CN108327662A CN201810204213.4A CN201810204213A CN108327662A CN 108327662 A CN108327662 A CN 108327662A CN 201810204213 A CN201810204213 A CN 201810204213A CN 108327662 A CN108327662 A CN 108327662A
Authority
CN
China
Prior art keywords
harness
band
fixed
installation
sheet metal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810204213.4A
Other languages
Chinese (zh)
Other versions
CN108327662B (en
Inventor
周伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongfeng Commercial Vehicle Co Ltd
Original Assignee
Dongfeng Commercial Vehicle Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongfeng Commercial Vehicle Co Ltd filed Critical Dongfeng Commercial Vehicle Co Ltd
Priority to CN201810204213.4A priority Critical patent/CN108327662B/en
Publication of CN108327662A publication Critical patent/CN108327662A/en
Application granted granted Critical
Publication of CN108327662B publication Critical patent/CN108327662B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60RVEHICLES, VEHICLE FITTINGS, OR VEHICLE PARTS, NOT OTHERWISE PROVIDED FOR
    • B60R16/00Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for
    • B60R16/02Electric or fluid circuits specially adapted for vehicles and not otherwise provided for; Arrangement of elements of electric or fluid circuits specially adapted for vehicles and not otherwise provided for electric constitutive elements
    • B60R16/0207Wire harnesses
    • B60R16/0215Protecting, fastening and routing means therefor

Abstract

A kind of wire bundle fixing structure of dotted line positioning, including beam and harness, the harness are fixed on by band in beam;The wire bundle fixing structure further includes plate, and the harness is fixed on by hangnail band on plate, and the harness is fixed on by steel card band and sheet metal fastener in beam;The end set of the beam has at least two sheet metal fasteners, middle part steel card band and the sheet metal fastener interval of the beam to be arranged.Not only harness fixes reliability height, but also the simple and effective raising efficiency of assembling of assembly technology to the design.

