CN108331319A - A kind of collapsible steel building platform device for high-altitude operation - Google Patents

A kind of collapsible steel building platform device for high-altitude operation Download PDF

Info

Publication number
CN108331319A
CN108331319A CN201810120985.XA CN201810120985A CN108331319A CN 108331319 A CN108331319 A CN 108331319A CN 201810120985 A CN201810120985 A CN 201810120985A CN 108331319 A CN108331319 A CN 108331319A
Authority
CN
China
Prior art keywords
pair
pillar
platform device
altitude operation
steel building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810120985.XA
Other languages
Chinese (zh)
Inventor
梁准宪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DKS Co Ltd China
Original Assignee
DKS Co Ltd China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DKS Co Ltd China filed Critical DKS Co Ltd China
Priority to CN201810120985.XA priority Critical patent/CN108331319A/en
Publication of CN108331319A publication Critical patent/CN108331319A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • E04G1/152Platforms made of metal or with metal-supporting frame
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of collapsible steel building platform device for high-altitude operation, including rack body and the hanging mechanism for being fixedly connected with the rack body;The rack body includes a pair of of front pillar relatively disposed in parallel and a pair of of rear pillar relatively disposed in parallel, and is connected and fixed by front rod between a pair of of front pillar, is connected and fixed by rear connecting rod between a pair of of rear pillar;It is flexibly connected respectively by more beam rails between front pillar and rear pillar.Structure of the invention reasonable design, and it is light secured, the operation of plugging into of high-rise steel structure is can be applied not only to, can also pass through folding storage, safe and convenient carrying when not in use.

Description

A kind of collapsible steel building platform device for high-altitude operation
Technical field
The present invention relates to Architectural Equipment technical fields, more particularly to a kind of collapsible steel building aerial work platform Device.
Background technology
The structure of general skyscraper build it is firm during, core frame is typically all using girder steel as frame Tie-beam generally uses stiff beam to connect between girder steel.
In high-rise steel structure installation process, the welding quality of the steel constructions such as beam column is most important, and welds the work used Whether tool and method are safe and simple and are directly related to the quality of engineering.Therefore, how to ensure Construction of Steel Structure when safety work Important link in the process.
In the prior art, operation, but hanging basket foot hand are carried out usually using hanging basket scaffold or using aerial work platform Frame heavy workload takes and laborious, and is also easier when setting up hanging basket scaffold safety accident occur.In addition, due to The complexity of steel construction is not suitable for the operation of high-altitude steel structure so as to cause hanging basket scaffold.And it is carried out using aerial work platform Operation should select smooth ground, after must being padded with sleeper if ground is soft or uneven can operation, it is economical at This is very high, is not suitable for small-scale working at height.
Invention content
Based on this, it is an object of the invention to overcome the deficiencies of the prior art and provide a kind of collapsible steel building is high Working platform device, the device it is reasonable in design, and it is light securely, can be applied not only to connecing for high-rise steel structure Operation is refuted, can also pass through folding storage, safe and convenient carrying when not in use.
To achieve the goals above, the technical solution adopted by the present invention is:A kind of collapsible steel building working at height Stage apparatus, including rack body and the hanging mechanism for being fixedly connected with the rack body;The rack body includes opposite A pair of front pillar disposed in parallel and a pair of of rear pillar relatively disposed in parallel, and connected admittedly by front rod between a pair of of front pillar It is fixed, it is connected and fixed by rear connecting rod between a pair of of rear pillar;It is flexibly connected respectively by more beam rails between front pillar and rear pillar.
Collapsible steel building platform device for high-altitude operation of the present invention as a result, using novel structure design, The function of folding shrinking is realized by more beam rails, and light secured, can be applied not only to connecing for high-rise steel structure Operation is refuted, can also pass through folding storage, safe and convenient carrying when not in use.In addition, the collapsible steel of the present invention Structural construction platform device for high-altitude operation is simple in structure, and install convenient, versatile, has very high market popularization value.
In order to achieve better technical results, further technical improvements include be equipped with more on the front pillar, rear pillar A mounting hole, the both ends of more beam rails are successively set in front pillar, the mounting hole on rear pillar.
In order to achieve better technical results, further technical improvements include the more beam rails pass through nut It is connected and fixed respectively with front pillar, rear pillar.
In order to achieve better technical results, further technical improvements include the more beam rails include upper cross Beam column, middle cross beam bar and bottom end rail bar, beam rail, middle cross beam bar and bottom end rail bar are arranged equally spaced at front pillar successively Between rear pillar.
In order to achieve better technical results, further technical improvements include, the beam rail, middle cross beam bar with And bottom end rail bar surrounds three quadro frame structures with a pair of of front pillar, a pair of of rear pillar respectively.
In order to achieve better technical results, further technical improvements include, the bottom end rail bar and a pair of of front pillar, The quadro frame structure that a pair of of rear pillar surrounds is equipped with bottom plate.
In order to achieve better technical results, further technical improvements include the hanging mechanism includes a pair of hangs Hook is separately positioned on the upper end of a pair of of front pillar.
In order to achieve better technical results, further technical improvements include the pair of hook is square hook.
Description of the drawings
Fig. 1 is the structural schematic diagram of the collapsible steel building platform device for high-altitude operation of the present invention.
Specific implementation mode
To further illustrate that each embodiment, the present invention are provided with attached drawing.These attached drawings are that the invention discloses one of content Point, mainly to illustrate embodiment, and the associated description of specification can be coordinated to explain the operation principles of embodiment.Cooperation ginseng These contents are examined, those skilled in the art will be understood that other may obtain embodiment and advantages of the present invention.
Referring to Fig. 1, it is the structural schematic diagram of the collapsible steel building platform device for high-altitude operation of the present invention.
A kind of collapsible steel building platform device for high-altitude operation, including rack body 10 and it is fixedly connected with the branch The hanging mechanism 20 of frame body 10;The rack body 10 includes a pair of of front pillar 30 relatively disposed in parallel and relatively parallel sets A pair of of the rear pillar 40 set, and be connected and fixed by front rod between a pair of of front pillar 30, it is connected after passing through between a pair of of rear pillar 40 Bar is connected and fixed;It is flexibly connected respectively by more beam rails between front pillar 30 and rear pillar 40.
Specifically, the front pillar 30, be equipped with multiple mounting holes 60 on rear pillar 40, the both ends of more beam rails are set gradually In mounting hole 60 on front pillar 30, rear pillar 40.In the present embodiment, it is preferable that the more beam rails by nut respectively with Front pillar 30, rear pillar 40 are connected and fixed.
In addition, the more beam rails include beam rail 51, middle cross beam bar 52 and bottom end rail bar 53, beam rail 51, middle cross beam bar 52 and bottom end rail bar 53 are arranged equally spaced at successively between front pillar 30 and rear pillar 40.The beam rail 51, middle cross beam bar 52 and bottom end rail bar 53 surround three quadro frame structures with a pair of of front pillar 30, a pair of of rear pillar 40 respectively.Its In, the quadro frame structure that the bottom end rail bar 53 is surrounded with a pair of of front pillar 30, a pair of of rear pillar 40 is equipped with bottom plate 70.
In this implementation, the hanging mechanism 20 includes a pair of of hook, is separately positioned on the upper end of a pair of of front pillar 30.Further Ground, the pair of hook are square hook.
The operation principle of the present invention described further below:
The present apparatus is tight by screw and nut mainly by front and back pillar and square floor plus surrounding beam rail, connecting rod Guan County loads, and it is also to be securedly mounted to together by screw and nut in addition to also have hook and rack body 10.
Specifically, the present apparatus can plug into as steel building H goosenecks when aerial work platform, application method It is exactly that H steel is then caught on by hook portion, is finally opened up in a folded state with small-sized crane by present apparatus climb to altitude Platform is opened, the operation of plugging into progress H goosenecks on workbench is climbed down from H steel by operator.
Compared with prior art, collapsible steel building platform device for high-altitude operation of the present invention, use are novel Structure design, realize the function of folding shrinking by more beam rails, and it is light securely, can be applied not only to high level The operation of plugging into of steel construction can also pass through folding storage, safe and convenient carrying when not in use.In addition, of the invention Collapsible steel building platform device for high-altitude operation it is simple in structure and install convenient, versatile, there is very high market Promotional value.
Several embodiments of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Range.

Claims (8)

1. a kind of collapsible steel building platform device for high-altitude operation, it is characterised in that:Including rack body and fixed company Connect the hanging mechanism of the rack body;The rack body includes a pair of of front pillar relatively disposed in parallel and relatively parallel sets A pair of of the rear pillar set, and be connected and fixed by front rod between a pair of of front pillar, it is connected by rear connecting rod between a pair of of rear pillar It is fixed;It is flexibly connected respectively by more beam rails between front pillar and rear pillar.
2. collapsible steel building platform device for high-altitude operation according to claim 1, it is characterised in that:Before described It is equipped with multiple mounting holes on column, rear pillar, the both ends of more beam rails are successively set in front pillar, the mounting hole on rear pillar.
3. collapsible steel building platform device for high-altitude operation according to claim 2, it is characterised in that:Described more Beam rail is connected and fixed with front pillar, rear pillar respectively by nut.
4. collapsible steel building platform device for high-altitude operation according to claim 3, it is characterised in that:Described more Beam rail includes beam rail, middle cross beam bar and bottom end rail bar, beam rail, middle cross beam bar and bottom end rail bar successively etc. between It is arranged between front pillar and rear pillar away from ground.
5. collapsible steel building platform device for high-altitude operation according to any one of claims 1 to 4, feature exist In:The beam rail, middle cross beam bar and bottom end rail bar surround three quadro frame knots with a pair of of front pillar, a pair of of rear pillar respectively Structure.
6. collapsible steel building platform device for high-altitude operation according to claim 5, it is characterised in that:The lower cross The quadro frame structure that beam column is surrounded with a pair of of front pillar, a pair of of rear pillar is equipped with bottom plate.
7. collapsible steel building platform device for high-altitude operation according to claim 6, it is characterised in that:The hanging Mechanism includes a pair of of hook, is separately positioned on the upper end of a pair of of front pillar.
8. collapsible steel building platform device for high-altitude operation according to claim 7, it is characterised in that:It is the pair of Hook is square hook.
CN201810120985.XA 2018-02-07 2018-02-07 A kind of collapsible steel building platform device for high-altitude operation Pending CN108331319A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810120985.XA CN108331319A (en) 2018-02-07 2018-02-07 A kind of collapsible steel building platform device for high-altitude operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810120985.XA CN108331319A (en) 2018-02-07 2018-02-07 A kind of collapsible steel building platform device for high-altitude operation

Publications (1)

Publication Number Publication Date
CN108331319A true CN108331319A (en) 2018-07-27

Family

ID=62928350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810120985.XA Pending CN108331319A (en) 2018-02-07 2018-02-07 A kind of collapsible steel building platform device for high-altitude operation

Country Status (1)

Country Link
CN (1) CN108331319A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4029173A (en) * 1974-12-30 1977-06-14 Hidenori Wakabayashi Foldable scaffold devices
EP0338145A1 (en) * 1988-04-18 1989-10-25 Nisso Sangyo Co Ltd Foldable scaffolding unit
CN2255468Y (en) * 1996-05-23 1997-06-04 余鹏 External basket for building construction
US20020157900A1 (en) * 2001-04-27 2002-10-31 Tatsuo Ono Foldable scaffold device
CN204024005U (en) * 2014-07-11 2014-12-17 中建安装工程有限公司 Assembly type suspension platform
CN204040435U (en) * 2014-03-31 2014-12-24 中国建筑第八工程局有限公司 High-altitude steel structure welding Hanging Basket
CN208122242U (en) * 2018-02-07 2018-11-20 台山市东扩钢构有限公司 A kind of shrinkable steel building platform device for high-altitude operation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4029173A (en) * 1974-12-30 1977-06-14 Hidenori Wakabayashi Foldable scaffold devices
EP0338145A1 (en) * 1988-04-18 1989-10-25 Nisso Sangyo Co Ltd Foldable scaffolding unit
CN2255468Y (en) * 1996-05-23 1997-06-04 余鹏 External basket for building construction
US20020157900A1 (en) * 2001-04-27 2002-10-31 Tatsuo Ono Foldable scaffold device
CN204040435U (en) * 2014-03-31 2014-12-24 中国建筑第八工程局有限公司 High-altitude steel structure welding Hanging Basket
CN204024005U (en) * 2014-07-11 2014-12-17 中建安装工程有限公司 Assembly type suspension platform
CN208122242U (en) * 2018-02-07 2018-11-20 台山市东扩钢构有限公司 A kind of shrinkable steel building platform device for high-altitude operation

Similar Documents

Publication Publication Date Title
CN108104452A (en) A kind of new steel structure builds platform device for high-altitude operation
CN205840761U (en) A kind of packaged type construction raises ladder
CN2255468Y (en) External basket for building construction
CN208122242U (en) A kind of shrinkable steel building platform device for high-altitude operation
CN110185247A (en) Mobile outrigger platform
CN208122257U (en) A kind of new steel structure building platform device for high-altitude operation
CN206195246U (en) Electrical -power maintenance is with overhauing frame
CN108331319A (en) A kind of collapsible steel building platform device for high-altitude operation
CN204788911U (en) Multi -functional safety belt testing arrangement
CN112160577A (en) Construction method for beam column connection operation by using aerial work platform device
CN211596431U (en) Railway bridge pad stone construction operation protector
GB609428A (en) Improvements in or relating to scaffolds and gantries
CN205555855U (en) Set up promotion support on steel structure platform
CN212802428U (en) Portable lifting scaffold
CN209837752U (en) Anti-overturning type temporary protection device for hole
CN210195198U (en) Elevartor shaft moving platform
CN208702128U (en) High and big die plate construction steel pipe scaffold fast dismounting device
CN209040527U (en) A kind of scaffold cradle structure
CN208718350U (en) Inner guide type elevating scaffold attached wall support base
CN210508307U (en) Scaffold for building engineering
CN108824214A (en) A kind of fast-type high-speed rail Bridge Pier Construction hanging basket mounting platform and application method
CN215631516U (en) Hanging flower basket device is used in construction of roof slope roofing platform curtain
CN212154087U (en) Aerial work platform device
CN214302782U (en) Portable scaffold
CN206957181U (en) Elevator circulates steel operating platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180727

RJ01 Rejection of invention patent application after publication