CN108314098A - Water purifier and water purifier boiler - Google Patents

Water purifier and water purifier boiler Download PDF

Info

Publication number
CN108314098A
CN108314098A CN201810031851.0A CN201810031851A CN108314098A CN 108314098 A CN108314098 A CN 108314098A CN 201810031851 A CN201810031851 A CN 201810031851A CN 108314098 A CN108314098 A CN 108314098A
Authority
CN
China
Prior art keywords
water
boiler
pedestal
water tank
heating board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810031851.0A
Other languages
Chinese (zh)
Other versions
CN108314098B (en
Inventor
金容贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LG Electronics Inc
Original Assignee
LG Electronics Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LG Electronics Inc filed Critical LG Electronics Inc
Publication of CN108314098A publication Critical patent/CN108314098A/en
Application granted granted Critical
Publication of CN108314098B publication Critical patent/CN108314098B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B67OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
    • B67DDISPENSING, DELIVERING OR TRANSFERRING LIQUIDS, NOT OTHERWISE PROVIDED FOR
    • B67D1/00Apparatus or devices for dispensing beverages on draught
    • B67D1/08Details
    • B67D1/0895Heating arrangements
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/001Processes for the treatment of water whereby the filtration technique is of importance
    • C02F1/003Processes for the treatment of water whereby the filtration technique is of importance using household-type filters for producing potable water, e.g. pitchers, bottles, faucet mounted devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B67OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
    • B67DDISPENSING, DELIVERING OR TRANSFERRING LIQUIDS, NOT OTHERWISE PROVIDED FOR
    • B67D1/00Apparatus or devices for dispensing beverages on draught
    • B67D1/08Details
    • B67D1/0801Details of beverage containers, e.g. casks, kegs
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2201/00Apparatus for treatment of water, waste water or sewage
    • C02F2201/002Construction details of the apparatus

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)
  • Water Treatment By Electricity Or Magnetism (AREA)

Abstract

The present invention provides water purifier and water purifier boiler, in more detail, including:Tank lid is formed by resin material, and is formed with the outlet part for entering water portion and water being discharged for flowing into water;Water tank pedestal, is formed by resin material, and with the tank lid in conjunction with and form hot water accommodating space;And heating board, it is set to the water tank pedestal, to form a part for the hot water accommodating space, and is formed by plate-shaped metal material.The heating board is arranged with the mode that the actuating coil for generating magnetic force when power supply separates at a predetermined interval, to be generated heat in the operation of the actuating coil to heat the water inside the hot water accommodating space.

Description

Water purifier and water purifier boiler
Technical field
The present invention relates to water purifiers and water purifier boiler.
Background technology
In general, water purifier is by being filtered deimpurity device of making a return journey to water, being widely used in family.
Domestic water purifier is connect with water pipe, and the suspended matter contained in tap water or harmful components are removed using filter Deng, and the water purifier is configured to, and can purify and take out the water of requirement depending on the user's operation.
This Domestic water purifier has listed multiple product, can not only take out water purification, but also can take out hot water And cold water.Also, it is small and may be mounted at the water purifier in different installation environments in recent years, to develop size.Recently, it develops A kind of water purifier that purified water is heated and is capable of providing with heater in the state of being placed in water tank hot water.
Typically, KR published patent the 10-2012-0112060th discloses a kind of hot water supply apparatus, wherein net Change water on the heating channel of metal material to pass through, during on the heating channel passing through, by the outside of heating channel Top plate heater and base plate heating unit heat to provide hot water.
But in this existing technology, it is difficult to it is molded and processes the sealed container for being equipped with purified water, therefore, It is restricted to achievable shape.
In addition, for the molding of heating channel, need to carry out the welding sequence for jointing metal material, but exist due to Welding sequence and cause cost and activity duration the problem of productivities reduce such as to increase.Moreover, because metal material in welding process The variation for expecting property, causes corrosion resistance to reduce, this is the serious problem for causing water purification quality to reduce.
Also, since the heating channel of metal material is easy to happen plastic deformation, therefore, it is necessary to additional structures to prevent Plastic deformation.
Invention content
The purpose of the present invention is to provide a kind of water purifier and water purifier boiler, it can reduce to store and pass through sense It answers the manufacturing cost of the boiler of the water of mode of heating heating and can increase productivity.
The purpose of the present invention is to provide a kind of water purifiers and water purifier boiler, can pass through induction heating mode Heat hot water, and with improved corrosion resistance and durability.
Water purifier boiler in order to reach the embodiment of the present invention of this purpose of the present invention includes:Tank lid, by Resin material is formed, and is formed with the outlet part for entering water portion and water being discharged for flowing into water;Water tank pedestal, is formed by resin material, And with the tank lid in conjunction with and form hot water accommodating space;And heating board, it is set to the water tank pedestal, described in formation A part for hot water accommodating space, and formed by plate-shaped metal material.The heating board and the active line that magnetic force is generated when power supply It encloses the mode separated at a predetermined interval to arrange, to generate heat to heat the hot water accommodating space in the work of the actuating coil Internal water.
The heating board can insert-molding in the water tank pedestal.
On the position of the one side towards the tank lid, the water tank pedestal is formed as corresponding size and shape Shape.
In the one side towards the heating board, the outlet part and enters water portion and protrude in vertical manner, the water outlet Portion and entering can be formed between water portion, to the dispersion portion of the flowing of heating board protrusion and disperse water.
It may be provided with the liner sealed between the water tank pedestal and tank lid on the periphery of the water tank pedestal.
The angle of the tank lid is formed with lid fixed part, is formed with the fastener hole penetrated through for fastening member, the water tank The angle of pedestal is formed with pedestal fixed part, wherein there is the fixing lug boss protrusion for fastening member fastening, and can pass through The fastening of the fastening member presses the liner.
On the side of the water tank pedestal towards the face for being equipped with the heating board, the coil that can be formed with recess is accommodating Portion, to house the actuating coil.
The water tank pedestal may include:Water tank frame forms the water tank pedestal periphery;Support portion, to pass through the water Mode between cabinet frame is formed, and supports the heating board.
The one side of the support portion can support the heating board, and opposite another side can support the actuating coil.
The support portion may include multiple openings, and the heating board is externally exposed.
The support portion may include:Central portion supports the center of the heating board, and is formed with opening in inside;It is multiple Interconnecting piece extends to the medial surface of the base framework from the central portion.
It is formed in the tank lid along the vertically extending edge part in periphery, the water tank pedestal may include:First prolongs Extending portion is extended vertically along the water tank pedestal periphery, to be contacted with the medial surface of the edge part;Second extension, with institute It states the first extension to separate, and forms the periphery of the water tank pedestal;Edge insertion section is formed in first extension and Between two extensions, inserted with the edge part in conjunction with the tank lid and water tank pedestal.
Also, the water purifier of the embodiment of the present invention includes:Shell;Filter is set to the enclosure interior, and purifies institute The water of supply;Piping, connect with the filter, and guides the flowing of water;Actuating coil is set to the enclosure interior, and Magnetic force is generated when power supply;Boiler is connected with the piping, and provides the space for heating supplied water.The hot water luggage It includes:Tank lid is formed by resin material, and is formed with the outlet part for entering water portion and water being discharged for flowing into water;The water tank pedestal, Formed by resin material, and with the tank lid in conjunction with and form hot water accommodating space;Heating board is set to the water tank base Seat, to form a part for the hot water accommodating space, and is formed by plate-shaped metal material.The actuating coil can be disposed at face To in the one side of the boiler of the heating board, with heating board described in sensing heating.
The boiler recess has the coil holding part housed for the actuating coil, and FERRITE CORE is with radial arrangement It, therefore, can be by the boiler and module composition in the one side of the actuating coil.
The enclosure interior is provided with control assembly, includes the action of the water purifier of the actuating coil with control, is pacifying In the state of the actuating coil, the boiler can be fixedly installed in the control assembly.
