CN108316337A - Integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation - Google Patents

Integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation Download PDF

Info

Publication number
CN108316337A
CN108316337A CN201810315724.3A CN201810315724A CN108316337A CN 108316337 A CN108316337 A CN 108316337A CN 201810315724 A CN201810315724 A CN 201810315724A CN 108316337 A CN108316337 A CN 108316337A
Authority
CN
China
Prior art keywords
foundation
main transformer
oil pit
track girder
prefabricated assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810315724.3A
Other languages
Chinese (zh)
Inventor
陈轩
彭益成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Electric Power Design Institute Co Ltd
Original Assignee
Shanghai Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Electric Power Design Institute Co Ltd filed Critical Shanghai Electric Power Design Institute Co Ltd
Priority to CN201810315724.3A priority Critical patent/CN108316337A/en
Publication of CN108316337A publication Critical patent/CN108316337A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to the integral prefabricated assembled main transformer foundations and oil pit structure for indoor substation.It includes the building raft foundation poured, the foundation bolt of the pre-buried matrix arrangement in position of main transformer is set on the building raft foundation, foundation pile is set on the foundation bolt, connecting cross beam at the top of the foundation pile, track girder is arranged along the length direction of building raft foundation in the capital of the foundation pile, the track girder is arranged with beam vertical, oil pit wall card slot is preset on building raft foundation around the main transformer, oil pit wall is placed in the card slot, and oil pit wall top connects the crossbeam and track girder.Present invention employs the integral assembling technologies of main transformer foundation, overcome the deficiency of traditional main transformer foundation cast-in-place construction, the duration of main transformer foundation subdivisional work can be greatlyd save, improve construction efficiency, Framework Architecture stability is good, bearing capacity is strong, and so that oil pit oil leak probability is substantially reduced using novel splicing prefabricated wallboard technology.

Description

Integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation
Technical field
The invention belongs to main transformer of transformer substation basic technology fields, and more particularly, to indoor substation is whole pre- Assembled main transformer foundation processed and oil pit structure.
Background technology
Full indoor substation usually has main transformer in a layer arrangement, since transformer weight is big, generally can not directly put It sets on floor, needs that basis is separately provided.Indoor substation is typically provided with one layer of basement, and main transformer foundation is placed in basement It is interior, do an entirety with basement bottom board or the whole raft foundation built.
Under prior art conditions, substation's basement part generally use cast-in-place concrete structure.Main transformer foundation is also adopted Use cast-in-place concrete structure.Main transformer foundation needs setting track girder due to needing to meet equipment in place and the requirement of equipment conveying And buttress, setting collection oil pit by through hole is also needed to around main transformer, similar to pool construction, generally use surrounding is poured to be erected collection oil pit by through hole The concrete panel come surrounds.These components all use cast-in-place concrete, the reserved joint bar from sole plate to be poured on basis After the completion, assembling reinforcement, formwork, pour, conserve, finally complete.Whole process is complicated, simultaneously because main transformer foundation buttress, beam Between spacing it is smaller, operation is difficult, causes formwork difficult, and it is big to pour difficulty, and the duration is longer.
There are many performances of the patent of assembled main transformer foundation to be independent main transformer foundation at present, and this basis is suitable for family Outer substation, for indoor not the relevant technologies that are being combined with underground chamber base and integrally being assembled with oil pit of standing.This technology The technical staff in field is dedicated to solving above-mentioned technological deficiency.
Invention content
In view of the drawbacks described above of the prior art, technical purpose of the invention is to provide that a kind of process is simple, operator Just, short time limit, the safe and efficient integral prefabricated assembled main transformer foundation and oil pit structure for being used for indoor substation.
To realize the above-mentioned technical purpose, technical solution provided by the invention is as follows:
Integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation comprising the building raft poured Plate basis, the foundation bolt for building the pre-buried matrix arrangement in position of setting main transformer on raft foundation, the lower margin spiral shell Foundation pile is set on bolt, and foundation pile top connecting cross beam, the capital of the foundation pile is along the length side of building raft foundation To setting track girder, the track girder is arranged with beam vertical, and oil is preset on the building raft foundation around the main transformer Crater wall card slot, oil pit wall are placed in the card slot, and oil pit wall top connects the crossbeam and track girder.
The above-mentioned integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, the building raft Four row's foundation bolts of pre-buried setting along its length on the basis of plate, two foundation bolts of often row's setting.
The above-mentioned integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, the oil pit wall Built-in connection is arranged in the corresponding position on top, and the connector is welded to connect the crossbeam and track girder.
The above-mentioned integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, the oil pit wall Waterproof material is filled between card slot.
The above-mentioned integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, the track girder Using steel I-beam.
The above-mentioned integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, the track girder Between be arranged cobble grid.
The above-mentioned integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, the track girder It is welded in the foundation columns.
The above-mentioned integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, the foundation columns For the I-shaped column of Prefabricated steel construction or precast concrete column.
Beneficial effects of the present invention:
Present invention employs the integral assembling technologies of main transformer foundation, by main transformer foundation prefabrication and assembly construction in building raft foundation On, the deficiency of traditional main transformer foundation cast-in-place construction is overcome, the duration of main transformer foundation subdivisional work can be greatlyd save, while not Subsequent handling is influenced, construction efficiency is improved, entire foundation columns form frame system, structural stability with crossbeam, track girder Good, bearing capacity is strong, saves amount of concrete, after the waterproof construction of card slot and oil pit wall can effectively ensure that basis installation is complete Water resistance, oil pit oil leak probability substantially reduce.
Description of the drawings
Fig. 1 is the planar structure schematic diagram of the present invention;
Fig. 2 is the sectional view of Section A-A in Fig. 1;
Fig. 3 is the sectional view of section B-B in Fig. 1;
Fig. 4 is the sectional view in the sections C-C in Fig. 1;
Fig. 5 is oil pit wall water proof structure;
Wherein, 1, building raft foundation, 2, oil pit wall, 3, track girder, 4, crossbeam, 5, foundation columns, 6, the pre-buried company of oil pit wall Fitting, 7, foundation bolt, 8, backing plate, 9, water tight packing, 10, grid, 11, cobble, 12, grill bearing part, 201, oil pit wall end Section waterproof structure.
Specific implementation mode
The technique effect of the design of the present invention, concrete structure and generation is described further below with reference to attached drawing, with It is fully understood from the purpose of the present invention, feature and effect.
Embodiment:
Referring to Fig.1, Fig. 2, Fig. 3, the present invention include cast-in-place building entirety raft foundation 1, the building raft foundation 1 The foundation bolt 7 of the pre-buried matrix arrangement in position of upper setting main transformer is built on the basis of raft plate 1 described in this example along length Four row's foundation bolts 7 of the pre-buried setting in direction, two foundation bolts 7 of often row's setting.Backing plate 8, institute are set on the foundation bolt 7 Setting foundation pile 5 on backing plate 8 is stated, 5 top connecting cross beam 4 of the foundation pile, the capital of the foundation pile 5 is along 1 base of building raft plate The length direction welding setting track girder 3 of plinth, the track girder 3 use steel I-beam.The track girder 3 is vertical with crossbeam 4 to be set It sets, oil pit wall card slot is preset on the building raft foundation 1 around the main transformer, oil pit wall 2 is placed in the card slot, institute It states and fills waterproof material 9 between oil pit wall 2 and card slot.
With reference to Fig. 4, grill bearing part 12 is set on the track girder 3, cobble grid is set on the grill bearing part 12 10, the cobble grid 10 is interior to be arranged cobble 11.
With reference to Fig. 5, built-in connection 6 is arranged in the corresponding position that the oil pit wall 2 pushes up, and the connector 6 is welded to connect institute State crossbeam 4 and track girder 3.These beams can be welded or are bolted.
The construction procedure of the present invention:
1, before the raft foundation of substation's building pours, in the foundation bolt of the pre-buried main transformer foundation column in precalculated position With the card slot of oil pit wall, later basic maintenance completion.
2, main transformer foundation column is installed at foundation bolt, main transformer foundation column is two rows, one group of a row, every group of component Including two foundation columns, three crossbeams, this partial component is welded as a whole for prefabrication, transport to in-site installation.
3, after after 4 groups of foundation columns, installation is complete, the track girder of installation twice longitudinal direction, track girder can pass through with foundation columns It is welded to connect.
4, oil pit siding, top of panels pre-embedded steel slab or built-in fitting are installed, it can be with crossbeam, track girder and grill bearing Part is welded to connect.The pre-buried waterproof construction in end of siding side, such as Fig. 5.After first piece of siding is in place, bottom is put into card slot, inside After being welded and fixed with beam, then second piece is lifted, lifted from the top down, the mutual clamping of waterproof connector of end, then third Block, and so on.After all sidings install, line chart brushes one times waterproof material in the preformed groove of bottom raft plate, then uses again Waterproof mortar fills groove.The brushing waterproof material at plate end connection again, then at the gap in two pieces of flashing members Fill waterproof mortar.
5, siding has just had main transformer mounting condition after installation is complete.After installation is complete after main transformer, both sides up and down are placed Flase floor is then paved with cobble on flase floor, in order to oil strain and fire prevention.
Advantages of the present invention:
1, main transformer foundation integral assembling technology is used, raft foundation is built combining, overcomes previous prefabricated main transformer base Plinth must make the deficiency that isolated footing can not be combined with building raft foundation, and raft plate top is needed to the basis of cast-in-place completion Quantities is all changed to prefabrication and assembly construction, 80% or more the duration of main transformer foundation subdivisional work can be saved using this patent maximum, together When do not influence subsequent handling;
2, the assembled completion together with main transformer oil pit by main transformer foundation, improves previous only prefabricated main transformer foundation and oil pit must The deficiency that must finally construct after installation is complete in main transformer equally greatly improves efficiency and saves the duration;
3, crossbeam is not only arranged in the application, is also provided with long rails beam, and entire foundation columns form frame with beam body system System, structural stability is good, and bearing capacity is strong, and more previous mass concrete main transformer foundation saves 60% amount of concrete;
4, track girder be not only able to keep stablize, while can also serve as main transformer transporting and hoisting it is in place during track, just Do not have to individually set up conveying track again when position, relatively previous prefabricated main transformer foundation improves the efficiency of transportational process;
5, due to oil pit wall is too long can not be integral prefabricated, need to assemble after being segmented prefabricated transport to scene.Several pieces of assemblings When, this card slot waterproof is all used between every two pieces, the right-angle side and opposite side Novel clamping slot waterproof that oil pit wall surrounding wallboard uses Technology can effectively ensure that water resistance of the basis after installation is complete, oil pit oil leak probability substantially reduce.
6, track girder uses steel I-beam, and after main transformer is in place, flange plate can also serve as cobble lattice at the top and bottom of track girder The scrap (bridge) of grid, a material is multi-purpose, improves later stage efficiency of assembling.
This patent is a kind of technology can be widely applied to indoor substation main transformer foundation construction, has wide answer Use foreground.
The preferred embodiment of the present invention has been described in detail above.It should be appreciated that those skilled in the art without It needs creative work according to the present invention can conceive and makes many modifications and variations.Therefore, all technologies in the art Personnel can be obtained by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea Technical solution, all should be in the protection domain being defined in the patent claims.

Claims (8)

1. integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation, which is characterized in that including what is poured Raft foundation is built, the foundation bolt of the pre-buried matrix arrangement in position of main transformer is set on the building raft foundation, it is described Foundation pile is set on foundation bolt, and foundation pile top connecting cross beam, the capital of the foundation pile is along building raft foundation Track girder is arranged in length direction, and the track girder is arranged with beam vertical, on the building raft foundation around the main transformer Default oil pit wall card slot, oil pit wall are placed in the card slot, and oil pit wall top connects the crossbeam and track girder.
2. the integral prefabricated assembled main transformer foundation and oil pit structure according to claim 1 for indoor substation, It is characterized in that, four row's foundation bolts of pre-buried setting along its length on the building raft foundation, two lower margin spiral shells of often row's setting Bolt.
3. the integral prefabricated assembled main transformer foundation and oil pit structure according to claim 1 for indoor substation, It is characterized in that, built-in connection is arranged in the corresponding position on oil pit wall top, and the connector is welded to connect the crossbeam and rail Road beam.
4. the integral prefabricated assembled main transformer foundation and oil pit structure according to claim 1 for indoor substation, It is characterized in that, waterproof material is filled between the oil pit wall and card slot.
5. the integral prefabricated assembled main transformer foundation and oil pit structure according to claim 1 for indoor substation, It is characterized in that, the track girder uses steel I-beam.
6. the integral prefabricated assembled main transformer foundation and oil pit structure according to claim 1 for indoor substation, It is characterized in that, cobble grid is set between the track girder.
7. the integral prefabricated assembled main transformer foundation and oil pit structure according to claim 1 for indoor substation, It is characterized in that, the track girder is welded in the foundation columns.
8. the integral prefabricated assembled main transformer foundation and oil pit structure according to claim 1 for indoor substation, It is characterized in that, the foundation columns are the I-shaped column of Prefabricated steel construction or precast concrete column.
CN201810315724.3A 2018-04-10 2018-04-10 Integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation Pending CN108316337A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810315724.3A CN108316337A (en) 2018-04-10 2018-04-10 Integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810315724.3A CN108316337A (en) 2018-04-10 2018-04-10 Integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation

Publications (1)

Publication Number Publication Date
CN108316337A true CN108316337A (en) 2018-07-24

Family

ID=62898136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810315724.3A Pending CN108316337A (en) 2018-04-10 2018-04-10 Integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation

Country Status (1)

Country Link
CN (1) CN108316337A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318414A (en) * 2019-06-06 2019-10-11 浙江华云电力工程设计咨询有限公司 A kind of assembled sets of brackets on top of the columns basis
CN110541428A (en) * 2019-08-20 2019-12-06 浙江大学 Foundation structure of transformer substation distribution device building
CN111335686A (en) * 2020-03-13 2020-06-26 广东顺德电力设计院有限公司 Transformer substation building structure built by adopting prefabricated parts
CN112681851A (en) * 2020-12-18 2021-04-20 宁波市电力设计院有限公司 Prefabricated unit assembly structure of large-volume underground structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322071A (en) * 2011-06-29 2012-01-18 浙江省电力设计院 Universal base structure of main transformer of 220kV substation
CN104652468A (en) * 2015-02-15 2015-05-27 成都城电电力工程设计有限公司 Common transformer foundation and construction method
CN107447773A (en) * 2017-07-14 2017-12-08 中国能源建设集团浙江省电力设计院有限公司 A kind of main transformer basis manufacture method for being used to discharge data constraint
CN208415293U (en) * 2018-04-10 2019-01-22 上海电力设计院有限公司 Integral prefabricated assembled main transformer foundation for indoor substation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322071A (en) * 2011-06-29 2012-01-18 浙江省电力设计院 Universal base structure of main transformer of 220kV substation
CN104652468A (en) * 2015-02-15 2015-05-27 成都城电电力工程设计有限公司 Common transformer foundation and construction method
CN107447773A (en) * 2017-07-14 2017-12-08 中国能源建设集团浙江省电力设计院有限公司 A kind of main transformer basis manufacture method for being used to discharge data constraint
CN208415293U (en) * 2018-04-10 2019-01-22 上海电力设计院有限公司 Integral prefabricated assembled main transformer foundation for indoor substation

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318414A (en) * 2019-06-06 2019-10-11 浙江华云电力工程设计咨询有限公司 A kind of assembled sets of brackets on top of the columns basis
CN110318414B (en) * 2019-06-06 2024-01-23 浙江华云电力工程设计咨询有限公司 Assembled bucket arch foundation
CN110541428A (en) * 2019-08-20 2019-12-06 浙江大学 Foundation structure of transformer substation distribution device building
CN110541428B (en) * 2019-08-20 2024-01-19 浙江大学 Basic structure of transformer substation distribution device building
CN111335686A (en) * 2020-03-13 2020-06-26 广东顺德电力设计院有限公司 Transformer substation building structure built by adopting prefabricated parts
CN112681851A (en) * 2020-12-18 2021-04-20 宁波市电力设计院有限公司 Prefabricated unit assembly structure of large-volume underground structure

Similar Documents

Publication Publication Date Title
CN107090925B (en) Reinforced precast reinforced concrete shear wall, structural system and construction method thereof
CN108316337A (en) Integral prefabricated assembled main transformer foundation and oil pit structure for indoor substation
CN110056092B (en) Connecting structure of bolting-inserting type upper and lower prefabricated shear walls and superimposed sheet and construction method
CN107419824A (en) The full precast shear wall structural system of regenerative steel skeleton and construction method
CN108005410A (en) A kind of assembled Residential System of Steel-concrete Composite Structure and its construction method
CN108005265A (en) A kind of prefabricated steel reinforced concrete shear wall structure of multilayer and its preparation and construction method
CN208415293U (en) Integral prefabricated assembled main transformer foundation for indoor substation
CN109139049B (en) Construction method for secondary lining buckling arch of underground excavation station of subway
CN107654021A (en) A kind of assembling prefabricated reinforced concrete column and assembled combination frame building system
CN207739674U (en) A kind of assembled Residential System of Steel-concrete Composite Structure
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN110185061B (en) Assembled integral type underground space retaining wall and construction method
CN214399425U (en) Newly-increased double-elevator supporting structure for reconstruction and extension project
CN110388096B (en) Structure and construction method for flexible construction of coke oven greenhouse
CN115324104B (en) Permanent-face combined assembled station and construction method thereof
CN216740195U (en) Shear wall mixed structure system connected by grouting sleeve
CN207228309U (en) The concrete shear wall system house of band perps in a kind of steel frame
CN208202224U (en) A kind of prefabricated steel reinforced concrete shear wall structure of multilayer
CN214739012U (en) Assembled double-connecting-beam combined shear wall component and connecting structure thereof
CN115075834A (en) Cross subdivision section structure of electric power tunnel and construction method
CN210530415U (en) Coke oven greenhouse construction structure
CN212001725U (en) Full bolted connection multilayer prefabricated section steel concrete shear wall structure
CN211172365U (en) Assembled low-rise residential structure system
CN111576478A (en) Elevator well foundation structure
CN108867879A (en) A kind of assembled steel frame concrete building plate composite structure and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180724