A kind of installing engineering of city electricity electric power detection device and its application method Download PDF

Info

Publication number
CN108333392A
CN108333392A CN201711340380.3A CN201711340380A CN108333392A CN 108333392 A CN108333392 A CN 108333392A CN 201711340380 A CN201711340380 A CN 201711340380A CN 108333392 A CN108333392 A CN 108333392A
Authority
CN
China
Prior art keywords
block
sliding
current detecting
detecting instrument
slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711340380.3A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haian Rui Hua Textile Technology Co Ltd
Original Assignee
Haian Rui Hua Textile Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haian Rui Hua Textile Technology Co Ltd filed Critical Haian Rui Hua Textile Technology Co Ltd
Priority to CN201711340380.3A priority Critical patent/CN108333392A/en
Publication of CN108333392A publication Critical patent/CN108333392A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/04Housings; Supporting members; Arrangements of terminals
    • G01R1/0408Test fixtures or contact fields; Connectors or connecting adaptors; Test clips; Test sockets
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

The invention discloses a kind of installing engineering of city electricity electric power detection device and its application methods, its city electricity installing engineering electric power detection device includes pedestal, there are two shells for the pedestal top rotational installation, two shells are symmetrical arranged, and two shells are adapted, the shell is hollow structure, and the bottom side and side close to each other of two shells are opening, the same placement block is movably installed in two shells, application method includes the following steps:S1:Adjust the position relationship between two shells:Mobile first sliding block, the first sliding block drives retractable handle to stretch, and the first sliding block is slided in the first sliding groove.The present invention can be convenient for convenient for firm installation current detecting instrument ontology, and prevent from placing position during block shakes and change, convenient for there is cushioning effect to placing during block shakes, simultaneously, convenient for adjusting the openings of sizes between two shells, it is convenient for current detecting instrument ontology and uses operation.

Description

A kind of installing engineering of city electricity electric power detection device and its application method
Technical field
The present invention relates to technical field of electric power detection more particularly to a kind of city electricity installing engineering electric power detection device and its Application method.
Background technology
Society is constantly progressive so that power grid scale is growing, and power equipment increases.Power equipment occurs at runtime Unstable parameter it is also more and more, but cannot find fault point in time in numerous power equipments and repair, can make At prodigious economic loss.
Application No. is 201710213457.4 patents to disclose a kind of portable power detection device, which includes one Number rectangular susceptor, No.1 rectangular susceptor surface are fixedly connected with the rectangle to match with No.1 rectangular susceptor and carry babinet, Flexible electric power testing agency is equipped in the rectangle bearing box body, No.1 rectangular susceptor lower surface is moved equipped with electrical-controlled lifting Mechanism, the rectangular susceptor carrying babinet rear side surface, which is equipped with, carries mechanism, and advantageous effect is easy to operate, portable and movement side Formula is a variety of, easy to detect, is effectively protected the device of detection device, however, the device, which cannot consolidate, carries out placement current detecting Instrument, and in mobile and carrying process can cause the position of current detecting instrument built on the sand due to shaking, and cannot obtain buffering effect Fruit be easy to cause current detecting instrument damage, has certain limitation in use.
Invention content
Technical problems based on background technology, the present invention propose a kind of city electricity installing engineering electric power detection device And its application method.
A kind of city electricity installing engineering electric power detection device proposed by the present invention, including pedestal, the pedestal top rotation There are two shells for installation, and two shells are symmetrical arranged, and two shells are adapted, and the shell is hollow structure, two shells Bottom side and side close to each other be opening, the same placement block is movably installed in two shells, in the placement block It is movably installed with current detecting instrument ontology, the firm organization being equipped in block for firm installation current detecting instrument ontology is placed, puts It sets block and is surrounded by buffer gear for buffer current detector ontology.
Preferably, two shell sides close to each other are installed with fixed block, and two fixed blocks are close to each other Side is respectively equipped with fixture and card slot, and the card slot is adapted with fixture, and two shell top sides offer the first sliding groove, two It is slidably fitted with the first sliding block in the first sliding groove, the same retractable handle, institute are movably installed between two the first sliding blocks State the top that retractable handle is located at two shells.
Preferably, equidistant intervals offer limiting slot on side inner wall of the first sliding groove far from opening, and described the One sliding block bottom end is installed with limited block, and the limited block is adapted with limiting slot.
Preferably, the firm organization includes being opened in the placing groove for placing block top side, and the current detecting instrument ontology is lived It is dynamic to be mounted in placing groove, movable plate is movably installed on the inner wall of the placing groove both sides, two movable plates are based on placing groove Be open center symmetric setting, and two movable plates side close to each other is in contact with current detecting instrument ontology, two activities The side that plate is located remotely from each other is equipped with the first spring and hinge, and first spring one end, which is welded on movable plate and is located remote from slot, to be opened On the side of mouth, the first spring other end is welded on placing groove inner wall, and it is close that described hinge one end is rotatably installed in movable plate On the side for placing channel opening, the other end of hinge is welded on placing groove inner wall.
Preferably, the buffer gear includes being opened in the first groove for placing block bottom end, on the first groove top inner wall It is installed with moving block, the moving block both sides offer the rotation slot that both sides are opening, are equipped in the rotation slot It is rotatably installed in the connecting rod on rotation slot inner wall by first rotating shaft, described connecting rod one end extends to outside rotation slot, described Connecting rod is located at one end outside rotation slot and is rotatablely equipped with movable block by the second shaft, and the pedestal top side symmetrically offers two A second groove, two movable blocks are movably arranged on respectively in two the second grooves.
Preferably, second sliding slot, the movable block bottom end are offered on side inner wall of second groove far from opening Be installed with the second sliding block, second sliding block is slidably mounted in second sliding slot, two the second grooves be located remotely from each other one Fixed link is installed on the inner wall of side, two fixed link sides close to each other offer sliding groove, two sliding grooves Inside be slidably fitted with sliding bar, one end of the sliding bar extends to outside sliding groove, and sliding bar be located at outside sliding groove one End is fixedly mounted on movable block, third sliding slot is offered on the inner wall of the sliding groove both sides, sliding bar is located in sliding groove One end both sides be installed with third sliding block, two third sliding blocks are slidably mounted on respectively in two third sliding slots, described Movable block is welded with the second spring being socketed in fixed link and sliding bar close to the side of fixed link, and the second spring is separate One end of movable block is welded in fixed link.
Preferably, the placement block both sides are installed with L-shaped fixed link, there are two the pedestal top symmetrically opens up Dashpot, one end that the L-shaped fixed link is located remote from block extend in dashpot, are welded on the inner wall of the dashpot top side The top of third spring, third spring is welded on the bottom end of L-shaped fixed link.
The city electricity installing engineering application method of electric power detection device, includes the following steps:
S1:Adjust the position relationship between two shells:Mobile first sliding block, the first sliding block drive retractable handle to be stretched Contracting, and the first sliding block is slided in the first sliding groove, the first sliding block drives limited block to be slided in limiting slot, limited block and limit Position slot is used cooperatively, and is consolidated position relationship of first sliding block in the first sliding groove, is adjusted the collapsing length of retractable handle, together When, adjust the size being open between two shells;
S2:It takes current detecting instrument ontology:Current detecting instrument ontology is moved up, current detecting instrument ontology is in two activities It is slided on plate, current detecting instrument ontology moves upwardly so that the active force of the first spring becomes smaller, and two movable plates are to electric current The extruding force of detector ontology becomes smaller, and removes current detecting instrument ontology;
S3:It is firm to place current detecting instrument ontology:Current detecting instrument ontology is put into placing groove, current detecting instrument ontology Both sides squeeze two movable plates, two movable plates and squeeze two the first springs, two the first reactive spring force difference respectively respectively Two movable plates are squeezed, two movable plates squeeze current detecting instrument ontology, consolidate installation current detecting instrument ontology;
S4:Buffer current detector ontology:It places block operating and teetertottering in moving process, places block and drive Moving block moves up and down, and moving block drives connecting rod to move up and down, and connecting rod is rotated in rotation slot;
S41:Connecting rod is rotated during moving up and down on movable block, meanwhile, connecting rod drives movable block the It is moved in two grooves, movable block drives the second sliding block to be slided in second sliding slot, and movable block squeezes sliding bar, sliding Lever drives third sliding block to be slided in third sliding slot, and movable block squeezes second spring, and buffering places block;
S42:Block is placed during moving up and down, drives L fixed links to move up and down, L-shaped fixed link is in dashpot It is moved, and L-shaped fixed link squeezes third spring, reaches firm and place the position of block, and have the effect of buffering.
In the present invention, a kind of installing engineering of city electricity electric power detection device and its application method, by placing block, putting Slot, current detecting instrument ontology, movable plate, the first spring, hinge is set to be used cooperatively, it can be by two movable plates to current detecting Instrument ontology is squeezed, and convenient for firm installation current detecting instrument ontology, passes through L-shaped fixed link, dashpot, third spring, first Groove, moving block, rotation slot, first rotating shaft, connecting rod, the second groove, fixed link, sliding groove, sliding bar, third sliding block, Three sliding slots, second spring, the second shaft, second sliding slot, the second sliding block, movable block are used cooperatively, and can be squeezed by connecting rod Movable block, movable block squeeze second spring and sliding bar, and convenient for having cushioning effect during block shakes to placing, and L-shaped is solid Fixed pole is used cooperatively with dashpot, consolidates the position for placing block, is prevented from placing position during block shakes and is changed, by solid Determine block, card slot, fixture, retractable handle, the first sliding block, the first sliding groove, limiting slot, limited block to be used cooperatively, movement can be passed through First sliding block adjusts the position of the first sliding block, convenient for adjusting the openings of sizes between two shells, is convenient for current detecting instrument Using operation, the present invention can be convenient for convenient for firm installation current detecting instrument ontology ontology, and prevent from placing during block shakes Position changes, convenient for there is cushioning effect during block shakes to placing, meanwhile, convenient for adjusting opening between two shells Mouth size is convenient for current detecting instrument ontology and uses operation.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of city electricity installing engineering electric power detection device proposed by the present invention;
Fig. 2 is a kind of part A structural schematic diagram of city electricity installing engineering electric power detection device proposed by the present invention;
Fig. 3 is a kind of part B structural schematic diagram of city electricity installing engineering electric power detection device proposed by the present invention;
Fig. 4 is a kind of C portion structural schematic diagram of city electricity installing engineering electric power detection device proposed by the present invention;
Fig. 5 is a kind of housing tip structural schematic diagram of city electricity installing engineering electric power detection device proposed by the present invention.
In figure:Block, 7 placing grooves, 8 electric currents are placed in 1 pedestal, 2 shells, 3 L-shaped fixed links, 4 dashpots, 5 third springs, 6 Detector ontology, 9 movable plates, 10 first springs, 11 hinges, 12 first grooves, 13 moving blocks, 14 rotation slots, 15 first rotating shafts, 16 connecting rods, 17 second grooves, 18 fixed links, 19 sliding grooves, 20 sliding bars, 21 third sliding blocks, 22 third sliding slots, 23 second bullets Spring, 24 second shafts, 25 second sliding slots, 26 second sliding blocks, 27 movable blocks, 28 fixed blocks, 29 card slots, 30 fixtures, 31 stretching handles Hand, 32 first sliding blocks, 33 the first sliding grooves, 34 limiting slots, 35 limited blocks.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Embodiment.
Referring to Fig.1-5, a kind of city electricity installing engineering electric power detection device, including pedestal 1, the rotational installation of 1 top of pedestal There are two shell 2, two shells 2 are symmetrical arranged, and two shells 2 are adapted, and shell 2 is hollow structure, the bottom of two shells 2 Side and side close to each other are opening, and the same placement block 6 is movably installed in two shells 2, place activity peace in block 6 Equipped with current detecting instrument ontology 8, the firm organization being equipped in block 6 for firm installation current detecting instrument ontology 8 is placed, block is placed 6 are surrounded by the buffer gear for buffer current detector ontology 8.The present invention can be convenient for convenient for firm installation current detecting Instrument ontology 8, and prevent from placing position during block 6 shakes and change, convenient for placing during block 6 shakes there is buffering to make With, meanwhile, convenient for adjusting the openings of sizes between two shells 2, it is convenient for current detecting instrument ontology 8 and uses operation.
Two shells 2 side close to each other is installed with fixed block 28, two fixed blocks 28 it is close to each other one Side is respectively equipped with fixture 30 and card slot 29, and card slot 29 is adapted with fixture 30, and two 2 top sides of shell offer the first sliding groove 33, the first sliding block 32 is slidably fitted in two the first sliding grooves 33, is movably installed between two the first sliding blocks 32 same A retractable handle 31, retractable handle 31 are located at the top of two shells 2, and the first sliding groove 33 is equidistant on the side inner wall far from opening It sows discord and separates equipped with limiting slot 34,32 bottom end of the first sliding block is installed with limited block 35, and limited block 35 is suitable with 34 phase of limiting slot Match.Pass through fixed block 28, card slot 29, fixture 30, retractable handle 31, the first sliding block 32, the first sliding groove 33, limiting slot 34, limit Block 35 is used cooperatively, and can adjust the position of the first sliding block 32 by mobile first sliding block 32, convenient for adjust two shells 2 it Between openings of sizes, be convenient for current detecting instrument ontology 8 using operation.
Firm organization includes being opened in the placing groove 7 for placing 6 top side of block, and current detecting instrument ontology 8 is movably arranged on placement In slot 7, movable plate 9 is movably installed on 7 both sides inner wall of placing groove, two movable plates 9 are based on the opening central symmetry of placing groove 7 Setting, and two movable plates 9 side close to each other is in contact with current detecting instrument ontology 8, two movable plates 9 are located remotely from each other Side be equipped with the first spring 10 and hinge 11,10 one end of the first spring is welded on one that movable plate 9 is located remote from the opening of slot 7 On side, 10 other end of the first spring is welded on 7 inner wall of placing groove, and 11 one end of hinge is rotatably installed in movable plate 9 close to placement On the side that slot 7 is open, the other end of hinge 11 is welded on 7 inner wall of placing groove.By placing block 6, placing groove 7, electric current inspection Instrument ontology 8, movable plate 9, the first spring 10, hinge 11 is surveyed to be used cooperatively, it can be by two movable plates 9 to current detecting instrument sheet Body 8 is squeezed, convenient for firm installation current detecting instrument ontology 8.
Buffer gear includes being opened in the first groove 12 for placing 6 bottom end of block, fixed peace on 12 top inner wall of the first groove Equipped with moving block 13,13 both sides of moving block offer the rotation slot 14 that both sides are opening, are equipped in rotation slot 14 by the One shaft 15 is rotatably installed in the connecting rod 16 on 14 inner wall of rotation slot, and 16 one end of connecting rod extends to outside rotation slot 14, connection Bar 16 is located at one end outside rotation slot 14 and is rotatablely equipped with movable block 27 by the second shaft 24, and 1 top side of pedestal symmetrically offers Two the second grooves 17, two movable blocks 27 are movably arranged on respectively in two the second grooves 17, and the second groove 17 is far from opening Side inner wall on offer second sliding slot 25,27 bottom end of movable block is installed with the second sliding block 26, the sliding of the second sliding block 26 In second sliding slot 25, it is installed with fixed link 18 on the side inner wall that two the second grooves 17 are located remotely from each other, two The side close to each other of a fixed link 18 offers sliding groove 19, and sliding bar 20 is slidably fitted in two sliding grooves 19, One end of sliding bar 20 extends to outside sliding groove 19, and one end that sliding bar 20 is located at outside sliding groove 19 is fixedly mounted on movable block On 27, third sliding slot 22 is offered on 19 both sides inner wall of sliding groove, one end both sides that sliding bar 20 is located in sliding groove 19 are equal It is installed with third sliding block 21, two third sliding blocks 21 are slidably mounted on respectively in two third sliding slots 22, and movable block 27 leans on The side of nearly fixed link 18 is welded with the second spring 23 being socketed in fixed link 18 and sliding bar 20, and second spring 23 is far from shifting One end of motion block 27 is welded in fixed link 18, is placed 6 both sides of block and is installed with L-shaped fixed link 3,1 top of pedestal is symmetrical It opens up there are two dashpot 4, one end that L-shaped fixed link 3 is located remote from block 6 extends in dashpot 4,4 top side inner wall of dashpot On be welded with third spring 5, the top of third spring 5 is welded on the bottom end of L-shaped fixed link 3.Pass through L-shaped fixed link 3, buffering Slot 4, the first groove 12, moving block 13, rotation slot 14, first rotating shaft 15, connecting rod 16, the second groove 17, is consolidated third spring 5 Fixed pole 18, sliding groove 19, sliding bar 20, third sliding block 21, third sliding slot 22, second spring 23, the second shaft 24, second sliding slot 25, the second sliding block 26, movable block 27 are used cooperatively, and movable block 27 can be squeezed by connecting rod 16, and movable block 27 squeezes second Spring 23 and sliding bar 20, convenient for having cushioning effect to placing during block 6 shakes, and L-shaped fixed link 3 is matched with dashpot 4 It closes and uses, consolidate the position for placing block 6, prevent from placing position during block 6 shakes and change, the present invention can be convenient for Firm installation current detecting instrument ontology 8, and prevent from placing position during block 6 shakes and change, convenient for being shaken to placing block 6 There is cushioning effect in the process, meanwhile, convenient for adjusting the openings of sizes between two shells 2, it is convenient for current detecting instrument sheet Body 8 uses operation.
The city electricity installing engineering application method of electric power detection device, includes the following steps:
S1:Adjust the position relationship between two shells 2:Mobile first sliding block 32, the first sliding block 32 drive retractable handle 31 stretch, and the first sliding block 32 is slided in the first sliding groove 33, and the first sliding block 32 drives limited block 35 in limiting slot Sliding, limited block 35 are used cooperatively with limiting slot 34 in 34, are consolidated position of first sliding block 32 in the first sliding groove 33 and are closed System adjusts the collapsing length of retractable handle 31, meanwhile, adjust the size being open between two shells 2;
S2:It takes current detecting instrument ontology 8:Current detecting instrument ontology 8 is moved up, current detecting instrument ontology 8 is at two It is slided on movable plate 9, current detecting instrument ontology 8 moves upwardly so that the active force of the first spring 10 becomes smaller, two activities Plate 9 becomes smaller to the extruding force of current detecting instrument ontology 8, removes current detecting instrument ontology 8;
S3:It is firm to place current detecting instrument ontology 8:Current detecting instrument ontology 8 is put into placing groove 7, current detecting instrument 8 both sides of ontology squeeze two movable plates, 9 two movable plates 9 and squeeze two the first springs 10, two the first springs 10 respectively respectively Reaction force squeezes two movable plates 9 respectively, and two movable plates 9 squeeze current detecting instrument ontology 8, consolidate installation current detecting instrument Ontology 8;
S4:Buffer current detector ontology 8:It places block 6 operating and teetertottering in moving process, places block 6 Moving block 13 is driven to move up and down, moving block 13 drives connecting rod 16 to move up and down, and connecting rod 16 is in rotation slot It is rotated in 14;
S41:Connecting rod 16 is rotated during moving up and down on movable block 27, meanwhile, connecting rod 16 drives movement Block 27 is moved in the second groove 17, and movable block 27 drives the second sliding block 26 to be slided in second sliding slot 25, and is moved Motion block 27 squeezes sliding bar 20, and sliding bar 20 drives third sliding block 21 to be slided in third sliding slot 22, and movable block 27 squeezes Second spring 23, buffering place block 6;
S42:Block 6 is placed during moving up and down, drives L fixed links 3 to move up and down, L-shaped fixed link 3 is in dashpot It is moved in 4, and L-shaped fixed link 3 squeezes third spring 5, reaches firm and place the position of block 6, and have the effect of buffering.
The present invention:Adjust the position relationship between two shells 2:Mobile first sliding block 32, the first sliding block 32 drive flexible Handle 31 stretches, and the first sliding block 32 is slided in the first sliding groove 33, and the first sliding block 32 drives limited block 35 limiting Sliding in the slot 34 of position, limited block 35 are used cooperatively with limiting slot 34, consolidate position of first sliding block 32 in the first sliding groove 33 Relationship is set, the collapsing length of retractable handle 31 is adjusted, meanwhile, adjust the size being open between two shells 2;It takes current detecting Instrument ontology 8:Current detecting instrument ontology 8 is moved up, current detecting instrument ontology 8 is slided on two movable plates 9, electric current inspection It surveys instrument ontology 8 and moves upwardly so that the active force of the first spring 10 becomes smaller, two movable plates 9 are squeezed to current detecting instrument ontology 8 Pressure becomes smaller, and removes current detecting instrument ontology 8;It is firm to place current detecting instrument ontology 8:Current detecting instrument ontology 8 is put into It sets in slot 7,8 both sides of current detecting instrument ontology squeeze two movable plates, 9 two movable plates 9 and squeeze two the first springs respectively respectively 10, two 10 reaction forces of the first spring squeeze two movable plates 9 respectively, and two movable plates 9 squeeze current detecting instrument ontology 8, Firm installation current detecting instrument ontology 8;Buffer current detector ontology 8:Block 6 is placed to operate with progress in moving process up and down It shakes, places block 6 and moving block 13 is driven to move up and down, moving block 13 drives connecting rod 16 to move up and down, and connects Bar 16 is rotated in rotation slot 14;Connecting rod 16 is rotated during moving up and down on movable block 27, meanwhile, connection Bar 16 drives movable block 27 to be moved in the second groove 17, movable block 27 drive the second sliding block 26 in the second sliding slot 25 into Row sliding, and movable block 27 squeezes sliding bar 20, sliding bar 20 drives third sliding block 21 to be slided in third sliding slot 22, moves Motion block 27 squeezes second spring 23, and buffering places block 6;Block 6 is placed during moving up and down, drives and is moved down in L fixed links 3 Dynamic, L-shaped fixed link 3 is moved in dashpot 4, and L-shaped fixed link 3 squeezes third spring 5, reaches firm placement block 6 Position, and have the effect of buffering.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (8)

1. a kind of city electricity installing engineering electric power detection device, including pedestal (1), which is characterized in that pedestal (1) top turns There are two shells (2) for dynamic installation, and two shells (2) are symmetrical arranged, and two shells (2) are adapted, and the shell (2) is hollow Structure, the bottom side and side close to each other of two shells (2) are opening, are movably installed in two shells (2) same Block (6) is placed, current detecting instrument ontology (8) is movably installed in the placement block (6), places in block (6) and is equipped with for consolidating The firm organization of current detecting instrument ontology (8) is installed, block (6) is placed and is surrounded by for buffer current detector ontology (8) Buffer gear.
2. a kind of city electricity installing engineering electric power detection device according to claim 1, which is characterized in that two shells (2) side close to each other is installed with fixed block (28), and two fixed block (28) sides close to each other are respectively equipped with Fixture (30) and card slot (29), the card slot (29) are adapted with fixture (30), and two shell (2) top sides offer the first cunning Slot (33), is slidably fitted with the first sliding block (32) in two the first sliding grooves (33), activity between two the first sliding blocks (32) The same retractable handle (31) is installed, the retractable handle (31) is located at the top of two shells (2).
3. a kind of city electricity installing engineering electric power detection device according to claim 2, which is characterized in that described first slides Equidistant intervals offer limiting slot (34) on side inner wall of the slot (33) far from opening, and the first sliding block (32) bottom end is fixed Limited block (35) is installed, the limited block (35) is adapted with limiting slot (34).
4. a kind of city electricity installing engineering electric power detection device according to claim 1, which is characterized in that the firm machine Structure includes being opened in the placing groove (7) for placing block (6) top side, and the current detecting instrument ontology (8) is movably arranged on placing groove (7) It is interior, movable plate (9) is movably installed on the inner wall of placing groove (7) both sides, two movable plates (9) are opened based on placing groove (7) Mouthful center symmetric setting, and two movable plates (9) side close to each other is in contact with current detecting instrument ontology (8), two The side that movable plate (9) is located remotely from each other is equipped with the first spring (10) and hinge (11), the first spring (10) one end welding On the side that movable plate (9) is located remote from slot (7) opening, the first spring (10) other end is welded on placing groove (7) inner wall, Described hinge (11) one end is rotatably installed in movable plate (9) on the side of placing groove (7) opening, the other end of hinge (11) It is welded on placing groove (7) inner wall.
5. a kind of city electricity installing engineering electric power detection device according to claim 1, which is characterized in that the buffer Structure includes being opened in the first groove (12) for placing block (6) bottom end, and rotation is installed on the inner wall of the first groove (12) top Block (13), moving block (13) both sides offer the rotation slot (14) that both sides are opening, are set in the rotation slot (14) There are the connecting rod (16) being rotatably installed in by first rotating shaft (15) on rotation slot (14) inner wall, described connecting rod (16) one end to prolong Extend to rotation slot (14) outside, the connecting rod (16) is located at the one end of rotation slot (14) outside and is rotatablely installed by the second shaft (24) There are movable block (27), pedestal (1) top side symmetrically to open up there are two the second groove (17), two movable blocks (27) are movable respectively In two the second grooves (17).
6. a kind of city electricity installing engineering electric power detection device according to claim 5, which is characterized in that described second is recessed Slot (17) offers second sliding slot (25) on the side inner wall far from opening, and movable block (27) bottom end is installed with second Sliding block (26), second sliding block (26) are slidably mounted in second sliding slot (25), what two the second grooves (17) were located remotely from each other Fixed link (18) is installed on the inner wall of side, two fixed link (18) sides close to each other offer sliding groove (19), it is slidably fitted with sliding bar (20) in two sliding grooves (19), one end of the sliding bar (20) extends to sliding groove (19) outside, and sliding bar (20) is located at the one end of sliding groove (19) outside and is fixedly mounted on movable block (27), the sliding groove (19) third sliding slot (22) is offered on the inner wall of both sides, it is fixed that sliding bar (20) is located at one end both sides in sliding groove (19) Third sliding block (21) is installed, two third sliding blocks (21) are slidably mounted on respectively in two third sliding slots (22), the movement Block (27) is welded with the second spring (23) being socketed in fixed link (18) and sliding bar (20) close to the side of fixed link (18), The one end of the second spring (23) far from movable block (27) is welded in fixed link (18).
7. a kind of city electricity installing engineering electric power detection device according to claim 1, which is characterized in that the placement block (6) both sides are installed with L-shaped fixed link (3), and pedestal (1) top symmetrically opens up that there are two dashpot (4), the L One end that shape fixed link (3) is located remote from block (6) extends in dashpot (4), is welded on the inner wall of dashpot (4) top side The top of third spring (5), third spring (5) is welded on the bottom end of L-shaped fixed link (3).
8. the application method of city electricity installing engineering electric power detection device, which is characterized in that include the following steps:
S1:Adjust the position relationship between two shells (2):Mobile first sliding block (32), the first sliding block (32) drive stretching handle Hand (31) stretches, and the first sliding block (32) is slided in the first sliding groove (33), and the first sliding block (32) drives limited block (35) sliding, limited block (35) are used cooperatively with limiting slot (34) in limiting slot (34), and firm first sliding block (32) exists Position relationship in the first sliding groove (33) adjusts the collapsing length of retractable handle (31), meanwhile, between two shells (2) of adjusting The size of opening;
S2:It takes current detecting instrument ontology (8):Current detecting instrument ontology (8) is moved up, current detecting instrument ontology (8) is two It being slided on a movable plate (9), current detecting instrument ontology (8) moves upwardly so that the active force of the first spring (10) becomes smaller, Two movable plates (9) become smaller to the extruding force of current detecting instrument ontology (8), remove current detecting instrument ontology (8);
S3:It is firm to place current detecting instrument ontology (8):Current detecting instrument ontology (8) is put into placing groove (7), current detecting Instrument ontology (8) both sides squeeze (9) two movable plates (9) of two movable plates and squeeze two the first springs (10) respectively respectively, two First spring (10) reaction force squeezes two movable plates (9) respectively, and two movable plates (9) squeeze current detecting instrument ontology (8), Firm installation current detecting instrument ontology (8);
S4:Buffer current detector ontology (8):It places block (6) operating and teetertottering in moving process, places block (6) moving block (13) is driven to move up and down, moving block (13) drives connecting rod (16) to move up and down, and connecting rod (16) it is rotated in rotation slot (14);
S41:Connecting rod (16) is rotated during moving up and down on movable block (27), meanwhile, connecting rod (16), which drives, moves Motion block (27) is moved in the second groove (17), movable block (27) drive the second sliding block (26) in second sliding slot (25) into Row sliding, and movable block (27) squeezes sliding bar (20), sliding bar (20) drives third sliding block (21) in third sliding slot (22) It is slided, movable block (27) squeezes second spring (23), and buffering places block (6);
S42:Block (6) is placed during moving up and down, drives L fixed links (3) to move up and down, L-shaped fixed link (3) is buffering It is moved in slot (4), and L-shaped fixed link (3) squeezes third spring (5), reaches firm and place the position of block (6), and have The effect of buffering.
CN201711340380.3A 2017-12-14 2017-12-14 A kind of installing engineering of city electricity electric power detection device and its application method Pending CN108333392A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711340380.3A CN108333392A (en) 2017-12-14 2017-12-14 A kind of installing engineering of city electricity electric power detection device and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711340380.3A CN108333392A (en) 2017-12-14 2017-12-14 A kind of installing engineering of city electricity electric power detection device and its application method

Publications (1)

Publication Number Publication Date
CN108333392A true CN108333392A (en) 2018-07-27

Family

ID=62922415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711340380.3A Pending CN108333392A (en) 2017-12-14 2017-12-14 A kind of installing engineering of city electricity electric power detection device and its application method

Country Status (1)

Country Link
CN (1) CN108333392A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109142981A (en) * 2018-09-28 2019-01-04 四川能投云电科技有限公司 A kind of fault locator of transmission line
CN110297522A (en) * 2019-06-28 2019-10-01 京东方科技集团股份有限公司 A kind of display device
CN112091687A (en) * 2020-10-20 2020-12-18 李艳艳 Fixing clamp for numerical control machine tool
CN112285409A (en) * 2020-11-25 2021-01-29 慈溪市质量技术监督检验检测服务中心 Portable static voltmeter detection device
CN113687163A (en) * 2021-08-24 2021-11-23 上海金智晟东电力科技有限公司 Power distribution terminal tester based on high protection performance
CN114035105A (en) * 2021-03-31 2022-02-11 加维斯自动化科技(苏州)有限公司 Easy operation's automobile connector check out test set
CN114235315A (en) * 2021-10-27 2022-03-25 福建省永正工程质量检测有限公司 Wireless automatic comprehensive monitoring system for engineering structure
CN116632502A (en) * 2023-06-29 2023-08-22 上海尚远通讯科技有限公司 Portable 5G big dipper integrated antenna

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109142981B (en) * 2018-09-28 2023-09-19 四川能投云电科技有限公司 Fault positioning device for transmission line
CN109142981A (en) * 2018-09-28 2019-01-04 四川能投云电科技有限公司 A kind of fault locator of transmission line
CN110297522A (en) * 2019-06-28 2019-10-01 京东方科技集团股份有限公司 A kind of display device
US11770909B2 (en) 2019-06-28 2023-09-26 Beijing Boe Technology Development Co., Ltd. Display device
CN112091687A (en) * 2020-10-20 2020-12-18 李艳艳 Fixing clamp for numerical control machine tool
CN112285409A (en) * 2020-11-25 2021-01-29 慈溪市质量技术监督检验检测服务中心 Portable static voltmeter detection device
CN114035105A (en) * 2021-03-31 2022-02-11 加维斯自动化科技(苏州)有限公司 Easy operation's automobile connector check out test set
CN113687163A (en) * 2021-08-24 2021-11-23 上海金智晟东电力科技有限公司 Power distribution terminal tester based on high protection performance
CN113687163B (en) * 2021-08-24 2023-12-01 上海金智晟东电力科技有限公司 Power distribution terminal tester based on high protection
CN114235315A (en) * 2021-10-27 2022-03-25 福建省永正工程质量检测有限公司 Wireless automatic comprehensive monitoring system for engineering structure
CN114235315B (en) * 2021-10-27 2024-05-14 福建省永正工程质量检测有限公司 Wireless automatic comprehensive monitoring system for engineering structure
CN116632502A (en) * 2023-06-29 2023-08-22 上海尚远通讯科技有限公司 Portable 5G big dipper integrated antenna
CN116632502B (en) * 2023-06-29 2024-05-28 上海尚远通讯科技有限公司 Portable 5G big dipper integrated antenna

Similar Documents

Publication Publication Date Title
CN108333392A (en) A kind of installing engineering of city electricity electric power detection device and its application method
CN207514499U (en) A kind of electrical equipment for having four-point damping
CN206786286U (en) A kind of medical device support device
CN110476270A (en) Accommodation apparatus
CN209189432U (en) Cleaning device in a kind of WR and hydropower construction borehole
CN204618110U (en) Effort-saving is without dead angle cleaner
CN208605859U (en) A kind of Electronics and Information Engineering practical traning platform
CN207106014U (en) Painting canvas straightening device
CN107284813A (en) A kind of computer maintenance tool container
CN107617209A (en) A kind of bagging equipment of physical training sandbag
CN207584280U (en) A kind of environmental protecting device easy to remove
CN207129709U (en) Compounding machine unreeling structure
CN209510233U (en) A kind of geological mapping drilling rig
CN108273465A (en) A kind of nitrogen hydrogen-oxygen all-in-one machine turning chloroform production for carbon tetrachloride
CN207782367U (en) A kind of fixed mechanism of lightning protection device supporting rack
CN107498565A (en) A kind of cable tunnel inspection robot
CN208422331U (en) A kind of agricultural technology extension propagandizing device
CN209729188U (en) A kind of mathematical model displaying device convenient for rotation
CN208367196U (en) A kind of electric instrument detection device
CN207114541U (en) A kind of soil moisture monitoring device that can monitor different soils depth
CN108289264A (en) A kind of energy-saving Baffle Box of Bluetooth with mobile phone charging function
CN207234848U (en) A kind of smart mobile phone with compass functional
CN208158105U (en) A kind of power protection plate with dust reduction capability
CN206357226U (en) A kind of rotating mechanical arm for charge and discharge
CN208159428U (en) A kind of Rice Cropping case

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180727

WD01 Invention patent application deemed withdrawn after publication