CN108331612A - A kind of cutting method of ore pass - Google Patents
A kind of cutting method of ore pass Download PDFInfo
- Publication number
- CN108331612A CN108331612A CN201810093744.0A CN201810093744A CN108331612A CN 108331612 A CN108331612 A CN 108331612A CN 201810093744 A CN201810093744 A CN 201810093744A CN 108331612 A CN108331612 A CN 108331612A
- Authority
- CN
- China
- Prior art keywords
- centre bore
- ore pass
- upper layer
- cage
- hole drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000005553 drilling Methods 0.000 claims abstract description 22
- 239000002360 explosive Substances 0.000 claims abstract description 14
- 238000000465 moulding Methods 0.000 claims abstract description 4
- 239000000463 material Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 7
- 230000015572 biosynthetic process Effects 0.000 abstract 1
- 238000009423 ventilation Methods 0.000 description 3
- 241000209094 Oryza Species 0.000 description 2
- 235000007164 Oryza sativa Nutrition 0.000 description 2
- 239000003517 fume Substances 0.000 description 2
- 231100000572 poisoning Toxicity 0.000 description 2
- 230000000607 poisoning effect Effects 0.000 description 2
- 235000009566 rice Nutrition 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 238000007664 blowing Methods 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000007373 indentation Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F13/00—Transport specially adapted to underground conditions
- E21F13/04—Transport of mined material in gravity inclines; in staple or inclined shafts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/007—Drilling by use of explosives
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/28—Enlarging drilled holes, e.g. by counterboring
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Mechanical Engineering (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
The present invention relates to a kind of cutting methods of ore pass, and the molding of ore pass is realized by following step:The first step, hidden hole drilling trepanning:Go out a centre bore from below lane to upper layer underground drilling unit using hidden hole drilling;Second step installs cage:One winch is set in the tunnel of upper layer, and the rope of winch is across centre bore, in the below lane that hangs down, and installs cage in the end of rope;Third walks, and blows out reaming:Hidden hole drilling is reused, is located in below lane around centre bore and drills out blasthole, then promoted worker by cage, explosive is filled in blasthole, after the completion of explosive filling, worker withdraws, and ignition charge expands centre bore;Repeat above-mentioned ream operation, until the centre bore by below lane to upper layer tunnel all completes reaming, formation ore pass.The present invention has the characteristics that construction safety, efficient low with expense.
Description
Technical field
The present invention relates to a kind of cutting methods of ore pass, belong to coal mining technical field.
Background technology
Mine ore pass is that the ore in top stage casing is put into the pit shaft that lower part haulage drift is passed through using dead weight.It is existing
Ore pass largely using anti-pick method from the bottom up, supporting is carried out on one side up construct while, is laid with when top is blown out safe
Canopy, ventilation are matched using indentation and suction.The shortcomings that prior art:First, generally apart due to upper layer tunnel and below lane
Tens of rice when needing more complicated supporting in high-order blast hole drilling, and will withdraw supporting when blowing out every time, therefore construct
Progress is slow, and engineering cost is high;Second is that due to being always blind hole operation, it is difficult to discharge fume, easily lead to smoke poisoning, operation is dangerous
Greatly.
Invention content
The present invention provides one kind and slips for cutting time long, the costly and poor safety problem of existing ore pass
The cutting method of mine.
The technical solution that the present invention solves above-mentioned technical problem is as follows:A kind of cutting method of ore pass, which is characterized in that
The molding of ore pass is realized by following step:
The first step, hidden hole drilling trepanning:Go out a centre bore from below lane to upper layer underground drilling unit using hidden hole drilling;
Second step installs cage:One winch is set in the tunnel of upper layer, and the rope of winch passes through centre bore, under hanging down
In layer tunnel, and cage is installed in the end of rope;
Third walks, and blows out reaming:Hidden hole drilling is reused, is located in below lane around centre bore and drills out blasthole,
Then worker is promoted by cage, explosive is filled in blasthole, after the completion of explosive filling, worker withdraws, ignition charge, by center
Hole expands, and forms first segment ore pass;Continue to drill out blasthole using hidden hole drilling around centre bore at the top of first segment ore pass,
Reaming is carried out after filling explosive and ignition, forms second segment ore pass;Repeat above-mentioned ream operation, until by lower layer lane
The centre bore in road to upper layer tunnel all completes reaming, forms ore pass.
The beneficial effects of the invention are as follows:Process safety is dug, because opening centre bore, construction ore pass is logical using centre bore
Wind, ventilation effect is good, effectively prevents because of improper ventilation, the possibility of caused blasting fume poisoning;Cage is hung using centre bore,
The expense for eliminating supporting and the protection of safe canopy alleviates the labor intensity of worker, reduces using servant on winch traction cage
Time of worker's work surface up and down.
Based on the above technical solution, the present invention can also be improved as follows.
Further, it is located at the opening in the tunnel of upper layer on the top of the ore pass, carries out putting mouth, make horn mouth
The opening of shape.
Further, reaming procedure is blown out described, after populated explosive, removes cage, put in the lower part of centre bore
Set truck, after ignition charge, broken ore falls directly into truck.The time of muck entrucking can be saved.
Further, a diameter of 100mm of the centre bore.
The present invention relates to mine down-hole ore pass construction method, using digging mode on earth's surface hidden hole drilling, ore pass of first constructing
Centre bore, then the anti-pick construction ore pass by winch and cage safely and fast.
Description of the drawings
Fig. 1 is the structural schematic diagram during a kind of cutting of ore pass of the present invention.
Reference numeral record is as follows:The upper layers 1- tunnel, 2- below lanes, 3- centre bores, 4- winches, 5- cages, 6- ropes,
7- trucks, the main vertical shafts of 8-.
Specific implementation mode
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and
It is non-to be used to limit the scope of the present invention.
A kind of cutting method (referring to Fig. 1) of ore pass, including main vertical shaft 8 and be connected to main vertical shaft 8 neighbouring
Upper layer tunnel 1 and below lane 2 realize the molding of ore pass by following step:
The first step, hidden hole drilling trepanning:Using hidden hole drilling a centre bore 3 is drilled out from below lane 2 to upper layer tunnel 1;
Second step installs cage:One winch 4 is set in upper layer tunnel 1, and the rope 6 of winch 4 passes through centre bore 3, hangs down
Enter in below lane 2, and cage 5 is installed in the end of rope 6;
Third walks, and blows out reaming:Hidden hole drilling is reused, is located in below lane 2 around centre bore 3 and drills out big gun
Then hole is promoted worker by cage 5, explosive is filled in blasthole, and after the completion of explosive filling, worker withdraws, ignition charge, will
Centre bore 3 expands, and forms first segment ore pass;Continuation is drilled out around centre bore using hidden hole drilling at the top of first segment ore pass
Blasthole fills explosive and carries out reaming after igniting, forms second segment ore pass;Repeat above-mentioned ream operation, Zhi Daoyou
The centre bore in below lane to upper layer tunnel all completes reaming, forms ore pass.
Based on the above technical solution, the present invention can also be improved as follows.
It is located at the opening in upper layer tunnel 1 on the top of the ore pass, carries out putting mouth, make opening for bell mouth shape
Mouthful.
Reaming procedure is blown out described, after populated explosive, cage 5 is removed, truck is placed in the lower part of centre bore
7, after ignition charge, broken ore falls directly into truck 7.The time of muck entrucking can be saved.
Further, a diameter of 100mm of the centre bore 3.
In specific construction, some determinations are carried out to equipment and condition:
In the construction of mine ore pass, ZQS-100D hidden hole drilling machine drill 100mm centre bores, the drill hole of drilling machine depth 20 are first used
Rice (vertically downward, if can reach 60 meters upwards), bore diameter 65-130mm, using wind pressure 0.5-1.2MPa, air quantity is about
6M3/mi n.The YD-3 travelling winches for recycling installed power 3KW, coordinate 2m*2m cages, driling explosion, gets from bottom to up
The ore pass of design requirement.It is construction safety of the present invention, efficient low with expense.30 meters of ore pass are made a call to, are worked continuously, one week or so
It can complete.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all the present invention spirit and
Within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention.
Claims (4)
1. a kind of cutting method of ore pass, which is characterized in that is be connected to including main vertical shaft and with main vertical shaft is neighbouring upper
Layer tunnel and below lane realize the molding of ore pass by following step:
The first step, hidden hole drilling trepanning:Go out a centre bore from below lane to upper layer underground drilling unit using hidden hole drilling;
Second step installs cage:One winch is set in the tunnel of upper layer, and the rope of winch passes through centre bore, Chui Ru lower layers lane
In road, and cage is installed in the end of rope;
Third walks, and blows out reaming:Hidden hole drilling is reused, is located in below lane around centre bore and drills out blasthole, then
Worker is promoted by cage, explosive is filled in blasthole, after the completion of explosive filling, worker withdraws, and ignition charge expands centre bore
Greatly, first segment ore pass is formed;Continue to drill out blasthole using hidden hole drilling around centre bore at the top of first segment ore pass, fill
Reaming is carried out after explosive and ignition, forms second segment ore pass;Repeat above-mentioned ream operation, until by below lane to
The centre bore in upper layer tunnel all completes reaming, forms ore pass.
2. the cutting method of ore pass according to claim 1, which is characterized in that be located on the top of the ore pass
Opening in the tunnel of upper layer carries out putting mouth, makes the opening of bell mouth shape.
3. the cutting method of ore pass according to claim 1, which is characterized in that reaming procedure is blown out described,
After populated explosive, cage is removed, after the lower part of centre bore placement truck, ignition charge, broken ore falls directly into material
Vehicle.
4. the cutting method of ore pass according to claim 1, which is characterized in that the centre bore it is a diameter of
100mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810093744.0A CN108331612A (en) | 2018-01-31 | 2018-01-31 | A kind of cutting method of ore pass |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810093744.0A CN108331612A (en) | 2018-01-31 | 2018-01-31 | A kind of cutting method of ore pass |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108331612A true CN108331612A (en) | 2018-07-27 |
Family
ID=62926795
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810093744.0A Pending CN108331612A (en) | 2018-01-31 | 2018-01-31 | A kind of cutting method of ore pass |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108331612A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102787864A (en) * | 2012-08-06 | 2012-11-21 | 山东黄金矿业股份有限公司新城金矿 | Quick dredging method of linear deep slip shaft of underground mine |
CN206000569U (en) * | 2016-08-28 | 2017-03-08 | 赤峰山金红岭有色矿业有限责任公司 | Construction safety protection device in ore pass |
CN107461205A (en) * | 2017-09-25 | 2017-12-12 | 中国华冶科工集团有限公司 | A kind of construction method for expanding brush day drop shaft |
-
2018
- 2018-01-31 CN CN201810093744.0A patent/CN108331612A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102787864A (en) * | 2012-08-06 | 2012-11-21 | 山东黄金矿业股份有限公司新城金矿 | Quick dredging method of linear deep slip shaft of underground mine |
CN206000569U (en) * | 2016-08-28 | 2017-03-08 | 赤峰山金红岭有色矿业有限责任公司 | Construction safety protection device in ore pass |
CN107461205A (en) * | 2017-09-25 | 2017-12-12 | 中国华冶科工集团有限公司 | A kind of construction method for expanding brush day drop shaft |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101328809B (en) | Non-bottom pillar deep hole falling-back type mining method | |
CN102758633B (en) | The construction method of the good large cross-section tunnel of a kind of country rock situation | |
CN109341449B (en) | Sectional control blasting well completion method for one-time rock drilling of large-section high raise | |
CN103114855B (en) | Jamb recovery and cushion layer formation integrated technology in process of mining from outdoors into underground | |
CN110118084B (en) | Ultra-deep shaft construction method | |
CN106014473B (en) | A kind of cross borehole constrained expansion explosion network permeability-increasing gas drainage method | |
CN103850684A (en) | Sinking technology for expanding pilot well drilled by raise-boring machine, by using vertical well heading machine | |
WO2023005072A1 (en) | Open stope mining method for steeply inclined veined ore body | |
CN113530558B (en) | Double-drop shaft-inclined drift combined layered construction method for high-large chamber | |
CN104481543A (en) | Sub-level shrinkage caving method | |
CN108374661A (en) | A kind of middle pilot shaft shaft formatting by one blasting method | |
CN111364997A (en) | Upward drift-caving combined mining method | |
CN108533268A (en) | A kind of shaft construction device and its application method | |
CN110952986A (en) | Secondary shaft expanding and digging method and steel platform | |
CN105649635A (en) | Method for tunneling coal bed repeated mining roadway in goaf | |
CN103696774A (en) | Development method of blind shaft frame for surface and underground parallel construction | |
CN216922116U (en) | Shaft tunneling cutter head and shaft tunneling equipment | |
CN109539915B (en) | Cutting raise blasting construction method | |
CN111780633B (en) | Step-type rapid excavation method for IV-V-level surrounding rock lower step of double-track tunnel | |
CN210741274U (en) | Construction structure for rapid well formation by deep hole blasting | |
CN108316927B (en) | A kind of stage Contining ore removal filling mining method | |
CN115183639B (en) | Three-face upper-breaking single-roadway down-cutting blasting construction method for roof-cutting retained roadway | |
CN108331612A (en) | A kind of cutting method of ore pass | |
CN115559744A (en) | Bottom structure arrangement mode suitable for mining inclined and steeply inclined thin ore body | |
CN104989409A (en) | Full-face excavation method after vertical shaft small-face pore forming |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180727 |