A kind of distribution line trip event management method and device Download PDF

Info

Publication number
CN108320032A
CN108320032A CN201810062817.XA CN201810062817A CN108320032A CN 108320032 A CN108320032 A CN 108320032A CN 201810062817 A CN201810062817 A CN 201810062817A CN 108320032 A CN108320032 A CN 108320032A
Authority
CN
China
Prior art keywords
information
tripping
distribution line
work order
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810062817.XA
Other languages
Chinese (zh)
Inventor
蒙天骐
范瑞祥
王文彬
李琼
李升健
王华云
郑蜀江
肖红霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201810062817.XA priority Critical patent/CN108320032A/en
Publication of CN108320032A publication Critical patent/CN108320032A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

A kind of distribution line trip event management method provided in an embodiment of the present invention and device, are related to electric power system fault process field.This method and device generate distribution line tripping repairing work order when the tripping information received meets presetting condition, and send distribution line tripping repairing work order to the user terminal of any one and the type matching of distribution line tripping repairing work order, so that user terminal transmission and the distribution line tripping repairing associated in-situ processing information of work order, and monitoring is tracked to distribution line tripping repairing work order according to the tripping information for receiving the time of in-situ processing information and receiving again;To by generating distribution line tripping repairing work order, to tripping to distribution line, the performance for repairing work order is tracked monitoring, realize the closed loop management and control to distribution network line tripping repairing, strengthen the management and control ability to distribution line tripping repairing, the stability for improving power distribution network operation level improves electricity consumption reliability level.

Description

A kind of distribution line trip event management method and device
Technical field
The present invention relates to power system fault pre-alarmings and method field, in particular to a kind of distribution line tripping thing Part management method and device.
Background technology
Important public infrastructure of the power distribution network as national economy and social development, has that scale is big, distribution is wide, network The features such as connection is various with the method for operation.And with the continuous expansion of distribution scale, the composition of electric load also has occurred Significant changes are obviously improved wherein business and electricity consumption of resident have, this will make distribution line and transformer load increase, Lead to line tripping event increases.
Currently, the power distribution network management level due to China is also more weak, most of investigative technique and major power supply enterprise The administrative skill that industry is used is matched primarily directed to the differentiated control of electrical equipment and files on each of customers in relation to various in power distribution network Actively repairing and the technology for the supervisor that stops transport are less for electric line tripping, and fail to be formed one from managing and control system to power supply command centre The complete tissue system of repairing teams and groups is arrived again.
Invention content
In view of this, the purpose of the present invention is to provide a kind of distribution line trip event management method and device, with solution The certainly above problem.
To achieve the goals above, technical solution used in the embodiment of the present invention is as follows:
In a first aspect, an embodiment of the present invention provides a kind of distribution line trip event management method, it is applied to a power supply Maneuvering platform is serviced, the electric service maneuvering platform is connect at least one user terminal communication, the distribution line tripping Event management method includes:
Receive tripping information, power off time, higher level's line outage information and the interruption maintenance meter of public system transmission Draw information;
Power supply interrupted district is determined according to the tripping information;
According to the power supply interrupted district, the power off time, higher level's line outage information and the interruption maintenance meter It draws information and generates distribution line tripping repairing work order;
It trips to any one with the distribution line and repairs the matched user terminal transmission distribution line jump of work order Lock repairs work order;
The associated in-situ processing of work order is repaired according to the tripping with the distribution line for user terminal transmission is received The time of information and the tripping information received again are tracked monitoring to distribution line tripping repairing work order.
Second aspect, the embodiment of the present invention additionally provide a kind of distribution line trip event managing device, are applied to one and supply Electricity service maneuvering platform, the electric service maneuvering platform are connect at least one user terminal communication, and the distribution line is jumped Lock incident management device includes:
Data receipt unit, for receives a public system transmission tripping information, power off time, higher level's line outage believe Breath and interruption maintenance plan information;
Power supply interrupted district determination unit, for determining power supply interrupted district according to the tripping information;
Work order generation unit, for according to the power supply interrupted district, the power off time, higher level's line outage information with And the interruption maintenance plan information generates distribution line tripping repairing work order;
Transmission unit repairs the matched user terminal hair of work order for tripping to any one with the distribution line Delivery electric line tripping repairing work order;
Tracing monitoring unit receives the tripping with the distribution line for user terminal transmission for foundation and repairs work The time of single associated feedback information and the feedback information are tracked monitoring to distribution line tripping repairing work order.
Distribution line trip event management method provided in an embodiment of the present invention and device are full in the tripping information received Generate distribution line tripping repairing work order when the presetting condition of foot, and to any one and distribution line tripping repairing work order Type matching user terminal send distribution line tripping repairing work order so that user terminal send with distribution line trip rob The associated in-situ processing information of work order is repaiied, and according to the tripping letter for receiving the time of in-situ processing information and receiving again Breath is tracked monitoring to distribution line tripping repairing work order;To repair work order by generating distribution line tripping, to matching The performance of electric line tripping repairing work order is tracked monitoring, realizes the closed loop pipe to distribution network line tripping repairing Control, improves first-aid repair efficiency and service level, strengthens the management and control ability to distribution line tripping repairing, improves power distribution network The stability of operation level improves electricity consumption reliability level.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, preferred embodiment cited below particularly, and coordinate Appended attached drawing, is described in detail below.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 shows the functional block diagram that can be applied to the maneuvering platform of the electric service in the embodiment of the present invention.
Fig. 2 shows the flow charts of distribution line trip event management method provided in an embodiment of the present invention.
Fig. 3 shows the particular flow sheet of step S203 in Fig. 2.
Fig. 4 shows the particular flow sheet of step S205 in Fig. 2.
Fig. 5 shows the functional block diagram of distribution line trip event managing device provided in an embodiment of the present invention.
Icon:100- electric service maneuvering platforms;111- memories;112- processors;113- communication units;200- distribution Line tripping incident management device;210- data receipt units;220- power supply interrupted district determination units;230- work order generation units; 240- transmission units;250- tracing monitoring units.
Specific implementation mode
Below in conjunction with attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete Ground describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Usually exist The component of the embodiment of the present invention described and illustrated in attached drawing can be arranged and be designed with a variety of different configurations herein.
Therefore, below the detailed description of the embodiment of the present invention to providing in the accompanying drawings be not intended to limit it is claimed The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiment of the present invention, people in the art The every other embodiment that member is obtained without making creative work, shall fall within the protection scope of the present invention.
It should be noted that:Similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined, then it further need not be defined and explained in subsequent attached drawing in a attached drawing.
It should be noted that the relational terms of term " first " and " second " or the like be used merely to an entity or Operation is distinguished with another entity or operation, and without necessarily requiring or implying between these entities or operation, there are any This actual relationship or sequence.Moreover, the terms "include", "comprise" or its any other variant be intended to it is non-exclusive Property include so that including a series of elements process, method, article or equipment not only include those elements, but also Further include other elements that are not explicitly listed, or further include for this process, method, article or equipment it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including described There is also other identical elements in the process, method, article or equipment of element.
The present invention provides a kind of electric service maneuvering platform 100, for realizing to the active management and control of power distribution network, O&M, And realization is to the real-time oversight of distribution problem.Referring to Fig. 1, Fig. 1 shows a kind of confession that can be applied in the embodiment of the present invention The functional block diagram of electricity service maneuvering platform 100.The electric service maneuvering platform 100 includes distribution line trip event managing device 200, memory 111, storage control, one or more (one is only shown in figure) processors 112, communication unit 113.These Component is mutually communicated by one or more communication bus/signal wire.It is described to wait for that distribution line trip event managing device 200 is wrapped Include at least one can be stored in the memory 111 or be solidificated in the power supply in the form of software or firmware (firmware) Service the SFU software functional unit in the operating system (operating S4stem, OS) of maneuvering platform 100.
Memory 111 can be used for storing software program and unit, as in the embodiment of the present invention software testing device and Program instruction/unit corresponding to method, processor 112 are stored in the tripping thing of the distribution line in memory 111 by operation Part managing device 200, the software program of method and unit, to perform various functions application and data processing, such as this hair The distribution line trip event management method that bright embodiment provides.Wherein, the memory 111 may be, but not limited to, at random Memory (Random Access Memory, RAM) is accessed, read-only memory (Read Only Memory, ROM) may be programmed Read-only memory (Programmable Read-Only Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only Memory, EPROM), electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only Memory, EEPROM) etc..Processor 112 and other possible components are to memory 111 access can carry out under the control of storage control.
The communication unit 113 is used to establish the electric service maneuvering platform 100 and other communications by the network Communication connection between terminal, and for passing through the network transceiving data.
It should be understood that structure shown in FIG. 1 is only to illustrate, electric service maneuvering platform 100 may also include than in Fig. 1 Shown more either less components or with the configuration different from shown in Fig. 1.Each component shown in Fig. 1 may be used Hardware, software, or its combination is realized.
First embodiment
An embodiment of the present invention provides a kind of distribution line trip event management methods, are applied to electric service maneuvering platform 100, for realizing to the active management and control of power distribution network, O&M, and realize the real-time oversight to distribution problem.Referring to Fig. 2, Fig. 2 Show a kind of flow chart of distribution line trip event management method provided in an embodiment of the present invention.Distribution line tripping thing Part management method includes:
Step S201:It receives the tripping information of public system transmission, power off time, higher level's line outage information and stop Plan information is repaiied in electric-examination.
Specifically, public system is for acquiring tripping information, power off time, higher level's line outage information and interruption maintenance Plan information, and tripping information, power off time, higher level's line outage information and interruption maintenance plan information are transmitted to power supply Service maneuvering platform 100.The public system includes but are not limited to electrical power distribution automatization system, Energy Management System (EMS), electric power Production management system (PMS), power information acquisition system, marketing system etc..
Wherein, tripping information is for indicating that trip event, including Energy Management System (EMS) occurs in line related in distribution The EMS system telemetering of acquisition, remote signalling data etc.;Power off time is due to power-off time caused by the trip event;Higher level's circuit Stop information refers to the power supply interrupted district of certain special line trippings or reclosing;Interruption maintenance plan information is the power failure meter in each region It draws.
Step S202:Power supply interrupted district is determined according to tripping information.
Specifically, tripping information can be divided into two classes:Respectively main line tripping information and branch line tripping information.
When electric service maneuvering platform 100 receives main line tripping information, built in advance is based in response to main line tripping information Vertical topological structure of electric determines power supply interrupted district from the first preset path;Wherein, the first preset path is the-side of branch line that serves as theme To, specifically, electric service maneuvering platform 100 analyzes the topological structure of power grid by the direction from main line to branch line, To determine the specific location of power supply interrupted district.
When electric service maneuvering platform 100 receives branch line tripping information, built in advance is based in response to branch line tripping information Vertical topological structure of electric determines power supply interrupted district from the second preset path;Wherein, the second preset path is branch line-main line-branch line Direction, specifically, power supply point is traced back to public backbone toward main line direction from branch line and opened by electric service maneuvering platform 100 It closes, then using this trunk wiretap as starting point, the analysis of topological structure of electric is carried out so that it is determined that power failure area toward its branch line direction Domain.
Step S203:According to power supply interrupted district, power off time, higher level's line outage information and the life of interruption maintenance plan information It trips at distribution line and repairs work order.
Referring to Fig. 3, for the particular flow sheet of step S203.Step S203 includes:
Sub-step S2031:Judge idle time whether less than the first preset time and power supply interrupted district and higher level's line outage Whether information and interruption maintenance plan information match, if so, thening follow the steps S201;If not, thening follow the steps S2032.
By judging whether idle time is less than the first preset time, it may be determined that whether the trip event, which belongs to public become, is jumped Lock event.
Interruption maintenance plan information includes the stoppage in transit plan in certain region, thus power supply interrupted district and interruption maintenance plan information It is planned stoppage in transit in region with referring to the reason of generating the power supply interrupted district.
Higher level's line outage information can indicate the fault message with higher level's circuit of the relevant circuit of the power supply interrupted district, have a power failure Region occurs with the higher level that higher level's line outage information matches refer to exactly circuit the reason of generating the power supply interrupted district The failures such as tripping.
It, can be with by judging whether power supply interrupted district matches with higher level's line outage information and the interruption maintenance plan information It filters due to trip event caused by the power failure in regional planning or the tripping as caused by higher level's failure, to avoid generating weight Multiple or invalid distribution line tripping repairing work order.
Step S2032:Generate distribution line tripping repairing work order.
It is to be appreciated that when idle time is less than the first preset time and power supply interrupted district and higher level's line outage information and stops When electric-examination is repaiied plan information and mismatched, show the trip condition necessary being, and not for occur in region trip event and When stopping transport caused by not inside the plan stoppage in transit or higher level's failure, distribution line tripping repairing work order is generated, to remind repair people Member as early as possible overhauls stoppage in transit region, to restore normal power supply.
Step S204:It trips to any one with distribution line and repairs the matched user terminal transmission distribution line jump of work order Lock repairs work order.
It should be noted that each user terminal is stored with the identity of the line teams and groups using the user terminal, The identity shows the business of the line teams and groups.For example, a line teams and groups can be but be not limited only to processing active forewarning Work order, data exception processing work order, distribution line tripping repairing work order and work order etc. of taking the initiative in offering a hand.
Thus, the user terminal with the type matching of distribution line tripping repairing work order refers to being stored in the user terminal Identity and distribution line tripping repairing work order type matching, i.e. the identity shows that a line teams and groups can be handled Distribution line tripping repairing work order.
Step S205:The associated feedback information of work order is repaired according to tripping with distribution line for user terminal transmission is received Time and feedback information to distribution line trip repairing work order be tracked monitoring.
It should be noted that feedback information includes confirmation message and in-situ processing information.Wherein, confirmation message is a line After teams and groups receive distribution line tripping repairing work order by user terminal, input instructs so that the information that user terminal is sent. In-situ processing information, which is a line teams and groups, reaches power supply interrupted district and after being handled, by user terminal send about scene The information such as repairing progress, electric line trip reason and disposition.
In a kind of preferred embodiment, referring to Fig. 4, step S205 includes:
Sub-step S2051:Judge whether to receive confirmation message in the second preset time, if it is not, then executing sub-step Rapid S2052;If it is, executing sub-step S2053.
By judging whether the time for receiving confirmation message is more than the second preset time, electric service maneuvering platform 100 It can be seen that whether a line teams and groups receive distribution line tripping repairing work order within the time limit, repaired with realizing to trip to distribution line The tracing monitoring of work order.
Sub-step S2052:Generate the first prompt message.
When not receiving confirmation message in the second preset time, show that a line teams and groups also have not enough time to check the distribution Line tripping is repaired work order or is not handled in time distribution line tripping repairing work order, thus generates the first prompt letter Breath reminds a line teams and groups.
Sub-step S2053:Judge whether to receive in-situ processing information in third preset time, if it is not, then executing Sub-step S2054;If it is, executing sub-step S2055.
By judging whether to receive in-situ processing information in third preset time, electric service maneuvering platform 100 can It learns whether a line teams and groups are handled distribution line tripping repairing work order within the time limit, is tripped to distribution line with realizing Repair the tracing monitoring of work order.
Sub-step S2054:Generate the second prompt message.
When the time for receiving in-situ processing information being more than third preset time, show that a line teams and groups are right not within the time limit Distribution line tripping repairing work order is handled, thus is generated the first prompt message pair line teams and groups and reminded.
Sub-step S2055:According to in-situ processing information, the time for receiving confirmation message, receive in-situ processing information Time and distribution line tripping repairing work order generate archive information.
When receiving the confirmation message in the second preset time and receive the scene in third preset time When handling information, indicate to be solved the problem of including in distribution line tripping repairing work order, at this time according to in-situ processing Information, the time for receiving confirmation message, the time for receiving in-situ processing information and distribution line tripping repairing work order generate Archive information can be used for carrying out the operations such as performance appraisal to the line teams and groups.
Second embodiment
Referring to Fig. 5, Fig. 5 is a kind of distribution line trip event managing device 200 that present pre-ferred embodiments provide Functional block diagram.It should be noted that the distribution line trip event managing device 200 that the present embodiment is provided, basic Principle and the technique effect of generation are identical with above-described embodiment, and to briefly describe, the present embodiment part does not refer to place, can refer to Corresponding contents in the above embodiments.The distribution line trip event managing device 200 includes data receipt unit 210, has a power failure Area determination unit 220, work order generation unit 230, transmission unit 240 and tracing monitoring unit 250.
Wherein, data receipt unit 210 is for receiving tripping information, power off time that a public system transmits, higher level's line Road stop information and interruption maintenance plan information.
It is to be appreciated that in a kind of preferred embodiment, data receipt unit 210 can be used for executing step S201.
Power supply interrupted district determination unit 220 is used to determine power supply interrupted district according to tripping information.
Specifically, tripping information includes that main line tripping information and branch line tripping information, power supply interrupted district determination unit 220 are used In in response to main line trip information and power supply interrupted district is determined from the first preset path based on pre-established topological structure of electric;Power failure area Domain determination unit 220 is additionally operable to true from the second preset path based on pre-established topological structure of electric in response to branch line tripping information Determine power supply interrupted district.
It is to be appreciated that in a kind of preferred embodiment, power supply interrupted district determination unit 220 can be used for executing step S202。
Work order generation unit 230 is used for according to power supply interrupted district, power off time, higher level's line outage information and interruption maintenance Plan information generates distribution line tripping repairing work order.
Specifically, when idle time is less than the first preset time and power supply interrupted district is examined with higher level's line outage information and power failure When repairing plan information and mismatching, distribution line tripping repairing work order is generated.
It is to be appreciated that in a kind of preferred embodiment, work order generation unit 230 can be used for executing step S203.
Transmission unit 240, which is used to trip with distribution line to any one, repairs the matched user terminal transmission distribution of work order Line tripping repairs work order.
Tracing monitoring unit 250 is used for foundation and receives being associated with distribution line tripping repairing work order for user terminal transmission Feedback information time and feedback information to distribution line trip repairing work order be tracked monitoring.
Specifically, tracing monitoring unit 250 is used for when not receiving confirmation message in the second preset time, generates the One prompt message;When receiving confirmation message in the second preset time and do not receive in-situ processing in third preset time When information, the second prompt message is generated;When confirmation message is received in the second preset time and in third preset time it is inscribed When receiving in-situ processing information, according to in-situ processing information, the time for receiving confirmation message, in-situ processing information is received Time and distribution line tripping repairing work order generate archive information.
It is to be appreciated that in a kind of preferred embodiment, tracing monitoring unit 250 can be used for executing step S205, son Step S2051, sub-step S2052, sub-step S2053, sub-step S2054 and sub-step S2055.
In conclusion distribution line trip event management method provided in an embodiment of the present invention and device, what is received Tripping information generates distribution line tripping repairing work order when meeting presetting condition, and is jumped to any one and the distribution line The user terminal that lock repairs the type matching of work order sends distribution line tripping repairing work order, so that user terminal is sent and distribution Line tripping repairs the associated in-situ processing information of work order, and foundation receives the time of in-situ processing information and receives again To tripping information to distribution line trip repairing work order be tracked monitoring;To by generating distribution line tripping repairing work Single, to tripping to distribution line, the performance for repairing work order is tracked monitoring, realizes and trip event occurs to power distribution network When closed loop management and control, improve first-aid repair efficiency and service level, improve the stability of power distribution network operation level, enhance use Family experience sense.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.It should be noted that:Similar label and letter exist Similar terms are indicated in following attached drawing, therefore, once being defined in a certain Xiang Yi attached drawing, are then not required in subsequent attached drawing It is further defined and is explained.

Claims (10)

1. a kind of distribution line trip event management method, which is characterized in that be applied to an electric service maneuvering platform, the confession Electricity service maneuvering platform is connect at least one user terminal communication, the distribution line trip event management method packet It includes:
Receive tripping information, power off time, higher level's line outage information and the interruption maintenance plan letter of public system transmission Breath;
Power supply interrupted district is determined according to the tripping information;
Believe according to the power supply interrupted district, the power off time, higher level's line outage information and the interruption maintenance plan Breath generates distribution line tripping repairing work order;
Distribution line tripping is sent to any one with the matched user terminal of distribution line tripping repairing work order to rob Repair work order;
According to receive that the user terminal sends with the distribution line trip the repairing associated feedback information of work order when Between and the feedback information to the distribution line trip repairing work order be tracked monitoring.
2. distribution line trip event management method according to claim 1, which is characterized in that described according to the power failure Region, the power off time, higher level's line outage information and the interruption maintenance plan information generate distribution line and jump Lock repair work order the step of include:
It is less than the first preset time and the power supply interrupted district and higher level's line outage information and described when the idle time When interruption maintenance plan information mismatches, the distribution line tripping repairing work order is generated.
3. distribution line trip event management method according to claim 1, which is characterized in that the tripping information includes Trip information and branch line of main line trips information, and described the step of determining power supply interrupted district according to the tripping information includes:
It responds the main line tripping information and the power failure is determined from the first preset path based on pre-established topological structure of electric Region;
It responds the branch line tripping information and the power failure is determined from the second preset path based on pre-established topological structure of electric Region.
4. the distribution line trip event management method according to any one of claim 1-3, which is characterized in that described Feedback information includes confirmation message and in-situ processing information, and the foundation receives matching with described for the user terminal transmission The time of the electric line tripping repairing associated feedback information of work order and the feedback information trip to the distribution line and repair Work order is tracked the step of monitoring and includes:
When not receiving the confirmation message in the second preset time, the first prompt message is generated;
When receiving the confirmation message in the second preset time, according to time, the reception for receiving the confirmation message Distribution line tripping repairing work order is chased after to the time of the in-situ processing information and the in-situ processing information Track monitors.
5. distribution line trip event management method according to claim 4, which is characterized in that the foundation receives institute The time of confirmation message, the time for receiving the in-situ processing information and the in-situ processing information are stated to the distribution wire The step of work order is tracked monitoring is repaired in road tripping:
When receiving the confirmation message in the second preset time and do not received at the scene in third preset time When managing information, the second prompt message is generated;
When receiving the confirmation message in the second preset time and receive the in-situ processing in third preset time When information, according to the in-situ processing information, the time for receiving the confirmation message, the in-situ processing information is received Time and distribution line tripping repairing work order generate archive information.
6. a kind of distribution line trip event managing device, which is characterized in that be applied to an electric service maneuvering platform, the confession Electricity service maneuvering platform is connect at least one user terminal communication, and the distribution line trip event managing device includes:
Data receipt unit, for receives a public system transmit tripping information, power off time, higher level's line outage information with And interruption maintenance plan information;
Power supply interrupted district determination unit, for determining power supply interrupted district according to the tripping information;
Work order generation unit, for according to the power supply interrupted district, the power off time, higher level's line outage information and institute It states interruption maintenance plan information and generates distribution line tripping repairing work order;
Transmission unit is matched for tripping to repair the matched user terminal of work order and send with the distribution line to any one Electric line tripping repairing work order;
Tracing monitoring unit receives tripping with the distribution line for the user terminal transmission for foundation and repairs work order pass The time of the feedback information of connection and the feedback information are tracked monitoring to distribution line tripping repairing work order.
7. distribution line trip event managing device according to claim 6, which is characterized in that the work order generation unit For working as the idle time less than the first preset time and the power supply interrupted district and higher level's line outage information and described When interruption maintenance plan information mismatches, the distribution line tripping repairing work order is generated.
8. distribution line trip event managing device according to claim 6, which is characterized in that the tripping information includes Trip information and branch line of main line trips information, and the power supply interrupted district determination unit is for responding the main line tripping information and base In pre-established topological structure of electric the power supply interrupted district is determined from the first preset path;
The power supply interrupted district determination unit be additionally operable to respond the branch line tripping information and based on pre-established topological structure of electric The power supply interrupted district is determined from the second preset path.
9. wanting the distribution line trip event managing device described in any one of 6-8 according to right, which is characterized in that described anti- Feedforward information includes confirmation message and in-situ processing information, and the tracing monitoring unit in the second preset time for that ought not be inscribed When receiving the confirmation message, the first prompt message is generated;
The tracing monitoring unit is additionally operable to when receiving the confirmation message in the second preset time, and foundation receives institute The time of confirmation message, the time for receiving the in-situ processing information and the in-situ processing information are stated to the distribution wire Road tripping repairing work order is tracked monitoring.
10. distribution line trip event managing device according to claim 9, which is characterized in that the tracing monitoring list Member is additionally operable to when receiving the confirmation message in the second preset time and not receive in third preset time described existing When the processing information of field, the second prompt message is generated;
The tracing monitoring unit is additionally operable to when receiving the confirmation message in the second preset time and when third is preset In when receiving the in-situ processing information, according to the in-situ processing information, the time for receiving the confirmation message, connect The time and distribution line tripping repairing work order for receiving the in-situ processing information generate archive information.
CN201810062817.XA 2018-01-23 2018-01-23 A kind of distribution line trip event management method and device Pending CN108320032A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810062817.XA CN108320032A (en) 2018-01-23 2018-01-23 A kind of distribution line trip event management method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810062817.XA CN108320032A (en) 2018-01-23 2018-01-23 A kind of distribution line trip event management method and device

Publications (1)

Publication Number Publication Date
CN108320032A true CN108320032A (en) 2018-07-24

Family

ID=62887014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810062817.XA Pending CN108320032A (en) 2018-01-23 2018-01-23 A kind of distribution line trip event management method and device

Country Status (1)

Country Link
CN (1) CN108320032A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102208048A (en) * 2011-03-15 2011-10-05 福建省电力有限公司 Technology support system of marketing and distribution integration power supply service and method thereof
CN103761625A (en) * 2014-02-13 2014-04-30 国家电网公司 Outage management system based on information exchange bus and data processing method thereof
CN105305393A (en) * 2015-10-21 2016-02-03 珠海许继芝电网自动化有限公司 Distribution network emergency repair commanding system and method based on marketing and distribution communication
CN105894172A (en) * 2015-11-17 2016-08-24 国家电网公司 Joint outage judging method based on marketing and distribution fusion
CN106203830A (en) * 2016-07-12 2016-12-07 国网江西省电力公司南昌供电分公司 Promote Distribution Network Failure response and the electric service system of repairing ability
CN107506849A (en) * 2017-07-24 2017-12-22 国网江西省电力公司电力科学研究院 A kind of intelligent optimization distribution transforming, which has a power failure, studies and judges system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102208048A (en) * 2011-03-15 2011-10-05 福建省电力有限公司 Technology support system of marketing and distribution integration power supply service and method thereof
CN103761625A (en) * 2014-02-13 2014-04-30 国家电网公司 Outage management system based on information exchange bus and data processing method thereof
CN105305393A (en) * 2015-10-21 2016-02-03 珠海许继芝电网自动化有限公司 Distribution network emergency repair commanding system and method based on marketing and distribution communication
CN105894172A (en) * 2015-11-17 2016-08-24 国家电网公司 Joint outage judging method based on marketing and distribution fusion
CN106203830A (en) * 2016-07-12 2016-12-07 国网江西省电力公司南昌供电分公司 Promote Distribution Network Failure response and the electric service system of repairing ability
CN107506849A (en) * 2017-07-24 2017-12-22 国网江西省电力公司电力科学研究院 A kind of intelligent optimization distribution transforming, which has a power failure, studies and judges system

Similar Documents

Publication Publication Date Title
CN108320086A (en) A kind of power distribution network risk management method and device
Chen et al. Modernizing distribution system restoration to achieve grid resiliency against extreme weather events: An integrated solution
CN101710400B (en) Method and device for evaluating risk of nuclear power station
CN106990328A (en) The analysis of distribution repairing abnormal data, fault location system and method
CN102947801A (en) Malicious attack detection and analysis
KR101278309B1 (en) Outage schedule management apparatus and method in ems
CN105427039A (en) Efficient processing method of distribution network repair work orders based on responsibility areas
CN106357414B (en) Information interacting method and system for base station electric generation management
CN201910672U (en) Rural intelligent power distribution network construction and management system
CN108229841A (en) A kind of data exception processing method and processing device
CN107093017B (en) The business datum acquisition methods and its device and system of power-off event
CN206849087U (en) A kind of grid maintenance task and power failure program data processing system
CN108171362A (en) Power supply facilities breakdown repair method, system and terminal device
CN109697576A (en) A kind of area's line loss exception analysis system
CN107832886A (en) A kind of method that big data supports Utilities Electric Co.'s operation and development
CN108460517A (en) A kind of power distribution network management-control method and device
CN105913126A (en) Transformer station intelligent alarm model method for big data and cloud environment
CN108287290A (en) A kind of power grid cascading fault pre-alarming analysis system based on the operation of big regional power grid
CN108460468A (en) It is a kind of public to become failure event management method and device
CN108320032A (en) A kind of distribution line trip event management method and device
CN103296756A (en) Managing and monitoring system for transformer substation
US10229577B2 (en) Proactive power outage alerts management system and methods
CN106443333A (en) Integrated intelligent communication first-aid repair control system
CN207339915U (en) A kind of vulnerability scanning managing device
CN107425600A (en) One kind power supply distribution transformer monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180724