CN207891761U - Windy and sandy area road sand storm protection system animal corridor and road sand storm protection system - Google Patents
Windy and sandy area road sand storm protection system animal corridor and road sand storm protection system Download PDFInfo
- Publication number
- CN207891761U CN207891761U CN201820210024.3U CN201820210024U CN207891761U CN 207891761 U CN207891761 U CN 207891761U CN 201820210024 U CN201820210024 U CN 201820210024U CN 207891761 U CN207891761 U CN 207891761U
- Authority
- CN
- China
- Prior art keywords
- resistance
- group
- sand
- husky fence
- fence group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model is related to sand storm protection fields, in particular to a kind of windy and sandy area road sand storm protection system animal corridor and road sand storm protection system.The logical road includes first passage, and in the husky fence group of resistance, it includes the husky fence group of the first resistance and the husky fence group of the second resistance to hinder husky fence group, and at least one first passage to pass through for people and animals is provided in the husky fence group of the first resistance for first passage setting;The husky fence group of second resistance is used to coordinate with first passage, second channel;Second channel is arranged in lattice group of fixing the sand, and lattice group of fixing the sand includes multiple grids that fix the sand, and multiple grids that fix the sand connect into lattice group of fixing the sand, and there is lattice group of fixing the sand first edge and second edge, second channel to be penetrated through from first edge to second edge.It can greatly facilitate herdsman and animal traffic by the way that first passage and second channel is arranged, also efficiently avoid destruction of the animal to sand storm protection system, sand storm protection effect is good.
Description
Technical field
The utility model is related to sand storm protection fields, in particular to a kind of windy and sandy area road sand storm protection system
Animal corridor and road sand storm protection system.
Background technology
The key for solving desert area development problem is to repair the roads, and desert area constructs a railway road just in face of serious dust storm
Prevention task.And the build of road and its dust storm countermeasure system to local people provide it is many convenient while, also can be at that time
The people cause inconvenience.For the desert area people mainly based on herdsman, the both sides of the road of build are all the pastures for belonging to herdsman,
And road and its dust storm countermeasure system can cause herdsman pasture to be isolated and close, this causes big inconvenience and damage to herdsman
It loses.
For there is such case, utility model people has found, at least there are following problems in the prior art:(1) although road
Some sections of road are provided with culvert and people and animals channel, but due to the setting of sand- prevention system, still can not be successfully herdsman and herding
Pass through;(2) high vertical sand-proof net forms similar fence and acts on, result in blockage because being the setting of strip line;(3) low vertical solid
After the setting in flakes of sand net, herdsman and herding enter, one is very inconvenient action, another herding causes Sand-fixation net prodigious
It destroys.For occurring these situations at present, it is necessary to propose a kind of road sand storm protection system animal corridor.
Utility model content
The purpose of this utility model is to provide a kind of windy and sandy area road sand storm protection system animal corridors, solve existing
The inconvenient problem of dust storm guard system people and animals passage in technology.
The another object of the utility model is to provide a kind of road sand storm protection system, and sand storm protection effect is good, and just
It passes through in people and animals.
To achieve the goals above, the technical solution that the utility model embodiment uses is as follows:
A kind of windy and sandy area road sand storm protection system animal corridor comprising
First passage, first passage setting is in the husky fence group of resistance, so that people and animals can pass through first passage to be hindered in each group
It is walked between husky fence group;The husky fence group of resistance includes the husky fence group of the first resistance and the husky fence group of the second resistance, the husky fence group of the first resistance
On be provided with it is at least one for people and animals pass through first passage;The husky fence group of second resistance is used to coordinate with first passage, to block
The dust storm for cutting prevailing wind direction passes through first passage;
Second channel;Second channel is arranged in lattice group of fixing the sand, and lattice group of fixing the sand includes multiple grids that fix the sand, multiple sides of fixing the sand
Lattice connect into lattice group of fixing the sand, and there is lattice group of fixing the sand first edge and second edge, second channel to be penetrated through from first edge to second
Edge;So that people and animals can walk across second channel in lattice group of fixing the sand.
In the utility model preferred embodiment,
The length of the husky fence group of second resistance is more than or equal to the width of first passage;The width 3-6m of first passage;Second resistance
The length of husky fence group is 4-12m.
In the utility model preferred embodiment,
The husky fence group of first resistance and the husky fence group of the second resistance are arranged in parallel, the husky fence group of the first resistance and the husky fence group of the second resistance
Between be spaced 2-5 meters;The husky fence group of second resistance is located at the windward side of first passage, and the both ends and first of the husky fence group of the second resistance
The lap of the husky fence group of resistance is 3-4m.
In the utility model preferred embodiment,
The both ends of the husky fence group of second resistance are both provided with alar part, and alar part extends to the direction far from the husky fence group of the first resistance,
And with the husky fence group of the second resistance in 120-150 ° of angle.
In the utility model preferred embodiment,
One end of the husky fence group of second resistance is connected at the first passage of the first resistance sand fence group, the husky fence group of the second resistance
The other end is in 120-150 ° of angle with first passage.
In the utility model preferred embodiment,
The husky fence group of first resistance and the husky fence group staggered parallel of the second resistance;
The husky fence group of first resistance has first end and opposite second end, the side that first end hinders husky fence group to separate second
To extension;
The husky fence group of second resistance has third end and a 4th opposite end, third end overlapping 6-8m parallel with second end, the
One channel is arranged between second end and third end.
In the utility model preferred embodiment,
The third end of the husky fence group of second resistance is provided with alar part;Alar part extends to the direction far from the husky fence group of the first resistance,
And with the husky fence group of the second resistance in 120-150 ° of angle.
In the utility model preferred embodiment,
The husky fence group of third resistance is provided on the outside of first edge, the husky fence group of third resistance is used to coordinate with second channel,
Dust storm to intercept prevailing wind direction passes through second channel;
Second channel width is 4-8m, and the length of the husky fence group of third resistance is 10-14m.
In the utility model preferred embodiment,
Second channel is in 45-70 ° with first edge and second edge.
A kind of road sand storm protection system including above-mentioned windy and sandy area road sand storm protection system animal corridor.
The utility model has the beneficial effects that:
A kind of windy and sandy area road sand storm protection system animal road provided by the utility model is logical comprising first passage,
First passage setting is in the husky fence group of resistance, so that people and animals can walk across first passage each group hinders husky fence group;
The husky fence group of resistance includes the husky fence group of the first resistance and the husky fence group of the second resistance, and at least one use is provided in the husky fence group of the first resistance
In the first passage that people and animals pass through;The husky fence group of second resistance is used to coordinate with first passage, and the dust storm to intercept prevailing wind direction passes through
First passage;Second channel;Second channel is arranged in lattice group of fixing the sand, and lattice group of fixing the sand includes multiple grids that fix the sand, multiple to fix the sand
Grid connects into lattice group of fixing the sand, and there is lattice group of fixing the sand first edge and second edge, second channel to be penetrated through from first edge to the
Two edges;So that people and animals can walk across second channel in lattice group of fixing the sand.By the way that first passage and second channel energy is arranged
It is enough greatly to facilitate herdsman and animal traffic, also efficiently avoid destruction of the animal to sand storm protection system.
A kind of road including above-mentioned windy and sandy area road sand storm protection system animal corridor provided by the utility model
Sand storm protection system, not only sand storm protection effect is good, but also people and animals pass through conveniently.
Description of the drawings
It, below will be to required use in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment
Attached drawing be briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore should not be by
Regard the restriction to range as, for those of ordinary skill in the art, without creative efforts, may be used also
To obtain other relevant attached drawings according to these attached drawings.
Fig. 1 is the structural schematic diagram for the road sand storm protection system that the utility model first embodiment provides;
Fig. 2 is the structural representation of the husky fence group of resistance for the road sand storm protection system that the utility model first embodiment provides
Figure;
Fig. 3 is the knot of the column of the husky fence group of resistance for the road sand storm protection system that the utility model first embodiment provides
Structure schematic diagram;
Fig. 4 is the first passage of the husky fence group of resistance for the road sand storm protection system that the utility model first embodiment provides
Two kinds of set-up modes schematic diagram;
Between the husky fence group of multiple tracks resistance for the road sand storm protection system that Fig. 5 provides for the utility model first embodiment,
The setting schematic diagram of first passage;
Fig. 6 is the first visual angle of the lattice group of fixing the sand for the road sand storm protection system that the utility model first embodiment provides
Structural schematic diagram;
Fig. 7 is the second visual angle of the lattice group of fixing the sand for the road sand storm protection system that the utility model first embodiment provides
Structural schematic diagram;
Fig. 8 is the second channel of the lattice group of fixing the sand for the road sand storm protection system that the utility model first embodiment provides
The schematic diagram of arrangement;
Fig. 9 is the first passage of the husky fence group of resistance for the road sand storm protection system that the utility model second embodiment provides
Arrangement schematic diagram;
The first of the husky fence group of resistance for the road sand storm protection system that Figure 10 provides for the utility model 3rd embodiment is logical
The schematic diagram of two kinds of arrangements in road.
Icon:100- road sand storm protection systems;The husky fence group of 110- resistances;111- hinders husky fence group first;112- is vertical
Column;113- sand proof nets;120- edge sealing fence;130- fixes the sand lattice group;131- blank tapes;150- roads;160- first passages;161-
The husky fence group of first resistance;162- second hinders husky fence group;170- second channels;171- first edges;172- second edges;173-
The husky fence group of third resistance.
Specific implementation mode
It is new below in conjunction with this practicality to keep the purpose, technical scheme and advantage of the utility model embodiment clearer
Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched
The embodiment stated is the utility model a part of the embodiment, instead of all the embodiments.Usually here described in attached drawing and
The component of the utility model embodiment shown can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiments of the present invention to providing in the accompanying drawings is not intended to limit requirement below
The scope of the utility model of protection, but it is merely representative of the selected embodiment of the utility model.Based in the utility model
Embodiment, the every other embodiment that those of ordinary skill in the art are obtained without creative efforts, all
Belong to the range of the utility model protection.
It should be noted that:Similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined, then it further need not be defined and explained in subsequent attached drawing in a attached drawing.
In the description of the utility model embodiment, it should be noted that the orientation or position of the instructions such as term "upper", "inner"
Set relationship be based on the orientation or positional relationship shown in the drawings or the utility model product using when the orientation usually put
Or position relationship, be merely for convenience of describing the present invention and simplifying the description, do not indicate or imply the indicated device or
Element must have a particular orientation, with specific azimuth configuration and operation, therefore should not be understood as the limit to the utility model
System.
In the description of the present invention, it should also be noted that, unless otherwise clearly defined and limited, term " is set
Set ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection,
Or it is integrally connected;It can be directly connected, can also can be indirectly connected through an intermediary the company inside two elements
It is logical.For the ordinary skill in the art, above-mentioned term in the present invention specific can be understood with concrete condition
Meaning.
First embodiment
Fig. 1-Fig. 8 is please referred to, the present embodiment provides a kind of road sand storm protection systems 100 comprising the husky fence group of resistance
110, edge sealing fence 120 and lattice group 130 of fixing the sand.
Further, husky fence group 110 is hindered along 150 extending direction of road to be arranged in the both sides of road 150.Specifically, it hinders
Husky fence group 110 is arranged in place of 150 both sides of road far from road 150, is parallel to the trend of road 150.Resistance sand fence group 110
It is the outermost barrier of the entire road sand storm protection system 100 suitable for gobi strong wind area.Resistance sand fence group 110 can press down wind
Resistance is husky, so that the wind energy for entering the road sand storm protection system 100 suitable for gobi strong wind area is reduced, while stopping sand material, makes
Sand material is deposited near resistance sand fence group 110, to protect lattice group 130 of fixing the sand, road 150 and roadbed.
Further, it hinders husky 110 height of fence group and is selected as 1.6-3m.Still optionally further, husky 110 height of fence group is hindered
It is selected as 2m.
Specifically, it includes angle steel column 112 and sand proof net 113 to hinder husky fence group 110, and the selection of sand proof net 113 has anti-purple
Outside line, anti-strong wind, strength degree material.Optionally, the material of sand proof net 113 selects high density polyethylene (HDPE) (HDPE) material.
Further, the grid-gap degree of sand proof net 113 is set as structure close under dredging.In other words, closer to ground
The voidage in face, sand proof net 113 is smaller.
Further, above-mentioned angle steel column 112 uses Zinc-coated angle steel, and equal leg angle may be used, and size is the length of side
× the length of side × thickness=40mm × 40mm × 4mm or unequal angle, size be the length of side × length of side × thickness=63mm ×
Then 40mm × 4mm uses antirust paint to spray one layer on angle steel surface layer, prevents from getting rusty and erode.It cuts 112 bottom end of angle steel column
At tip, it is facilitated to enter gobi underground.Equal leg angle keeps one right-angle surface and husky 110 aspect of fence group of resistance flat when fixed
Row side's row, non-equal leg angle keep its long right-angle surface side's row parallel with the husky fence group 110 of resistance so that it is convenient to sand proof net when fixed
113 installation, and conducive to protection sand proof net 113, cut from angle steel seamed edge.
Further, arrangement modeling skin galvanized wire between angle steel, at arranged crosswise, sand-proof net between two root posts 112
It is arranged in the windward side for intersecting iron wire, is fixed with the modeling zinc-plated tied silk of skin between sand-proof net and iron wire.Because mould skin galvanized wire and
Moulding the zinc-plated tied silk of skin not only has relatively strength degree, but also UV radiation, while the modeling micromicro of outside is to reduce iron wire and prick
The friction of silk and sand-proof net bearing, prevents from being cut.
Further, there are three screw holes for setting at the 50-80cm of its top of angle steel column 112.Wait for dust storm product to the husky fence of resistance
It when 2/3 eminence of group 110, can continue that fence is arranged above, press down the effect of windage sand to raise it.The sand prevention being arranged above
Fence includes column 112 and sand proof net 113, and there are three screw holes and following resistance sand fence group at 112 lower end 50-80cm of column
110 is corresponding, is screwed, then is fastened by iron wire, and 113 height of sand proof net is 1m, and voidage is uniform
It is consistent with the voidage of the upper surface of following sand-proof net.
Further, in the windward side of road 150, it includes multiple tracks to hinder husky fence group 110;Per the adjacent husky fence of twice resistance
110 interval setting of group, and it is gradually distance from road 150.
Still optionally further, it in the windward side of road 150, hinders husky fence group 110 and selects 3 or more setting, it is adjacent
It is divided into 25-50m, optimal selection 30m between resistance sand fence group 110.And near the husky fence of first of resistance for lattice group 130 of fixing the sand
111 distances of group fix the sand lattice group 130 as 15-25m, and optimal is 20m.
Above-mentioned each spacing distance is calculated according to the sand prevention effective distance of resistance sand fence group 110, will be each
Spacing distance is arranged in above-mentioned range, can effectively enhance the husky effect of resistance.
Further, in the leeward side of road 150, it includes one or multiple tracks to hinder husky fence group 110.When the husky fence group of resistance
110 when including multiple tracks, and per adjacent twice resistance, husky fence group 110 is spaced setting, and is gradually distance from road 150.
It should be understood that the quantity that the leeward side of road 150 specifically hinders husky fence group 110 can be carried out according to practical situation
Selection setting, set-up mode are identical as the specific set-up mode of resistance sand fence group 110 of the windward side of road 150.
Still optionally further, in the leeward side of road 150, husky fence group 110 is hindered according to hazards of sand storms situation, 1-2 is set
Resistance husky fence group 110 in road is divided into 25-50m, optimal selection 30m between hindering between husky fence group 110.And near lattice group 130 of fixing the sand
One of distance fix the sand lattice group 130 be 15-25m, it is optimal be 20m.
Fig. 5 is please referred to, hinders and is provided with first passage 160 in husky fence group 110.The setting of first passage 160 is in the husky fence of resistance
In group 110, so that people and animals can walk across first passage 160 each group hinders husky fence group 110;Resistance sand fence group 110
The husky fence group 162 of 161 and second resistance of husky fence group is hindered including first, at least one use is provided in the first resistance sand fence group 161
In the first passage 160 that people and animals pass through.Further, second resistance can also be set in the windward side of the first resistance sand fence group 161
Husky fence group 162.Second resistance sand fence group 162 with first passage 160 for coordinating, to intercept the dust storm of prevailing wind direction by first
Channel 160.
In the present embodiment, the length of the second resistance sand fence group 162 is more than or equal to the width of first passage 160;First is logical
The width 3-6m in road 160, further optionally, selection are set as 4m.The length of second resistance sand fence group 162 is 4-12m, into
One step optionally, selection be set as 10m.The husky 161 and second resistance sand fence group 162 of fence group of first resistance is arranged in parallel, and first
2-5 meters of interval between the husky husky fence group 162 of 161 and second resistance of fence group of resistance, further optionally, selection is set as 3m.The
Two resistance sand fence groups 162 are located at the windward side of first passage 160, and the both ends of the second resistance sand fence group 162 hinder husky grid with first
The lap of column group 161 is 3-4m.
Further, the both ends of the husky fence group of the second resistance 162 are respectively provided with it is also an option that setting alar part, and alar part is to far from the
The direction of one resistance sand fence group 161 extends, and is in 120-150 ° of angle with the second resistance sand fence group 162.
Specifically, husky 162 both ends of fence group of the second resistance carry the alar part put on display outward, which is in encircle shape outward
Shape, which has the resistance sand amount for increasing by the second resistance sand fence group 162, while can prevent 162 both ends of the second resistance sand fence group
Convolution wind, which makes sand enter the first passage 160 of the husky fence group of the first resistance 161.
It can greatly facilitate herdsman and animal traffic by the way that first passage 160 is arranged, also efficiently avoid animal pair
The destruction of sand storm protection system.
Fig. 6 is please referred to, further, in the sand storm protection system, is both provided in each group of resistance sand fence group 110
The first passage 160 stated, further, the position for the first passage 160 being arranged in every two groups of adjacent resistance sand fence groups 110 are handed over
Mistake setting, avoids prevailing wind direction from forming channel, effectively stream can be avoided to convey in this way.Optionally, the husky fence of two resistances is mutually led
The first passage 160 of group 110 is vertically staggered 8-15m in prevailing wind direction.
Further, edge sealing fence 120 is arranged along 150 extending direction of road is intersected in the both sides of road 150.
In other words, the setting direction of edge sealing fence 120 is not parallel to road 150, edge sealing fence 120 and road 150 it
Between be provided with certain angle, the angle be more than zero degree be less than 180 °.Still optionally further, each edge sealing fence 120 can be with
It is in 90 ° that selection, which is set as intersecting with the road 150 of corresponding section,.
By the way that edge sealing fence 120 is arranged, the dust storm come from the direction non-perpendicular to road 150 can be effectively prevented.Especially
It is parallel to the stream of road 150, and it is very big on the influence of 150 roadbed of road, and upper rapidly road can be arrived along side slope
On 150 roadbeds, and bulk deposition is caused on road surface.Especially in wind season transition phase, dust storm is come in directly from both sides during this
Jeopardize roadbed and lattice group 130 of fixing the sand, and edge sealing fence 120 just play the role of preventing it is such.
Further, the minimum range of the edge of edge sealing fence 120 and lattice group 130 of fixing the sand is 2-4m;So as to people
Poultry is passed through.120 one end of edge sealing fence is extended roadbed slope foot position, and the other end is extended on first of resistance sand fence group
At the 111 positions positions extension 2-5m.
Further, edge sealing fence 120 includes multigroup;The setting of multigroup interval of edge sealing fence 120, and extend along road 150
Directional spreding.
Still optionally further, at interval of 0.5-2 kilometers, one of edge sealing fence 120 is respectively set in the both sides of road 150.And
And it is also provided with edge sealing fence 120 in 150 corner of road.Preferably, it at interval of 1 kilometer, is respectively set in the both sides of road 150
Set one of edge sealing fence 120.It is also equipped with edge sealing fence 120 at the both ends that entire sand- prevention system starts and terminates.
Further, the concrete structure of edge sealing fence 120 and installation method are identical as the husky fence group 110 of aforementioned resistance.
Further, lattice group 130 of fixing the sand is arranged in the both sides of road 150, and positioned at edge sealing fence 120, the husky fence group of resistance
110 and the region that is enclosed of road 150 in.The husky fence group 110 of resistance and the height of edge sealing fence 120 are all higher than lattice group of fixing the sand
130 height.So as to effectively stop the dust storm blown from periphery, lattice group 130 of fixing the sand is protected, and then to play anti-berm
The effect on road 150.
Further, in the windward side of road 150, lattice group 130 of fixing the sand includes multigroup;Per adjacent two groups lattice groups of fixing the sand
Blank tape 131 is provided between 130.Wherein, the height close to the lattice group 130 of fixing the sand of road 150 is less than consolidating far from road 150
The height of husky lattice group 130.To which not only dustproof effect is good, but also good economical benefit.
Still optionally further, in the windward side of road 150, at least two groups, i.e. two panel regions are arranged in lattice group 130 of fixing the sand.It should
Two groups of lattice groups 130 of fixing the sand are parallel to road 150 and move towards setting, wherein 150 region height of separate road is 30cm, and 2m × 2m is leaned on
Shortcut road 150 is 20cm, 1.5m × 1.5m.130 width of lattice group that fixes the sand far from road 150 is 20-30m, close to road 150
Fix the sand 130 width of lattice group be 10-20m.It should be understood that being not limited to two panel regions, according to hazards of sand storms severity, can increase
The width in separate region, setting is consistent with separate region.Lattice group 130 of fixing the sand close to roadbed is opened from roadbed slope foot position
Begin to be arranged.
Further, it is provided with blank tape 131 between every adjacent two groups lattice groups 130 of fixing the sand.
Still optionally further, the width of blank tape 131 is set as 8-10m, and width should not be greater than one group of lattice group of fixing the sand
The width in 130 region.Optimal width is 8m.
By the way that blank tape 131 is arranged, the use of people and animals channel and flame proof passageway were on the one hand both can be used for, on the other hand from anti-
Husky effect angle, blank tape 131 and the lattice group 130 of fixing the sand on both sides form a concave surface, compare, this is than being all set to the lattice that fix the sand
Group 130 can play the role of increasing roughness of ground surface to the disturbance bigger of air-flow, and sand prevention becomes apparent from, while complete compared to relatively
Portion is set as lattice group 130 of fixing the sand, and more saves the net materials that largely fix the sand, and saves sand control cost.
Further, in the leeward side of road 150, lattice group 130 of fixing the sand is including one group or multigroup;When lattice group 130 of fixing the sand
Including it is multigroup when, be provided with blank tape 131 per between adjacent two groups 130 groups of lattice groups of fixing the sand.In the leeward side of road 150, when
When lattice group 130 of fixing the sand includes multigroup, the height close to the lattice group 130 of fixing the sand of road 150 is less than the lattice group of fixing the sand far from road 150
130 height.
Still optionally further, in the leeward side of road 150, lattice group 130 of fixing the sand can be arranged a panel region, highly be
20cm, 1.5m × 1.5m.Width is 20-30m.Lattice group 130 of fixing the sand is started setting up from roadbed slope foot position.
In the utility model other optional embodiments, in the leeward side of road 150, lattice group 130 of fixing the sand can be arranged
At least two panel regions are 30cm, 2m × 2m far from road area height, are 20cm, 1.5m × 1.5m close to road 150.Far
From width be 20-30m, close 10-20m.Two panel regions are not limited to, according to hazards of sand storms severity, can be increased remote
From region, but its setting width should be less than windward side.
Further, the selection of Sand-fixation net material is optimal with high density polyethylene (HDPE) (HDPE) material, which not only stretches by force
Degree is strong, and resistance to water erosion, not afraid of water.Sand-fixation net porosity is between 45-70%.Sand-fixation net is fixed using column, and column is also adopted
Optimal with high density polyethylene (HDPE) (HDPE) material, column under ground portion is fixed in earth's surface for fixation, and aerial part carries
Middle crack structure can clamp Sand-fixation net, and making it through this seam can wind, and ultimately form the same grid of honeycomb.
Further, second channel 170 is arranged in lattice group 130 of fixing the sand, and lattice group 130 of fixing the sand has 171 He of first edge
Second edge 172, second channel 170 are penetrated through from first edge 171 to second edge 172;So that people and animals can pass through second to lead to
Road 170 is walked in lattice group 130 of fixing the sand.
Further, the outside of first edge 171 is provided with the husky fence group 173 of third resistance, husky 173 use of fence group of third resistance
Coordinate in second channel 170, the dust storm to intercept prevailing wind direction passes through second channel 170;
170 width of second channel is 4-8m, and the length of third resistance sand fence group 173 is 10-14m.The husky fence group of third resistance
173 height 1.5-3m.
Further, second channel 170 and first edge 171 and second edge 172 are in 45-70 °.
Specifically, the width selection of second channel 170 is set as 4-8m.
In other alternative-embodiments, the both ends that husky fence group 173 is hindered in third are respectively set to the windward side exhibition wing
Portion, the alar part is with the husky fence group 173 of third resistance in 120-150 ° of angle.Outward in shape is encircled, which, which has, increases third
Resistance sand fence group 173 hinders husky amount, while can prevent the convolution wind at husky 173 both ends of fence group of third resistance, which makes sand
Into the animal corridor for lattice group 130 of fixing the sand.
Second embodiment
Fig. 9 is please referred to, the present embodiment provides a kind of road sand storm protection system, the road transportation work style provided with first embodiment
The basic structure all same of husky protection system, institute the difference is that, the setting of the first passage of the road sand storm protection system
Mode is different.
In the present embodiment, one end of the husky fence of the second resistance is connected at the first passage of the first resistance sand fence, the second resistance
The other end of husky fence is in 120-150 ° of angle with first passage.The husky fence of second resistance is put on display outward, length 4-8m.Second resistance
Husky fence is according to prevailing wind direction, it can be provided two kinds, prevailing wind direction is in compared with vertical direction with the husky fence 4 of resistance.
3rd embodiment
Figure 10 is please referred to, the present embodiment provides a kind of road sand storm protection system, the road provided with first embodiment
The basic structure all same of sand storm protection system, institute the difference is that, the first passage of the road sand storm protection system is set
Set mode difference.
In the present embodiment, the husky fence of the first resistance and the husky fence staggered parallel of the second resistance;The husky fence of first resistance has first
End and opposite second end, first end extend to the direction far from the husky fence of the second resistance;The second husky fence of resistance have third end and
The 4th opposite end, third end overlapping 6-8m parallel with second end, first passage are arranged between second end and third end.Second
The husky fence of resistance is located at the outside of the husky fence of the first resistance, and distance is 2-5m between the two, and optimal is 3m.
Further, the third end of the husky fence of the second resistance is also an option that setting alar part;Alar part is to far from the husky grid of the first resistance
The direction on column extends, and is in 120-150 ° of angle with the husky fence of the second resistance.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this
For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model
Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.It should be noted that
It arrives:Similar label and letter indicate similar terms in following attached drawing, therefore, once determined in a certain Xiang Yi attached drawing
Justice further need not then be defined and explained to it in subsequent attached drawing.
Claims (10)
1. a kind of windy and sandy area road sand storm protection system animal corridor, which is characterized in that including
First passage, the first passage setting is in the husky fence group of resistance, so that people and animals can pass through the first passage each
It is walked between the husky fence group of the group resistance;The husky fence group of the resistance includes the husky fence group of the first resistance and the husky fence group of the second resistance, institute
It states and is provided at least one first passage to pass through for people and animals in the first resistance sand fence group;The husky fence group of second resistance is used for
Coordinate with the first passage, the dust storm to intercept prevailing wind direction passes through the first passage;
Second channel;The second channel is arranged in lattice group of fixing the sand, and the lattice group of fixing the sand includes multiple grids that fix the sand, Duo Gesuo
It states the grid that fixes the sand and connects into the lattice group of fixing the sand, the lattice group of fixing the sand has first edge and second edge, the second channel
It is penetrated through from the first edge to the second edge;So that the people and animals can pass through the second channel in the lattice that fix the sand
It is walked in group.
2. windy and sandy area road sand storm protection system animal corridor as described in claim 1, which is characterized in that
The length of the husky fence group of second resistance is more than or equal to the width of the first passage;The width 3- of the first passage
6m;The length of the husky fence group of second resistance is 4-12m.
3. windy and sandy area road sand storm protection system animal corridor as claimed in claim 2, which is characterized in that
The husky fence group of first resistance and the husky fence group of the second resistance are arranged in parallel, the husky fence group of first resistance and described the
It is spaced 2-5 meters between the husky fence group of two resistances;The husky fence group of second resistance is located at the windward side of the first passage, and described the
The both ends of the husky fence group of two resistances and the lap of the husky fence group of the first resistance are 3-4m.
4. windy and sandy area road sand storm protection system animal corridor as claimed in claim 3, which is characterized in that
The both ends of the husky fence group of second resistance are both provided with alar part, the side that the alar part hinders husky fence group to separate described first
It is in 120-150 ° of angle to extension, and with the husky fence group of the second resistance.
5. windy and sandy area road sand storm protection system animal corridor as described in claim 1, which is characterized in that
One end of the husky fence group of second resistance is connected at the first passage of the husky fence group of the first resistance, and described second
The other end of the husky fence group of resistance and the first passage are in 120-150 ° of angle.
6. windy and sandy area road sand storm protection system animal corridor as described in claim 1, which is characterized in that
The husky fence group of first resistance and the husky fence group staggered parallel of the second resistance;
The husky fence group of first resistance has first end and opposite second end, and the first end is to far from the husky grid of the second resistance
The direction of column group extends;
The husky fence group of second resistance has third end and a 4th opposite end, third end overlapping parallel with the second end
6-8m, the first passage are arranged between the second end and the third end.
7. windy and sandy area road sand storm protection system animal corridor as claimed in claim 6, which is characterized in that
The third end of the husky fence group of second resistance is provided with alar part;The alar part is to far from the husky fence group of the first resistance
Direction extend, and be in 120-150 ° of angle with the husky fence group of the second resistance.
8. windy and sandy area road sand storm protection system animal corridor as described in claim 1, which is characterized in that
It is provided with third on the outside of the first edge and hinders husky fence group, the husky fence group of third resistance is used to lead to described second
Road coordinates, and the dust storm to intercept prevailing wind direction passes through the second channel;
The second channel width is 4-8m, and the length of the husky fence group of third resistance is 10-14m.
9. windy and sandy area road sand storm protection system animal corridor as claimed in claim 8, which is characterized in that
The second channel is in 45-70 ° with the first edge and the second edge.
10. a kind of road comprising such as claim 1-9 any one of them windy and sandy area road sand storm protection system animal corridors
Transportation work style sand protection system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820210024.3U CN207891761U (en) | 2018-02-06 | 2018-02-06 | Windy and sandy area road sand storm protection system animal corridor and road sand storm protection system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820210024.3U CN207891761U (en) | 2018-02-06 | 2018-02-06 | Windy and sandy area road sand storm protection system animal corridor and road sand storm protection system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207891761U true CN207891761U (en) | 2018-09-21 |
Family
ID=63543428
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820210024.3U Active CN207891761U (en) | 2018-02-06 | 2018-02-06 | Windy and sandy area road sand storm protection system animal corridor and road sand storm protection system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207891761U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116397561A (en) * | 2023-03-24 | 2023-07-07 | 兰州交通大学 | Half-honeycomb sand-blocking fence structure suitable for sand dune topography |
-
2018
- 2018-02-06 CN CN201820210024.3U patent/CN207891761U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116397561A (en) * | 2023-03-24 | 2023-07-07 | 兰州交通大学 | Half-honeycomb sand-blocking fence structure suitable for sand dune topography |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201305845Y (en) | Wind-proof sand stablization barrier | |
CN108316172A (en) | Highway dust storm protection system and its construction method suitable for gobi strong wind area | |
CN207891760U (en) | Road sand storm protection system suitable for drift sand area | |
CN108103968A (en) | Suitable for the road sand storm protection system and its construction method in drift sand area | |
CN103046579B (en) | A kind of two-way eight track lakebed open cuts secretly bury tunnel structure | |
CN108316170A (en) | Windy and sandy area road sand storm protection system animal corridor and road sand storm protection system | |
CN207891761U (en) | Windy and sandy area road sand storm protection system animal corridor and road sand storm protection system | |
CN108049319A (en) | Suitable for the road dust storm countermeasure system and its construction method of rolling topography | |
CN104727239A (en) | High and vertical type sand-preventing barrier for high-wind-speed sandy areas | |
CN207904793U (en) | Highway dust storm protection system suitable for gobi strong wind area | |
CN208545666U (en) | A kind of transition section apparatus of Bridge guardrail and roadbed corrugated beam barrier | |
CN207919387U (en) | Road dust storm countermeasure system suitable for rolling topography | |
CN106013227A (en) | Culvert structure, wind sand protection device and roadbed system | |
CN102002916B (en) | Wind-preventing sand-throwing wall | |
CN207959025U (en) | Suitable for passing through the highway dust storm protection system of shrub sand dune | |
CN206607574U (en) | It is anti-to wash in a pan erosion device and sand- prevention system | |
CN205421050U (en) | Railroad embankment river valley sand storm protection structure | |
CN109281260A (en) | A kind of recyclable sand stop wall and sand wall system | |
CN202482782U (en) | Doublet sand resistance structure for road protection in sandstorm area | |
CN209066347U (en) | A kind of anchor of concrete anti-collision guard bar attaching structure | |
CN112030791A (en) | Wind and sand prevention device with inclined plane net prevention structure and roadbed wind and sand protection system | |
CN209227406U (en) | A kind of recyclable sand stop wall and sand wall system | |
CN208486459U (en) | Planted roof | |
CN108570941A (en) | Sand prevention board wall and its husky method buried of prevention migrating dune area highway division wind erosion | |
CN109281259A (en) | A kind of sliding sand stop wall and sand wall system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200609 Address after: 730000 No.318, Donggang West Road, Chengguan District, Lanzhou City, Gansu Province Patentee after: NORTHWEST INSTITUTE OF ECO-ENVIRONMENT AND RESOURCES, CAS Address before: Chengguan District of Gansu city of Lanzhou province Donggang West Road 730000 No. 320 Patentee before: Institute of environment and Engineering in cold and dry areas, Chinese Academy of Sciences |
|
TR01 | Transfer of patent right |