Description

A kind of wire bundle fixing structure and its method for arranging of dotted line positioning
Technical field
The wire bundle fixing structure and its arrangement positioned the present invention relates to a kind of wire bundle fixing structure more particularly to a kind of dotted line Method, it is particularly applicable to reduce harness installation difficulty, improve harness efficiency of assembling.
Background technology
Harness refers to the conducting wire set that electric function is achieved for connecting vehicle electric component.Vehicle frame harness refers to cloth It sets on vehicle frame, the harness for various electric components on connecting base plate.Vehicle frame is generally by left and right longeron and several crossbeam groups At vehicle electric appliance is generally divided into electric appliances of cab and chassis electric appliance two parts, and driver's cabin harness is for connecting electric appliances of cab, vehicle Stringing beam is used for connecting base plate electric appliance.Left and right driver's cabin harness is respectively docked with vehicle frame harness near cab front wall, to protect Vehicle electric appliance normal work is demonstrate,proved, realizes vehicle electric function.
China Patent Publication No. is CN102673494A, and publication date is that the patent of invention on the 19th of September in 2012 discloses one Kind vehicle frame pencil routing method and its vehicle frame harness, belong to car electrics technical field.Its wiring method includes a. by left longeron The wire laying mode that harness is connected by second cross beam intercepts out each conducting wire, installation wiring connector respectively;B. on vehicle frame The junction of two crossbeams and left longeron as wiring benchmark A, by the wiring benchmark A point location sets on each conducting wire to a bit, with Constitute left longeron harness and right vertical beam harness;C. vehicle frame harness is corresponded to wire harness fixture and is fixed.Described in its vehicle frame harness Right vertical beam harness is connected in the second cross beam of vehicle frame with left stringer attachment locations with left longeron harness.Although the invention can subtract Small rigging error, but its there are still problems with:
The error margin of harness is adjusted in the mode that the invention is not provided with effect, still remains certain play phenomenon.
Invention content
The purpose of the present invention is overcome the problems, such as it is existing in the prior art cannot to speed limit error carry out surplus adjusting, carry A kind of wire bundle fixing structure and its method for arranging of the dotted line positioning that surplus adjusting can be carried out to speed limit error are supplied.
In order to achieve the above object, technical solution of the invention is:
A kind of wire bundle fixing structure of dotted line positioning, including beam and harness, the harness are fixed on by band in beam;
The wire bundle fixing structure further includes plate, and the harness is fixed on by hangnail band on plate, and the harness passes through Steel card band and sheet metal fastener are fixed in beam.
The end set of the beam has at least two sheet metal fasteners, the middle part steel card band and sheet metal fastener of the beam Interval setting.
The sheet metal fastener includes wire harness bracket and troubles iron sheet, and the bottom of the wire harness bracket is fixedly connected with beam, Described one end for troubling iron sheet is fixed in beam, described to trouble iron sheet and cluster binding tight fit, the wire harness bracket and harness Limit cooperation.
The hangnail band includes band portion and the fixed part of interconnection, the band portion and cluster binding tight fit, institute Fixed part is stated by the mounting hole on plate to coordinate with plate limit.
The steel card band includes tie part and card-tight part, and the tie part and cluster binding tight fit, the card-tight part are solid Due on the band bearing in beam, the band bearing coordinates with harness limit.
A kind of method for arranging of the wire bundle fixing structure of dotted line positioning, includes the following steps:
The first step:Designed lines according to the fixed demand of harness, determine the installation circuit of harness, then, according to setting first Installation circuit determine each installation point on harness, and the buckle of each installation point is determined according to the fixation material of installation point Type is then positioned using hangnail band when installation point is located on plate, is then pricked using steel card when installation point is located in beam Band or sheet metal fastener positioning are finally determined according to installation circuit often with the length of line in harness, while calculating each hangnail Band and installation site of the steel card band on harness, at this time circuit design are completed;
Second step:Punching, holder make, and harness fixed mechanism is arranged according to the harness installation point set in the first step first, when When installation point is located on plate, the mounting hole of hangnail band is opened up at upper each installation point of plate;When installation point is located at beam On part and when fixed card buckle is steel card band, then band bearing is welded at each installation point of steel card band in beam;Work as installation When point is located in beam and fixed card buckle is sheet metal fastener, then welded iron sheet card at each installation point of sheet metal fastener in beam Son is welded in beam, and punching, holder complete at this time;
Third walks:Bound harness intercepts regulation as required according to the length per single line in the harness obtained in the first step first The line of length, after the line installation installation requirement of interception is arranged, according to the hangnail band obtained in the first step and steel card band Installation site, using hangnail band and steel card band in the position bound harness of design, harness ties up completion at this time;
4th step:Harness is fixed and installation, the harness for completing to tie up during third is walked are installed on plate and beam, first will be each Hangnail band is installed in corresponding mounting hole, last whole then by steel card band clamping fixed on corresponding band bearing Lineation Shu Liyong sheet metal fasteners trouble harness, and the adjusting to harness length surplus is paid attention to during troubling, and check that determination is each solid Determine after part is fixedly secured, harness arrangement is completed at this time.
Compared with prior art, beneficial effects of the present invention are:
1, utilize hangnail band and steel card band under assembly line by line in a kind of wire bundle fixing structure of dotted line positioning of the present invention It ties in and ties, then fixed on assembly line more than the length that hangnail band and steel card band finally utilize sheet metal fastener to adjust harness Amount, effective fixed beam while, avoids the play of harness, while hangnail band and steel card band mounting means are simple, effectively Improve the efficiency of assembling of harness.Therefore, the harness of the design fixes reliability height, the simple and effective raising assembly effect of assembly technology Rate.
2, the end set of beam has at least two sheet metal fasteners in a kind of wire bundle fixing structure of dotted line positioning of the present invention, Above-mentioned sheet metal fastener is for adjusting the harness surplus being fixed on plate, between the middle part steel card band and sheet metal fastener of the beam It is such to be designed with conducive to the accumulation of harness length surplus is reduced every setting, improve the fixed reliability of harness.Therefore, it originally sets Meter rationally designs the number and installation site of sheet metal fastener, reduces harness length surplus, effectively avoids harness play.
3, the fixation of harness is bonded without using pressure-sensitive adhesive plaster in a kind of wire bundle fixing structure of dotted line positioning of the present invention, by It is easy to fall off under high temperature environment in pressure-sensitive adhesive plaster, and will appear aging phenomenon with the increase of use time, be easy to cause line Beam is detached from constraint and causes harness play.Therefore, the harness of the design is not suitable for pressure-sensitive immobilization with adhesive tape, and it is solid to improve harness on the whole Fixed reliability.
Description of the drawings
Fig. 1 is the structural schematic diagram of the present invention.
Fig. 2 is the structural schematic diagram of hangnail band in Fig. 1.
Fig. 3 is the structural schematic diagram of steel card band in Fig. 1.
In figure:Plate 1, mounting hole 11, beam 2, band bearing 21, hangnail band 3, band portion 31, fixed part 32, steel card Band 4, card-tight part 42, sheet metal fastener 5, wire harness bracket 51, troubles iron sheet 52, harness 6 at tie part 41.
Specific implementation mode
Below in conjunction with description of the drawings, the present invention is described in further detail with specific implementation mode.
Referring to Fig. 1 to Fig. 3, a kind of wire bundle fixing structure of dotted line positioning, including beam 2 and harness 6, the harness 6 are logical Band is crossed to be fixed in beam 2;
The wire bundle fixing structure further includes plate 1, and the harness 6 is fixed on by hangnail band 3 on plate 1, the harness 6 It is fixed in beam 2 by steel card band 4 and sheet metal fastener 5.
The end set of the beam 2 has at least two sheet metal fasteners 5, the middle part steel card band 4 and iron sheet of the beam 2 The setting of the interval of clamp 5.
The sheet metal fastener 5 includes wire harness bracket 51 and troubles iron sheet 52, and the bottom of the wire harness bracket 51 and beam 2 are solid Fixed connection, described one end for troubling iron sheet 52 are fixed in beam 2, and the iron sheet 52 that troubles tightens cooperation, the line with harness 6 Bundle branch frame 51 coordinates with the limit of harness 6.
The hangnail band 3 includes that the band portion 31 being connected with each other and fixed part 32, the band portion 31 are tightened with harness 6 Cooperation, the fixed part 32 are coordinated by the mounting hole 11 on plate 1 with the limit of plate 1.
The steel card band 4 includes tie part 41 and card-tight part 42, and the tie part 41 tightens cooperation with harness 6, described Card-tight part 42 is fixed on the band bearing 21 in beam 2, and the band bearing 21 coordinates with the limit of harness 6.
A kind of method for arranging of the wire bundle fixing structure of dotted line positioning, includes the following steps:
The first step:Designed lines according to the fixed demand of harness 6, determine the installation circuit of harness 6 first, then, according to setting Fixed installation circuit determines each installation point on harness 6, and determines each installation point according to the fixation material of installation point Snap type then uses hangnail band 3 to position, is then used when installation point is located in beam 2 when installation point is located on plate 1 Steel card band 4 or sheet metal fastener 5 position, and finally, are determined in harness 6 often with the length of line according to installation circuit, are calculated simultaneously Go out each hangnail band 3 and installation site of the steel card band 4 on harness 6, circuit design at this time is completed;
Second step:Punching, holder make, and harness fixed mechanism is arranged according to 6 installation point of harness set in the first step first, when When installation point is located on plate 1, the mounting hole 11 of hangnail band 3 is opened up at upper each installation point of plate 1;When installation point In in beam 2 and when fixed card buckle is steel card band 4, then band bearing is welded at each installation point of steel card band 4 in beam 2 21;When installation point be located in beam 2 and fixed card buckle be sheet metal fastener 5 when, then in beam 2 sheet metal fastener 5 each installation point Sheet metal fastener 5 is welded in beam 2 by place's welding, and punching, holder complete at this time;
Third walks:Bound harness intercepts regulation as required according to the length per single line in the harness 6 obtained in the first step first The line of length, after the line installation installation requirement of interception is arranged, according to the hangnail band 3 obtained in the first step and steel card band 4 installation site, using hangnail band 3 and steel card band 4 in the position bound harness 6 of design, harness ties up completion at this time;
4th step:Harness is fixed and installation, and the harness tied up 6 is completed during third is walked and is installed on plate 1 and beam 2, first Each hangnail band 3 is installed in corresponding mounting hole 11, then by 4 clamping fixed of steel card band in corresponding band bearing 21 On, it finally arranges harness 6 and troubles harness 6 using sheet metal fastener 5, the adjusting to 6 length surplus of harness is paid attention to during troubling, It checks after determining that each fixing piece is fixedly secured, harness arrangement is completed at this time.
The principle of the present invention is described as follows:
The sheet metal fastener 5 is used to adjust the error of harness, therefore the installation point of sheet metal fastener 5 is located at hangnail band 3 and steel card Between the installation point of band 4 or between two 4 installation points of steel card band.Such be designed with is kept away conducive to the surplus adjusting of harness Exempt to be reliably fixed harness while harness play.
Embodiment 1:
A kind of wire bundle fixing structure of dotted line positioning, including beam 2 and harness 6, the harness 6 are fixed on beam 2 by band On;The wire bundle fixing structure further includes plate 1, and the harness 6 is fixed on by hangnail band 3 on plate 1, the harness 6 It is fixed in beam 2 by steel card band 4 and sheet metal fastener 5.
A kind of method for arranging of the wire bundle fixing structure of dotted line positioning, includes the following steps:
The first step:Designed lines according to the fixed demand of harness 6, determine the installation circuit of harness 6 first, then, according to setting Fixed installation circuit determines each installation point on harness 6, and determines each installation point according to the fixation material of installation point Snap type then uses hangnail band 3 to position, is then used when installation point is located in beam 2 when installation point is located on plate 1 Steel card band 4 or sheet metal fastener 5 position, and finally, are determined in harness 6 often with the length of line according to installation circuit, are calculated simultaneously Go out each hangnail band 3 and installation site of the steel card band 4 on harness 6, circuit design at this time is completed;
Second step:Punching, holder make, and harness fixed mechanism is arranged according to 6 installation point of harness set in the first step first, when When installation point is located on plate 1, the mounting hole 11 of hangnail band 3 is opened up at upper each installation point of plate 1;When installation point In in beam 2 and when fixed card buckle is steel card band 4, then band bearing is welded at each installation point of steel card band 4 in beam 2 21;When installation point be located in beam 2 and fixed card buckle be sheet metal fastener 5 when, then in beam 2 sheet metal fastener 5 each installation point Sheet metal fastener 5 is welded in beam 2 by place's welding, and punching, holder complete at this time;
Third walks:Bound harness intercepts regulation as required according to the length per single line in the harness 6 obtained in the first step first The line of length, after the line installation installation requirement of interception is arranged, according to the hangnail band 3 obtained in the first step and steel card band 4 installation site, using hangnail band 3 and steel card band 4 in the position bound harness 6 of design, harness ties up completion at this time;
4th step:Harness is fixed and installation, and the harness tied up 6 is completed during third is walked and is installed on plate 1 and beam 2, first Each hangnail band 3 is installed in corresponding mounting hole 11, then by 4 clamping fixed of steel card band in corresponding band bearing 21 On, it finally arranges harness 6 and troubles harness 6 using sheet metal fastener 5, the adjusting to 6 length surplus of harness is paid attention to during troubling, It checks after determining that each fixing piece is fixedly secured, harness arrangement is completed at this time.
Embodiment 2:
Embodiment 2 is substantially the same manner as Example 1, the difference is that:
The end set of the beam 2 has at least two sheet metal fasteners 5, the middle part steel card band 4 and sheet metal fastener of the beam 2 5 interval settings.
Embodiment 3:
Embodiment 3 is substantially the same manner as Example 2, the difference is that:
The sheet metal fastener 5 includes wire harness bracket 51 and troubles iron sheet 52, and the bottom of the wire harness bracket 51 is fixed with beam 2 to be connected It connects, described one end for troubling iron sheet 52 is fixed in beam 2, and the iron sheet 52 that troubles tightens cooperation, the harness branch with harness 6 Frame 51 coordinates with the limit of harness 6;The hangnail band 3 includes the band portion 31 being connected with each other and fixed part 32, the band portion 31 tighten cooperation with harness 6, and the fixed part 32 is coordinated by the mounting hole 11 on plate 1 with the limit of plate 1;The steel card is pricked Band 4 includes tie part 41 and card-tight part 42, and the tie part 41 tightens cooperation with harness 6, and the card-tight part 42 is fixed on beam 2 On band bearing 21 on, the limit of the band bearing 21 and harness 6 coordinates.

Claims (6)

1. a kind of wire bundle fixing structure of dotted line positioning, including beam 2 and harness 6, the harness 6 are fixed on beam by band On 2, it is characterised in that:
The wire bundle fixing structure further includes plate 1, and the harness 6 is fixed on by hangnail band 3 on plate 1, the harness 6 It is fixed in beam 2 by steel card band 4 and sheet metal fastener 5.
2. a kind of wire bundle fixing structure of dotted line positioning according to claim 1, it is characterised in that:
The end set of the beam 2 has at least two sheet metal fasteners 5, the middle part steel card band 4 and sheet metal fastener of the beam 2 5 interval settings.
3. a kind of wire bundle fixing structure of dotted line positioning according to claim 1 or 2, it is characterised in that:
The sheet metal fastener 5 includes wire harness bracket 51 and troubles iron sheet 52, and the bottom of the wire harness bracket 51 is fixed with beam 2 to be connected It connects, described one end for troubling iron sheet 52 is fixed in beam 2, and the iron sheet 52 that troubles tightens cooperation, the harness branch with harness 6 Frame 51 coordinates with the limit of harness 6.
4. a kind of wire bundle fixing structure of dotted line positioning according to claim 3, it is characterised in that:
The hangnail band 3 includes the band portion 31 being connected with each other and fixed part 32, and the band portion 31 is tightened with harness 6 matches It closes, the fixed part 32 is coordinated by the mounting hole 11 on plate 1 with the limit of plate 1.
5. a kind of wire bundle fixing structure of dotted line positioning according to claim 3, it is characterised in that:
The steel card band 4 includes tie part 41 and card-tight part 42, and the tie part 41 tightens cooperation, the clamping with harness 6 Portion 42 is fixed on the band bearing 21 in beam 2, and the band bearing 21 coordinates with the limit of harness 6.
6. a kind of method for arranging of the wire bundle fixing structure of dotted line positioning according to any one of claim 1-5, packet Include following steps:
The first step:Designed lines according to the fixed demand of harness 6, determine the installation circuit of harness 6 first, then, according to setting Fixed installation circuit determines each installation point on harness 6, and determines each installation point according to the fixation material of installation point Snap type then uses hangnail band 3 to position, is then used when installation point is located in beam 2 when installation point is located on plate 1 Steel card band 4 or sheet metal fastener 5 position, and finally, are determined in harness 6 often with the length of line according to installation circuit, are calculated simultaneously Go out each hangnail band 3 and installation site of the steel card band 4 on harness 6, circuit design at this time is completed;
Second step:Punching, holder make, and harness fixed mechanism is arranged according to 6 installation point of harness set in the first step first, when When installation point is located on plate 1, the mounting hole 11 of hangnail band 3 is opened up at upper each installation point of plate 1;When installation point In in beam 2 and when fixed card buckle is steel card band 4, then band bearing is welded at each installation point of steel card band 4 in beam 2 21;When installation point be located in beam 2 and fixed card buckle be sheet metal fastener 5 when, then in beam 2 sheet metal fastener 5 each installation point Sheet metal fastener 5 is welded in beam 2 by place's welding, and punching, holder complete at this time;
Third walks:Bound harness intercepts regulation as required according to the length per single line in the harness 6 obtained in the first step first The line of length, after the line installation installation requirement of interception is arranged, according to the hangnail band 3 obtained in the first step and steel card band 4 installation site, using hangnail band 3 and steel card band 4 in the position bound harness 6 of design, harness ties up completion at this time;
4th step:Harness is fixed and installation, and the harness tied up 6 is completed during third is walked and is installed on plate 1 and beam 2, first Each hangnail band 3 is installed in corresponding mounting hole 11, then by 4 clamping fixed of steel card band in corresponding band bearing 21 On, it finally arranges harness 6 and troubles harness 6 using sheet metal fastener 5, the adjusting to 6 length surplus of harness is paid attention to during troubling, It checks after determining that each fixing piece is fixedly secured, harness arrangement is completed at this time.
CN201810204213.4A 2018-03-13 2018-03-13 Wire harness fixing structure with dotted line positioning function and arrangement method thereof Active CN108327662B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810204213.4A CN108327662B (en) 2018-03-13 2018-03-13 Wire harness fixing structure with dotted line positioning function and arrangement method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810204213.4A CN108327662B (en) 2018-03-13 2018-03-13 Wire harness fixing structure with dotted line positioning function and arrangement method thereof

Publications (2)

Publication Number Publication Date
CN108327662A true CN108327662A (en) 2018-07-27
CN108327662B CN108327662B (en) 2023-10-20

Family

ID=62930813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810204213.4A Active CN108327662B (en) 2018-03-13 2018-03-13 Wire harness fixing structure with dotted line positioning function and arrangement method thereof

Country Status (1)

Country Link
CN (1) CN108327662B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101631693A (en) * 2007-02-21 2010-01-20 索格克莱尔公司 Device, means of delivery equipped therewith and the installation method of indefinite scale device are installed on the means of delivery framework
JP2010057317A (en) * 2008-08-29 2010-03-11 Yazaki Corp Wire harness routing structure
CN102673492A (en) * 2011-03-04 2012-09-19 铃木株式会社 Routing structure of high-voltage cable in vehicle
CN102673494A (en) * 2012-05-23 2012-09-19 东风汽车有限公司 Vehicle frame wire harness wiring method and vehicle frame wire harness thereof
CN205149733U (en) * 2015-11-10 2016-04-13 湖北省齐星汽车车身股份有限公司 Automotive wires restrainted rami parietales frame
CN106080841A (en) * 2016-08-26 2016-11-09 广州电力机车有限公司 A kind of six wheel drive dumper assembly methods
CN206394582U (en) * 2016-12-07 2017-08-11 东风商用车有限公司 A kind of commercial car wheel speed sensor wire harness fixation clamp
CN107215287A (en) * 2017-07-19 2017-09-29 宁波天安汽车零部件有限公司 A kind of automobile door plate wire harness positioning protective cradle

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101631693A (en) * 2007-02-21 2010-01-20 索格克莱尔公司 Device, means of delivery equipped therewith and the installation method of indefinite scale device are installed on the means of delivery framework
JP2010057317A (en) * 2008-08-29 2010-03-11 Yazaki Corp Wire harness routing structure
CN102673492A (en) * 2011-03-04 2012-09-19 铃木株式会社 Routing structure of high-voltage cable in vehicle
CN102673494A (en) * 2012-05-23 2012-09-19 东风汽车有限公司 Vehicle frame wire harness wiring method and vehicle frame wire harness thereof
CN205149733U (en) * 2015-11-10 2016-04-13 湖北省齐星汽车车身股份有限公司 Automotive wires restrainted rami parietales frame
CN106080841A (en) * 2016-08-26 2016-11-09 广州电力机车有限公司 A kind of six wheel drive dumper assembly methods
CN206394582U (en) * 2016-12-07 2017-08-11 东风商用车有限公司 A kind of commercial car wheel speed sensor wire harness fixation clamp
CN107215287A (en) * 2017-07-19 2017-09-29 宁波天安汽车零部件有限公司 A kind of automobile door plate wire harness positioning protective cradle

Also Published As

Publication number Publication date
CN108327662B (en) 2023-10-20

Similar Documents

Publication Publication Date Title
CN107317087A (en) A kind of top antenna fixed structure
CN108327662A (en) A kind of wire bundle fixing structure and its method for arranging of dotted line positioning
CN208164931U (en) A kind of wire bundle fixing structure of dotted line positioning
CN207815646U (en) Air port mounting structure
CN204053319U (en) A kind of for Cab Welding Jig
CN108705244A (en) A kind of welding tooling for electromobile frame
CN111114568B (en) Fixing installation part for vehicle through passage folding shed
CN107336679A (en) A kind of automobile cabin Wire harness box and automobile
CN208754672U (en) A kind of fertilizer distributor installation part
CN209617066U (en) A kind of mounting bracket and electric car
CN202733193U (en) Multi-layer clamp bracket
CN207656163U (en) A kind of built-up jig of vehicle frame chain stay tooling
CN203358501U (en) BCM (Body Control Module) fixing bracket
CN210822820U (en) Auxiliary tool for assembling panel of aircraft equipment
CN209448687U (en) Photovoltaic module installation system in a kind of flexible photovoltaic bracket
CN205118457U (en) Pipe clamp
CN213443235U (en) Tool for packaging adhesive tape
CN206749931U (en) Body structure and vehicle
CN212762378U (en) Mounting device for machine tool truss
CN209366296U (en) Automotive floor panel front beam
CN215101215U (en) Welding gun testing workstation
CN210416474U (en) Novel gearbox wire harness limiting fixing support
CN207291881U (en) A kind of roof fixed frame, Driving Test training vehicle
CN215817356U (en) Automobile instrument platen wire harness wire protecting box
CN218771111U (en) Adjustable wire slot structure for rail vehicle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant