CN108316931A - 一种渡线段隧道crd法施工方法 - Google Patents
一种渡线段隧道crd法施工方法 Download PDFInfo
- Publication number
- CN108316931A CN108316931A CN201810178372.1A CN201810178372A CN108316931A CN 108316931 A CN108316931 A CN 108316931A CN 201810178372 A CN201810178372 A CN 201810178372A CN 108316931 A CN108316931 A CN 108316931A
- Authority
- CN
- China
- Prior art keywords
- branch
- bridge section
- tunnel
- cut bridge
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 51
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 239000002689 soil Substances 0.000 claims abstract description 40
- 238000005553 drilling Methods 0.000 claims abstract description 14
- 238000007569 slipcasting Methods 0.000 claims abstract description 9
- 230000007123 defense Effects 0.000 claims abstract description 5
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 4
- 239000004567 concrete Substances 0.000 claims abstract description 4
- 239000007788 liquid Substances 0.000 claims abstract description 4
- 239000010959 steel Substances 0.000 claims abstract description 4
- 239000011378 shotcrete Substances 0.000 claims description 12
- 210000005239 tubule Anatomy 0.000 claims description 8
- 238000007596 consolidation process Methods 0.000 claims description 6
- 239000002002 slurry Substances 0.000 claims description 6
- 239000004568 cement Substances 0.000 abstract description 4
- 239000002893 slag Substances 0.000 abstract description 2
- 239000011800 void material Substances 0.000 abstract description 2
- 238000009412 basement excavation Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/003—Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Soil Sciences (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明公开了一种渡线段隧道CRD法施工方法,上台阶核心土范围外掌子面在每排超前小导管注浆前用C20混凝土封闭(厚度50mm)。每榀钢架接头处均设1根锁脚锚管,锚管采用的钢花管,L=2.0m。每个导洞应前后错开不应小于10m,具体错开长度可根据断面长度适当调整。在安装钢架前务必清除地脚下虚渣,超挖部分宜用喷射砼填充,使钢架底坐落在喷射砼垫层上,以防止钢架整体下沉或两边不均匀下沉。区间隧道开挖进尺同格栅间距;区间隧道人防段面、渡线断面1、渡线断面2、渡线断面3采用CRD法施工,每个导洞采用台阶法施工,通过"管超前、严注浆、短进尺、强支护、早封闭、勤量测"方针施工,确保了隧道施工能安全、顺利进行。
Description
技术领域
本发明涉及地铁隧道施工技术领域,具体是一种渡线段隧道CRD法施工方法。
背景技术
在地铁隧道施工中,渡线段隧道需要用矿山法进行大断面开挖,以满足正线段和停车线同处于一个大断面隧道的要求,大断面开挖一般采用中隔墙法(CD法)或交叉中隔墙法(CRD法),CD法是在软弱围岩大跨度隧道中,先分部开挖隧道的一侧,并施作中隔壁,然后再分部开挖另一侧的施工方法。CRD法是在软弱围岩大跨度隧道中,先分部开挖隧道一侧,施作中隔壁和横隔板,再分部开挖隧道另一侧,并完成横隔板施工的施工方法,也就是将隧道分成四个断面进行开挖。当遇到断面跨度过大时,由于采用CD法和CRD法施工,在跨度上均是采用两次分割开挖的方法,存在每次开挖断面跨度过大的问题,在开挖施工过程中,容易出现隧道顶部塌陷。另外,由于隧道断面开挖完成后,需要先做初期支护,其中包括中隔壁的支护,在施做二次衬砌时,必须拆除初期支护的中隔壁,由于断面过大,拆除中隔壁时容易导致隧道顶部塌陷,造成施工安全事故。
发明内容
本发明的目的在于提供一种渡线段隧道CRD法施工方法,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:
一种渡线段隧道CRD法施工方法,具体施工步骤如下:
第一步:
a.施作①部超前小导管,注浆加固地层,并根据土层选择浆液进行注浆;
b.台阶法开挖①部土体,预留核心土,并及时进行格栅支护,打设锁脚锚管;
c.及时进行锚喷作业施工;
第二步:
a.待①部土体下台阶进尺10m以上,台阶法开挖②部土体;并及时进行格栅支护;
b.及时进行锚喷作业施工;
第三步:
a.待②部土体下台阶进尺10m以上,施作③部超前小导管,注浆加固地层,并根据土层选择浆液进行注浆;
b.台阶法开挖③部土体,预留核心土,并及时进行格栅支护,打设锁脚锚管;
c.及时进行锚喷作业施工;
第四步:
a.待③部土体下台阶进尺10m以上,台阶法开挖④部土体,预留核心土,并及时进行格栅支护;
b.及时进行锚喷作业施工。
作为本发明进一步的方案:所述的超前小导管为环向间距0.3m,锁脚锚管为1根40锁脚锚管,L=2m。
作为本发明进一步的方案:所述区间隧道人防段面、渡线断面1、渡线断面2、渡线断面3为CRD法施工,每个导洞采用台阶法施工。
作为本发明进一步的方案:上台阶核心土范围外掌子面在每排超前小导管注浆前用C20混凝土封闭,厚度为50mm;每榀钢架接头处均设1根锁脚锚管,锚管采用的钢花管,L=2.0m;每个导洞应前后错开不应小于10m。
与现有技术相比,本发明的有益效果是:区间隧道人防段面、渡线断面1、渡线断面2、渡线断面3采用CRD法施工,每个导洞采用台阶法施工,通过"管超前、严注浆、短进尺、强支护、早封闭、勤量测"方针施工,确保了隧道施工能安全、顺利进行。
附图说明
图1为本发明的渡线段隧道CRD法施工步骤一的结构示意图。
图2为本发明的渡线段隧道CRD法施工步骤二的结构示意图。
图3为本发明的渡线段隧道CRD法施工步骤三的结构示意图。
图4为本发明的渡线段隧道CRD法施工步骤四的结构示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
本发明实施例中,区间隧道人防段面、渡线断面1、渡线断面2、渡线断面3采用CRD法施工,每个导洞采用台阶法施工。上台阶核心土范围外掌子面在每排超前小导管注浆前用C20混凝土封闭(厚度50mm)。每榀钢架接头处均设1根锁脚锚管,锚管采用的钢花管,L=2.0m。每个导洞应前后错开不应小于10m,具体错开长度可根据断面长度适当调整。在安装钢架前务必清除地脚下虚渣,超挖部分宜用喷射砼填充,使钢架底坐落在喷射砼垫层上,以防止钢架整体下沉或两边不均匀下沉。区间隧道开挖进尺同格栅间距,且应严格执行"管超前、严注浆、短进尺、强支护、早封闭、勤量测"方针施工,确保隧道施工能安全、顺利进行。
一种渡线段隧道CRD法施工方法,具体施工步骤如下:
第一步:请参阅图1所示,
a.施作①部超前小导管,注浆加固地层,并根据土层选择浆液进行注浆;
b.台阶法开挖①部土体,预留核心土,并及时进行格栅支护,打设锁脚锚管;
c.及时进行锚喷作业施工。
第二步:请参阅图2所示,
a.待①部土体下台阶进尺10m以上,台阶法开挖②部土体;并及时进行格栅支护;
b.及时进行锚喷作业施工。
第三步:请参阅图3所示,
a.待②部土体下台阶进尺10m以上,施作③部超前小导管,注浆加固地层,并根据土层选择浆液进行注浆;
b.台阶法开挖③部土体,预留核心土,并及时进行格栅支护,打设锁脚锚管;
c.及时进行锚喷作业施工.
第四步:请参阅图4所示,
a.待③部土体下台阶进尺10m以上,台阶法开挖④部土体,预留核心土,并及时进行格栅支护;
b.及时进行锚喷作业施工。
需要进一步说明的是:所述的超前小导管为环向间距0.3m,锁脚锚管为1根40锁脚锚管,L=2m。
本发明并不局限于上述实施例,在本发明公开的技术方案的基础上,本领域的技术人员根据所公开的技术内容,不需要创造性的劳动就可以对其中的一些技术特征作出一些简单修改、等同变化与修饰,均属于本发明技术方案的范围内。
Claims (4)
1.一种渡线段隧道CRD法施工方法,其特征在于,具体施工步骤如下:
第一步:
a.施作①部超前小导管,注浆加固地层,并根据土层选择浆液进行注浆;
b.台阶法开挖①部土体,预留核心土,并及时进行格栅支护,打设锁脚锚管;
c.及时进行锚喷作业施工;
第二步:
a.待①部土体下台阶进尺10m以上,台阶法开挖②部土体;并及时进行格栅支护;
b.及时进行锚喷作业施工;
第三步:
a.待②部土体下台阶进尺10m以上,施作③部超前小导管,注浆加固地层,并根据土层选择浆液进行注浆;
b.台阶法开挖③部土体,预留核心土,并及时进行格栅支护,打设锁脚锚管;
c.及时进行锚喷作业施工;
第四步:
a.待③部土体下台阶进尺10m以上,台阶法开挖④部土体,预留核心土,并及时进行格栅支护;
b.及时进行锚喷作业施工。
2.根据权利要求1所述的一种渡线段隧道CRD法施工方法,其特征在于,所述的超前小导管为环向间距0.3m,锁脚锚管为1根40锁脚锚管,L=2m。
3.根据权利要求1所述的一种渡线段隧道CRD法施工方法,其特征在于,区间隧道人防段面、渡线断面1、渡线断面2、渡线断面3为CRD法施工,每个导洞采用台阶法施工。
4.根据权利要求3所述的一种渡线段隧道CRD法施工方法,其特征在于,上台阶核心土范围外掌子面在每排超前小导管注浆前用C20混凝土封闭,厚度为50mm;每榀钢架接头处均设1根锁脚锚管,锚管采用的钢花管,L=2.0m;每个导洞应前后错开不应小于10m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810178372.1A CN108316931A (zh) | 2018-03-05 | 2018-03-05 | 一种渡线段隧道crd法施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810178372.1A CN108316931A (zh) | 2018-03-05 | 2018-03-05 | 一种渡线段隧道crd法施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108316931A true CN108316931A (zh) | 2018-07-24 |
Family
ID=62901076
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810178372.1A Pending CN108316931A (zh) | 2018-03-05 | 2018-03-05 | 一种渡线段隧道crd法施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108316931A (zh) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109519176A (zh) * | 2019-01-28 | 2019-03-26 | 粤水电轨道交通建设有限公司 | 富水花岗岩残积土地层矿山法隧道注浆加固方法及结构 |
CN109611101A (zh) * | 2018-12-04 | 2019-04-12 | 中铁二十四局集团有限公司 | 一种矿山法隧道中的断面转换施工工艺 |
CN110107313A (zh) * | 2019-04-26 | 2019-08-09 | 中铁二十三局集团第六工程有限公司 | 一种与既有线路共向的城市地下通道施工方法 |
CN110552704A (zh) * | 2019-09-16 | 2019-12-10 | 北京市市政四建设工程有限责任公司 | 一种富水砂卵石地层渡线段暗挖穿越城市主干道施工方法 |
CN110985002A (zh) * | 2019-11-11 | 2020-04-10 | 中铁十九局集团第五工程有限公司 | 一种用于横向半软半硬断面地层中的隧道施工方法 |
CN111156004A (zh) * | 2020-01-15 | 2020-05-15 | 中铁四局集团第三建设有限公司 | 一种大断面平顶直墙式隧道下穿已有隧道的施工方法 |
CN111236984A (zh) * | 2020-02-28 | 2020-06-05 | 中铁第一勘察设计院集团有限公司 | 基于有效控制初支钢架竖向位移的锁脚体系及其构建方法 |
CN111594185A (zh) * | 2020-05-29 | 2020-08-28 | 中铁一局集团有限公司 | 一种黄土地层条件下隧道全断面机械开挖crd施工方法 |
CN112962694A (zh) * | 2021-02-04 | 2021-06-15 | 中国地质大学(武汉) | 一种矿山法隧道内桥梁桩基托换施工方法 |
CN114109402A (zh) * | 2022-01-29 | 2022-03-01 | 中国铁路设计集团有限公司 | 一种由区间隧道组织实施的暗挖渡线大断面修建方法 |
CN114810091A (zh) * | 2022-04-29 | 2022-07-29 | 中铁建华南建设有限公司 | 一种三台阶法向crd法直接转换快速施工方法 |
CN115142854A (zh) * | 2022-04-29 | 2022-10-04 | 北京城建设计发展集团股份有限公司 | 矿山法隧道单层衬砌结构体系及施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102392648A (zh) * | 2011-10-12 | 2012-03-28 | 北京市轨道交通建设管理有限公司 | 大直径盾构隧道扩挖建造地铁车站的方法 |
CN104790978A (zh) * | 2015-03-10 | 2015-07-22 | 中铁九局集团有限公司 | 小净距立体交叉隧道环形导坑施工方法 |
CN106121659A (zh) * | 2016-06-27 | 2016-11-16 | 中交公局第三工程有限公司 | 一种下穿城市主干道上软下硬地层小断面隧道开挖方法 |
CN106917627A (zh) * | 2017-03-24 | 2017-07-04 | 中建交通建设集团有限公司 | 一种富水地层暗挖施工下导洞的超前支护方法 |
CN107060840A (zh) * | 2017-05-07 | 2017-08-18 | 中铁十八局集团有限公司 | 一种大断面隧道v级围岩开挖支护的施工方法 |
-
2018
- 2018-03-05 CN CN201810178372.1A patent/CN108316931A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102392648A (zh) * | 2011-10-12 | 2012-03-28 | 北京市轨道交通建设管理有限公司 | 大直径盾构隧道扩挖建造地铁车站的方法 |
CN104790978A (zh) * | 2015-03-10 | 2015-07-22 | 中铁九局集团有限公司 | 小净距立体交叉隧道环形导坑施工方法 |
CN106121659A (zh) * | 2016-06-27 | 2016-11-16 | 中交公局第三工程有限公司 | 一种下穿城市主干道上软下硬地层小断面隧道开挖方法 |
CN106917627A (zh) * | 2017-03-24 | 2017-07-04 | 中建交通建设集团有限公司 | 一种富水地层暗挖施工下导洞的超前支护方法 |
CN107060840A (zh) * | 2017-05-07 | 2017-08-18 | 中铁十八局集团有限公司 | 一种大断面隧道v级围岩开挖支护的施工方法 |
Non-Patent Citations (2)
Title |
---|
宋建学: "《施工安全技术与管理》", 30 April 2015, 郑州大学出版社 * |
红枫(豆丁用户名): "《豆丁》", 27 November 2014 * |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109611101A (zh) * | 2018-12-04 | 2019-04-12 | 中铁二十四局集团有限公司 | 一种矿山法隧道中的断面转换施工工艺 |
CN109519176A (zh) * | 2019-01-28 | 2019-03-26 | 粤水电轨道交通建设有限公司 | 富水花岗岩残积土地层矿山法隧道注浆加固方法及结构 |
CN109519176B (zh) * | 2019-01-28 | 2024-04-02 | 粤水电轨道交通建设有限公司 | 富水花岗岩残积土地层矿山法隧道注浆加固方法及结构 |
CN110107313A (zh) * | 2019-04-26 | 2019-08-09 | 中铁二十三局集团第六工程有限公司 | 一种与既有线路共向的城市地下通道施工方法 |
CN110552704A (zh) * | 2019-09-16 | 2019-12-10 | 北京市市政四建设工程有限责任公司 | 一种富水砂卵石地层渡线段暗挖穿越城市主干道施工方法 |
CN110985002A (zh) * | 2019-11-11 | 2020-04-10 | 中铁十九局集团第五工程有限公司 | 一种用于横向半软半硬断面地层中的隧道施工方法 |
CN110985002B (zh) * | 2019-11-11 | 2021-03-23 | 中铁十九局集团第五工程有限公司 | 一种用于横向半软半硬断面地层中的隧道施工方法 |
CN111156004B (zh) * | 2020-01-15 | 2021-03-02 | 中铁四局集团第三建设有限公司 | 一种大断面平顶直墙式隧道下穿已有隧道的施工方法 |
CN111156004A (zh) * | 2020-01-15 | 2020-05-15 | 中铁四局集团第三建设有限公司 | 一种大断面平顶直墙式隧道下穿已有隧道的施工方法 |
CN111236984A (zh) * | 2020-02-28 | 2020-06-05 | 中铁第一勘察设计院集团有限公司 | 基于有效控制初支钢架竖向位移的锁脚体系及其构建方法 |
CN111594185A (zh) * | 2020-05-29 | 2020-08-28 | 中铁一局集团有限公司 | 一种黄土地层条件下隧道全断面机械开挖crd施工方法 |
CN111594185B (zh) * | 2020-05-29 | 2021-11-26 | 中铁一局集团有限公司 | 一种黄土地层条件下隧道全断面机械开挖crd施工方法 |
CN112962694A (zh) * | 2021-02-04 | 2021-06-15 | 中国地质大学(武汉) | 一种矿山法隧道内桥梁桩基托换施工方法 |
CN114109402A (zh) * | 2022-01-29 | 2022-03-01 | 中国铁路设计集团有限公司 | 一种由区间隧道组织实施的暗挖渡线大断面修建方法 |
CN114109402B (zh) * | 2022-01-29 | 2022-04-22 | 中国铁路设计集团有限公司 | 一种由区间隧道组织实施的暗挖渡线大断面修建方法 |
CN114810091A (zh) * | 2022-04-29 | 2022-07-29 | 中铁建华南建设有限公司 | 一种三台阶法向crd法直接转换快速施工方法 |
CN115142854A (zh) * | 2022-04-29 | 2022-10-04 | 北京城建设计发展集团股份有限公司 | 矿山法隧道单层衬砌结构体系及施工方法 |
CN114810091B (zh) * | 2022-04-29 | 2022-12-27 | 中铁建华南建设有限公司 | 一种三台阶法向crd法直接转换快速施工方法 |
US11821316B1 (en) | 2022-04-29 | 2023-11-21 | Beijing Urban Construction Design & Development Group Co. Limited | System and construction method of single-layer lining tunnel structure based on mine-tunnelling method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108316931A (zh) | 一种渡线段隧道crd法施工方法 | |
CN111594181B (zh) | 新增暗挖通道与既有站厅层连通接驳施工方法 | |
CN108442943A (zh) | 一种渡线段隧道双侧壁导坑法施工方法 | |
CN107605489B (zh) | 三线大跨隧道斜井进正洞施工方法 | |
CN102606167B (zh) | 浅埋暗挖隧道横向注浆导管沉降控制施工方法 | |
CN104389610B (zh) | 一种穿越运营高速公路隧道超短台阶施工方法 | |
CN102606168B (zh) | 防止浅埋暗挖隧道开挖时沉降变形的施工方法 | |
CN104329095B (zh) | 一种既有隧道拓宽施工方法 | |
CN108457656A (zh) | 一种出土隧道施工方法 | |
CN109812270A (zh) | 一种隧道穿越富水填充型溶洞的支护结构及其施工方法 | |
CN110159298A (zh) | 一种地铁暗挖车站初支扣拱施工方法 | |
CN108589771A (zh) | 一种已运营地下车站增层换乘节点施工方法 | |
CN105065037A (zh) | 公路软岩隧道双层拱架支护施工方法 | |
CN107939415A (zh) | 浅埋大跨软塑粘土隧道留核心土微二台阶施工方法 | |
CN102953737A (zh) | Ⅵ级富水围岩隧道仰拱施工方法 | |
CN108166989A (zh) | 富水地层“oc”形非对称联拱隧道中隔壁施工方法 | |
CN106988750A (zh) | 一种大跨度区间隧道超近距离下穿既有站的实施方式 | |
CN110318772A (zh) | 黄土地区大跨小净距非对称断面隧道支护结构及施工方法 | |
CN104405411A (zh) | 超大变断面隧道支护结构 | |
CN107130607A (zh) | 建筑物地下室支护 | |
CN103993885A (zh) | 一种暗挖隧道侧向开洞支撑体系构建方法 | |
CN108561156A (zh) | 分离式隧道换拱支护结构及其施工方法 | |
CN113669073B (zh) | 一种控制临近建筑变形的富水砂性地层先隧后站施工方法 | |
CN104963693B (zh) | 矩形平行顶管联络通道施工方法 | |
CN108756897B (zh) | 一种破碎围岩人防隧道交叉点的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180724 |