CN108332064A - A kind of natural gas management system for monitoring - Google Patents
A kind of natural gas management system for monitoring Download PDFInfo
- Publication number
- CN108332064A CN108332064A CN201810135208.2A CN201810135208A CN108332064A CN 108332064 A CN108332064 A CN 108332064A CN 201810135208 A CN201810135208 A CN 201810135208A CN 108332064 A CN108332064 A CN 108332064A
- Authority
- CN
- China
- Prior art keywords
- natural gas
- sensor
- data
- monitoring
- remote monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Alarm Systems (AREA)
- Emergency Alarm Devices (AREA)
- Measuring Volume Flow (AREA)
- Arrangements For Transmission Of Measured Signals (AREA)
- Examining Or Testing Airtightness (AREA)
Abstract
The present invention discloses a kind of natural gas management system for monitoring, including the control of chip type integrated sensor, sensor external and data collector, the App of wireless network transmissions device, remote monitoring platform and user's intelligent terminal.The present invention is by remotely monitoring the leakage situation of gas pipeline, data are wirelessly transmitted to remote monitoring platform in time, real-time prevention is accomplished, accurate measurements, has timely feedbacked, harm of the natural gas leaking to environment, to people's life's property can be reduced.
Description
The application is application No. is 2015105680059, and the applying date is on 09 08th, 2015, and invention and created name is
A kind of divisional application of the patent of " natural gas intelligent remote monitoring and managing system ".
Technical field
The present invention relates to a kind of natural gas monitoring system more particularly to a kind of natural gas intelligent remote monitoring and managing systems.
Background technology
Natural gas be a kind of rich reserves, the high and low pollution of the thermal efficiency clean energy resource.The main component of natural gas is first
Alkane is a kind of inflammable, explosive, with greenhouse effects gas, and greenhouse effects are the decades of times of isometric carbon dioxide.Naturally
The mode of gas conveying is mostly underground piping conveying now, therefore, lives and properties peace of the natural gas leaking to environment, to the people
There is tremendous influence entirely.
In the prior art, to the detection of natural gas underground gas pipeline, there are two types of modes:
(1) passive detection:When user has found peculiar smell, professional visits detection, and this detection initiative is very
Difference be easy to cause accident.
(2) active detecting:By the way of line walking, number that is primary, therefore acquiring is detected by professional contingent every a period of time
According to not in time, discontinuously, hidden leakage point cannot be found in time.
For the prior art in terms of to leakage Analysis of Potential, the result that line walking detects is inaccurate, and data input calculates
Reprocessing is also inconvenient in machine, cannot timely and accurately determine at leakage hidden danger, can not accurately take out counte-rplan.
It is real-time that Chinese patent CN104794862A discloses a kind of natural gas line based on ZigBee wireless communication techniques
Monitoring system, once having abnormal gas pipeline leakage, ambient temperature and humidity, breakage in installation and corrosion accident, system can
Alarm is sent out in time, can truly reflect the various parameters such as pipeline gas leakage, humiture, vibrations, corrosion when accident occurs
Variation, take the necessary measures reliable, effective information be provided for administrative staff, to reduce dangerous natural gas leaking, explosion is made
At destruction and loss, solve conventional natural gas pipelines detection many deficiencies.But the invention is not by user monitoring point, management
Center, the monitoring of user's real-time contacts, and the functions such as analysis, prevention of untapped monitoring center.
Invention content
To solve the defect of the prior art, the present invention provides a kind of natural gas intelligent remote monitoring and managing systems, including:
1, sensor, 2, sensor external control and data collector, 3, wireless network transmissions device, 4, remote monitoring platform.
The sensor is the chip type integrated sensor of pressure sensor, flow sensor, methane transducer composition, institute
Chip type integrated sensor is stated, there are 3 parallel electrode contacts, it is another in the vertical direction of 3 parallel electrode contacts
There are corresponding 3 electrode contacts, parallel 3 electrode contacts and 3 vertical electrode contacts outside, forms one two-by-two
Circuit, 3 parallel circuits formed altogether.
Further, the chip type integrated sensor has 4 parallel electrode contacts, in 4 parallel electricity
In addition the vertical direction of pole contact has corresponding 4 electrode contacts, parallel 4 electrode contacts and 4 vertical electricity
Pole contact forms a circuit, 4 parallel circuits formed altogether two-by-two.This 4 circuits, in addition to pressure sensor, flow pass
It is additionally provided with smoke sensor device outside sensor, methane transducer, it is therefore an objective to exclude the hidden fire-fighting danger that environment occurs in time.
Each circuit of the chip type integrated sensor further includes the resistance that a resistance value differs in size, to control
Current value in circuit.
There are one common probe, the probes to be mounted on prison for each parallel circuit tool of the chip type integrated sensor
At measuring point, to obtain the accurate data of natural gas.
The chip type integrated sensor is encapsulated by accurate, prevents active gases from corroding to it.
There are two types of the mounting means of chip type integrated sensor, and first way is that sensing is installed in each user family
Device and sensor external control and data collector, each user are while carry-on in user there are one independent unique ID
Corresponding App is installed on the intelligent terminal of carrying and also assigns a same ID.The function that the App has
For:1, gas discharge is monitored in real time.2, this month, consumes Natural gas data and is converted into natural gas expense automatically.3, by day
Data are passed to remote monitoring platform, look into gas meter without registering one's residence, you can obtain by the real time monitoring of right throughput in time
This month, consumes natural gas expense.When 4, for natural gas leaking or warning information occurs, user is notified in time.
The intelligent terminal can be the smart machines such as mobile phone or the tablet computer of user.
The second way is installed on gas delivering pipe road.
It was found that after leakage failure, uploads leak data and alarm to remote monitoring platform, staff can be by long-range
The method of control, the electrically operated valve of Temporarily Closed failure pipe network prevent from continuing to leak, and wait for staff's repair.
The sensor external control includes power supply, signal amplifier, signal adapter, data storage with data collector
Device, display device, control device.
The operating voltage range of the power supply is:5~25V.
The curent change detected in circuit is amplified and is transmitted to signal adapter by the signal amplifier.
The signal adapter converts the current variation value received to wave signal or optical signal, and defeated in display device
Go out, while the data that detection obtains are input to data storage.
The data storage is connected with wireless transmitting system, and the detection data received is backed up, and is sent to wireless
Transmission system.
The monitoring data received are classified and are identified by wireless transmitting system, and are sent to remote monitoring platform.
If any pipeline leakage phenomenon, remote monitoring platform is alarmed at once, can be by remotely controlling after staff receives warning message
The method of system, the electrically operated valve of Temporarily Closed failure pipe network prevent from continuing to leak, and wait for staff's repair.At the same time, far
Leakage information is sent in a manner of notifications on responsible person's mobile phone by journey monitoring management platform in time;If location of leak is
In user family, remote monitoring platform will send notifications from trend user App, to allow user to take timely measure reduction
Lose or avoid danger.
The effect of remote monitoring platform more than that, periodically by the information being collected into carry out taxonomic revision, and with
Historical data comparison, analysis, assess the risk of leakage of each test point, the judgement that science is made for staff provides
Data are supported, to which test point high to risk of leakage in advance such as is prevented, repaired at the work.
Data are wirelessly transmitted to long-range monitoring pipe by the present invention in time by remotely monitoring the leakage situation of gas pipeline
Platform has been accomplished real-time prevention, accurate measurements, has been timely feedbacked.
The present invention can accurately and timely have found natural gas leaking accident, and take a series of alarm measures, make staff fast
Speed is reacted, and notifies user that it is avoided to be lost by bigger in time.Can reduce natural gas leaking to environment, to the people group
The harm of many lives and properties.
Specific implementation mode
Below by specific embodiment, further technical scheme of the present invention is specifically described.It should be understood that below
Embodiment be intended only as illustrating, and do not limit the scope of the invention, while those skilled in the art is according to the present invention
The obvious change and modification made are also contained within the scope of the invention.
Embodiment 1
A kind of natural gas intelligent remote monitoring and managing system, including:1, sensor, 2, sensor external control and data receipts
Storage, 3, wireless network transmissions device, 4, remote monitoring platform.
The sensor is the chip type integrated sensor of pressure sensor, flow sensor, methane transducer composition, institute
Chip type integrated sensor is stated, there are 3 parallel electrode contacts, it is another in the vertical direction of 3 parallel electrode contacts
There are corresponding 3 electrode contacts, parallel 3 electrode contacts and 3 vertical electrode contacts outside, forms one two-by-two
Circuit, 3 parallel circuits formed altogether.
Each circuit of the chip type integrated sensor further includes the resistance that a resistance value differs in size, to control
Current value in circuit.
There are one common probe, the probes to be mounted on prison for each parallel circuit tool of the chip type integrated sensor
At measuring point, from the accurate data for obtaining natural gas.
The chip type integrated sensor is encapsulated by accurate, prevents active gases from corroding to it.
Chip type integrated sensor is installed on pipeline.
It was found that after leakage failure, uploads leak data and alarm to remote monitoring platform, staff can be by long-range
The method of control, the electrically operated valve of Temporarily Closed failure pipe network prevent from continuing to leak, and wait for staff's repair.
The sensor external control includes power supply, signal amplifier, signal adapter, data storage with data collector
Device, display device, control device.
The operating voltage range of the power supply is:5~25V.
The curent change detected in circuit is amplified and is transmitted to signal adapter by the signal amplifier.
The signal adapter converts the current variation value received to wave signal or optical signal, and defeated in display device
Go out, while the data that detection obtains are input to data storage.
The data storage is connected with wireless transmitting system, and the detection data received is backed up, and is sent to wireless
Transmission system.
The monitoring data received are classified and are identified by wireless transmitting system, and are sent to remote monitoring platform.
If any pipeline leakage phenomenon, remote monitoring platform is alarmed at once, can be by remotely controlling after staff receives warning message
The method of system, the electrically operated valve of Temporarily Closed failure pipe network prevent from continuing to leak, and wait for staff's repair.At the same time, far
Leakage information is sent in a manner of notifications on responsible person's mobile phone by journey monitoring management platform in time, with timely processing.
Embodiment 2
A kind of natural gas intelligent remote monitoring and managing system, including:1, sensor, 2, sensor external control and data receipts
Storage, 3, wireless network transmissions device, 4, remote monitoring platform, 5, the App of user's intelligent terminal.
The sensor is the chip type integrated sensor of pressure sensor, flow sensor, methane transducer composition, institute
Chip type integrated sensor is stated, there are 3 parallel electrode contacts, it is another in the vertical direction of 3 parallel electrode contacts
There are corresponding 3 electrode contacts, parallel 3 electrode contacts and 3 vertical electrode contacts outside, forms one two-by-two
Circuit, 3 parallel circuits formed altogether.
Each circuit of the chip type integrated sensor further includes the resistance that a resistance value differs in size, to control
Current value in circuit.
There are one common probe, the probes to be mounted on prison for each parallel circuit tool of the chip type integrated sensor
At measuring point, from the accurate data for obtaining natural gas.
The chip type integrated sensor is encapsulated by accurate, prevents active gases from corroding to it.
Sensor and sensor external control and data collector, each user are installed in each user family to be had
One unique ID of independence, while corresponding App being installed on the portable smart mobile phone of user and also assigns one
Same ID.The function that the App has is:1, gas discharge is monitored in real time.2, this month consumption Natural gas data and automatic
It is converted into natural gas expense.3, by the real time monitoring to gas discharge, data are passed to remote monitoring platform in time,
Gas meter is looked into without registering one's residence, you can show that this month consumes natural gas expense.4, for natural gas leaking or warning information occurs
When, user is notified in time.
It was found that after leakage failure, uploads leak data and alarm to remote monitoring platform, staff can be by long-range
The method of control, the electrically operated valve of Temporarily Closed failure pipe network prevent from continuing to leak, and wait for staff's repair.
The sensor external control includes power supply, signal amplifier, signal adapter, data storage with data collector
Device, display device, control device.
The operating voltage range of the power supply is:5~25V.
The curent change detected in circuit is amplified and is transmitted to signal adapter by the signal amplifier.
The signal adapter converts the current variation value received to wave signal or optical signal, and defeated in display device
Go out, while the data that detection obtains are input to data storage.
The data storage is connected with wireless transmitting system, and the detection data received is backed up, and is sent to wireless
Transmission system.
The monitoring data received are classified and are identified by wireless transmitting system, and are sent to remote monitoring platform.
If any pipeline leakage phenomenon, remote monitoring platform is alarmed at once, can be by remotely controlling after staff receives warning message
The method of system, the electrically operated valve of Temporarily Closed failure pipe network prevent from continuing to leak, and wait for staff's repair.Long-range monitoring pipe
Platform will send notifications from trend user App, to allow user to take timely measure reduction loss or avoid danger.
Embodiment 3
A kind of natural gas intelligent remote monitoring and managing system, including:1, sensor, 2, sensor external control and data receipts
Storage, 3, wireless network transmissions device, 4, remote monitoring platform.
The sensor is the chip type integrated sensor of pressure sensor, flow sensor, methane transducer composition, institute
State chip type integrated sensor have 4 parallel electrode contacts, 4 parallel electrode contacts vertical direction in addition
There are corresponding 4 electrode contacts, parallel 4 electrode contacts and 4 vertical electrode contacts, forms an electricity two-by-two
Road, 4 parallel circuits formed altogether.This 4 circuits, also set other than pressure sensor, flow sensor, methane transducer
It is equipped with smoke sensor device, it is therefore an objective to exclude the hidden fire-fighting danger that environment occurs in time.
Each circuit of the chip type integrated sensor further includes the resistance that a resistance value differs in size, to control
Current value in circuit.
There are one common probe, the probes to be mounted on prison for each parallel circuit tool of the chip type integrated sensor
At measuring point, from the accurate data for obtaining natural gas.
The chip type integrated sensor is encapsulated by accurate, prevents active gases from corroding to it.
Chip type integrated sensor is mounted on pipeline.
It was found that after leakage failure, uploads leak data and alarm to remote monitoring platform, staff can be by long-range
The method of control, the electrically operated valve of Temporarily Closed failure pipe network prevent from continuing to leak, and wait for staff's repair.
The sensor external control includes power supply, signal amplifier, signal adapter, data storage with data collector
Device, display device, control device.
The operating voltage range of the power supply is:5~25V.
The curent change detected in circuit is amplified and is transmitted to signal adapter by the signal amplifier.
The signal adapter converts the current variation value received to wave signal or optical signal, and defeated in display device
Go out, while the data that detection obtains are input to data storage.
The data storage is connected with wireless transmitting system, and the detection data received is backed up, and is sent to wireless
Transmission system.
The monitoring data received are classified and are identified by wireless transmitting system, and are sent to remote monitoring platform.
If any pipeline leakage phenomenon, remote monitoring platform is alarmed at once, can be by remotely controlling after staff receives warning message
The method of system, the electrically operated valve of Temporarily Closed failure pipe network prevent from continuing to leak, and wait for staff's repair.At the same time, far
Leakage information is sent in a manner of notifications on responsible person's mobile phone by journey monitoring management platform in time.
The information being collected into periodically is carried out taxonomic revision by remote monitoring platform, and is compared with historical data, analysis,
The risk of leakage of each test point is assessed, it is high to risk of leakage in advance to allow staff to make the judgement of science
Test point such as is prevented, is repaired at the work.
Claims (8)
1. a kind of natural gas management system for monitoring, including:Sensor, wireless network transmissions device, sensor external control and number
According to collector, remote monitoring platform;
The sensor is the chip type collection of pressure sensor, flow sensor, methane transducer and smoke sensor device composition
At sensor, the chip type integrated sensor has 4 parallel electrode contacts, in 4 parallel electrode contacts
In addition vertical direction has corresponding 4 electrode contacts, parallel 4 electrode contacts and a 4 vertical electrode contacts, and two
Two one circuit of composition, 4 parallel circuits formed altogether;
There are one common probe, the probes to be mounted on monitoring point for each parallel circuit tool of the chip type integrated sensor
Place, the accurate data for obtaining natural gas;
Chip formula integrated sensor and sensor external control and data collector, each use in each user family
All there are one independent unique ID at family, while installing corresponding App on the portable intelligent terminal of user
Also a same ID is assigned;
The monitoring data received are classified and are identified by wireless transmitting system, and are sent to remote monitoring platform;If any
Pipeline leakage phenomenon, remote monitoring platform is alarmed at once, after staff receives warning message, can pass through remote control
Method, the electrically operated valve of Temporarily Closed failure pipe network prevent from continuing to leak, and wait for staff's repair;At the same time, long-range prison
Leakage information is sent in a manner of notifications on responsible person's mobile phone by test tube platform in time.
2. natural gas management system for monitoring according to claim 1, it is characterised in that:The chip type integrated sensor
Each circuit further includes the resistance that a resistance value differs in size, to the current value in control circuit;
The chip type integrated sensor is encapsulated by accurate, prevents active gases from corroding to it.
3. natural gas management system for monitoring according to claim 1, it is characterised in that:The sensor external control and number
Include power supply, signal amplifier, signal adapter, data storage, display device, control device according to collector;
The operating voltage range of the power supply is:5~25V;
The curent change detected in circuit is amplified and is transmitted to signal adapter by the signal amplifier;
The signal adapter converts the current variation value received to wave signal or optical signal, and is exported in display device,
The data that detection obtains are input to data storage simultaneously;
The data storage is connected with wireless transmitting system, the detection data received is backed up, and be sent to wireless transmission
System.
4. natural gas management system for monitoring according to claim 1, it is characterised in that:The intelligent terminal is described
The mobile phone or tablet computer of user.
5. natural gas management system for monitoring according to claim 1, it is characterised in that:The function that the App has is:
(1) gas discharge is monitored in real time;
(2) this month, consumes Natural gas data and is converted into natural gas expense automatically;
(3) by the real time monitoring to gas discharge, data is passed to remote monitoring platform in time, day is looked into without registering one's residence
Right gas meter, you can show that this month consumes natural gas expense;
(4) for natural gas leaking or warning information occurs when, user is notified in time.
6. any native gas management system for monitoring according to claims 1 to 5, it is characterised in that:It is existing if any pipeline leakage
As when, remote monitoring platform is alarmed at once, after staff receives warning message, can be faced by the method for remote control
When closing fault pipe network electrically operated valve, prevent from continuing to leak, wait for staff repair;
At the same time, leakage information is sent to responsible person's mobile phone by remote monitoring platform in time in a manner of notifications
On;Remote monitoring platform will send notifications from trend user App, with allow user take timely measure reduction loss or
Avoid danger.
7. natural gas management system for monitoring according to claim 1 or 2, it is characterised in that:The integrated sensing of the chip type
Device is mounted on gas delivering pipe road;
When if any pipeline leakage phenomenon, remote monitoring platform is alarmed at once, after staff receives warning message, can be passed through
The method of remote control, the electrically operated valve of Temporarily Closed failure pipe network prevent from continuing to leak, and wait for staff's repair;With this
Meanwhile leakage information is sent in a manner of notifications on responsible person's mobile phone by remote monitoring platform in time.
8. any native gas management system for monitoring according to claims 1 to 7, it is characterised in that:The long-range monitoring pipe
Another function of platform is:The information being collected into periodically is subjected to taxonomic revision, and is compared with historical data, analysis, to every
The risk of leakage of a test point is assessed, and the judgement that science is made for staff provides data support, in advance to letting out
The high test point in danger that leaks out such as is prevented, is repaired at the work.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810135208.2A CN108332064B (en) | 2015-09-08 | 2015-09-08 | Natural gas monitoring management system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810135208.2A CN108332064B (en) | 2015-09-08 | 2015-09-08 | Natural gas monitoring management system |
CN201510568005.9A CN105156906B (en) | 2015-09-08 | 2015-09-08 | A kind of natural gas intelligent remote monitoring and managing system |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510568005.9A Division CN105156906B (en) | 2015-09-08 | 2015-09-08 | A kind of natural gas intelligent remote monitoring and managing system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108332064A true CN108332064A (en) | 2018-07-27 |
CN108332064B CN108332064B (en) | 2021-04-13 |
Family
ID=54797871
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510568005.9A Active CN105156906B (en) | 2015-09-08 | 2015-09-08 | A kind of natural gas intelligent remote monitoring and managing system |
CN201810135208.2A Active CN108332064B (en) | 2015-09-08 | 2015-09-08 | Natural gas monitoring management system |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510568005.9A Active CN105156906B (en) | 2015-09-08 | 2015-09-08 | A kind of natural gas intelligent remote monitoring and managing system |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN105156906B (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108072415A (en) * | 2016-11-09 | 2018-05-25 | 谷泽竑 | A kind of gas safe intelligent control method and system based on mobile terminal and gas metering |
CN106647592A (en) * | 2017-01-24 | 2017-05-10 | 深圳双创科技发展有限公司 | Robot alarm system and method for city |
CN106989280A (en) * | 2017-05-08 | 2017-07-28 | 西北工业大学 | A kind of SCM Based detection pipe leakage and the automatic water flow monitoring system and method for closing protection |
CN107620867A (en) * | 2017-09-27 | 2018-01-23 | 昆山特酷信息科技有限公司 | A kind of intelligent controlling device for oil-gas pipeline maintenance |
CN107940243A (en) * | 2017-11-28 | 2018-04-20 | 奕铭(大连)科技发展有限公司 | A kind of pipeline pressure detecting system of accurate positionin |
CN108594701A (en) * | 2018-03-29 | 2018-09-28 | 华广发 | A kind of intelligence LNG natural gases management system |
CN108922126B (en) * | 2018-07-06 | 2020-11-03 | 四川长虹电器股份有限公司 | Natural gas leakage alarm system and alarm method |
CN109558673A (en) * | 2018-11-28 | 2019-04-02 | 四川岚强石油天然气工程勘察设计有限责任公司 | A kind of natural gas transmission and distribution system Adaptability Analysis research method |
CN110826804A (en) * | 2019-11-06 | 2020-02-21 | 重庆神缘智能科技有限公司 | Gas safety inspection management system of registering one's residence |
CN111174104A (en) * | 2020-01-15 | 2020-05-19 | 深圳市华霆自动化工程有限公司 | LORA-based natural gas transmission remote monitoring system |
CN111539661B (en) * | 2020-07-08 | 2020-09-22 | 浙江浙能天然气运行有限公司 | Natural gas station leakage monitoring method based on risk evaluation and TDLAS |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201570106U (en) * | 2009-11-05 | 2010-09-01 | 无锡职业技术学院 | Novel household gas alarm |
CN101968393A (en) * | 2010-08-31 | 2011-02-09 | 北京航天凯恩化工科技有限公司 | Monitoring device for detecting leakage of hydrazine gas and using method thereof |
CN202795680U (en) * | 2012-05-21 | 2013-03-13 | 蒋建民 | GSM (Global System for Mobile Communications) wireless intelligent household gas safety system |
CN103196630A (en) * | 2013-03-13 | 2013-07-10 | 浙江省电力公司电力科学研究院 | Method and device of evaluating accuracy of ammonia escape monitoring value |
US20130190901A1 (en) * | 2010-10-08 | 2013-07-25 | Jae Wook Ko | Method and system for safely managing gas station |
CN203433588U (en) * | 2013-06-04 | 2014-02-12 | 大庆英辰创新科技有限公司 | Gas metering system |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101183899B (en) * | 2007-12-19 | 2010-09-01 | 天津大学 | BP network based pipeline security identifying method for optical fiber pipeline leakage monitoring device |
CN201425574Y (en) * | 2009-06-19 | 2010-03-17 | 哈尔滨市电子计算技术研究所 | On-line flue gas monitoring system based on wireless GPRS |
US9046414B2 (en) * | 2012-09-21 | 2015-06-02 | Google Inc. | Selectable lens button for a hazard detector and method therefor |
CN104217500A (en) * | 2013-06-04 | 2014-12-17 | 大庆英辰创新科技有限公司 | Gas metering method and system and intelligent gas meter |
CN104424717A (en) * | 2013-09-10 | 2015-03-18 | 北京市燃气集团有限责任公司 | Civil CPU (Central Processing Unit) card-meter metering and charging management system |
CN204314987U (en) * | 2014-12-29 | 2015-05-06 | 淮安新奥燃气发展有限公司 | A kind of gas meter |
CN104700504B (en) * | 2015-03-31 | 2017-10-31 | 成都秦川物联网科技股份有限公司 | Safety cut-off type IC-card intelligent quality flow gas table and its management system |
-
2015
- 2015-09-08 CN CN201510568005.9A patent/CN105156906B/en active Active
- 2015-09-08 CN CN201810135208.2A patent/CN108332064B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201570106U (en) * | 2009-11-05 | 2010-09-01 | 无锡职业技术学院 | Novel household gas alarm |
CN101968393A (en) * | 2010-08-31 | 2011-02-09 | 北京航天凯恩化工科技有限公司 | Monitoring device for detecting leakage of hydrazine gas and using method thereof |
US20130190901A1 (en) * | 2010-10-08 | 2013-07-25 | Jae Wook Ko | Method and system for safely managing gas station |
CN202795680U (en) * | 2012-05-21 | 2013-03-13 | 蒋建民 | GSM (Global System for Mobile Communications) wireless intelligent household gas safety system |
CN103196630A (en) * | 2013-03-13 | 2013-07-10 | 浙江省电力公司电力科学研究院 | Method and device of evaluating accuracy of ammonia escape monitoring value |
CN203433588U (en) * | 2013-06-04 | 2014-02-12 | 大庆英辰创新科技有限公司 | Gas metering system |
Also Published As
Publication number | Publication date |
---|---|
CN108332064B (en) | 2021-04-13 |
CN105156906A (en) | 2015-12-16 |
CN105156906B (en) | 2018-03-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105156906B (en) | A kind of natural gas intelligent remote monitoring and managing system | |
CN205785299U (en) | A kind of piping lane condition monitoring system | |
US20090007968A1 (en) | Pipe network, with a hierarchical structure, for supplying water or gas and/or for removing industrial water, process for detecting a leak in such a pipe network and process for determining, with the aid of a computer, the operating life theoretically remaining for a renewable power source for at least one flowmeter in such a pipe network | |
US10656045B2 (en) | Apparatus for analyzing the performance of fluid distribution equipment | |
US20110074601A1 (en) | Utility meter with flow rate sensitivity shut off | |
WO2008088664A1 (en) | Method and system for gas leak detection and localization | |
KR100949428B1 (en) | System and method for remote monitoring gas supply apparatus | |
CN107024629A (en) | One kind is used for the few oily Condition Detection evaluation system of electric power and method for evaluating state | |
US11340133B2 (en) | System and method of detecting gas-leakage along an underground pipeline system | |
CN106959143A (en) | A kind of self adaptation high-precision pressure formula water level monitoring warning device and method | |
KR20220020065A (en) | Integrated Information Providing System Using Multiple Water Quality Measurements For Smart Water City | |
CN110185940A (en) | A kind of monitoring of fuel gas pipeline leakage and positioning system | |
Ntambi et al. | Design of a water management system | |
CN102606889A (en) | Gas valve pit leakage monitoring terminal | |
KR102495230B1 (en) | Counter terminal to check the number of communication outputs | |
CN105203858A (en) | Solar power supply wireless transmission type oil product electrostatic online monitor and monitoring method thereof | |
CN106382472A (en) | City underground comprehensive pipe gallery intelligent monitoring system based on small aircraft | |
CN110081224A (en) | A kind of pipeline leakage testing control system based on Internet of Things | |
CN107237983A (en) | Natural gas leaking detects laser detector | |
WO2020223776A1 (en) | System, method and device for monitoring the sealing of electrical equipment and electrical equipment with monitored sealing | |
CN202510988U (en) | Gas valve well leakage monitoring terminal | |
TWI615046B (en) | Data channel diagnostic system and method thereof for internet of things | |
KR102564671B1 (en) | Soil corrosion evaluation monitoring system | |
CN203838096U (en) | Socket-and-spigot type semiconductor module detector for combustible gas | |
JP2004138627A (en) | Piping monitor for leakage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210310 Address after: 062550 No.3 middle Jianshe Road, Renqiu City, Cangzhou City, Hebei Province Applicant after: CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP, NORTH CHINA Co. Address before: 362300 Fujian Quanzhou Nanan City Mei Mei Success Industrial Zone Applicant before: Nan'an Weisu Electronic Technology Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |