- CN108316337A CN108316337A CN201810315724.3A CN201810315724A CN108316337A CN 108316337 A CN108316337 A CN 108316337A CN 201810315724 A CN201810315724 A CN 201810315724A CN 108316337 A CN108316337 A CN 108316337A
- Authority
- CN
- China
- Prior art keywords
- foundation
- main transformer
- oil pit
- track girder
- prefabricated assembled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 claims abstract description 13
- 239000011159 matrix material Substances 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 6
- 239000011178 precast concrete Substances 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 abstract description 12
- 230000007812 deficiency Effects 0.000 abstract description 5
- 239000004567 concrete Substances 0.000 description 8
- 238000009434 installation Methods 0.000 description 8
- 238000000034 method Methods 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 238000009417 prefabrication Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001680 brushing effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Foundations (AREA)
Abstract
The present invention relates to the integral prefabricated assembled main transformer foundations and oil pit structure for indoor substation.It includes the building raft foundation poured, the foundation bolt of the pre-buried matrix arrangement in position of main transformer is set on the building raft foundation, foundation pile is set on the foundation bolt, connecting cross beam at the top of the foundation pile, track girder is arranged along the length direction of building raft foundation in the capital of the foundation pile, the track girder is arranged with beam vertical, oil pit wall card slot is preset on building raft foundation around the main transformer, oil pit wall is placed in the card slot, and oil pit wall top connects the crossbeam and track girder.Present invention employs the integral assembling technologies of main transformer foundation, overcome the deficiency of traditional main transformer foundation cast-in-place construction, the duration of main transformer foundation subdivisional work can be greatlyd save, improve construction efficiency, Framework Architecture stability is good, bearing capacity is strong, and so that oil pit oil leak probability is substantially reduced using novel splicing prefabricated wallboard technology.
Description
Technical field
The invention belongs to main transformer of transformer substation basic technology fields, and more particularly, to indoor substation is whole pre-
Assembled main transformer foundation processed and oil pit structure.
Background technology
Full indoor substation usually has main transformer in a layer arrangement, since transformer weight is big, generally can not directly put
It sets on floor, needs that basis is separately provided.Indoor substation is typically provided with one layer of basement, and main transformer foundation is placed in basement
It is interior, do an entirety with basement bottom board or the whole raft foundation built.
Under prior art conditions, substation's basement part generally use cast-in-place concrete structure.Main transformer foundation is also adopted
Use cast-in-place concrete structure.Main transformer foundation needs setting track girder due to needing to meet equipment in place and the requirement of equipment conveying
And buttress, setting collection oil pit by through hole is also needed to around main transformer, similar to pool construction, generally use surrounding is poured to be erected collection oil pit by through hole
The concrete panel come surrounds.These components all use cast-in-place concrete, the reserved joint bar from sole plate to be poured on basis
After the completion, assembling reinforcement, formwork, pour, conserve, finally complete.Whole process is complicated, simultaneously because main transformer foundation buttress, beam
Between spacing it is smaller, operation is difficult, causes formwork difficult, and it is big to pour difficulty, and the duration is longer.
There are many performances of the patent of assembled main transformer foundation to be independent main transformer foundation at present, and this basis is suitable for family
Outer substation, for indoor not the relevant technologies that are being combined with underground chamber base and integrally being assembled with oil pit of standing.This technology
The technical staff in field is dedicated to solving above-mentioned technological deficiency.
Invention content
In view of the drawbacks described above of the prior art, technical purpose of the invention is to provide that a kind of process is simple, operator
Just, short time limit, the safe and efficient integral prefabricated assembled main transformer foundation and oil pit structure for being used for indoor substation.
To realize the above-mentioned technical purpose, technical solution provided by the invention is as follows:
Integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation comprising the building raft poured
Plate basis, the foundation bolt for building the pre-buried matrix arrangement in position of setting main transformer on raft foundation, the lower margin spiral shell
Foundation pile is set on bolt, and foundation pile top connecting cross beam, the capital of the foundation pile is along the length side of building raft foundation
To setting track girder, the track girder is arranged with beam vertical, and oil is preset on the building raft foundation around the main transformer
Crater wall card slot, oil pit wall are placed in the card slot, and oil pit wall top connects the crossbeam and track girder.
The above-mentioned integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, the building raft
Four row's foundation bolts of pre-buried setting along its length on the basis of plate, two foundation bolts of often row's setting.
The above-mentioned integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, the oil pit wall
Built-in connection is arranged in the corresponding position on top, and the connector is welded to connect the crossbeam and track girder.
The above-mentioned integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, the oil pit wall
Waterproof material is filled between card slot.
The above-mentioned integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, the track girder
Using steel I-beam.
The above-mentioned integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, the track girder
Between be arranged cobble grid.
The above-mentioned integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, the track girder
It is welded in the foundation columns.
The above-mentioned integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, the foundation columns
For the I-shaped column of Prefabricated steel construction or precast concrete column.
Beneficial effects of the present invention:
Present invention employs the integral assembling technologies of main transformer foundation, by main transformer foundation prefabrication and assembly construction in building raft foundation
On, the deficiency of traditional main transformer foundation cast-in-place construction is overcome, the duration of main transformer foundation subdivisional work can be greatlyd save, while not
Subsequent handling is influenced, construction efficiency is improved, entire foundation columns form frame system, structural stability with crossbeam, track girder
Good, bearing capacity is strong, saves amount of concrete, after the waterproof construction of card slot and oil pit wall can effectively ensure that basis installation is complete
Water resistance, oil pit oil leak probability substantially reduce.
Description of the drawings
Fig. 1 is the planar structure schematic diagram of the present invention;
Fig. 2 is the sectional view of Section A-A in Fig. 1;
Fig. 3 is the sectional view of section B-B in Fig. 1;
Fig. 4 is the sectional view in the sections C-C in Fig. 1;
Fig. 5 is oil pit wall water proof structure;
Wherein, 1, building raft foundation, 2, oil pit wall, 3, track girder, 4, crossbeam, 5, foundation columns, 6, the pre-buried company of oil pit wall
Fitting, 7, foundation bolt, 8, backing plate, 9, water tight packing, 10, grid, 11, cobble, 12, grill bearing part, 201, oil pit wall end
Section waterproof structure.
Specific implementation mode
The technique effect of the design of the present invention, concrete structure and generation is described further below with reference to attached drawing, with
It is fully understood from the purpose of the present invention, feature and effect.
Embodiment:
Referring to Fig.1, Fig. 2, Fig. 3, the present invention include cast-in-place building entirety raft foundation 1, the building raft foundation 1
The foundation bolt 7 of the pre-buried matrix arrangement in position of upper setting main transformer is built on the basis of raft plate 1 described in this example along length
Four row's foundation bolts 7 of the pre-buried setting in direction, two foundation bolts 7 of often row's setting.Backing plate 8, institute are set on the foundation bolt 7
Setting foundation pile 5 on backing plate 8 is stated, 5 top connecting cross beam 4 of the foundation pile, the capital of the foundation pile 5 is along 1 base of building raft plate
The length direction welding setting track girder 3 of plinth, the track girder 3 use steel I-beam.The track girder 3 is vertical with crossbeam 4 to be set
It sets, oil pit wall card slot is preset on the building raft foundation 1 around the main transformer, oil pit wall 2 is placed in the card slot, institute
It states and fills waterproof material 9 between oil pit wall 2 and card slot.
With reference to Fig. 4, grill bearing part 12 is set on the track girder 3, cobble grid is set on the grill bearing part 12
10, the cobble grid 10 is interior to be arranged cobble 11.
With reference to Fig. 5, built-in connection 6 is arranged in the corresponding position that the oil pit wall 2 pushes up, and the connector 6 is welded to connect institute
State crossbeam 4 and track girder 3.These beams can be welded or are bolted.
The construction procedure of the present invention:
1, before the raft foundation of substation's building pours, in the foundation bolt of the pre-buried main transformer foundation column in precalculated position
With the card slot of oil pit wall, later basic maintenance completion.
2, main transformer foundation column is installed at foundation bolt, main transformer foundation column is two rows, one group of a row, every group of component
Including two foundation columns, three crossbeams, this partial component is welded as a whole for prefabrication, transport to in-site installation.
3, after after 4 groups of foundation columns, installation is complete, the track girder of installation twice longitudinal direction, track girder can pass through with foundation columns
It is welded to connect.
4, oil pit siding, top of panels pre-embedded steel slab or built-in fitting are installed, it can be with crossbeam, track girder and grill bearing
Part is welded to connect.The pre-buried waterproof construction in end of siding side, such as Fig. 5.After first piece of siding is in place, bottom is put into card slot, inside
After being welded and fixed with beam, then second piece is lifted, lifted from the top down, the mutual clamping of waterproof connector of end, then third
Block, and so on.After all sidings install, line chart brushes one times waterproof material in the preformed groove of bottom raft plate, then uses again
Waterproof mortar fills groove.The brushing waterproof material at plate end connection again, then at the gap in two pieces of flashing members
Fill waterproof mortar.
5, siding has just had main transformer mounting condition after installation is complete.After installation is complete after main transformer, both sides up and down are placed
Flase floor is then paved with cobble on flase floor, in order to oil strain and fire prevention.
Advantages of the present invention:
1, main transformer foundation integral assembling technology is used, raft foundation is built combining, overcomes previous prefabricated main transformer base
Plinth must make the deficiency that isolated footing can not be combined with building raft foundation, and raft plate top is needed to the basis of cast-in-place completion
Quantities is all changed to prefabrication and assembly construction, 80% or more the duration of main transformer foundation subdivisional work can be saved using this patent maximum, together
When do not influence subsequent handling;
2, the assembled completion together with main transformer oil pit by main transformer foundation, improves previous only prefabricated main transformer foundation and oil pit must
The deficiency that must finally construct after installation is complete in main transformer equally greatly improves efficiency and saves the duration;
3, crossbeam is not only arranged in the application, is also provided with long rails beam, and entire foundation columns form frame with beam body system
System, structural stability is good, and bearing capacity is strong, and more previous mass concrete main transformer foundation saves 60% amount of concrete;
4, track girder be not only able to keep stablize, while can also serve as main transformer transporting and hoisting it is in place during track, just
Do not have to individually set up conveying track again when position, relatively previous prefabricated main transformer foundation improves the efficiency of transportational process;
5, due to oil pit wall is too long can not be integral prefabricated, need to assemble after being segmented prefabricated transport to scene.Several pieces of assemblings
When, this card slot waterproof is all used between every two pieces, the right-angle side and opposite side Novel clamping slot waterproof that oil pit wall surrounding wallboard uses
Technology can effectively ensure that water resistance of the basis after installation is complete, oil pit oil leak probability substantially reduce.
6, track girder uses steel I-beam, and after main transformer is in place, flange plate can also serve as cobble lattice at the top and bottom of track girder
The scrap (bridge) of grid, a material is multi-purpose, improves later stage efficiency of assembling.
This patent is a kind of technology can be widely applied to indoor substation main transformer foundation construction, has wide answer
Use foreground.
The preferred embodiment of the present invention has been described in detail above.It should be appreciated that those skilled in the art without
It needs creative work according to the present invention can conceive and makes many modifications and variations.Therefore, all technologies in the art
Personnel can be obtained by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea
Technical solution, all should be in the protection domain being defined in the patent claims.
Claims (8)
1. integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, which is characterized in that including what is poured
Raft foundation is built, the foundation bolt of the pre-buried matrix arrangement in position of main transformer is set on the building raft foundation, it is described
Foundation pile is set on foundation bolt, and foundation pile top connecting cross beam, the capital of the foundation pile is along building raft foundation
Track girder is arranged in length direction, and the track girder is arranged with beam vertical, on the building raft foundation around the main transformer
Default oil pit wall card slot, oil pit wall are placed in the card slot, and oil pit wall top connects the crossbeam and track girder.
2. the integral prefabricated assembled main transformer foundation and oil pit structure according to claim 1 for indoor substation,
It is characterized in that, four row's foundation bolts of pre-buried setting along its length on the building raft foundation, two lower margin spiral shells of often row's setting
Bolt.
3. the integral prefabricated assembled main transformer foundation and oil pit structure according to claim 1 for indoor substation,
It is characterized in that, built-in connection is arranged in the corresponding position on oil pit wall top, and the connector is welded to connect the crossbeam and rail
Road beam.
4. the integral prefabricated assembled main transformer foundation and oil pit structure according to claim 1 for indoor substation,
It is characterized in that, waterproof material is filled between the oil pit wall and card slot.
5. the integral prefabricated assembled main transformer foundation and oil pit structure according to claim 1 for indoor substation,
It is characterized in that, the track girder uses steel I-beam.
6. the integral prefabricated assembled main transformer foundation and oil pit structure according to claim 1 for indoor substation,
It is characterized in that, cobble grid is set between the track girder.
7. the integral prefabricated assembled main transformer foundation and oil pit structure according to claim 1 for indoor substation,
It is characterized in that, the track girder is welded in the foundation columns.
8. the integral prefabricated assembled main transformer foundation and oil pit structure according to claim 1 for indoor substation,
It is characterized in that, the foundation columns are the I-shaped column of Prefabricated steel construction or precast concrete column.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810315724.3A CN108316337A (en) | 2018-04-10 | 2018-04-10 | Integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810315724.3A CN108316337A (en) | 2018-04-10 | 2018-04-10 | Integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108316337A true CN108316337A (en) | 2018-07-24 |
Family
ID=62898136
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810315724.3A Pending CN108316337A (en) | 2018-04-10 | 2018-04-10 | Integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108316337A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110318414A (en) * | 2019-06-06 | 2019-10-11 | 浙江华云电力工程设计咨询有限公司 | A kind of assembled sets of brackets on top of the columns basis |
CN110541428A (en) * | 2019-08-20 | 2019-12-06 | 浙江大学 | Foundation structure of transformer substation distribution device building |
CN111335686A (en) * | 2020-03-13 | 2020-06-26 | 广东顺德电力设计院有限公司 | Transformer substation building structure built by adopting prefabricated parts |
CN112681851A (en) * | 2020-12-18 | 2021-04-20 | 宁波市电力设计院有限公司 | Prefabricated unit assembly structure of large-volume underground structure |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102322071A (en) * | 2011-06-29 | 2012-01-18 | 浙江省电力设计院 | Universal base structure of main transformer of 220kV substation |
CN104652468A (en) * | 2015-02-15 | 2015-05-27 | 成都城电电力工程设计有限公司 | Common transformer foundation and construction method |
CN107447773A (en) * | 2017-07-14 | 2017-12-08 | 中国能源建设集团浙江省电力设计院有限公司 | A kind of main transformer basis manufacture method for being used to discharge data constraint |
CN208415293U (en) * | 2018-04-10 | 2019-01-22 | 上海电力设计院有限公司 | Integral prefabricated assembled main transformer foundation for indoor substation |
-
2018
- 2018-04-10 CN CN201810315724.3A patent/CN108316337A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102322071A (en) * | 2011-06-29 | 2012-01-18 | 浙江省电力设计院 | Universal base structure of main transformer of 220kV substation |
CN104652468A (en) * | 2015-02-15 | 2015-05-27 | 成都城电电力工程设计有限公司 | Common transformer foundation and construction method |
CN107447773A (en) * | 2017-07-14 | 2017-12-08 | 中国能源建设集团浙江省电力设计院有限公司 | A kind of main transformer basis manufacture method for being used to discharge data constraint |
CN208415293U (en) * | 2018-04-10 | 2019-01-22 | 上海电力设计院有限公司 | Integral prefabricated assembled main transformer foundation for indoor substation |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110318414A (en) * | 2019-06-06 | 2019-10-11 | 浙江华云电力工程设计咨询有限公司 | A kind of assembled sets of brackets on top of the columns basis |
CN110318414B (en) * | 2019-06-06 | 2024-01-23 | 浙江华云电力工程设计咨询有限公司 | Assembled bucket arch foundation |
CN110541428A (en) * | 2019-08-20 | 2019-12-06 | 浙江大学 | Foundation structure of transformer substation distribution device building |
CN110541428B (en) * | 2019-08-20 | 2024-01-19 | 浙江大学 | Basic structure of transformer substation distribution device building |
CN111335686A (en) * | 2020-03-13 | 2020-06-26 | 广东顺德电力设计院有限公司 | Transformer substation building structure built by adopting prefabricated parts |
CN112681851A (en) * | 2020-12-18 | 2021-04-20 | 宁波市电力设计院有限公司 | Prefabricated unit assembly structure of large-volume underground structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107090925B (en) | Reinforced precast reinforced concrete shear wall, structural system and construction method thereof | |
CN108316337A (en) | Integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation | |
CN110056092B (en) | Connecting structure of bolting-inserting type upper and lower prefabricated shear walls and superimposed sheet and construction method | |
CN107419824A (en) | The full precast shear wall structural system of regenerative steel skeleton and construction method | |
CN108005410A (en) | A kind of assembled Residential System of Steel-concrete Composite Structure and its construction method | |
CN108005265A (en) | A kind of prefabricated steel reinforced concrete shear wall structure of multilayer and its preparation and construction method | |
CN208415293U (en) | Integral prefabricated assembled main transformer foundation for indoor substation | |
CN109139049B (en) | Construction method for secondary lining buckling arch of underground excavation station of subway | |
CN107654021A (en) | A kind of assembling prefabricated reinforced concrete column and assembled combination frame building system | |
CN207739674U (en) | A kind of assembled Residential System of Steel-concrete Composite Structure | |
CN207017483U (en) | The full precast shear wall structural system of regenerative steel skeleton | |
CN110185061B (en) | Assembled integral type underground space retaining wall and construction method | |
CN214399425U (en) | Newly-increased double-elevator supporting structure for reconstruction and extension project | |
CN110388096B (en) | Structure and construction method for flexible construction of coke oven greenhouse | |
CN115324104B (en) | Permanent-face combined assembled station and construction method thereof | |
CN216740195U (en) | Shear wall mixed structure system connected by grouting sleeve | |
CN207228309U (en) | The concrete shear wall system house of band perps in a kind of steel frame | |
CN208202224U (en) | A kind of prefabricated steel reinforced concrete shear wall structure of multilayer | |
CN214739012U (en) | Assembled double-connecting-beam combined shear wall component and connecting structure thereof | |
CN115075834A (en) | Cross subdivision section structure of electric power tunnel and construction method | |
CN210530415U (en) | Coke oven greenhouse construction structure | |
CN212001725U (en) | Full bolted connection multilayer prefabricated section steel concrete shear wall structure | |
CN211172365U (en) | Assembled low-rise residential structure system | |
CN111576478A (en) | Elevator well foundation structure | |
CN108867879A (en) | A kind of assembled steel frame concrete building plate composite structure and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |