CN108315915B - A kind of energy-saving natural fiber processing unit and processing method - Google Patents

A kind of energy-saving natural fiber processing unit and processing method Download PDF

Info

Publication number
CN108315915B
CN108315915B CN201810381499.3A CN201810381499A CN108315915B CN 108315915 B CN108315915 B CN 108315915B CN 201810381499 A CN201810381499 A CN 201810381499A CN 108315915 B CN108315915 B CN 108315915B
Authority
CN
China
Prior art keywords
cleaning
block
water
water pipe
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810381499.3A
Other languages
Chinese (zh)
Other versions
CN108315915A (en
Inventor
朱榆洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Yong Shun Printing and dyeing Co., Ltd.
Original Assignee
Shaoxing Yong Shun Printing And Dyeing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Yong Shun Printing And Dyeing Co Ltd filed Critical Shaoxing Yong Shun Printing And Dyeing Co Ltd
Priority to CN201810381499.3A priority Critical patent/CN108315915B/en
Publication of CN108315915A publication Critical patent/CN108315915A/en
Application granted granted Critical
Publication of CN108315915B publication Critical patent/CN108315915B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • DTEXTILES; PAPER
    • D06TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR
    • D06BTREATING TEXTILE MATERIALS USING LIQUIDS, GASES OR VAPOURS
    • D06B3/00Passing of textile materials through liquids, gases or vapours to effect treatment, e.g. washing, dyeing, bleaching, sizing, impregnating
    • D06B3/02Passing of textile materials through liquids, gases or vapours to effect treatment, e.g. washing, dyeing, bleaching, sizing, impregnating of fibres, slivers or rovings
    • DTEXTILES; PAPER
    • D06TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR
    • D06BTREATING TEXTILE MATERIALS USING LIQUIDS, GASES OR VAPOURS
    • D06B15/00Removing liquids, gases or vapours from textile materials in association with treatment of the materials by liquids, gases or vapours
    • D06B15/10Removing liquids, gases or vapours from textile materials in association with treatment of the materials by liquids, gases or vapours by use of centrifugal force
    • DTEXTILES; PAPER
    • D06TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR
    • D06BTREATING TEXTILE MATERIALS USING LIQUIDS, GASES OR VAPOURS
    • D06B23/00Component parts, details, or accessories of apparatus or machines, specially adapted for the treating of textile materials, not restricted to a particular kind of apparatus, provided for in groups D06B1/00 - D06B21/00
    • D06B23/20Arrangements of apparatus for treating processing-liquids, -gases or -vapours, e.g. purification, filtration, distillation

Abstract

The invention discloses a kind of energy-saving natural fiber processing units, including apparatus main body, the cleaning device being set in described device main body, it is set to the intracorporal water circle device of described device master and is set to the forward gear on the downside of described device main body in end face, the cleaning device includes the first cleaning block for being fixedly connected on described device upside Middle face position, the first cleaning chamber of opening upwards is provided in first cleaning block, first motor is fixedly installed in the downside inner wall of the first cleaning chamber, the first motor upper end is connected with intracavitary positioned at first cleaning and the connection that is rotatably assorted with the first cleaning cavity wall the second cleaning block by shaft power, it is connected by power and is equipped with the first sealing ring between the shaft of the first motor upper end and the downside inner wall of the first cleaning chamber.

Description

A kind of energy-saving natural fiber processing unit and processing method
Technical field
The present invention relates to laundry cleaning applications, specifically a kind of energy-saving natural fiber processing unit and processing method.
Background technique
Our daily worn the clothes objects be all made of various fibers, for the health used, usually wearing and into It requires to carry out these fibers cleaning, drying before row processing, now most of washed by washing machine, still It requires to cause no small waste using a large amount of water purification is fallen, especially in the area of some water shortages, and make washing one barrel of clothing With dry-cleaning mode higher cost, therefore the one kind for designing a kind of cleaning that clothing can be completed using small amount water is energy-saving Natural fiber processing unit it is really necessary to.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of energy-saving natural fiber processing units, are able to solve State the problems in present technology.
The present invention is achieved through the following technical solutions: a kind of energy-saving natural fiber processing unit of the invention, Including apparatus main body, the cleaning device being set in described device main body, it is set to the intracorporal water circle device of described device master And it is set to the forward gear on the downside of described device main body in end face, the cleaning device includes being fixedly connected on described device First cleaning block of upside Middle face position is provided with the first cleaning chamber of opening upwards in first cleaning block, described It is fixedly installed first motor in the downside inner wall of first cleaning chamber, the first motor upper end is cooperatively connected by shaft power There is intracavitary positioned at first cleaning and the connection that is rotatably assorted with the first cleaning cavity wall the second cleaning block, is connected by power The first sealing is equipped between the shaft of the first motor upper end and the downside inner wall of the first cleaning chamber It encloses, the second cleaning chamber of opening upwards is provided in second cleaning block, described second cleans in all side walls of chamber and downside The first clean tank for being connected to the second cleaning chamber and the first cleaning chamber, the upper end of the second cleaning chamber are provided on wall What is matched is provided with seal cover assembly, and the upper end of the intracavitary side end face of first cleaning is fixedly installed to be filled with the sealing cover The first fixed block matched is set, is fixedly installed third cleaning block, the third on the downside inner wall of the second cleaning chamber It is provided with the third cleaning chamber of opening upwards in cleaning block, is fixedly installed the second electricity in the downside inner wall of the third cleaning chamber Machine, the upper end of second motor is connected with by shaft power cleans the first intracavitary centrifugal-block positioned at the third, It is connected by power and is connected between the shaft of second motor upper end and the downside inner wall of third cleaning chamber Second sealing ring is fixedly installed the second centrifugal-block of protrusion, the third cleaning on the upside end face of first centrifugal-block It is provided with centrifugal chamber in the side inner wall of chamber, connection third cleaning chamber and described the are provided on the side wall of the centrifugal chamber Two clean the second clean tank of chambers, are provided with the third centrifugal-block that can slide up and down, the third centrifugal-block in the centrifugal chamber On be provided through with second clean tank third clean tank that shifts to install up and down, the upper end of the third centrifugal-block is fixed It is connected with the first electromagnet, second matched with first electromagnet is fixedly installed in the upper inside walls of the centrifugal chamber Electromagnet, first electromagnet and second electromagnet are series in the circuit of first motor and the second motor.
The seal cover assembly includes being symmetrical set in described device main body and opening as a preferred technical solution, Mouthful the first upward cavity on rear side of first cavity and is located on the upside end face of described device main body and is fixedly installed second Fixed block, the upper end of second fixed block, which is rotatably assorted, is connected with the first bull stick, solid in the rear side inner wall of first cavity Surely it is provided with third motor, the front end power of the third motor is connected with lead screw, the lead screw rear end and described first Third sealing ring is equipped between the rear side inner wall of cavity, the front end of the lead screw is rotatably assorted by bearing is connected to institute On the front inner wall for stating the first cavity, it is provided in first cavity and can slide back and forth and be cooperatively connected with the threads of lead screw The first sliding block, be fixedly connected with the second sliding block, the upside end face of second sliding block on the upside end face of first sliding block Inside it is provided with the second cavity of opening upwards, the upper end of second sliding block is provided with third sliding block, under the third sliding block It is fixedly installed extension on side end face and is passed through Four-slider in second cavity, is fixed in the back end surface of the third sliding block It is provided with third fixed block, the third fixed block is rotatably assorted with the upper end of first bull stick and connect, is symmetrical set The upper end of the third sliding block opposing end surface be fixedly connected with the first link block, the centre of end face on the downside of first link block Position is fixedly installed the second link block, is rotatably assorted on the lower end surface of second link block by bearing and is connected with third company Block is connect, the lower end of the third link block is fixedly connected with sealing cover, and all side end faces of the sealing cover and described first are fixed The snug engagement of block connects, be provided with that Open Side Down in the downside end face of the sealing cover and with the second cleaning chamber phase The fourth cleaning chamber of cooperation is fixedly installed in the upper inside walls of the fourth cleaning chamber and to match with the third cleaning block Fourth cleaning block.
The water circle device includes being set in described device main body and opening upwards as a preferred technical solution, Cricoid first water receiving tank, what the left end of first water receiving tank was connected is provided with the second water receiving tank, second water receiving tank Left end be connected be provided with to be fixedly installed on intracorporal first water pipe of described device master, first water pipe and draw water Device, what the left end of first water pipe was connected is provided with the second water pipe extended outside described device main body left end face, It is provided with first switch on second water pipe, is provided with and communicated on first water pipe in described device main body and upper end Extend the third water pipe on the upside of described device main body outside end face, the third water pipe extends end face on the upside of described device main body Outer one end is fixedly connected in the left end face of second sliding block in left side by fixed frame, setting in the third water pipe There is second switch, what is be connected on the third water pipe is provided with the 4th water pipe, third switch is provided on the 4th water pipe, The 5th water pipe, institute are fixedly connected with by connection frame in the left end face of the third sliding block and the upside end face of the first link block It states and is fixedly connected with flexible water-supply-pipe between the 4th water pipe upper end and the 5th water pipe lower end, setting in the third link block There are the fourth cleaning slot that Open Side Down and is connected with third cleaning chamber, the upper end of the fourth cleaning slot and the described 5th Water pipe is connected.
Described method includes following steps:
Firstly, the third motor rotation, and then drive first sliding block in first cavity by the lead screw It inside moves backward, and then second sliding block is driven to move backward, and then the third sliding block is driven to move backward, it is described at this time Third sliding block is moved up by the ejection force effect of first bull stick, and then first link block is driven to move up, And then driving the fourth cleaning chamber to move up, and then open the second cleaning chamber, staff is by required progress at this time It is intracavitary that clean natural fiber is put into second cleaning, and it is intracavitary that builder is put into third cleaning.
Secondly, the third motor reversal, and then the sealing cover is driven to decline to greatest extent, at this time the sealing cover Lower end surface and the upper surface of second cleaning block abut against, and the lower end surface of the fourth cleaning block and the third clean at this time The upper surface of block abuts against, and the third switch is opened at this time, while the second switch and the first switch are in closing State, extraneous water tank is by the third water pipe, the elasticity water-supply-pipe and the 5th water pipe to the fourth cleaning at this time Cleaning water is injected in slot, in the process shifting to install due to the third clean tank and second clean tank, inflow Isolated, the second motor rotation at this time of cleaning intracavitary water to the third, so by shaft drive described first from The rotation of heart block, and then drive the third to clean intracavitary water rotation, while the first motor rotates, and then passes through shaft band Second cleaning block rotation is moved, and then drives the third cleaning block rotation, the sealing cover is by described the in the process Two cleaning blocks drive to be rotated around the third link block, and first electromagnet and second electromagnet obtain electric generation at this time It is magnetic attracting, and then drive the third centrifugal-block to rise in the centrifugal chamber, and then drive the third clean tank and institute It states the second clean tank to be connected, the third cleans intracavitary moisture since centrifugation passes through the third clean tank and described at this time It is intracavitary that second clean tank is dumped into second cleaning, and then cleans intracavitary natural fiber to described second and clean, this When the sundries on natural fiber is taken away by the hydrone being centrifuged out, and be thrown out of described by first clean tank One cleaning is intracavitary, and then is flowed into second water receiving tank by first water receiving tank, and the first switch is opened at this time, The second switch and third switch are closed, while the water plug is opened, and then will be in second water receiving tank Moisture is by first water pipe, the third water pipe, the elastic water-supply-pipe, the 5th water pipe and the fourth cleaning slot Again it is pumped into that third cleaning is intracavitary to be utilized again, when moisture uses the first switch closing after for several times, the third Switch and the second switch are opened, and then the moisture after cleaning for several times is taken out by first water pipe and second water pipe Out, it and reuses clean moisture and is cleaned again.
The forward gear includes being rotatably assorted to be connected to end face on the downside of described device main body as a preferred technical solution, Interior feeder wheel, the feeder wheel carry out the carrying of device to assisting user, before and after described device main body side end face and It is fixedly installed buffer stopper in right end face, collides when the buffer stopper is to prevent handling device.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, the water of natural fiber is carried out by the present apparatus When washing down clean, the rotation of third motor, and then drive the first sliding block to move backward in the first cavity by lead screw, and then drive the Two sliding blocks move backward, and then third sliding block is driven to move backward, and third sliding block is acted on by the ejection force of the first bull stick at this time It moves up, and then the first link block is driven to move up, and then fourth cleaning chamber is driven to move up, and then it is clear to open second Clean chamber, staff carries out required clean natural fiber to be put into the second cleaning intracavitary at this time, and builder is put into the Three cleanings are intracavitary, third motor reversal at this time, and then sealing cover is driven to decline to greatest extent, at this time the lower end surface of sealing cover and the The upper surface of two cleaning blocks abuts against, and the lower end surface of fourth cleaning block and the upper surface of third cleaning block abut against at this time, at this time Third switch is opened, while second switch and first switch are in closed state, and extraneous water tank passes through third water pipe, elasticity at this time Water-supply-pipe and the 5th water pipe inject cleaning water into fourth cleaning slot, in the process due to third clean tank and the second cleaning Slot shifts to install, and is flowed into third and cleans that intracavitary water is isolated, and the second motor rotates at this time, and then passes through shaft drive the One centrifugal-block rotation, and then drive third to clean intracavitary water rotation, while first motor rotates, and then pass through shaft drive the The rotation of two cleaning blocks, and then the rotation of third cleaning block is driven, sealing cover is driven by the second cleaning block around third in the process Link block rotation, it is attracting to obtain electric generations magnetism for the first electromagnet and the second electromagnet at this time, so drive third centrifugal-block from Rise in the chambers of the heart, and then third clean tank driven to be connected with the second clean tank, at this time third clean intracavitary moisture due to from The heart is dumped into that the second cleaning is intracavitary by third clean tank and the second clean tank, so to the intracavitary natural fiber of the second cleaning into Row cleaning, is at this time taken away the sundries on natural fiber by the hydrone being centrifuged out, and be thrown out of by the first clean tank First cleaning is intracavitary, and then is flowed into the second water receiving tank by the first water receiving tank, at this time first switch unlatching, second switch and Third switch close, while water plug open, and then by the moisture in the second water receiving tank by the first water pipe, third water pipe, Elastic water-supply-pipe, the 5th water pipe and fourth cleaning slot are pumped into that third cleaning is intracavitary to be utilized again again, when moisture is using for several times First switch is closed afterwards, and third switch and second switch are opened, and then by the moisture after cleaning for several times by the first water pipe and the The extraction of two water pipes, and reuse clean moisture and cleaned again, it not only can be before being processed to day by the present apparatus Right fiber is cleaned, at the same some car washing installations of the present apparatus more currently on the market carry out the cleaning time save it is big The water of amount.
Detailed description of the invention
The present invention is described in detail by following specific embodiments and drawings for ease of explanation,.
Fig. 1 is a kind of schematic diagram of internal structure of energy-saving natural fiber processing unit of the invention;
Fig. 2 is the structural schematic diagram in direction " C-C " in Fig. 1;
Fig. 3 is the enlarged diagram of " A " in Fig. 1;
Fig. 4 is the enlarged diagram of " B " in Fig. 1.
Specific embodiment
As Figure 1-Figure 4, a kind of energy-saving natural fiber processing unit of the invention, including apparatus main body 11, setting In in described device main body 11 cleaning device, the water circle device that is set in described device main body 11 and be set to described Forward gear in 11 downside end face of apparatus main body, the cleaning device include being fixedly connected in 11 upside end face of described device First cleaning block 21 of portion position, is provided with the first cleaning chamber 33 of opening upwards in first cleaning block 21, and described first It cleans and is fixedly installed first motor 22 in the downside inner wall of chamber 33,22 upper end of first motor is connected by the cooperation of shaft power It is connected to and is located at the described first the second cleaning block 21 for cleaning the connection that is rotatably assorted in chamber 33 and with the first cleaning 33 inner wall of chamber, It is connected by power to cooperate between the shaft of 22 upper end of first motor and the downside inner wall of the first cleaning chamber 32 and set It is equipped with the first sealing ring 23, the second cleaning chamber 36 of opening upwards, second cleaning are provided in second cleaning block 21 First that the connection second cleaning chamber 36 and the first cleaning chamber 33 are provided on all side walls and downside inner wall of chamber 36 is clear Clean slot 63, what the upper end of the second cleaning chamber 36 matched is provided with seal cover assembly, first cleaning, 33 inner end of chamber The upper end in face is fixedly installed the first fixed block 38 matched with the seal cover assembly, the downside of the second cleaning chamber 36 It is fixedly installed third cleaning block 49 on inner wall, the third cleaning chamber 51 of opening upwards is provided in the third cleaning block 49, It is fixedly installed the second motor 43 in the downside inner wall of the third cleaning chamber 51, the upper end of second motor 43 passes through shaft Power is connected with the first centrifugal-block 45 in third cleaning chamber 51, is connected by power on second motor 43 Be connected with the second sealing ring 44 between the shaft at end and the downside inner wall of third cleaning chamber 51, described first from It is fixedly installed the second centrifugal-block 46 of protrusion on the upside end face of heart block 45, is set in the side inner wall of the third cleaning chamber 51 It is equipped with centrifugal chamber 48, the connection third cleaning chamber 51 and the second cleaning chamber 36 are provided on the side wall of the centrifugal chamber 48 The second clean tank 54, be provided with the third centrifugal-block 47 that can slide up and down, the third centrifugal-block 47 in the centrifugal chamber 48 On be provided through the third clean tank 55 shifted to install with about 54 second clean tank, the third centrifugal-block 47 it is upper End is fixedly connected with the first electromagnet 52, is fixedly installed in the upper inside walls of the centrifugal chamber 48 and first electromagnet 52 The second electromagnet 53 matched, first electromagnet 52 are series at first motor 22 and second with second electromagnet 53 In the circuit of motor 43.
Valuably, the seal cover assembly include be symmetrical set in described device main body 11 and opening upwards One cavity 74, first cavity, 74 rear side and is located on the upside end face of described device main body 11 that be fixedly installed second fixed Block 78, the upper end of second fixed block 78, which is rotatably assorted, is connected with the first bull stick 77, the rear side inner wall of first cavity 74 Inside it is fixedly installed third motor 71, the front end power of the third motor 71 is connected with lead screw 73, after the lead screw 73 It is equipped with third sealing ring 72 between end and the rear side inner wall of first cavity 74, the front end of the lead screw 73 passes through axis Forward it is dynamic be cooperatively connected can slide back and forth in being provided in first cavity 74 on the front inner wall of first cavity 74 and It is threadedly engaged the first sliding block 75 of connection with the lead screw 73, is fixedly connected with second on the upside end face of first sliding block 75 Sliding block 31 is provided with the second cavity 34 of opening upwards in the upside end face of second sliding block 31, second sliding block 31 Upper end is provided with third sliding block 37, and extension is fixedly installed on the downside end face of the third sliding block 37 and is passed through second cavity Four-slider 35 in 34 is fixedly installed third fixed block 76 in the back end surface of the third sliding block 37, and the third is fixed Block 76 is rotatably assorted with the upper end of first bull stick 77 and connect, 37 opposing end surface of third sliding block being symmetrical set Upper end is fixedly connected with the first link block 39, and the middle position of the 39 downside end face of the first link block is fixedly installed the second company Block 59 is connect, is rotatably assorted on the lower end surface of second link block 59 by bearing and is connected with third link block 58, the third The lower end of link block 58 is fixedly connected with sealing cover 41, the side of all side end faces of the sealing cover 41 and first fixed block 38 Wall sliding connection, is provided with that Open Side Down and matches with the second cleaning chamber 36 in the downside end face of the sealing cover 41 The fourth cleaning chamber 42 of conjunction, is fixedly installed in the upper inside walls of the fourth cleaning chamber 42 and the third cleaning block 49 matches The fourth cleaning block 56 of conjunction.
Valuably, the water circle device include be set in described device main body 11 and opening upwards cricoid first Water receiving tank 24, what the left end of first water receiving tank 24 was connected is provided with the second water receiving tank 25, second water receiving tank 25 What left end was connected is provided with the first water pipe 27 in described device main body 11, is fixedly installed on first water pipe 27 Water plug 26, what the left end of first water pipe 27 was connected, which be provided with, extends outside 11 left end face of described device main body Second water pipe 68 is provided with first switch 64 on second water pipe 68, is provided with and communicated on first water pipe 27 positioned at institute It states in apparatus main body 11 and the third water pipe 67 outside 11 upside end face of described device main body, the third water pipe 67 is extended in upper end Extend second sliding block 31 that one end outside 11 upside end face of described device main body is fixedly connected on left side by fixed frame Left end face on, second switch 69 is provided in the third water pipe 67, what is be connected on the third water pipe 67 is provided with 4th water pipe 65 is provided with third switch 66, the left end face of the third sliding block 37 and the first connection on the 4th water pipe The 5th water pipe 61,65 upper end of the 4th water pipe and the 5th water are fixedly connected with by connection frame on the upside end face of block 39 It is fixedly connected with flexible water-supply-pipe 62 between 61 lower end of pipe, is provided with that Open Side Down in the third link block 58 and with described The fourth cleaning slot 57 that three cleaning chambers 51 are connected, the upper end of the fourth cleaning slot 57 is connected with the 5th water pipe 61.
Described method includes following steps:
Firstly, the third motor 71 rotates, and then drive first sliding block 75 described the by the lead screw 73 It is moved backward in one cavity 74, and then second sliding block 31 is driven to move backward, and then drive the third sliding block 37 backward Mobile, the third sliding block 37 is moved up by the ejection force effect of first bull stick 77 at this time, and then drives described the One link block 39 moves up, and then the fourth cleaning chamber 42 is driven to move up, and then opens the second cleaning chamber 36, The required clean natural fiber of progress is put into the second cleaning chamber 36 by staff at this time, and builder is put into institute It states in third cleaning chamber 51.
Secondly, the third motor 71 inverts, and then drives the sealing cover 41 to decline to greatest extent, the sealing at this time The lower end surface of lid 41 and the upper surface of second cleaning block 21 abut against, at this time the lower end surface of the fourth cleaning block 56 and institute The upper surface for stating third cleaning block 49 abuts against, and the third switch 66 is opened at this time, at the same the second switch 69 with it is described First switch 64 is in closed state, and extraneous water tank passes through the third water pipe 67, the elasticity water-supply-pipe 62 and described at this time 5th water pipe 61 injects cleaning water into the fourth cleaning slot 57, in the process by the third clean tank 55 and institute Shifting to install for the second clean tank 54 is stated, the water being flowed into the third cleaning chamber 51 is isolated, at this time second motor 43 rotations, and then drive first centrifugal-block 45 to rotate by shaft, and then the water in the third cleaning chamber 51 is driven to turn It is dynamic, while the first motor 22 rotates, and then drives second cleaning block 21 to rotate by shaft, and then drive described the The rotation of three cleaning blocks 49, the sealing cover 41 is driven by second cleaning block 21 around the third link block in the process 58 rotations, at this time first electromagnet 52 and second electromagnet 53 electric generations magnetism is attracting, and then drive described the Three centrifugal-blocks 47 rise in the centrifugal chamber 48, and then the third clean tank 55 is driven to be connected with second clean tank 54 Logical, the moisture in the third cleaning chamber 51 passes through the third clean tank 55 and second clean tank 54 due to being centrifuged at this time It is dumped into the second cleaning chamber 36, and then the natural fiber in the second cleaning chamber 36 is cleaned, pass through at this time The hydrone being centrifuged out takes away the sundries on natural fiber, and is thrown out of described first clearly by first clean tank 63 It in clean chamber 33, and then is flowed into second water receiving tank 25 by first water receiving tank 24, at this time the first switch 64 It opens, the second switch 69 and the third switch 66 are closed, while the unlatching of the water plug 26, and then by described second Moisture in water receiving tank 25 is by first water pipe 27, the third water pipe 67, the elastic water-supply-pipe 62, the 5th water Pipe 61 and the fourth cleaning slot 57 are pumped into the third cleaning chamber 51 again and utilize again, when moisture uses after institute for several times The closing of first switch 64 is stated, the third switch 66 and the second switch 69 are opened, and then the moisture after cleaning for several times is passed through First water pipe 27 and second water pipe 68 extraction are crossed, and reuses clean moisture and is cleaned again.
Valuably, the forward gear includes the feeder wheel being connected in 11 downside end face of described device main body that is rotatably assorted 81, the feeder wheel 81 carries out the carrying of device, 11 front and back side end face of described device main body and right side to assisting user It is fixedly installed buffer stopper 82 on end face, collides when the buffer stopper 82 is to prevent handling device.
When carrying out the washing cleaning of natural fiber by the present apparatus, third motor 71 is rotated, and then is driven by lead screw 73 First sliding block 75 moves backward in the first cavity 74, and then the second sliding block 31 is driven to move backward, and then drives third sliding block 37 move backward, and third sliding block 37 is moved up by the ejection force effect of the first bull stick 77 at this time, and then drives the first connection Block 39 moves up, and then fourth cleaning chamber 42 is driven to move up, and then opens the second cleaning chamber 36, and staff will at this time The required clean natural fiber of progress is put into the second cleaning chamber 36, and builder is put into third cleaning chamber 51, at this time Third motor 71 inverts, and then sealing cover 41 is driven to decline to greatest extent, at this time the lower end surface of sealing cover 41 and the second cleaning block 21 upper surface abuts against, and the lower end surface of fourth cleaning block 56 and the upper surface of third cleaning block 49 abut against at this time, and at this time Three switches 66 are opened, while second switch 69 and first switch 64 are in closed state, and extraneous water tank passes through third water pipe at this time 67, elastic water-supply-pipe 62 and the 5th water pipe 61 inject cleaning water into fourth cleaning slot 57, in the process since third is clear Clean slot 55 is shifted to install with the second clean tank 54, and the water being flowed into third cleaning chamber 51 is isolated, at this time the second motor 43 Rotation, and then the rotation of the first centrifugal-block 45 is driven by shaft, and then drive the water rotation in third cleaning chamber 51, while first Motor 22 rotates, and then drives the rotation of the second cleaning block 21 by shaft, and then third cleaning block 49 is driven to rotate, in this process Middle sealing cover 41 is driven by the second cleaning block 21 and rotates around third link block 58, at this time the first electromagnet 52 and the second electromagnet 53 electric generations is magnetic attracting, and then drive third centrifugal-block 47 to rise in centrifugal chamber 48, and then drive third clean tank 55 It is connected with the second clean tank 54, the moisture in the chamber 51 of third cleaning at this time is clear by third clean tank 55 and second due to centrifugation Clean slot 54 is dumped into the second cleaning chamber 36, so to second cleaning chamber 36 in natural fiber clean, at this time by from The hydrone that the heart goes out takes away the sundries on natural fiber, and is thrown out of by the first clean tank 63 into the first cleaning chamber 33, And then be flowed into the second water receiving tank 25 by the first water receiving tank 24, first switch 64 is opened at this time, second switch 69 and third Switch 66 is closed, while water plug 26 is opened, and then the moisture in the second water receiving tank 25 is passed through the first water pipe 27, third water Pipe 67, elastic water-supply-pipe 62, the 5th water pipe 61 and fourth cleaning slot 57 are pumped into third cleaning chamber 51 again and utilize again, when Moisture is closed using first switch 64 after for several times, and third switch 66 and second switch 69 are opened, and then by the water after cleaning for several times Lease making crosses the first water pipe 27 and the extraction of the second water pipe 68, and reuses clean moisture and cleaned again.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, the water of natural fiber is carried out by the present apparatus When washing down clean, the rotation of third motor, and then drive the first sliding block to move backward in the first cavity by lead screw, and then drive the Two sliding blocks move backward, and then third sliding block is driven to move backward, and third sliding block is acted on by the ejection force of the first bull stick at this time It moves up, and then the first link block is driven to move up, and then fourth cleaning chamber is driven to move up, and then it is clear to open second Clean chamber, staff carries out required clean natural fiber to be put into the second cleaning intracavitary at this time, and builder is put into the Three cleanings are intracavitary, third motor reversal at this time, and then sealing cover is driven to decline to greatest extent, at this time the lower end surface of sealing cover and the The upper surface of two cleaning blocks abuts against, and the lower end surface of fourth cleaning block and the upper surface of third cleaning block abut against at this time, at this time Third switch is opened, while second switch and first switch are in closed state, and extraneous water tank passes through third water pipe, elasticity at this time Water-supply-pipe and the 5th water pipe inject cleaning water into fourth cleaning slot, in the process due to third clean tank and the second cleaning Slot shifts to install, and is flowed into third and cleans that intracavitary water is isolated, and the second motor rotates at this time, and then passes through shaft drive the One centrifugal-block rotation, and then drive third to clean intracavitary water rotation, while first motor rotates, and then pass through shaft drive the The rotation of two cleaning blocks, and then the rotation of third cleaning block is driven, sealing cover is driven by the second cleaning block around third in the process Link block rotation, it is attracting to obtain electric generations magnetism for the first electromagnet and the second electromagnet at this time, so drive third centrifugal-block from Rise in the chambers of the heart, and then third clean tank driven to be connected with the second clean tank, at this time third clean intracavitary moisture due to from The heart is dumped into that the second cleaning is intracavitary by third clean tank and the second clean tank, so to the intracavitary natural fiber of the second cleaning into Row cleaning, is at this time taken away the sundries on natural fiber by the hydrone being centrifuged out, and be thrown out of by the first clean tank First cleaning is intracavitary, and then is flowed into the second water receiving tank by the first water receiving tank, at this time first switch unlatching, second switch and Third switch close, while water plug open, and then by the moisture in the second water receiving tank by the first water pipe, third water pipe, Elastic water-supply-pipe, the 5th water pipe and fourth cleaning slot are pumped into that third cleaning is intracavitary to be utilized again again, when moisture is using for several times First switch is closed afterwards, and third switch and second switch are opened, and then by the moisture after cleaning for several times by the first water pipe and the The extraction of two water pipes, and reuse clean moisture and cleaned again, it not only can be before being processed to day by the present apparatus Right fiber is cleaned, at the same some car washing installations of the present apparatus more currently on the market carry out the cleaning time save it is big The water of amount.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention Protection scope should be determined by the scope of protection defined in the claims.

Claims (4)

1. a kind of energy-saving natural fiber processing unit, including apparatus main body, the cleaning device being set in described device main body, It is set to the intracorporal water circle device of described device master and is set to the forward gear on the downside of described device main body in end face, institute Stating cleaning device includes the first cleaning block for being fixedly connected on described device upside Middle face position, in first cleaning block It is provided with the first cleaning chamber of opening upwards, is fixedly installed first motor in the downside inner wall of the first cleaning chamber, it is described First motor upper end is connected with intracavitary positioned at first cleaning and cleans cavity wall with described first by shaft power Be rotatably assorted the second cleaning block of connection, is connected by power the shaft in the first motor upper end and the first cleaning chamber Downside inner wall between be equipped with the first sealing ring, be provided in second cleaning block opening upwards second cleaning Chamber, it is described second cleaning chamber all side walls and downside inner wall on be provided with connection it is described second cleaning chamber and it is described first cleaning chamber The first clean tank, what the upper end of the second cleaning chamber matched is provided with seal cover assembly, the intracavitary side of first cleaning The upper end of end face is fixedly installed the first fixed block matched with the seal cover assembly, and described second cleans in the downside of chamber It is fixedly installed third cleaning block on wall, the third cleaning chamber of opening upwards, the third are provided in the third cleaning block It cleans in the downside inner wall of chamber and is fixedly installed the second motor, the upper end of second motor is connected with by shaft power The first intracavitary centrifugal-block is cleaned positioned at the third, is connected by power the shaft in second motor upper end and described the It is connected with the second sealing ring between the downside inner wall of three cleaning chambers, is fixedly installed on the upside end face of first centrifugal-block There is the second centrifugal-block of protrusion, be provided with centrifugal chamber in the side inner wall of third cleaning chamber, on the side wall of the centrifugal chamber It is provided with the second clean tank for being connected to the third cleaning chamber and the second cleaning chamber, being provided in the centrifugal chamber can be upper and lower The third centrifugal-block of sliding is provided through the third shifted to install up and down with second clean tank on the third centrifugal-block Clean tank, the upper end of the third centrifugal-block are fixedly connected with the first electromagnet, and fixation is set in the upper inside walls of the centrifugal chamber It is equipped with the second electromagnet matched with first electromagnet, first electromagnet and second electromagnet are series at the In the circuit of one motor and the second motor.
2. a kind of energy-saving natural fiber processing unit according to claim 1, it is characterised in that: the seal cover assembly Including being symmetrical set in described device main body and the first cavity of opening upwards, on rear side of first cavity and it is located at institute It states and is fixedly installed the second fixed block on the upside end face of apparatus main body, the upper end of second fixed block, which is rotatably assorted, to be connected with First bull stick is fixedly installed third motor in the rear side inner wall of first cavity, and the front end power of the third motor is matched Conjunction is connected with lead screw, and third sealing ring, institute are equipped between the lead screw rear end and the rear side inner wall of first cavity The front end for stating lead screw is rotatably assorted on the front inner wall for being connected to first cavity by bearing, setting in first cavity There are the first sliding block that can slide back and forth and be cooperatively connected with the threads of lead screw, fixed company on the upside end face of first sliding block It is connected to the second sliding block, the second cavity of opening upwards is provided in the upside end face of second sliding block, second sliding block Upper end is provided with third sliding block, and extension is fixedly installed on the downside end face of the third sliding block and is passed through in second cavity Four-slider is fixedly installed third fixed block, the third fixed block and described first in the back end surface of the third sliding block The upper end of bull stick is rotatably assorted connection, and the upper end for the third sliding block opposing end surface being symmetrical set is fixedly connected with first The middle position of link block, the first link block downside end face is fixedly installed the second link block, second link block It is rotatably assorted on lower end surface by bearing and is connected with third link block, the lower end of the third link block is fixedly connected with sealing Lid, all side end faces of the sealing cover are connect with the snug engagement of first fixed block, the lower side of the sealing cover The fourth cleaning chamber for being provided with that Open Side Down in face and being matched with the second cleaning chamber, in the upside of the fourth cleaning chamber The fourth cleaning block matched with the third cleaning block is fixedly installed on wall.
3. a kind of natural fiber processing method using energy-saving natural fiber processing unit as claimed in claim 2, feature Be: the water circle device includes being set in described device main body and cricoid first water receiving tank of opening upwards, described What the left end of the first water receiving tank was connected is provided with the second water receiving tank, and what the left end of second water receiving tank was connected is provided with position In being fixedly installed water plug, a left side for first water pipe on intracorporal first water pipe of described device master, first water pipe It holds what is be connected to be provided with the second water pipe extended outside described device main body left end face, the is provided on second water pipe One switchs, and is provided with and communicated in described device main body on first water pipe and upper end is extended on the upside of described device main body Third water pipe outside end face, one end that the third water pipe extends on the upside of described device main body outside end face are fixed by fixed frame It is connected in the left end face of second sliding block in left side, second switch, the third water is provided in the third water pipe What is be connected on pipe is provided with the 4th water pipe, and third switch, the left-hand end of the third sliding block are provided on the 4th water pipe The 5th water pipe is fixedly connected with by connection frame on face and the upside end face of the first link block, the 4th water pipe upper end with it is described It is fixedly connected with flexible water-supply-pipe between 5th water pipe lower end, is provided with that Open Side Down in the third link block and with described The fourth cleaning slot that three cleaning chambers are connected, the upper end of the fourth cleaning slot is connected with the 5th water pipe;
Described method includes following steps:
Firstly, third motor rotation, so by the lead screw drive first sliding block in first cavity to After move, and then drive second sliding block to move backward, and then the third sliding block is driven to move backward, at this time the third Sliding block is moved up by the ejection force effect of first bull stick, and then first link block is driven to move up, in turn It drives the fourth cleaning chamber to move up, and then opens the second cleaning chamber, staff cleans required at this time Natural fiber to be put into second cleaning intracavitary, and it is intracavitary that builder is put into third cleaning;
Secondly, the third motor reversal, and then the sealing cover is driven to decline to greatest extent, at this time the lower end of the sealing cover Face and the upper surface of second cleaning block abut against, at this time the lower end surface of the fourth cleaning block and the third cleaning block Upper surface abuts against, and the third switch is opened at this time, while the second switch and the first switch are in closed state, Extraneous water tank is infused by the third water pipe, the elastic water-supply-pipe and the 5th water pipe into the fourth cleaning slot at this time Enter cleaning water, in the process shifting to install due to the third clean tank and second clean tank, is flowed into described Third cleans intracavitary water and is isolated, at this time the second motor rotation, and then drives first centrifugal-block to turn by shaft It is dynamic, and then drive the third to clean intracavitary water rotation, while the first motor rotates, and then by described in shaft drive The rotation of second cleaning block, and then the third cleaning block rotation is driven, the sealing cover is cleaned by described second in the process Block drives to be rotated around the third link block, and first electromagnet obtains the magnetic phase of electric generation with second electromagnet at this time It inhales, and then the third centrifugal-block is driven to rise in the centrifugal chamber, and then drive the third clean tank and described second Clean tank is connected, and the third cleans intracavitary moisture due to being centrifuged through the third clean tank and described second clearly at this time It is intracavitary that clean slot is dumped into second cleaning, and then cleans intracavitary natural fiber to described second and clean, and passes through at this time The hydrone being centrifuged out takes away the sundries on natural fiber, and is thrown out of first cleaning by first clean tank Intracavitary, and then be flowed into second water receiving tank by first water receiving tank, the first switch is opened at this time, and described the Two switches and third switch are closed, while the water plug is opened, and then the moisture in second water receiving tank is passed through First water pipe, the third water pipe, the elastic water-supply-pipe, the 5th water pipe and the fourth cleaning slot is crossed to take out again Enter to third cleaning is intracavitary and utilize again, when moisture is closed using the first switch described after for several times, the third switch and The second switch is opened, and then the moisture after cleaning for several times is extracted out by first water pipe and second water pipe, and Clean moisture is reused to be cleaned again.
4. a kind of energy-saving natural fiber processing unit according to claim 1, it is characterised in that: the forward gear packet The feeder wheel for being rotatably assorted and being connected on the downside of described device main body in end face is included, the feeder wheel is filled to assisting user The carrying set, is fixedly installed buffer stopper before and after described device main body in side end face and right end face, the buffer stopper to Prevent to collide when handling device.
CN201810381499.3A 2018-04-25 2018-04-25 A kind of energy-saving natural fiber processing unit and processing method Active CN108315915B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810381499.3A CN108315915B (en) 2018-04-25 2018-04-25 A kind of energy-saving natural fiber processing unit and processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810381499.3A CN108315915B (en) 2018-04-25 2018-04-25 A kind of energy-saving natural fiber processing unit and processing method

Publications (2)

Publication Number Publication Date
CN108315915A CN108315915A (en) 2018-07-24
CN108315915B true CN108315915B (en) 2019-01-11

Family

ID=62896017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810381499.3A Active CN108315915B (en) 2018-04-25 2018-04-25 A kind of energy-saving natural fiber processing unit and processing method

Country Status (1)

Country Link
CN (1) CN108315915B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110592843A (en) * 2019-10-12 2019-12-20 任晓倩 Textile production is with moist line device of high performance cotton thread

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104099739B (en) * 2014-08-06 2015-12-02 盐城工学院 A kind of cloth cleaning and drying plant
CN206046529U (en) * 2016-06-27 2017-03-29 贵州夜郎古畔茶业有限公司 A kind of water-saving Rhizoma Gastrodiae cleaning device
CN107488962A (en) * 2017-09-27 2017-12-19 芜湖凯奥尔环保科技有限公司 A kind of plant fiber washing equipment
CN107587305A (en) * 2017-11-02 2018-01-16 中山市创科科研技术服务有限公司 A kind of energy-conserving and environment-protective washing machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104099739B (en) * 2014-08-06 2015-12-02 盐城工学院 A kind of cloth cleaning and drying plant
CN206046529U (en) * 2016-06-27 2017-03-29 贵州夜郎古畔茶业有限公司 A kind of water-saving Rhizoma Gastrodiae cleaning device
CN107488962A (en) * 2017-09-27 2017-12-19 芜湖凯奥尔环保科技有限公司 A kind of plant fiber washing equipment
CN107587305A (en) * 2017-11-02 2018-01-16 中山市创科科研技术服务有限公司 A kind of energy-conserving and environment-protective washing machine

Also Published As

Publication number Publication date
CN108315915A (en) 2018-07-24

Similar Documents

Publication Publication Date Title
CN102154801B (en) Water-saving drum washing machine and clothes washing method
CN107794691B (en) Washing machine without water between inner and outer barrels
CN108315915B (en) A kind of energy-saving natural fiber processing unit and processing method
CN107059332A (en) The antifouling washing machine of one kind water saving
CN104947374A (en) Flocculation filtration cycling water device of washing machine and washing machine
CN103938415A (en) Electric-control three-way valve and washing machine with same
CN104963173A (en) Bucket cleaning method for washing machine and washing machine
CN109957937A (en) A kind of washing machine cycles filter device and washing machine
CN108405407A (en) A kind of aramid fiber fiber product production equipment washing device for parts
CN108560163B (en) A kind of processing method of natural fiber
CN103290647A (en) Rubbing washing machine and washing method thereof
CN108625063A (en) A method of passing through water jet treatment natural fiber
CN216493366U (en) Belt cleaning device is used in domestic fungus processing
CN202030949U (en) Washing machine
CN2297462Y (en) Jet-extrusion type washing machine
CN206967786U (en) A kind of Waste plastic cleaning machine
CN108360207A (en) The extruding of twin shaft gravity, damping type washing machine
CN205797949U (en) Full-automatic oil barrel washing device
CN109847948A (en) A kind of intelligence cleaning centrifugation all-in-one machine based on sodium bromate production
CN204058994U (en) The novel interior roller frame of a kind of tunnel type washing dragon
CN205775389U (en) A kind of device for washing machine
CN218951766U (en) 360 dry cleaner
CN216473929U (en) Melt-blown fabric rinsing device with water circulation mechanism
CN108193429A (en) Twin shaft gravity squeezes, sealed washing machine
CN215713907U (en) Non-ionic antistatic flushing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181108

Address after: 312073 coastal industrial zone of Keqiao District, Shaoxing, Zhejiang

Applicant after: Shaoxing Yong Shun Printing and dyeing Co., Ltd.

Address before: 301700 Tianjin Wuqing District Beijing Jin Electronic Commerce Industrial Park Wang Wang Road 2

Applicant before: Tianjin seven Sheng Amperex Technology Limited

GR01 Patent grant