and microclimates in open spaces
Mahyari The wind catcher: a passive cooling device for hot arid climate
Zhou et al. A continuous dynamic feature of the distribution of soil temperature and horizontal heat flux next to external walls in different orientations of construction sites in the autumn of Beijing, China
Dursun et al. Microclimate analysis of different urban forms in cold climates and the effect of thermal comfort
CN106370231A (en) Ground meteorological station meteorological sounding environment investigation evaluation method and system
QASİM et al. Archives of Agriculture and Environmental Science
Tariq et al. An ENVI-met Simulation Study on Urban Open Spaces of Dhaka. Bangladesh

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180727