CN108316670A - Steel pipe underpinning construction method under a kind of existing construction foundation basis - Google Patents

Steel pipe underpinning construction method under a kind of existing construction foundation basis Download PDF

Info

Publication number
CN108316670A
CN108316670A CN201810137988.4A CN201810137988A CN108316670A CN 108316670 A CN108316670 A CN 108316670A CN 201810137988 A CN201810137988 A CN 201810137988A CN 108316670 A CN108316670 A CN 108316670A
Authority
CN
China
Prior art keywords
steel pipe
pipe
drilling machine
construction
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810137988.4A
Other languages
Chinese (zh)
Other versions
CN108316670B (en
Inventor
佟建兴
王学彬
孙训海
杨新辉
陶德明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANYAN FOUNDATION ENGINEERING LLC
Original Assignee
JIANYAN FOUNDATION ENGINEERING LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANYAN FOUNDATION ENGINEERING LLC filed Critical JIANYAN FOUNDATION ENGINEERING LLC
Priority to CN201810137988.4A priority Critical patent/CN108316670B/en
Publication of CN108316670A publication Critical patent/CN108316670A/en
Application granted granted Critical
Publication of CN108316670B publication Critical patent/CN108316670B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/06Separating, lifting, removing of buildings; Making a new sub-structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/48Foundations inserted underneath existing buildings or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses steel pipe underpinning construction method under a kind of existing construction foundation basis, drilling machine underpins building side working face quasi-, and double-wall drill pipe is punched foundation soil to the building other side, removes interior drilling rod;Outer wall pipe bit is removed, uses connector to be locked with drilling machine outer wall pipe with outer wall pipe equal diameter steel pipe into the soil body being intended to underpin;Drilling machine is pulled back outer wall pipe, and drive underpins steel pipe and drags together, while in drilling machine active side removal outer wall pipe section by section, being dragged in completely in predetermined foundation soil until steel pipe is underpined;Successively steel pipe construction is underpined by root completion;It can be built into steel reinforcement cage, grout injection or cement mortar to steel pipe is underpined, increase the rigidity for underpining steel pipe.The construction method and simple for process of the present invention, very small to structure foundation soil construction disturbance, no collapse hole risk can closely carry out underpinning construction under building basis, can the operation in narrow construction space, meet the irrealizable construction of traditional construction engineering method.

Description

Steel pipe underpinning construction method under a kind of existing construction foundation basis
Technical field
The present invention is steel pipe underpinning construction method under a kind of existing construction foundation basis, belongs to existing building foundation Field of reinforcement.
Background technology
With Chinese national economy fast development, urban construction scale and underground space development constantly expand, in recent years, both There are building especially and need existing old house to be protected, the foundation underpinning project of landmark increasing.
In most cases, existing old house, landmark have the characteristics that building is of the remote past, structure type is fragile, When carrying out underpinning construction under the foundation, it is desirable that cannot generate foundation soil and superstructure compared with large disturbances, foundation soil cannot be caused It caves in.And certain special formation situations and construction operation condition, such as foundation soil are sandy gravel, silt, weak soil, banketed, Rich groundwater, basis is lower closely to carry out underpinning construction, and construction space operation is narrow, very using traditional pipe roof construction engineering method Hardly possible is applicable in, therefore just needs a kind of new construction method, to realize in above-mentioned certain special formation situations and construction operation condition Under steel pipe underpinning construction.
Invention content
The purpose of the present invention is to provide a kind of simple operation, it is cheap, safe and reliable, quality is high-quality the advantages that both There is steel pipe underpinning construction method under building foundation, foundation soil and superstructure are generated compared with large disturbances to avoid construction, from And cause that foundation soil caves in and building occurs larger sedimentation and even cracks, and working space is overcome to be limited, accelerate construction progress, It finally ensures the construction quality, reduces construction cost, creates maximum return.
To achieve the above object, the present invention provides steel pipe underpinning construction method under a kind of existing construction foundation basis, packets Include following steps:
Step 1: excavating the quasi- building both sides that underpin to basic following designed elevation, smooth location ensures that drilling machine can be just Often walking and work;
Step 2: drilling machine drives into building side work-yard i.e. active side, the double-wall drill pipe of drilling machine is pierced along level It in the quasi- foundation soil underpined under building basis, and punches to quasi- and underpins building other side working face, remove the interior brill of drilling machine Bar;
Step 3: removing drilling machine outer wall pipe bit, steel pipe is underpined using connector and drilling machine into the soil body being intended to underpin Outer wall pipe is locked;
Step 4: starting drilling machine, drilling machine outer wall pipe of pulling back underpins steel pipe and drags together, and building basis is underpined into quasi- Under foundation soil in, rotated simultaneously when ground soil resistance is big, shake drilling machine outer wall pipe and pull back, at the same drilling machine active side section by section Removal outer wall pipe is dragged in until steel pipe is underpined in predetermined foundation soil completely.
Step 5: being built into steel reinforcement cage, grout injection or cement mortar to steel pipe is underpined, increase underpins the rigid of steel pipe Degree.
Step 6: repeating step 1-step 5, the construction for underpining steel pipe is completed by root successively, building base is underpined quasi- Formed in foundation soil under plinth closely connect it is in a row underpin steel pipe, underpin steel pipe both ends and be fixed on and quasi- underpin building both sides Joist on, joist is fixed in vertical exchange pillar or stake, hold it is quasi- underpin building, ensure quasi- to underpin building stability.
Step 7: carrying out underground space earth excavation and Underground Construction under underpinning structure.
In a kind of preferred construction method, double-wall drill pipe is crept into step 2, inputs circulation fluid using interior drilling rod, inside Deslagging between drilling rod and outer wall pipe.
In a kind of preferred construction method, it is intended to underpin the steel pipe in foundation soil in step 3 and is necessarily less than or equal to brill Machine outer wall pipe diameter just can guarantee that step 4 is smoothed out in this way.
In a kind of preferred construction method, the connector in step 3 is connect with drilling machine outer wall pipe screw thread, and underpins steel Pipe uses pin joint, welding or threaded connection.
In a kind of preferred construction method, it is the complete steel pipe that a satisfaction underpins length that steel pipe is underpined in step 4, Or it is soldered to section by section using short steel pipes and underpins length.
In a kind of preferred construction method, step 5 need to be required according to underpinning beam, and decision underpins whether steel pipe needs It is built into steel reinforcement cage, grout injection or cement mortar, to increase the rigidity for underpining steel pipe.
In a kind of preferred construction method, joist is armored concrete fine strain of millet or section steel beam in step 6, will side by side Steel pipe is underpined to fix, joist is fixed in vertical exchange pillar or stake, hold it is quasi- underpin building, ensure that quasi- to underpin building steady It is fixed.
The construction method and simple for process, no collapse hole risk very small to structure foundation soil construction disturbance of the present invention, can Underpinning construction is closely carried out under building basis, can the operation in narrow construction space, meet traditional construction engineering method Irrealizable construction.
Description of the drawings
Fig. 1 is the implementing procedure figure of the present invention.
Fig. 2 is to underpin steel pipe construction diagrammatic cross-section.
Fig. 3 is diagrammatic cross-section after the completion of underpining.
Specific implementation mode
With reference to specific embodiment, the present invention will be further described.
As shown in Fig. 1, a kind of existing construction foundation basis steel pipe underpinning construction engineering method shown in the present invention, this method packet It includes:Excavate the following designed elevation in building both sides to basis, smooth location;Drilling machine drives into the (work of building side work-yard Side), double-wall drill pipe is pierced under building basis in foundation soil by design angle, and punches to building other side working face, Segment of drillpipe in removing;Outer wall pipe bit is removed, steel pipe is underpined using connector and outer wall pipe lock into the soil body being intended to underpin Tightly;Start drilling machine, outer wall pipe of pulling back underpins steel pipe and drags together, into foundation soil, can turn simultaneously when ground soil resistance is big Dynamic, vibrations outer wall pipe is pulled back, while in drilling machine active side removal outer wall pipe section by section, until being dragged in reservation place completely steel pipe is underpined In base soil;It can be built into steel reinforcement cage, grout injection or cement mortar to steel pipe is underpined, increase equal diameter and underpin the rigid of steel pipe Degree.As shown in Fig. 2.
The construction for underpining steel pipe by root completion successively, forms in foundation soil in this way under building basis and closely connects into one Row's underpins steel pipe, underpins steel pipe both ends and is fixed on the joist of building both sides, and joist is fixed on vertical exchange pillar (stake), Building is held, ensures building stability;Carry out underground space earth excavation and Underground Construction under underpinning structure.Such as attached drawing Shown in 3.
The diameter for underpining steel pipe be necessarily equal to or less than drilling machine outer wall pipe diameter.Connector and drilling machine outer wall pipe spiral shell Line connects, and pin joint, welding or threaded connection can be used with steel pipe is underpined, and easy to disassemble.It is that a satisfaction underpins to underpin steel pipe The complete steel pipe of length can also be section by section soldered to using short steel pipes and underpin length, and wall thickness, which need to meet, underpins load requirement.Double-walled When rod boring, circulation fluid, the deslagging between interior drilling rod and outer wall pipe are inputted using interior drilling rod.It is required according to underpinning beam, certainly Surely underpin whether steel pipe needs to be built into steel reinforcement cage, grout injection or cement mortar.
It is the exemplary embodiments of the present invention above, implementation of the invention is without being limited thereto.

Claims (7)

1. steel pipe underpinning construction method under a kind of existing construction foundation basis, it is characterised in that:Include the following steps:
Step 1: excavating the quasi- building both sides that underpin to basic following designed elevation, smooth location ensures that drilling machine being capable of normal row It walks and works;
Step 2: drilling machine drives into building side work-yard i.e. active side, the double-wall drill pipe of drilling machine is pierced into quasi- support along level It changes in the foundation soil under building basis, and punches to quasi- and underpin building other side working face, remove the interior drilling rod of drilling machine;
Step 3: removing drilling machine outer wall pipe bit, steel pipe is underpined using connector and drilling machine outer wall into the soil body being intended to underpin Pipe is locked;
Step 4: starting drilling machine, drilling machine outer wall pipe of pulling back underpins steel pipe and drags together, is underpined under building basis into quasi- It in foundation soil, rotated simultaneously when ground soil resistance is big, shake drilling machine outer wall pipe and pull back, while in drilling machine active side removal section by section Outer wall pipe is dragged in until steel pipe is underpined in predetermined foundation soil completely;
Step 5: being built into steel reinforcement cage, grout injection or cement mortar to steel pipe is underpined, increase the rigidity for underpining steel pipe;
Step 6: repeating step 1-step 5, the construction for underpining steel pipe is completed by root successively, is underpined under building basis quasi- Foundation soil in formed closely connect it is in a row underpin steel pipe, underpin steel pipe both ends and be fixed on the quasi- support for underpining building both sides Liang Shang, joist are fixed in vertical exchange pillar or stake, are held and are intended underpining building, ensure to intend underpining building stability;
Step 7: carrying out underground space earth excavation and Underground Construction under underpinning structure.
2. steel pipe underpinning construction method under a kind of existing construction foundation basis according to claim 1, it is characterised in that:Step Double-wall drill pipe is crept into rapid two, and circulation fluid, the deslagging between interior drilling rod and outer wall pipe are inputted using interior drilling rod.
3. steel pipe underpinning construction method under a kind of existing construction foundation basis according to claim 1, it is characterised in that:Step It is intended to underpin the steel pipe in foundation soil in rapid three and is necessarily less than or is equal to drilling machine outer wall pipe diameter, just can guarantee that step 4 is suitable in this way Profit carries out.
4. steel pipe underpinning construction method under a kind of existing construction foundation basis according to claim 1, it is characterised in that:Step Connector in rapid three is connect with drilling machine outer wall pipe screw thread, and pin joint, welding or threaded connection are used with steel pipe is underpined.
5. steel pipe underpinning construction method under a kind of existing construction foundation basis according to claim 1, it is characterised in that:Step It is the complete steel pipe that a satisfaction underpins length that steel pipe is underpined in rapid four, or is soldered to section by section using short steel pipes and underpins length.
6. steel pipe underpinning construction method under a kind of existing construction foundation basis according to claim 1, it is characterised in that:Step Rapid five need to require according to underpinning beam, and decision underpins whether steel pipe needs to be built into steel reinforcement cage, grout injection or cement mortar, To increase the rigidity for underpining steel pipe.
7. steel pipe underpinning construction method under a kind of existing construction foundation basis according to claim 1, it is characterised in that:Step Joist is armored concrete fine strain of millet or section steel beam in rapid six, the steel pipe that underpins side by side is fixed, joist is fixed on vertical exchange pillar Or in stake, hold and intend underpining building, ensures to intend underpining building stability.
CN201810137988.4A 2018-02-10 2018-02-10 Steel pipe underpinning construction method under existing building foundation Active CN108316670B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810137988.4A CN108316670B (en) 2018-02-10 2018-02-10 Steel pipe underpinning construction method under existing building foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810137988.4A CN108316670B (en) 2018-02-10 2018-02-10 Steel pipe underpinning construction method under existing building foundation

Publications (2)

Publication Number Publication Date
CN108316670A true CN108316670A (en) 2018-07-24
CN108316670B CN108316670B (en) 2020-01-10

Family

ID=62903567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810137988.4A Active CN108316670B (en) 2018-02-10 2018-02-10 Steel pipe underpinning construction method under existing building foundation

Country Status (1)

Country Link
CN (1) CN108316670B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335670A (en) * 2020-03-18 2020-06-26 同济大学建筑设计研究院(集团)有限公司 Method for constructing foundation pit and newly adding underground structure in situ under existing reserved building
CN111456080A (en) * 2020-03-12 2020-07-28 浙江大学城市学院 Steel pipe underpinning construction method under existing building foundation
CN113294010A (en) * 2021-06-09 2021-08-24 广州市鲁班建筑科技集团股份有限公司 Structure for separating bottom of ancient coffin chamber and construction method thereof
CN113323011A (en) * 2021-06-30 2021-08-31 武汉武建机械施工有限公司 Novel underpinning construction method for steel pipe under existing building foundation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101956466A (en) * 2010-09-13 2011-01-26 董兰田 Technical method for finishing vertical lifting in integral translation process of building
CN102127974A (en) * 2011-04-18 2011-07-20 上海现代建筑设计(集团)有限公司 Design and construction method of additional cellar under existing building
CN203856227U (en) * 2014-03-21 2014-10-01 上海建工四建集团有限公司 In-situ underground spatial structure of existing building
CN207739298U (en) * 2017-10-13 2018-08-17 建研地基基础工程有限责任公司 A kind of existing construction foundation basis steel pipe underpinning construction device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101956466A (en) * 2010-09-13 2011-01-26 董兰田 Technical method for finishing vertical lifting in integral translation process of building
CN102127974A (en) * 2011-04-18 2011-07-20 上海现代建筑设计(集团)有限公司 Design and construction method of additional cellar under existing building
CN203856227U (en) * 2014-03-21 2014-10-01 上海建工四建集团有限公司 In-situ underground spatial structure of existing building
CN207739298U (en) * 2017-10-13 2018-08-17 建研地基基础工程有限责任公司 A kind of existing construction foundation basis steel pipe underpinning construction device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456080A (en) * 2020-03-12 2020-07-28 浙江大学城市学院 Steel pipe underpinning construction method under existing building foundation
CN111335670A (en) * 2020-03-18 2020-06-26 同济大学建筑设计研究院(集团)有限公司 Method for constructing foundation pit and newly adding underground structure in situ under existing reserved building
CN113294010A (en) * 2021-06-09 2021-08-24 广州市鲁班建筑科技集团股份有限公司 Structure for separating bottom of ancient coffin chamber and construction method thereof
CN113323011A (en) * 2021-06-30 2021-08-31 武汉武建机械施工有限公司 Novel underpinning construction method for steel pipe under existing building foundation

Also Published As

Publication number Publication date
CN108316670B (en) 2020-01-10

Similar Documents

Publication Publication Date Title
CN108316670A (en) Steel pipe underpinning construction method under a kind of existing construction foundation basis
CN101122130B (en) Construction method of drilling follow casting pile used for building or bridge foundation
CN105735251B (en) Cutting type full-casing follow-up pile-forming construction method and system of bridge pile foundation rotary drilling rig
CN103306687B (en) Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method
CN110409461A (en) A kind of base pit stand construction based on assembled large-diameter tubular pile
CN108166483A (en) Bored pile construction method
CN105780763A (en) Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile
CN107035376B (en) One kind common law in huge thick bedrock aquifer digs shaft construction method
CN106545007A (en) The method of pile in stratum of the bottom for hard rock stratum
CN109026097A (en) A kind of double drill bit drilling construction methods of anti-float anchor rod
CN106320403A (en) Inclination rectification and reinforcement method for existing building
CN103485347A (en) Batter pile used for building foundation pit support and construction method thereof
CN105649010A (en) Grouting pile construction technology
CN102747729A (en) Sleeve connection device for bored cast-in-place pile construction
CN102839661A (en) Construction technology of reelingly stirring to eject anchor tube pile
CN102134861B (en) Method for testing precast pile in soil body
CN107687167B (en) A kind of I-steel mini pile pile making method
JP2007332559A (en) Removal method for existing underground pile
CN205605114U (en) Karst karst area prestressed anchorage cable drilling equipment
CN111877344A (en) Old pipe pile breaking method
CN207739298U (en) A kind of existing construction foundation basis steel pipe underpinning construction device
CN105804079A (en) Tool and method for smashing hard rock in large-diameter pile hole
CN1401858A (en) Method for anchor bolt construction by double sleeve
CN210396738U (en) Air-leg rock drill bit
KR102325623B1 (en) Construction method of retaining wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant