CN108316171A - Suitable for passing through the highway dust storm protection system and its construction method of shrub sand dune - Google Patents

Suitable for passing through the highway dust storm protection system and its construction method of shrub sand dune Download PDF

Info

Publication number
CN108316171A
CN108316171A CN201810118504.1A CN201810118504A CN108316171A CN 108316171 A CN108316171 A CN 108316171A CN 201810118504 A CN201810118504 A CN 201810118504A CN 108316171 A CN108316171 A CN 108316171A
Authority
CN
China
Prior art keywords
sand
highway
fence
resistance
husky
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810118504.1A
Other languages
Chinese (zh)
Other versions
CN108316171B (en
Inventor
肖建华
王以海
马莉
姜国文
王聚龙
刘建刚
梁斌
范玉成
杨虎
岳来成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alxa League Transportation Development Center
Northwest Institute of Eco Environment and Resources of CAS
Original Assignee
Alxa League Road Management Bureau
Cold and Arid Regions Environmental and Engineering Research Institute of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alxa League Road Management Bureau, Cold and Arid Regions Environmental and Engineering Research Institute of CAS filed Critical Alxa League Road Management Bureau
Priority to CN201810118504.1A priority Critical patent/CN108316171B/en
Publication of CN108316171A publication Critical patent/CN108316171A/en
Application granted granted Critical
Publication of CN108316171B publication Critical patent/CN108316171B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F7/00Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
    • E01F7/02Snow fences or similar devices, e.g. devices affording protection against sand drifts or side-wind effects
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F7/00Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
    • E01F7/02Snow fences or similar devices, e.g. devices affording protection against sand drifts or side-wind effects
    • E01F7/025Devices specially adapted for protecting against wind, e.g. screens, deflectors or attenuators at tunnel or lock entrances

Abstract

The present invention relates to gobi strong wind area sand storm protection fields, in particular to a kind of highway dust storm protection system and its construction method being suitable for passing through shrub sand dune.The system includes the husky fence of resistance, edge sealing fence and the grid that fixes the sand.Wherein, it includes multistage to hinder husky fence, and the husky fence of each section of resistance is arranged at V-shape between two adjacent shrub sand dunes, and edge sealing fence edge intersects at highway extending direction and is arranged in the both sides of highway;The grid that fixes the sand is located at edge sealing fence, hinders in the region that husky fence and highway are enclosed.The husky fence of resistance has intercepted a large amount of sand material; control Sha Yuan; and reduce the wind speed close to highway; and on the one hand the grid that fixes the sand close to highway subgrade carries out protection fixation to the earth's surface of near Highway; on the other hand the near surface wind speed close to highway is reduced; and grid setting can be such that the sand material into grid does not start again, to ensure sand material can not on in highway subgrade.

Description

Suitable for passing through the highway dust storm protection system and its construction method of shrub sand dune
Technical field
The present invention relates to shrub sand dune area sand storm protection fields, are suitable for passing through shrub sand dune in particular to one kind Highway dust storm protection system and its construction method.
Background technology
Sandstorm is to influence one of the principal element of the highway construction of desert and Gobi district railway and safe operation.For Traditional desert area, desert area are for a long time typical case, wind with the blue Shapotou Section of packet and Tarim Basin oil highway sand control Husky control effect is also the most apparent.Based on its main plant sand prevention, the measure supplemented by sand-prevention engineering.More and more railways are public Road starts to build in desert and Gobi area, and especially high-grade highway is more and more built in modification in recent years, and for height The report of standard highway sand damage is more and more, especially some special dust storm sections, and sand damage is extremely serious, such as passes through shrubbery Sand hill section causes its sand damage extremely serious because its sand material is abundant and landform is special, and is directed to and passes through shrub sand dune section High-grade highway measures for sand prevention is basic or measures for sand prevention according to other sections, this cannot reach effective sand prevention purpose.
Inventor has found, at least there are following problems in the prior art:(1) it is abundant to fill its sand amount of packet section that rustles, landform Complexity, drift sand is more, so sand damage is extremely serious;(2) the shrub sand dune ecotype important as desert area, in sand prevention While need to protect its ecosystem as possible;(3) current sand protecting technology does not form effective protection system, without needle To property, and single safeguard procedures are easy to fail, and integral protection benefit is poor.
Invention content
The purpose of the present invention is to provide a kind of highway dust storm protection systems being suitable for passing through shrub sand dune, solve existing There is the problem of sand storm protection effect difference in shrub sand dune area in technology.
The purpose of the present invention is to provide a kind of structure sides for the highway dust storm protection system being suitable for passing through shrub sand dune Method solves the problems, such as that shrub sand dune sand storm protection effect is poor in the prior art.
To achieve the goals above, technical solution used in the embodiment of the present invention is as follows:
A kind of highway dust storm protection system being suitable for passing through shrub sand dune, including:
The husky fence of resistance, is arranged along highway extending direction in the both sides of highway;The husky fence of resistance includes multistage, and each section of resistance is husky Fence is arranged between two adjacent shrub sand dunes, and each section is hindered husky fence between two adjacent shrub sand dunes into V The angle of font, V-shape is 130 ° -150 °;
Edge sealing fence is arranged along highway extending direction is intersected in the both sides of highway, and edge sealing fence, the husky fence of resistance with And highway is enclosed multiple protection zones independent of each other;And
It fixes the sand lattice group, is arranged in the both sides of highway, and in protection zone;It is arranged at least one in each protection zone Group is fixed the sand lattice group;The height of the husky fence of resistance and edge sealing fence is all higher than the height for lattice group of fixing the sand.
In preferred embodiments of the present invention,
The each section of husky fence of resistance includes two rows, and first row is arranged the windward side in two adjacent shrub sand dunes, and second The leeward side in two adjacent shrub sand dunes is arranged in row.
In preferred embodiments of the present invention,
First row and second row form a resistance sand ribbon, per the blank that 15-25m is arranged between two adjacent resistance sand ribbons Area, in clear area setting fix the sand grid.
In preferred embodiments of the present invention,
Edge sealing fence includes multigroup;Multigroup edge sealing fence interval is arranged, and is distributed along highway extending direction;
It is equal in the both sides of highway per being spaced 0.5-2 kilometers between two groups of adjacent edge sealing fence, and in highway corner It is provided with edge sealing fence.
In preferred embodiments of the present invention,
Edge sealing fence and lattice group interval setting of fixing the sand;The minimum range of the edge of edge sealing fence and lattice group of fixing the sand is 2- 4m;
Edge sealing fence one end extends to the roadbed of highway;The other end extends to first of resistance sand column location extension 2-5m At position.
In preferred embodiments of the present invention,
In at least one protection zone of the windward side of highway, it is provided with multigroup lattice group of fixing the sand;Per adjacent two groups It is provided with blank tape between lattice group of fixing the sand;
In at least one protection zone of the leeward side of highway, it is provided with one group or multigroup lattice group of fixing the sand;When setting Set it is multigroup fix the sand lattice group when, be provided with blank tape per between adjacent two groups lattice groups of fixing the sand.
In preferred embodiments of the present invention,
In the windward side of highway, the height of the lattice group of fixing the sand far from highway is less than close to the height of the lattice group of fixing the sand of highway;
In the leeward side of highway, when lattice group of fixing the sand includes multigroup, it is less than close to the height of the lattice group of fixing the sand of highway separate The height of the lattice group of fixing the sand of highway.
In preferred embodiments of the present invention,
Highway dust storm protection system suitable for passing through shrub sand dune further includes slope protection structure;Slope protection structure Including curing sand bed;The thickness for curing sand bed is 1-2cm.
A kind of highway dust storm protection system being suitable for passing through shrub sand dune, including:
The husky fence of resistance, is arranged along highway extending direction in the both sides of highway;The husky fence of resistance includes multistage, and each section of resistance is husky Fence is arranged between two adjacent shrub sand dunes, and each section is hindered husky fence between two adjacent shrub sand dunes into V The angle of font, V-shape is 130 ° -150 °;
Edge sealing fence is arranged along highway extending direction is intersected in the both sides of highway, and edge sealing fence, the husky fence of resistance with And highway is enclosed multiple protection zones independent of each other;
It fixes the sand lattice group, is arranged in the both sides of highway, and in protection zone;It is arranged at least one in each protection zone Group is fixed the sand lattice group;The height of the husky fence of resistance and edge sealing fence is all higher than the height for lattice group of fixing the sand;And
Psammophytes;Psammophytes is planted in the sandy soil that the husky fence of resistance is nearby accumulated.
A kind of construction method for the highway dust storm protection system being suitable for passing through shrub sand dune, including:
In both sides of highway, along the husky fence of resistance is arranged in highway extending direction, edge intersects at highway extending direction and edge sealing grid are arranged Behind column, the grid that fixes the sand is set, is located at edge sealing fence, hinders in the protection zone that husky fence and highway are enclosed;Its In, it includes multistage to hinder husky fence, and the husky fence of each section of resistance is arranged between two adjacent shrub sand dunes, and each section of resistance is husky For fence at V-shape between two adjacent shrub sand dunes, the angle of V-shape is 130 ° -150 °;
In both sides of highway, cured method is sprayed using chemical curing agent, slope protection structure is set.
The beneficial effects of the invention are as follows:
A kind of highway dust storm protection system being suitable for passing through shrub sand dune provided by the invention, suitable for passing through shrubbery The highway dust storm protection system of sand hill includes:The husky fence of resistance, edge sealing fence and the grid that fixes the sand.Wherein, husky fence is hindered, along public affairs Road extending direction is arranged in the both sides of highway;The husky fence of resistance includes multistage, and the husky fence of each section of resistance is arranged in two adjacent fillings Between clump sand hill, and each section of husky fence of resistance between two adjacent shrub sand dunes at V-shape, V-shape angle is 130 °- 150°;Edge sealing fence edge intersects at highway extending direction and is arranged in the both sides of highway;And edge sealing fence, the husky fence of resistance and public affairs Road is enclosed multiple protection zones independent of each other;It is arranged in the both sides of highway, and in protection zone;Each protection At least one set is arranged in region to fix the sand lattice group;The height of the husky fence of resistance and edge sealing fence is all higher than the height for lattice group of fixing the sand.The wind Husky protection system setting is arranged according to the shrub sand dune area stream characteristics of motion, the resistance sand ribbon that resistance husky fence in forward position is formed, both Guiding stream of making the best use of the situation has intercepted a large amount of sand material, controls Sha Yuan, while also protecting sand hill as much as possible Ecosystem, and reduce the wind speed close to highway.Edge sealing fence is effectively prevented from the direction non-perpendicular to highway Dust storm.On the one hand the grid that fixes the sand carries out protection fixation to the earth's surface of near Highway, on the other hand reduce close to the close of highway Earth's surface wind speed, and grid setting can be such that the sand material into grid does not start again, to ensure sand material can not on Onto highway subgrade.
A kind of highway dust storm protection system being suitable for passing through shrub sand dune provided by the invention, including above-mentioned resistance are husky Fence, edge sealing fence and fix the sand grid and psammophytes.Plant forms a benign sustainable sand prevention body with measures for sand prevention System, comprehensive sand storm protection effect are good.
A kind of construction method of highway dust storm protection system being suitable for passing through shrub sand dune provided by the invention, including: First in both sides of highway, the husky fence of resistance is set, after intersecting at highway extending direction setting edge sealing fence along highway extending direction, The grid that fixes the sand is set again, is located at edge sealing fence, hinders in the region that husky fence and highway are enclosed;Finally in highway Both sides spray cured method using chemical curing agent and slope protection structure are arranged.Sand storm protection system setting is according to filling The stream characteristics of motion setting of clump sand hill area, the resistance sand ribbon that resistance husky fence in forward position is formed, guiding stream of both making the best use of the situation block A large amount of sand material has been cut, Sha Yuan is controlled, while also having protected the ecosystem of sand hill as much as possible, and has been reduced Close to the wind speed of highway.And on the one hand the grid that fixes the sand close to highway subgrade carries out protection fixation to the earth's surface of near Highway, separately On the one hand the near surface wind speed close to highway is reduced, and grid setting can make the sand material into grid can not be again Start, to ensure sand material can not on in highway subgrade.And what side slope solidification allow only to remain accelerates to pass through without husky air-flow Roadbed forms air-flow accelerating region on road surface, comprehensive with the growth of the psammophytes such as resistance sand ribbon and the sacsaoul to fix the sand in grid Closing sand storm protection effect can become better and better, and plant is finally made to form a benign sustainable sand- prevention system with measures for sand prevention.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment Attached drawing is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not to be seen as It is the restriction to range, it for those of ordinary skill in the art, without creative efforts, can be with Other relevant attached drawings are obtained according to these attached drawings.
Fig. 1 is the of the highway dust storm protection system for being suitable for passing through shrub sand dune that first embodiment of the invention provides The structural schematic diagram at one visual angle;
Fig. 2 is the of the highway dust storm protection system for being suitable for passing through shrub sand dune that first embodiment of the invention provides The structural schematic diagram at two visual angles;
Fig. 3 is the resistance for the highway dust storm protection system for being suitable for passing through shrub sand dune that first embodiment of the invention provides The structural schematic diagram of husky fence;
Fig. 4 is the resistance for the highway dust storm protection system for being suitable for passing through shrub sand dune that first embodiment of the invention provides The structural schematic diagram of the column of husky fence;
Fig. 5 is consolidating for the highway dust storm protection system for being suitable for passing through shrub sand dune that first embodiment of the invention provides The structural schematic diagram at the first visual angle of husky lattice group;
Fig. 6 is consolidating for the highway dust storm protection system for being suitable for passing through shrub sand dune that first embodiment of the invention provides The structural schematic diagram at the second visual angle of husky lattice group.
Icon:100- is suitable for passing through the highway dust storm protection system of shrub sand dune;The husky fence of 110- resistances;111- resistances are husky Band;112- columns;113- sand proof nets;114- first rows;115- second rows;120- edge sealing fence;130- fixes the sand lattice group;131- Blank tape;140- slope protection structures;150- highways;151- shrub sand dunes.
Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention to providing in the accompanying drawings is not intended to limit requirement guarantor below The scope of the present invention of shield, but it is merely representative of the selected embodiment of the present invention.Based on the embodiments of the present invention, this field The every other embodiment that those of ordinary skill is obtained without creative efforts, belongs to guarantor of the present invention The range of shield.
It should be noted that:Similar label and letter indicate similar terms in following attached drawing, therefore, once a certain item exists It is defined, then it further need not be defined and explained in subsequent attached drawing in one attached drawing.
In the description of the embodiment of the present invention, it should be noted that the orientation or position of the instructions such as term "upper", "inner" Relationship be based on the orientation or positional relationship shown in the drawings or the invention product using when the orientation or position usually put Relationship is set, is merely for convenience of description of the present invention and simplification of the description, device is not indicated or implied the indicated or element is necessary With specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one Connect to body;It can be directly connected, can also can be indirectly connected through an intermediary the connection inside two elements. For the ordinary skill in the art, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
First embodiment
Fig. 1-Fig. 6 is please referred to, the present embodiment provides a kind of highway dust storm protection systems being suitable for passing through shrub sand dune 100 comprising resistance husky fence 110, edge sealing fence 120, lattice group 130 of fixing the sand and slope protection structure 140.
Further, husky fence 110 is hindered along 150 extending direction of highway to be arranged in the both sides of highway 150.Prolong along highway 150 Direction is stretched to be arranged in the both sides of highway 150;The husky fence 110 of resistance includes multistage, and each section of resistance sand fence 110 is arranged adjacent Between two shrub sand dunes 151, and each section is hindered husky fence 110 between two adjacent shrub sand dunes 151 into V-shape, V Font angle is 130 ° -150 °.Further, in the windward side of highway 150, the apex angle of each section of resistance sand fence 110 is away from public affairs Road 150, in the leeward side of highway 150, the apex angle of the husky fence of each section of resistance 110 is towards highway 150.
Each section of resistance sand fence 110 includes two rows, and meeting in two adjacent shrub sand dunes 151 is arranged in first row 114 The leeward side in two adjacent shrub sand dunes 151 is arranged in wind side, second row 115.
First row 114 and second row 115 form a resistance sand ribbon 111, are arranged per between two adjacent resistance sand ribbons 111 The clear area of 15-25m can select in clear area setting to fix the sand lattice group 130.
Specifically, it hinders the husky setting of fence 110 and is parallel to the trend of highway 150 in 150 both sides of highway.Resistance sand fence 110 is whole The outermost barrier of a highway dust storm protection system 100 for being suitable for passing through shrub sand dune.Resistance sand fence 110 can press down windage Sand makes the wind energy for entering the highway dust storm protection system 100 for being suitable for passing through shrub sand dune reduce, while stopping sand material, makes Sand material is deposited near resistance sand fence 110, to protect lattice group 130 of fixing the sand, highway 150, roadbed and side slope protection knot Structure 140.
The setting in the resistance sand ribbon 111 is arranged according to 151 area's stream feature of shrub sand dune, 151st area of shrub sand dune by It is influenced in by sand hill, space is divided into many glens, and stream is mainly defeated from the glen between two sand hills It moves, so the resistance sand fence 110 forms V-shape in glen area, can not only guide stream, but also can intercept to the greatest extent Sand material, while the ecosystem of sand hill is also protected as much as possible.
Further, the height selection being retained in after the husky installation of fence 110 of resistance in ground above section is set as 1.6- 3m.Still optionally further, the height selection of aforementioned resistance sand fence 110 is set as 2m.
Specifically, it includes angle steel column 112 and sand proof net 113 to hinder husky fence 110, and the selection of sand proof net 113 has uvioresistant The material of line, anti-strong wind, strength degree.Optionally, the material of sand proof net 113 selects high density polyethylene (HDPE) (HDPE) material.
Further, the grid-gap degree of sand proof net 113 is set as structure close under dredging.In other words, closer to ground The voidage in face, sand proof net 113 is smaller.
Further, above-mentioned angle steel column 112 uses Zinc-coated angle steel, and equal leg angle may be used, and size is the length of side × the length of side × thickness=40mm × 40mm × 4mm or unequal angle, size are the length of side × length of side × thickness=63mm Then × 40mm × 4mm uses antirust paint to spray one layer on angle steel surface layer, prevents from getting rusty and erode.It cuts angle steel column bottom end At tip, it is facilitated to enter gobi underground.Equal leg angle keeps one right-angle surface and 110 side of extension of the husky fence of resistance when fixed To parallel, non-equal leg angle keeps its long right-angle surface and resistance sand 110 extending direction of fence parallel so that it is convenient to anti-when fixed The installation of husky net 113, and conducive to protection sand proof net 113, cut from angle steel seamed edge.
Further, arrangement modeling skin galvanized wire between angle steel, at arranged crosswise, sand-proof net between two root posts 112 It is arranged in the windward side for intersecting iron wire, is fixed with the modeling zinc-plated tied silk of skin between sand-proof net and iron wire.Because mould skin galvanized wire and Moulding the zinc-plated tied silk of skin not only has relatively strength degree, but also UV radiation, while the modeling micromicro of outside is to reduce iron wire and prick The friction of silk and sand-proof net bearing, prevents from being cut.
Further, there are three screw holes for setting at the 50-80cm of its top of angle steel column 112.Wait for dust storm product to the husky fence of resistance It when 110 2/3 eminence, can continue that fence is arranged above, press down the effect of windage sand to raise it.The sand prevention being arranged above Fence includes column 112 and sand proof net 113, and there are three screw holes and following resistance sand fence 110 at 112 lower end 50-80cm of column It is corresponding, be screwed, then be fastened by iron wire, 113 height of sand proof net be 1m, voidage be uniformly with The voidage of the upper surface of following sand-proof net is consistent.
Further, in the windward side of highway 150, it includes multiple tracks to hinder husky fence 110;Per the adjacent husky fence of twice resistance 110 interval settings, and it is gradually distance from highway 150.
Still optionally further, in the windward side of highway 150, husky 3 or more the selection of fence 110 setting, adjacent resistance are hindered 25-50m, optimal selection 30m are divided between husky fence 110.And near first of resistance sand fence 110 of lattice group 130 of fixing the sand Distance fixes the sand lattice group 130 as 15-25m, and optimal is 20m.
Above-mentioned each spacing distance is calculated according to the sand prevention effective distance of resistance sand fence 110, by each Gauge can effectively enhance the husky effect of resistance from being arranged in above-mentioned range.
Further, in the leeward side of highway 150, it includes one or multiple tracks to hinder husky fence 110.When resistance sand fence 110 When including multiple tracks, per the adjacent husky interval of fence 110 setting of twice resistance, and it is gradually distance from highway 150.
It should be understood that the quantity that the leeward side of highway 150 specifically hinders husky fence 110 can be carried out according to practical situation Selection setting, set-up mode are identical as the specific set-up mode of resistance sand fence 110 of the windward side of highway 150.
Still optionally further, in the leeward side of highway 150, husky fence 110 is hindered according to hazards of sand storms situation, the roads setting 1-2 The husky fence 110 of resistance is divided into 25-50m, optimal selection 30m between hindering between husky fence 110.And near the of lattice group 130 of fixing the sand Husky fence distance is hindered together and fixes the sand lattice group 130 as 15-25m, and optimal is 20m.
Further, edge sealing fence 120 is arranged along 150 extending direction of highway is intersected in the both sides of highway 150.
By the way that edge sealing fence 120 is arranged, the dust storm come from the direction non-perpendicular to highway 150 can be effectively prevented.Especially It is parallel to the stream of highway 150, and it is very big on the influence of 150 roadbed of highway, can be upper to public affairs rapidly along side slope On 150 roadbed of road, and bulk deposition is caused on road surface.Especially in wind season transition phase, dust storm is come in directly from both sides during this Connect and jeopardize roadbed and lattice group 130 of fixing the sand, and edge sealing fence 120 just play the role of preventing it is such.
Further, distance fixes the sand lattice group 130 apart from for 2-4m when edge sealing fence 120 is arranged, and can be passed through with people and animals.Envelope 120 one end of picket fence is extended roadbed slope foot position, and the other end is extended on first of resistance sand column location extension 2- At the positions 5m.
Further, edge sealing fence 120 includes multigroup;The setting of multigroup interval of edge sealing fence 120, and extend along highway 150 Directional spreding.
Still optionally further, at interval of 1-2 kilometers, one of edge sealing fence 120 is respectively set in the both sides of highway 150.And It is also provided with edge sealing fence 120 in 150 corner of highway.
Further, the concrete structure of edge sealing fence 120 and installation method are identical as the husky fence 110 of aforementioned resistance.
Further, lattice group 130 of fixing the sand is arranged in the both sides of highway 150, and positioned at edge sealing fence 120, the husky fence of resistance 110 and the protection zone that is enclosed of highway 150 in.Each lattice group 130 of fixing the sand includes multiple grids that fix the sand.Each group Lattice group 130 of fixing the sand has certain width.
The height of the husky fence 110 of resistance and edge sealing fence 120 is all higher than the height for lattice group 130 of fixing the sand.So as to effectively Stop the dust storm blown from periphery, protects lattice group 130 of fixing the sand, and then to play the effect of protection highway 150.Further, Gu Husky web material matter selection is optimal with high density polyethylene (HDPE) (HDPE) material, and not only tensile strength is strong for the material, but also resistance to water erosion, no It is afraid of water.Sand-fixation net porosity is between 45-70%.Sand-fixation net is fixed using column, and column also uses high density polyethylene (HDPE) (HDPE) material is optimal, and column under ground portion is fixed in earth's surface for fixed, and aerial part carries middle crack structure, can be with Sand-fixation net is clamped, making it through this seam can wind, and ultimately form the same grid of honeycomb.
Further, lattice group 130 of fixing the sand at least one protection zone of the windward side of highway 150 includes multigroup. Wherein, the height close to the lattice group 130 of fixing the sand of highway 150 is less than the height of the lattice group 130 of fixing the sand far from highway 150.To not Only dustproof effect is good, and good economical benefit.
Still optionally further, lattice group 130 of fixing the sand at least one protection zone of the windward side of highway 150 is arranged At least two groups.This two groups lattice groups 130 of fixing the sand are parallel to highway 150 and move towards setting, wherein the lattice group of fixing the sand far from highway 150 130 region heights are 30cm, 2m × 2m, are 20cm, 1.5m × 1.5m close to highway 150.The lattice that fix the sand far from highway 150 130 width of group are 20-30m, and 130 width of lattice group that fixes the sand close to highway 150 is 10-20m.It should be understood that being not limited to two sections Domain can increase separate region according to hazards of sand storms severity, and the width of setting is consistent with separate region.It leans on The lattice group 130 of fixing the sand of shortcut base is started setting up from roadbed slope foot position.
Further, it is provided with blank tape 131 between every adjacent two groups lattice groups 130 of fixing the sand.
Still optionally further, the width of blank tape 131 is set as 8-10m, and width should not be greater than one group of lattice group of fixing the sand The width in 130 region.Optimal width is 8m.
By be arranged blank tape 131, on the one hand both can be used for people and animals channel use and flame proof passageway, on the other hand from Dustproof effect angle, blank tape 131 and the lattice group 130 of fixing the sand on both sides form a concave surface, compare, this is more solid than being all set to Husky lattice group 130 can play the role of increasing roughness of ground surface, sand prevention becomes apparent from, same phase to the disturbance bigger of air-flow Compare the lattice group 130 that is all set to fix the sand, more save the net materials that largely fix the sand, saves sand control cost.
Further, in the leeward side of highway 150, lattice group 130 of fixing the sand is including one group or multigroup;Lattice group 130 of fixing the sand is wrapped It includes multigroup;It is provided with blank tape 131 between per adjacent two groups lattice groups 130 of fixing the sand.
Still optionally further, in the leeward side of highway 150, lattice group 130 of fixing the sand can be arranged a panel region, highly be 20cm, 1.5m × 1.5m.Width is 20-30m.Lattice group 130 of fixing the sand is started setting up from roadbed slope foot position.
In other optional embodiments of the invention, in the leeward side of highway 150, lattice group 130 of fixing the sand can be arranged at least Two panel regions are 30cm, 2m × 2m, the width close to the region of the lattice group 130 of fixing the sand of highway 150 far from 150 region height of highway Degree is 20cm, and the length of side of each grid 130 that fixes the sand is 1.5m × 1.5m.Separate width is 20-30m, close 10- 20m.Two panel regions are not limited to, according to hazards of sand storms severity, separate region can be increased, but the width of its setting is answered Less than windward side.
It should be noted that the column for lattice group 130 of fixing the sand and the specific structure and mounting means of Sand-fixation net can be selected It selects identical as the husky fence 110 of aforementioned resistance.
Further, slope protection structure 140 includes solidification sand bed.Slope protection structure 140 can not only prevent wind Erosion, and roughness can be reduced, increase wind speed, play the role of sediment transport, sand material is made not accumulated in side slope and road surface.
Specifically, which is at the roadside slope using chemical sand-fixing materials sprinkling solidification highway 150 The solidification sand bed that sand is formed.Still optionally further, the thickness of the solidification sand bed is selected as 1-2cm.
It should be noted that above-mentioned chemical curing agent can select waterproof common in the market, and it is nontoxic, it is environmentally friendly Chemical curing agent.
Second embodiment
The present embodiment provides a kind of highway dust storm protection systems being suitable for passing through shrub sand dune, with first embodiment There is provided be suitable for pass through shrub sand dune highway dust storm protection system basic structure all same, institute the difference is that, should Highway dust storm protection system suitable for passing through shrub sand dune further includes psammophytes.Wherein psammophytes is planted in close to resistance In the sandy soil that husky fence is nearby accumulated.
Optionally, above-mentioned psammophytes selects sacsaoul.
Specifically, it waits the husky fence of resistance nearby and after grid spaces sand of fixing the sand, sacsaoul etc. is planted in conjunction with biological measures for sand prevention Psammophytes, and coordinate the measures such as manual watering, biological sand prevention is formed, with the growth of plant, should be suitable for passing through shrubbery sand The highway dust storm protection system synthesis sand storm protection effect of packet can become better and better, and plant is finally made to form one with measures for sand prevention Benign sustainable sand- prevention system.
3rd embodiment
The present embodiment provides a kind of construction methods for the highway dust storm protection system being suitable for passing through shrub sand dune, including:
In both sides of highway, along the husky fence of resistance is arranged in highway extending direction, edge intersects at highway extending direction and edge sealing grid are arranged Behind column, the grid that fixes the sand is set, is located at edge sealing fence, hinders in the protection zone that husky fence and highway are enclosed;Its In, it includes multistage to hinder husky fence, and the husky fence of each section of resistance is arranged between two adjacent shrub sand dunes, and each section of resistance is husky For fence at V-shape between two adjacent shrub sand dunes, the angle of V-shape is 130 ° -150 °.
In both sides of highway, cured method is sprayed using chemical curing agent, slope protection structure is set.
Specifically, the husky fence of windward side forward position resistance is first set gradually from outside to inside from windward side setting;Windward side is set again Edge sealing is lockstitched a border;Resistance husky fence in leeward side forward position is set again;Leeward side sealing lock seaming is set again;Windward side is set gradually again to fix the sand Grid;Leeward side is arranged again to fix the sand grid;The sprinkling solidification of windward side side slope sand-consolidating agent is set again;It is solid that leeward side side slope is set again Husky agent sprinkling solidification.
Sand storm protection system setting is arranged according to the shrub sand dune area stream characteristics of motion, the husky rail shape of forward position resistance At resistance sand ribbon, guiding stream of both making the best use of the situation intercepted a large amount of sand material, controlled Sha Yuan, while also using up maximum can The ecosystem of sand hill is protected to energy, and reduces the wind speed close to highway.And close to one side of grid that fixes the sand of highway subgrade Earth's surface in face of near Highway carries out protection fixation, on the other hand reduces the near surface wind speed close to highway, and grid is set Setting can be such that the sand material into grid does not start again, to ensure sand material can not on in highway subgrade.And side slope What solidification allow only to remain accelerates without husky air-flow through roadbed, air-flow accelerating region is formed on road surface, with resistance sand ribbon and the side of fixing the sand The growth of the psammophytes such as the sacsaoul in lattice, synthesis sand storm protection effect can become better and better, and finally make plant and measures for sand prevention Form a benign sustainable sand- prevention system.
In other alternative-embodiments, according to engineering construction condition, if highway is from windward side inconvenience to leeward Side, such as highway have been open to traffic, and do not have situations such as channel nearby, for convenience's sake, system be arranged the step of can also For:First the husky fence of windward side forward position resistance is set gradually from outside to inside from windward side setting;Side sealing lock seaming windward is set again;Again Windward side is set gradually to fix the sand grid;The sprinkling solidification of windward side side slope sand-consolidating agent is set again;Resistance husky grid in leeward side forward position are set again Column;Leeward side sealing lock seaming is set again;Leeward side is arranged again to fix the sand grid;The sprinkling solidification of leeward side side slope sand-consolidating agent is set again.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by Modification, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.It should be noted that:Similar label and word Mother indicates similar terms in following attached drawing, therefore, once it is defined in a certain Xiang Yi attached drawing, then in subsequent attached drawing In it further need not be defined and explained.

Claims (10)

1. a kind of highway dust storm protection system for being suitable for passing through shrub sand dune being suitable for passing through shrub sand dune, feature exist In, including:
The husky fence of resistance, is arranged along highway extending direction in the both sides of highway;The husky fence of the resistance includes multistage, each section of resistance Husky fence is arranged between two adjacent shrub sand dunes, and the husky fence of each section of resistance two adjacent shrub sand dunes it Between at V-shape, the angle of the V-shape is 130 ° -150 °;
Edge sealing fence is arranged along highway extending direction is intersected in the both sides of the highway, and the edge sealing fence, resistance sand Fence and the highway are enclosed multiple protection zones independent of each other;And
It fixes the sand lattice group, is arranged in the both sides of the highway, and in the protection zone;It is arranged in each protection zone It fixes the sand described at least one set lattice group;The height of the husky fence of resistance and the edge sealing fence is all higher than the height of the lattice group of fixing the sand Degree.
2. the highway dust storm protection system as described in claim 1 for being suitable for passing through shrub sand dune, which is characterized in that
The husky fence of each section of resistance includes two rows, and the windward side in two adjacent shrub sand dunes is arranged in first row, The leeward side in two adjacent shrub sand dunes is arranged in second row.
3. the highway dust storm protection system as claimed in claim 2 for being suitable for passing through shrub sand dune, which is characterized in that
The first row and the second row form a resistance sand ribbon, and 15-25m is arranged between every two adjacent resistance sand ribbons Clear area, fix the sand in the clear area grid described in setting.
4. the highway dust storm protection system as described in claim 1 for being suitable for passing through shrub sand dune, which is characterized in that
The edge sealing fence includes multigroup;Multigroup edge sealing fence interval setting, and be distributed along highway extending direction;
0.5-2 kilometers are spaced between edge sealing fence described in per adjacent two groups, and in the highway corner, in the highway Both sides are both provided with the edge sealing fence.
5. the highway dust storm protection system as claimed in claim 4 for being suitable for passing through shrub sand dune, which is characterized in that
The edge sealing fence and the lattice group interval setting of fixing the sand;The edge of the edge sealing fence and the lattice group of fixing the sand is most Small distance is 2-4m;
Edge sealing fence one end extends to the roadbed of the highway;The other end extends to outside the husky column location of first of resistance Prolong at the positions 2-5m.
6. the highway dust storm protection system as described in claim 1 for being suitable for passing through shrub sand dune, which is characterized in that
In at least one protection zone of the windward side of highway, it is provided with multigroup lattice group of fixing the sand;Per adjacent It is provided with blank tape between lattice group of fixing the sand described in two groups;
In at least one protection zone of the leeward side of highway, it is provided with one group or multigroup lattice group of fixing the sand; When be arranged it is multigroup it is described fix the sand lattice group when, per adjacent two groups described in fix the sand and be provided with blank tape between lattice group.
7. the highway dust storm protection system as claimed in claim 6 for being suitable for passing through shrub sand dune, which is characterized in that
In the windward side of highway, it is less than the described of the separate highway close to the height of the lattice group of fixing the sand of the highway and fixes the sand The height of lattice group;
In the leeward side of highway, when the lattice group of fixing the sand includes multigroup, close to the height of the lattice group of fixing the sand of the highway Less than the height far from lattice group of fixing the sand described in the highway.
8. as claim 1-7 any one of them is suitable for passing through the highway dust storm protection system of shrub sand dune, feature exists In,
It is described to be suitable for that pass through the highway dust storm protection system of shrub sand dune further include slope protection structure;The side slope protection knot Structure includes solidification sand bed;The thickness of the solidification sand bed is 1-2cm.
9. a kind of highway dust storm protection system being suitable for passing through shrub sand dune, which is characterized in that including:
The husky fence of resistance, is arranged along highway extending direction in the both sides of highway;The husky fence of the resistance includes multistage, each section of resistance Husky fence is arranged between two adjacent shrub sand dunes, and the husky fence of each section of resistance two adjacent shrub sand dunes it Between at V-shape, the angle of the V-shape is 130 ° -150 °;
Edge sealing fence is arranged along highway extending direction is intersected in the both sides of the highway, and the edge sealing fence, resistance sand Fence and the highway are enclosed multiple protection zones independent of each other;
It fixes the sand lattice group, is arranged in the both sides of the highway, and in the protection zone;It is arranged in each protection zone It fixes the sand described at least one set lattice group;The height of the husky fence of resistance and the edge sealing fence is all higher than the height of the lattice group of fixing the sand Degree;And
Psammophytes;The psammophytes is planted in the sandy soil that the husky fence of the resistance is nearby accumulated.
10. a kind of construction method for the highway dust storm protection system being suitable for passing through shrub sand dune, which is characterized in that including:
In both sides of highway, the husky fence of resistance is set, after intersecting at highway extending direction setting edge sealing fence along highway extending direction, The grid that fixes the sand is set, is located at the edge sealing fence, the protection zone that the husky fence of resistance and the highway are enclosed It is interior;Wherein, the husky fence of the resistance includes multistage, and the husky fence of each section of resistance is arranged between two adjacent shrub sand dunes, And the husky fence of each section of resistance between two adjacent shrub sand dunes at V-shape, the angle of the V-shape is 130 °- 150°;
In both sides of highway, cured method is sprayed using chemical curing agent, slope protection structure is set.
CN201810118504.1A 2018-02-06 2018-02-06 Highway sand-blast protection system suitable for crossing shrub sand bags and construction method thereof Active CN108316171B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810118504.1A CN108316171B (en) 2018-02-06 2018-02-06 Highway sand-blast protection system suitable for crossing shrub sand bags and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810118504.1A CN108316171B (en) 2018-02-06 2018-02-06 Highway sand-blast protection system suitable for crossing shrub sand bags and construction method thereof

Publications (2)

Publication Number Publication Date
CN108316171A true CN108316171A (en) 2018-07-24
CN108316171B CN108316171B (en) 2023-10-10

Family

ID=62902569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810118504.1A Active CN108316171B (en) 2018-02-06 2018-02-06 Highway sand-blast protection system suitable for crossing shrub sand bags and construction method thereof

Country Status (1)

Country Link
CN (1) CN108316171B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2922647A1 (en) * 2022-04-12 2022-09-19 Adif Alta Velocidad PROTECTOR OF RAILWAY LINEAR INFRASTRUCTURES AGAINST DRAG BY WIND ACTION OF THE SALSOLA KALI PLANT (Machine-translation by Google Translate, not legally binding)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110220857A1 (en) * 2008-11-10 2011-09-15 Daniel Castro Fresno Protective barrier for winds carrying snow or sand
CN204728304U (en) * 2015-05-15 2015-10-28 新疆铁道勘察设计院有限公司 A kind of wild goose font for cross flow area, Gobi desert hinders husky structure
CN105019423A (en) * 2015-06-30 2015-11-04 阿克苏公路管理局 Lap-joint slope wrapping wind prevention and sand fixation method
CN205399389U (en) * 2016-03-07 2016-07-27 民勤县成功农业开发有限责任公司 Sand prevention structure is fixed sand to two -stage
CN205604096U (en) * 2015-12-17 2016-09-28 何新兵 Husky system of roadlock says in husky district
CN106320194A (en) * 2016-08-31 2017-01-11 中国科学院寒区旱区环境与工程研究所 Sand prevention fence device and sand prevention system
CN106400772A (en) * 2016-08-31 2017-02-15 中国科学院寒区旱区环境与工程研究所 Sand preventing fence and sand preventing system
CN207959025U (en) * 2018-02-06 2018-10-12 中国科学院寒区旱区环境与工程研究所 Suitable for passing through the highway dust storm protection system of shrub sand dune

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110220857A1 (en) * 2008-11-10 2011-09-15 Daniel Castro Fresno Protective barrier for winds carrying snow or sand
CN204728304U (en) * 2015-05-15 2015-10-28 新疆铁道勘察设计院有限公司 A kind of wild goose font for cross flow area, Gobi desert hinders husky structure
CN105019423A (en) * 2015-06-30 2015-11-04 阿克苏公路管理局 Lap-joint slope wrapping wind prevention and sand fixation method
CN205604096U (en) * 2015-12-17 2016-09-28 何新兵 Husky system of roadlock says in husky district
CN205399389U (en) * 2016-03-07 2016-07-27 民勤县成功农业开发有限责任公司 Sand prevention structure is fixed sand to two -stage
CN106320194A (en) * 2016-08-31 2017-01-11 中国科学院寒区旱区环境与工程研究所 Sand prevention fence device and sand prevention system
CN106400772A (en) * 2016-08-31 2017-02-15 中国科学院寒区旱区环境与工程研究所 Sand preventing fence and sand preventing system
CN207959025U (en) * 2018-02-06 2018-10-12 中国科学院寒区旱区环境与工程研究所 Suitable for passing through the highway dust storm protection system of shrub sand dune

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2922647A1 (en) * 2022-04-12 2022-09-19 Adif Alta Velocidad PROTECTOR OF RAILWAY LINEAR INFRASTRUCTURES AGAINST DRAG BY WIND ACTION OF THE SALSOLA KALI PLANT (Machine-translation by Google Translate, not legally binding)

Also Published As

Publication number Publication date
CN108316171B (en) 2023-10-10

Similar Documents

Publication Publication Date Title
CN201305845Y (en) Wind-proof sand stablization barrier
CN108316172A (en) Highway dust storm protection system and its construction method suitable for gobi strong wind area
CN106320194B (en) A kind of anti-sand fence device and sand prevention system
CN207891760U (en) Road sand storm protection system suitable for drift sand area
CN102852119B (en) Sand wind hazard comprehensive protection system for railway in shore of cold highland area
CN104727239A (en) High and vertical type sand-preventing barrier for high-wind-speed sandy areas
CN207904793U (en) Highway dust storm protection system suitable for gobi strong wind area
CN108049319A (en) Suitable for the road dust storm countermeasure system and its construction method of rolling topography
CN105064315B (en) Gas solid separation formula sand-protecting barrier
CN207959025U (en) Suitable for passing through the highway dust storm protection system of shrub sand dune
CN108316171A (en) Suitable for passing through the highway dust storm protection system and its construction method of shrub sand dune
CN203129121U (en) Windproof sand resistance sand barrier
CN102002916B (en) Wind-preventing sand-throwing wall
CN105200972B (en) Method for comprehensive treatment of moving dune through top sealing, slope fixing and side locking
CN106013227A (en) Culvert structure, wind sand protection device and roadbed system
CN205421050U (en) Railroad embankment river valley sand storm protection structure
CN202482782U (en) Doublet sand resistance structure for road protection in sandstorm area
CN207891761U (en) Windy and sandy area road sand storm protection system animal corridor and road sand storm protection system
CN206607574U (en) It is anti-to wash in a pan erosion device and sand- prevention system
CN207919387U (en) Road dust storm countermeasure system suitable for rolling topography
CN204919521U (en) Integrated control structure suitable for moving dunes
CN112030791A (en) Wind and sand prevention device with inclined plane net prevention structure and roadbed wind and sand protection system
CN110241745A (en) It is a kind of for dredging the wind shield device and method of drift sand
CN108316170A (en) Windy and sandy area road sand storm protection system animal corridor and road sand storm protection system
KR101140811B1 (en) Grass cover of the roadside

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Chengguan District of Gansu city of Lanzhou province Donggang West Road 730000 No. 320

Applicant after: COLD AND ARID REGIONS ENVIRONMENTAL AND ENGINEERING Research Institute,CHINESE ACADEMY OF SCIENCES

Applicant after: Alxa League Transportation Development Center

Address before: Chengguan District of Gansu city of Lanzhou province Donggang West Road 730000 No. 320

Applicant before: COLD AND ARID REGIONS ENVIRONMENTAL AND ENGINEERING Research Institute,CHINESE ACADEMY OF SCIENCES

Applicant before: Alxa League highway transportation maintenance center

Address after: Chengguan District of Gansu city of Lanzhou province Donggang West Road 730000 No. 320

Applicant after: COLD AND ARID REGIONS ENVIRONMENTAL AND ENGINEERING Research Institute,CHINESE ACADEMY OF SCIENCES

Applicant after: Alxa League highway transportation maintenance center

Address before: Chengguan District of Gansu city of Lanzhou province Donggang West Road 730000 No. 320

Applicant before: COLD AND ARID REGIONS ENVIRONMENTAL AND ENGINEERING Research Institute,CHINESE ACADEMY OF SCIENCES

Applicant before: ALXA LEAGUE ROAD MANAGEMENT BUREAU

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20230906

Address after: 730013 No. 318, Donggang West Road, Chengguan District, Lanzhou City, Gansu Province

Applicant after: NORTHWEST INSTITUTE OF ECO-ENVIRONMENT AND RESOURCES, CHINESE ACADEMY OF SCIENCES

Applicant after: Alxa League Transportation Development Center

Address before: Chengguan District of Gansu city of Lanzhou province Donggang West Road 730000 No. 320

Applicant before: COLD AND ARID REGIONS ENVIRONMENTAL AND ENGINEERING Research Institute,CHINESE ACADEMY OF SCIENCES

Applicant before: Alxa League Transportation Development Center

GR01 Patent grant
GR01 Patent grant