CN108331612A - A kind of cutting method of ore pass - Google Patents

A kind of cutting method of ore pass Download PDF

Info

Publication number
CN108331612A
CN108331612A CN201810093744.0A CN201810093744A CN108331612A CN 108331612 A CN108331612 A CN 108331612A CN 201810093744 A CN201810093744 A CN 201810093744A CN 108331612 A CN108331612 A CN 108331612A
Authority
CN
China
Prior art keywords
centre bore
ore pass
upper layer
cage
hole drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810093744.0A
Other languages
Chinese (zh)
Inventor
袁永忠
蔡兴健
魏兴亮
冯波
朱国峰
杨盼许
杨驰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Yantai Xintai Gold Mining Industry Co Ltd
Original Assignee
Shandong Yantai Xintai Gold Mining Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Yantai Xintai Gold Mining Industry Co Ltd filed Critical Shandong Yantai Xintai Gold Mining Industry Co Ltd
Priority to CN201810093744.0A priority Critical patent/CN108331612A/en
Publication of CN108331612A publication Critical patent/CN108331612A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/04Transport of mined material in gravity inclines; in staple or inclined shafts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/007Drilling by use of explosives
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/28Enlarging drilled holes, e.g. by counterboring

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The present invention relates to a kind of cutting methods of ore pass, and the molding of ore pass is realized by following step:The first step, hidden hole drilling trepanning:Go out a centre bore from below lane to upper layer underground drilling unit using hidden hole drilling;Second step installs cage:One winch is set in the tunnel of upper layer, and the rope of winch is across centre bore, in the below lane that hangs down, and installs cage in the end of rope;Third walks, and blows out reaming:Hidden hole drilling is reused, is located in below lane around centre bore and drills out blasthole, then promoted worker by cage, explosive is filled in blasthole, after the completion of explosive filling, worker withdraws, and ignition charge expands centre bore;Repeat above-mentioned ream operation, until the centre bore by below lane to upper layer tunnel all completes reaming, formation ore pass.The present invention has the characteristics that construction safety, efficient low with expense.

Description

A kind of cutting method of ore pass
Technical field
The present invention relates to a kind of cutting methods of ore pass, belong to coal mining technical field.
Background technology
Mine ore pass is that the ore in top stage casing is put into the pit shaft that lower part haulage drift is passed through using dead weight.It is existing Ore pass largely using anti-pick method from the bottom up, supporting is carried out on one side up construct while, is laid with when top is blown out safe Canopy, ventilation are matched using indentation and suction.The shortcomings that prior art:First, generally apart due to upper layer tunnel and below lane Tens of rice when needing more complicated supporting in high-order blast hole drilling, and will withdraw supporting when blowing out every time, therefore construct Progress is slow, and engineering cost is high;Second is that due to being always blind hole operation, it is difficult to discharge fume, easily lead to smoke poisoning, operation is dangerous Greatly.
Invention content
The present invention provides one kind and slips for cutting time long, the costly and poor safety problem of existing ore pass The cutting method of mine.
The technical solution that the present invention solves above-mentioned technical problem is as follows:A kind of cutting method of ore pass, which is characterized in that The molding of ore pass is realized by following step:
The first step, hidden hole drilling trepanning:Go out a centre bore from below lane to upper layer underground drilling unit using hidden hole drilling;
Second step installs cage:One winch is set in the tunnel of upper layer, and the rope of winch passes through centre bore, under hanging down In layer tunnel, and cage is installed in the end of rope;
Third walks, and blows out reaming:Hidden hole drilling is reused, is located in below lane around centre bore and drills out blasthole, Then worker is promoted by cage, explosive is filled in blasthole, after the completion of explosive filling, worker withdraws, ignition charge, by center Hole expands, and forms first segment ore pass;Continue to drill out blasthole using hidden hole drilling around centre bore at the top of first segment ore pass, Reaming is carried out after filling explosive and ignition, forms second segment ore pass;Repeat above-mentioned ream operation, until by lower layer lane The centre bore in road to upper layer tunnel all completes reaming, forms ore pass.
The beneficial effects of the invention are as follows:Process safety is dug, because opening centre bore, construction ore pass is logical using centre bore Wind, ventilation effect is good, effectively prevents because of improper ventilation, the possibility of caused blasting fume poisoning;Cage is hung using centre bore, The expense for eliminating supporting and the protection of safe canopy alleviates the labor intensity of worker, reduces using servant on winch traction cage Time of worker's work surface up and down.
Based on the above technical solution, the present invention can also be improved as follows.
Further, it is located at the opening in the tunnel of upper layer on the top of the ore pass, carries out putting mouth, make horn mouth The opening of shape.
Further, reaming procedure is blown out described, after populated explosive, removes cage, put in the lower part of centre bore Set truck, after ignition charge, broken ore falls directly into truck.The time of muck entrucking can be saved.
Further, a diameter of 100mm of the centre bore.
The present invention relates to mine down-hole ore pass construction method, using digging mode on earth's surface hidden hole drilling, ore pass of first constructing Centre bore, then the anti-pick construction ore pass by winch and cage safely and fast.
Description of the drawings
Fig. 1 is the structural schematic diagram during a kind of cutting of ore pass of the present invention.
Reference numeral record is as follows:The upper layers 1- tunnel, 2- below lanes, 3- centre bores, 4- winches, 5- cages, 6- ropes, 7- trucks, the main vertical shafts of 8-.
Specific implementation mode
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the present invention.
A kind of cutting method (referring to Fig. 1) of ore pass, including main vertical shaft 8 and be connected to main vertical shaft 8 neighbouring Upper layer tunnel 1 and below lane 2 realize the molding of ore pass by following step:
The first step, hidden hole drilling trepanning:Using hidden hole drilling a centre bore 3 is drilled out from below lane 2 to upper layer tunnel 1;
Second step installs cage:One winch 4 is set in upper layer tunnel 1, and the rope 6 of winch 4 passes through centre bore 3, hangs down Enter in below lane 2, and cage 5 is installed in the end of rope 6;
Third walks, and blows out reaming:Hidden hole drilling is reused, is located in below lane 2 around centre bore 3 and drills out big gun Then hole is promoted worker by cage 5, explosive is filled in blasthole, and after the completion of explosive filling, worker withdraws, ignition charge, will Centre bore 3 expands, and forms first segment ore pass;Continuation is drilled out around centre bore using hidden hole drilling at the top of first segment ore pass Blasthole fills explosive and carries out reaming after igniting, forms second segment ore pass;Repeat above-mentioned ream operation, Zhi Daoyou The centre bore in below lane to upper layer tunnel all completes reaming, forms ore pass.
Based on the above technical solution, the present invention can also be improved as follows.
It is located at the opening in upper layer tunnel 1 on the top of the ore pass, carries out putting mouth, make opening for bell mouth shape Mouthful.
Reaming procedure is blown out described, after populated explosive, cage 5 is removed, truck is placed in the lower part of centre bore 7, after ignition charge, broken ore falls directly into truck 7.The time of muck entrucking can be saved.
Further, a diameter of 100mm of the centre bore 3.
In specific construction, some determinations are carried out to equipment and condition:
In the construction of mine ore pass, ZQS-100D hidden hole drilling machine drill 100mm centre bores, the drill hole of drilling machine depth 20 are first used Rice (vertically downward, if can reach 60 meters upwards), bore diameter 65-130mm, using wind pressure 0.5-1.2MPa, air quantity is about 6M3/mi n.The YD-3 travelling winches for recycling installed power 3KW, coordinate 2m*2m cages, driling explosion, gets from bottom to up The ore pass of design requirement.It is construction safety of the present invention, efficient low with expense.30 meters of ore pass are made a call to, are worked continuously, one week or so It can complete.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention.

Claims (4)

1. a kind of cutting method of ore pass, which is characterized in that is be connected to including main vertical shaft and with main vertical shaft is neighbouring upper Layer tunnel and below lane realize the molding of ore pass by following step:
The first step, hidden hole drilling trepanning:Go out a centre bore from below lane to upper layer underground drilling unit using hidden hole drilling;
Second step installs cage:One winch is set in the tunnel of upper layer, and the rope of winch passes through centre bore, Chui Ru lower layers lane In road, and cage is installed in the end of rope;
Third walks, and blows out reaming:Hidden hole drilling is reused, is located in below lane around centre bore and drills out blasthole, then Worker is promoted by cage, explosive is filled in blasthole, after the completion of explosive filling, worker withdraws, and ignition charge expands centre bore Greatly, first segment ore pass is formed;Continue to drill out blasthole using hidden hole drilling around centre bore at the top of first segment ore pass, fill Reaming is carried out after explosive and ignition, forms second segment ore pass;Repeat above-mentioned ream operation, until by below lane to The centre bore in upper layer tunnel all completes reaming, forms ore pass.
2. the cutting method of ore pass according to claim 1, which is characterized in that be located on the top of the ore pass Opening in the tunnel of upper layer carries out putting mouth, makes the opening of bell mouth shape.
3. the cutting method of ore pass according to claim 1, which is characterized in that reaming procedure is blown out described, After populated explosive, cage is removed, after the lower part of centre bore placement truck, ignition charge, broken ore falls directly into material Vehicle.
4. the cutting method of ore pass according to claim 1, which is characterized in that the centre bore it is a diameter of 100mm。
CN201810093744.0A 2018-01-31 2018-01-31 A kind of cutting method of ore pass Pending CN108331612A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810093744.0A CN108331612A (en) 2018-01-31 2018-01-31 A kind of cutting method of ore pass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810093744.0A CN108331612A (en) 2018-01-31 2018-01-31 A kind of cutting method of ore pass

Publications (1)

Publication Number Publication Date
CN108331612A true CN108331612A (en) 2018-07-27

Family

ID=62926795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810093744.0A Pending CN108331612A (en) 2018-01-31 2018-01-31 A kind of cutting method of ore pass

Country Status (1)

Country Link
CN (1) CN108331612A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787864A (en) * 2012-08-06 2012-11-21 山东黄金矿业股份有限公司新城金矿 Quick dredging method of linear deep slip shaft of underground mine
CN206000569U (en) * 2016-08-28 2017-03-08 赤峰山金红岭有色矿业有限责任公司 Construction safety protection device in ore pass
CN107461205A (en) * 2017-09-25 2017-12-12 中国华冶科工集团有限公司 A kind of construction method for expanding brush day drop shaft

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787864A (en) * 2012-08-06 2012-11-21 山东黄金矿业股份有限公司新城金矿 Quick dredging method of linear deep slip shaft of underground mine
CN206000569U (en) * 2016-08-28 2017-03-08 赤峰山金红岭有色矿业有限责任公司 Construction safety protection device in ore pass
CN107461205A (en) * 2017-09-25 2017-12-12 中国华冶科工集团有限公司 A kind of construction method for expanding brush day drop shaft

Similar Documents

Publication Publication Date Title
CN101328809B (en) Non-bottom pillar deep hole falling-back type mining method
CN102758633B (en) The construction method of the good large cross-section tunnel of a kind of country rock situation
CN109341449B (en) Sectional control blasting well completion method for one-time rock drilling of large-section high raise
CN103114855B (en) Jamb recovery and cushion layer formation integrated technology in process of mining from outdoors into underground
CN110118084B (en) Ultra-deep shaft construction method
CN106014473B (en) A kind of cross borehole constrained expansion explosion network permeability-increasing gas drainage method
CN103850684A (en) Sinking technology for expanding pilot well drilled by raise-boring machine, by using vertical well heading machine
WO2023005072A1 (en) Open stope mining method for steeply inclined veined ore body
CN113530558B (en) Double-drop shaft-inclined drift combined layered construction method for high-large chamber
CN104481543A (en) Sub-level shrinkage caving method
CN108374661A (en) A kind of middle pilot shaft shaft formatting by one blasting method
CN111364997A (en) Upward drift-caving combined mining method
CN108533268A (en) A kind of shaft construction device and its application method
CN110952986A (en) Secondary shaft expanding and digging method and steel platform
CN105649635A (en) Method for tunneling coal bed repeated mining roadway in goaf
CN103696774A (en) Development method of blind shaft frame for surface and underground parallel construction
CN216922116U (en) Shaft tunneling cutter head and shaft tunneling equipment
CN109539915B (en) Cutting raise blasting construction method
CN111780633B (en) Step-type rapid excavation method for IV-V-level surrounding rock lower step of double-track tunnel
CN210741274U (en) Construction structure for rapid well formation by deep hole blasting
CN108316927B (en) A kind of stage Contining ore removal filling mining method
CN115183639B (en) Three-face upper-breaking single-roadway down-cutting blasting construction method for roof-cutting retained roadway
CN108331612A (en) A kind of cutting method of ore pass
CN115559744A (en) Bottom structure arrangement mode suitable for mining inclined and steeply inclined thin ore body
CN104989409A (en) Full-face excavation method after vertical shaft small-face pore forming

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180727