Invention effect
The water purifier and water purifier of the embodiment of the present invention are had the following effects that with boiler.
The water purifier of the embodiment of the present invention has following structure, wherein boiler is molded into thermoplastic resin material Type, and heating board is disposed with inside it.Therefore, it is possible to reduce the mouldability and manufacturing cost of the boiler, and can improve Productivity.
It, can design path and can cloth in particular, the boiler molding with labyrinth and shape can be easy It sets in the reflection to the boiler of the labyrinths such as actuating coil.
In addition, by the way that heating board to be arranged in inside the boiler, institute can effectively be heated with induction heating mode State the water inside boiler.
In particular, by insert-molding, the heating board can be constituted with the boiler with unitary form, and branch is not only passed through Support part has stable support construction, and on the basis of the support portion, is respectively disposed with heating board and institute on opposite sides Actuating coil is stated, the spacing to enable the actuating coil and heating board to keep best, so that the heating board can produce Raw effective heating functioin.
Also, the characteristic of thermoplastic resin material is, will not only occur with prolonged heating through heating repeatedly It deforms and stable structure can be kept, and sufficient durability only can be ensured by injection molding.
Also, by the combination of water tank pedestal and tank lid, the inside of the boiler can be formed with the sealing of accommodating water Space can assemble the boiler, therefore, it is possible to significantly improve group by the simple assembling of the water tank pedestal and tank lid Fill feasibility.
In addition, the structure of the actuating coil is installed due to being provided on the boiler, it does not add additional Composition be also capable of providing to the heating board carry out sensing heating structure.
Description of the drawings
Fig. 1 is the stereogram of the water purifier of the embodiment of the present invention.
Fig. 2 is the exploded perspective view of the water purifier.
Fig. 3 is the stereogram of the sensing heating component of the embodiment of the present invention as viewed from front.
Fig. 4 is the stereogram of the sensing heating component as viewed from rear.
Fig. 5 is the exploded perspective view of the sensing heating component.
Fig. 6 is the stereogram of the boiler of the embodiment of the present invention as viewed from front.
Fig. 7 is the stereogram of the boiler as viewed from rear.
Fig. 8 is the exploded perspective view of the boiler.
Fig. 9 is the perspective cut-away view of the water tank pedestal of the boiler.
Figure 10 is the figure for indicating water flowing and heated condition inside the boiler.
Figure 11 is the longitudinal section view of the boiler of other embodiments of the present invention.
Specific implementation mode
Hereinafter, being described in detail with reference to specific embodiments of the present invention.It should be understood, however, that the present invention is unlimited In the embodiment of prompt inventive concept, and can be easy to propose that addition, change, deletion etc. because of other inscapes cause Other degenerations invention, or other embodiments within the scope of inventive concept.
Fig. 1 is the stereogram of the water purifier of the embodiment of the present invention.Also, Fig. 2 is the exploded perspective view of the water purifier.
As shown, the water purifier 1 of the embodiment of the present invention is formed in the longitudinal direction longlyer, and width in left and right directions It spends narrowly formed.Therefore, the appearance of the water purifier 1 has slender and compact shape on the whole.
The shape of the water purifier 1 can be formed by shell 10.The shell 10 with lower member by being constituted:Protecgulum 11, shape At the appearance of front;Rear cover 12 forms subsequent appearance;Pedestal 13 is formed following;Head cover 14 is formed above;Side panel 15, Form two sides.The protecgulum 11, rear cover 12, pedestal 13, head cover 14 and a pair of of side panel 15 can mutually assemble described in formation The appearance of water purifier 1.
Outlet part 20 is provided with before the water purifier 1.The outlet part 20 protrudes shape in the front of the protecgulum 11 At passing through downwardly projecting water outlet nozzle 25 and take out purified water.
The protecgulum 11 can be made of upper cover 111 and lower cover 112.Also, circulator 21 is rotationally arranged on described Between lid 111 and lower cover 112.
The outlet part 20 may be configured as rotating together with the circulator 21.Therefore, according to the configuration of the water purifier 1 State or configuration surroundings, user can rotate the outlet part 20 with required angle.At this point, being set to the behaviour of the head cover 14 Making portion 40 can also rotate together.The operation button 41 of at least more than one for inputting user's operation is set to the operation Portion 40 is also provided with the display for showing 1 mode of operation of water purifier as needed.
The pedestal 13 is provided with the pallet 90 protruded to the front of the protecgulum 11, which can be located at the water outlet The vertical lower in portion 20.Also, by the operation of user, the pallet 90 can direction rotation identical with the outlet part 20 Turn, can also be detached with the pedestal 13.The upper surface of described pallet 90 is formed as grille-like, to store from the outlet part 20 water to drip.
Filter mounting 30 is may be provided in the inside of the shell 10, the filter 34 for water purification is mountable to filter Device holder 30.Also, it can be arranged on the filter mounting 30:Filter socket 341 is equipped with and is connect with the filter 34 The filter 34;Multiple valves, for water purification, the flowing of cold water, hot water;Multiple pipings, for connecting the multiple valve.
Also, the circulator 21 is rotatably mounted in the upper end of the filter mounting 30.Also, the circulator 21 top may be provided with the operation portion 40, and the operation portion 40 is connect with the circulator 21, when the circulator 21 revolves It can be rotated together when turning.
The rotating ring 91 being rotatably mounted is provided on the pedestal 13, the pallet 90 is detachably arranged on described On rotating ring 91.Therefore, the pallet 90 can be rotated in a mounted state, to be located at and the outlet part 20 corresponding lower sections.Also, as needed, the pallet 90 is detachably connected on the rotating ring 91.
The upper surface of described pedestal 13 is provided with compressor 51 and condenser 52.Also, the compressor 51 and condenser 52 Between be provided with cooling fan 53, so as to which the compressor 51 and condenser 52 can be cooled down.Energy can be used in the compressor 51 It is enough to adjust the inverter type compressor of cooling capacity by changing frequency.Therefore, it is possible to effectively cool purified water, so as to Enough reduce power consumption.
Also, the condenser 52 is located at the rear of the pedestal 13, may be alternatively located at and be formed in spitting for the rear cover 12 Export 121 corresponding positions.In order to effectively utilize space, and heat exchanger effectiveness is improved simultaneously, the condenser 52 can It is formed in a manner of the refrigerant pipe of multiple bending flat cast, and may be configured as being placed in condenser brackets 54.
It is formed in the condenser brackets 54:Condenser mounting portion 541, the fixed condenser 52;Water tank mounting portion 542, the cooler bin 60 for making cold water can be installed.In order to house the condenser 52, the condenser mounting portion 541 are formed with hexahedral space corresponding with the global shape of the condenser 52.Also, the condenser mounting portion 541 are formed as that the part towards the cooling fan 53 and discharge opening 121 is made to be open respectively so that the condenser 52 can have Effect ground is cooling.
Also, the water tank mounting portion 542 is formed in the top of the condenser brackets 54, that is, the condenser installation The top in portion 541.The lower end of the cooler bin 60 is inserted in the water tank mounting portion 542 and the fixed cooler bin 60.
The cooler bin 60 is used to manufacture cold water by cool purified water, and fills and carry out hot friendship with the water purification flowed into The cooling water changed.Also, the inside of the cooler bin 60 can be equipped with the evaporator for cooling down the cooling water.Also, it can With by enabling water purification to cool down water purification inside the cooler bin.
The side of the filter mounting 30 is additionally provided with support plate 35, extends to 60 side of the cooler bin.It is described Support plate 35 is set to the top of the compressor 51, and extends to the condenser brackets 54 from the filter mounting 30 To provide the space of installation having heaters and control module 50.
The heater and control module 50 may be configured as:Sensing heating component 70, for making hot water;Control assembly 51, the integrated operation for controlling the water purifier 1.The sensing heating component 70 and control assembly 51 can be combined with each other to tie Be combined into a module status, and can in conjunction with state be installed in the support plate 35.
The control assembly 51 is used to control the action of the water purifier 1, consist of can control the compressor 51, Cooling fan 53, various valves and sensor, the sensing heating component 70 etc..The control assembly 51 can be by with different work( The combination of the printed circuit board (PCB) of multiple portions can be divided into and modularization.That is, only extracting cold water and net in the water purifier 1 In the structure of water, it is convenient to omit the PCB for controlling the sensing heating component 70, and can omit in this way at least More than one PCB.
The sensing heating component 70 is configured to for heating purified water through sensing heating (IH: Induction heating) mode heats.The sensing heating component 70 can be when hot water takes out and operates, instantaneously rapidly Water is heated, and the output in magnetic field can be controlled purified water is heated to required temperature, to provide it to user. Therefore, the hot water of required temperature can be taken out depending on the user's operation.
Fig. 3 is the stereogram of the sensing heating component of the embodiment of the present invention as viewed from front.Also, Fig. 4 is in terms of rear Remove the stereogram of the sensing heating component.Also, Fig. 5 is the exploded perspective view of the sensing heating component.
Hereinafter, being illustrated to the sensing heating component with reference to attached drawing.
The sensing heating component 70 can be by being constituted with lower member:Boiler 80, for accommodating and heat hot water;Work Coil 71, for being heated to the boiler 80;FERRITE CORE 73;Piping 763,773.Also, the boiler 80 With actuating coil 71, FERRITE CORE 73 interconnects with piping 763,773 and is configured to a module.Also, with mould Bulk state in conjunction with the sensing heating component 70 and the control assembly 51 in conjunction with and reconstitute for a module, to pacify Loaded on the filter mounting 341.
The boiler 80 is formed with, the space for flowing into and housing by the water of the purification of the filter 34.The heat Water tank 80 is made of water tank pedestal 81 and tank lid 82, and can be formed with the space of accommodating purified water in inside.Also, it is described Boiler 80 can be formed with:Enter water portion 826 and outlet part 825 for heated water to be discharged for flow into purified water.
Also, being placed in the water inside the boiler 80 can be added by the actuating coil 71 with induction heating mode Heat.For this purpose, the actuating coil 71 can be housed by being formed on the coil holding part 817 at 81 back side of water tank pedestal.
The actuating coil 71 forms the magnetic line of force, induces the fever of boiler 80, makes to be placed in the boiler 80 The water in portion can be heated with induction heating mode.When providing electric current to actuating coil 71, magnetic is formed in actuating coil 71 The line of force, the magnetic line of force influence the boiler 80, and the boiler 80 is influenced by the magnetic line of force and generated heat.For this purpose, metal material The heating plate 84 of material can be arranged inside the boiler 80.
The actuating coil 71 is arranged in a manner of being close to the bottom surface of flat shape on the coil holding part 817.Institute State that actuating coil 71 is made of more copper wire or other conducting wires and strands insulate, and by being applied to the actuating coil 71 Electric current and form magnetic field or the magnetic line of force.
At this point, the opposite side of the bottom surface of the coil holding part 817 may be provided with the heating board 84.Therefore, towards institute Stating the heating board 84 of actuating coil 71 is influenced by the magnetic line of force formed by actuating coil 71 and is generated heat.In Fig. 4, not in detail The strands of actuating coil 71 carefully are shown, and illustrate only the overall profile of the actuating coil 71 formed by winding strands.
It is exposed in the one side of the actuating coil 71 of the open side of the coil holding part 817 and is provided with mica sheet 72.The mica sheet 72 is formed as shape corresponding with the one side of the actuating coil 71, to cover the actuating coil 71 Exposure entire one side.
Also, FERRITE CORE 73 is provided with before the mica sheet 72.The FERRITE CORE 73 is for inhibiting electricity Stream loses and plays the role of the screened film of the magnetic line of force.The actuating coil 71 may include multiple FERRITE COREs 73, and more A FERRITE CORE 73 can be on the basis of the central part of the actuating coil 71 with radial arrangement.
The water tank pedestal 81 can be formed with core fixed part 817a with the fixation FERRITE CORE 73.The core fixed part 817a is protruded from the inside of the coil holding part 817 in a manner of not interfering the actuating coil 71, and by housing institute The end of FERRITE CORE 73 is stated with the fixation FERRITE CORE 73.
Certainly, the core fixed part 817a can be not formed on the water tank pedestal 81, when the additional fixed knot of offer It, can be along the actuating coil 71 with radial arrangement when structure.
Also, the center of the coil holding part, that is, the sensor mount of the concavity of the water tank pedestal can pacify Equipped with the water tank temperature sensor 74 for measuring 80 temperature of the boiler.The water tank temperature sensor 74 is set to hot water Therefore 80 center of case, the temperature in the space of the accommodating water can be measured in the state contacted with the heating board 84.
Therefore, the temperature of the hot water heated can be made to be maintained at range appropriate by the water tank temperature sensor 74 It is interior.That is, the output of the actuating coil 71 can be adjusted by the temperature detected by the water tank temperature sensor 74, and It can determine and control reheating or stop heating.
In addition, going out water connector 76 is connected to the outlet part 825.Also, with it is described go out hot water the hot water that connect of valve Piping 763 be connected to it is described go out water connector 76 side.Also, it is described go out water connector 76 the other side, that is, towards described in The direction of the bottom surface of water purifier 1 is provided with safety valve 761.
The safety valve 761 prevents institute for the steam generated when the heat hot water in the boiler 80 to be discharged The pressure inside boiler 80 is stated to be excessively increased because of steam.The safety valve 761 is configured in the case where setting pressure open, and Can have can be smoothly discharged by being connected to the steam piping 762 of the safety valve 761 inside the boiler 80 The various structures of steam.
Enter water connector 77 and be connected to the inlet portion 826, it is described enter water connector 77 side be provided with end cap 771 with Enter the opening of 77 side of water connector described in masking.Also, to it is described enter water connector 77 the side of lower opening can be arranged There is check-valves 772.The check-valves 772 be used for by water purification be supplied to it is described enter water portion 826, in a manner of being opened to the direction of the supply It is formed.Therefore, when removing the end cap 771 in the state that the check-valves 772 is closed, can by it is described enter water portion Water inside the 826 discharge boilers.
Also, enter the end that water piping 773 may be coupled to the check-valves 772.Therefore, the purified water can pass through Enter water piping 773 and is supplied to the boiler 80.When by it is described enter water piping 773 supply water when, the check-valves 772 is beaten Open, and water can by it is described enter water portion 826 be supplied to the inside of the boiler 80.
Fig. 6 is the stereogram of the boiler of the embodiment of the present invention as viewed from front.Also, Fig. 7 is described as viewed from rear The stereogram of boiler.Also, Fig. 8 is the exploded perspective view of the boiler.Also, Fig. 9 is the water tank base of the boiler The perspective cut-away view of seat.
Hereinafter, the structure of the boiler 80 is described in detail with reference to attached drawing.
80 inside of the boiler can form the space for accommodating heating water, and outside, which can be formed, is equipped with the active line The space of circle 71.The boiler 80 can be formed by using plastic resin material injection molding, being capable of institute easy to implement It states into the molding of water portion 826 and outlet part 825 and the labyrinths such as the space of accommodating water and the space of accommodating actuating coil.
In addition, the boiler 80 can be by with excellent corrosion resistance and heat resistance, excellent impact strength and ruler Very little stability and avirulent thermoplastic resin material are formed.For example, the boiler 80 can be formed by nylon material.
The boiler 80 can be made of the water tank pedestal 81 and tank lid 82 for being respectively formed its one side and the back side, be passed through The combination of the water tank pedestal 81 and the tank lid 82, can form the space of accommodating hot water.
The water tank pedestal 81 can be formed as rectangular frame on the whole, and can pass through the thermoplastic resins material such as nylon Material injection molding is formed.Also, it may be provided with the heating board 84 of metal material in the inside of the water tank pedestal 81.The fever Plate 84 forms the bottom surface of the water tank pedestal 81, and forms the one side in the space for housing water to heat inside the boiler 80 Water.
The heating plate 84 is formed as plate, can be carried out to the water tank pedestal 81 when being molded the water tank pedestal 81 Insert-molding, therefore, it is possible to which the heating board 84 and the water tank pedestal 81 holding to be integrated.Therefore, when the heating board In the state that 84 are combined with the water tank pedestal 81, it can prevent the water inside the boiler 80 from leaking into outside.Certainly, only Want the heating board 84 that can be connected to the water tank pedestal 81 in a gas tight manner, the heating board 84, which can have, removes inserts Integrated structure other than molding.
The heating board 84 is formed by the stainless steel material of excellent corrosion resistance, can form the boiler of accommodating water A part for 80 medial surface, in particular, can be formed by STS439 materials so that the fever effect caused by the actuating coil 71 Rate is excellent, and can improve the efficiency of heating surface inside the boiler 80.
The water tank pedestal 81 may be configured as:Base framework 810, the frame shape of the quadrangle with round angle; Support portion 814 passes through inside the base framework 810.
The base framework 810 may include:Extension 811, it is convex in the mode for being inserted into 82 inner space of the tank lid Go out, and is tightly attached to the tank lid 82;Placement portion 812 is padded, forms step part in 811 lower end of the extension, and outward It protrudes and is disposed for liner 83 in side.The liner placement portion 812 can be formed as outwardly protruding the width phase with the liner 83 Corresponding distance can press thus when the water tank pedestal 81 and the tank lid 82 combine and support the liner 83.
Also, four angles of the base framework 810 be formed as it is arc-shaped, and can be in the base framework 810 Each angle at form the pedestal fixed part 813 that outwardly protrudes.It can be formed with fixing lug boss on the pedestal fixed part 813 813a, fixing lug boss 813a are formed with the fastener hole 813b fastened for fastening members such as screws.The fixing lug boss 813a It can be protruded above in the pedestal fixed part 813, and the height contacted with the tank lid 82 can be protruded into.Therefore, work as institute When stating water tank pedestal 81 and being combined with the tank lid 82, the upper end of the fixing lug boss 813a can support the tank lid 82.
The inside of the base framework 810 can be formed with support portion 814.The support portion 814 can divide the opening The base framework 810 inside, and be configured to support the heating board 84 and the actuating coil on both sides 71。
The inner space for the base framework 810 being open is divided by the support portion 814, with the support portion 814 On the basis of formed side plate holding part 818 and the other side coil holding part 817.Therefore, it may be configured as the support portion 814 One side (right side of Fig. 9) support the heating board 84, and another side (left side of Fig. 9) support of the support portion 814 The actuating coil 71.
Therefore, the heating board 84 and the actuating coil 71 can keep predetermined space, and the heating board 84 is logical Crossing the magnetic line of force of the formation of the actuating coil 71 can effectively generate heat.
In addition, the support portion 814 can by the water tank pedestal 81 center central portion 815, and connection it is described in The interconnecting piece 816 of centre portion 815 and the base framework 810 is constituted.
The central portion 815 can be formed as quadrangle, and the inside of the central portion 815 can be formed with sensor peace Dress portion 815a.The central portion 815 is formed as various shapes to form the sensor mount 815a of opening shape, no The installation space of the water tank temperature sensor 74 and fuse 75 is only formed, but also provides to stablize and supports the fever The face in the center of plate 84.
The interconnecting piece 816 connects the medial surface of the base framework 810 from the outside of the central portion 815, as schemed institute Show, side up and down can be respectively arranged at.Certainly, 816 numbers of the interconnecting piece can be adjusted as needed, the connection Portion 816 supports the heating board 84 and the actuating coil 71.
Therefore, the interconnecting piece 816 can have scheduled width and thickness, and can have and can be effectively performed For making the heating board 84 and the actuating coil 71 be stablized the width and thickness of support and the interaction generated heat.
Also, the interconnecting piece 816 is formed in the center or adjacent with center of the width direction of the base framework 810 Position.Therefore, on the basis of the interconnecting piece 816, the both sides of the water tank pedestal 81 can form 818 He of plate holding part respectively The coil holding part 817.
In addition, the inside cross-section shape of the base framework 810 be formed as it is opposite with the shape of the heating board 84 It answers.Therefore, by the heating board 84, the space of the opening between the support portion 814 can be completely obscured.
Also, by the multiple openings formed by the support portion 814, the heating board 84 can effectively radiate, from And when the heating process of hot water terminates, the boiler 80 is cooled rapidly.
When the water tank pedestal 81 is combined with tank lid 82, the liner 83 is for sealing the water tank pedestal 81 and water Between case lid 82, it can be formed by silica gel elastomeric material.The liner 83 is formed as ring-shaped, can also be formed as edge The shape of the periphery setting of the extension 811.Therefore, the height of the liner 83 is formed as than the extension 811 Height it is lower, be formed as the width with liner placement portion 812 of same size or than the liner placement portion 812 It is narrower.
The water tank pedestal 81 and the tank lid 82 can be combined by the fastening member.The fastening member can be with By the fastener hole 823a of the tank lid 82, it is anchored on the fastener hole for the fixing lug boss 813a for being formed in the water tank pedestal 81 813b, at this point, the liner 83 is pressed with being placed in the state of the liner placement portion 812, so as to be fully sealed Between the water tank pedestal 81 and the tank lid 82.
The tank lid 82 is formed as, when being combined with the water tank pedestal 81 to house the extension of the water tank pedestal 81 Portion 811, and be formed as being formed the enclosure space of accommodating water by the extension 811 by covering the space being open.
The tank lid 82 can be by forming the cap 822 in the face towards the heating board 84, and along the cap The 822 vertically extending edge part 821 in periphery forms shape.
The cap 822 and edge part 821 are formed to have the quadrangle of circular arc, and being formed as can be by the water The shape that the extension 811 of case pedestal 81 is housed in inside.The lid protruded outward can be formed on the angle of the edge part 821 Fixed part 823.The lid fixed part 823 can be formed in the position towards the pedestal fixed part 813, and be formed as opposite The shape answered.
Also, the fastener hole 823a for fastening member fastening can be formed on the lid fixed part 823.The fastening Hole 823a is located on extension line identical with the fastener hole 813b of the pedestal fixed part 813, and therefore, the fastening member passes through Fastener hole 813b, 823a make tank lid 82 be combined with water tank pedestal 81.In addition, passing through the fastener hole 813b, 823a's is tight Gu component is anchored on the lateral surface of the control assembly 51, and the sensing heating component 70 is made to be fixedly installed in the control group On part 51, so that the sensing heating component 70 and the control assembly 51 constitute a module on the whole.
The cap 822 forms 82 one side of the tank lid, can be formed corresponding with the position towards the heating board 84 Shape.Also, the cap 822 can be formed with multiple dispersion portions 824.The dispersion portion 824 is into the boiler 80 Side space is recessed to be formed, and arrives top flowing water from below along the boiler 80 by disperseing, makes it in the boiler Spread to 80 inner homogeneous.
For this purpose, the dispersion portion 824 can be recessed into the position adjacent with the heating board 84, can be recessed into not with institute State the degree of the contact of heating board 84.Therefore, the dispersion portion can be dispersed in along the water of the internal flow of the boiler 80 Around 824.
Also, in the entire inside of the boiler 80 with the state flowing water that spreads can equably with the fever 84 entire surface of plate contacts, therefore, even if in the case where the short time passing through the boiler 80, it can also be by the heating board 84 Fully heat.
The dispersion portion 824 and can be formed as that the boiler can be disperseed up and down or left and right sides dispersed placement The various shapes of the water flowing of 80 inside.
The top and bottom of the cap 822 are respectively formed with outlet part 825 and enter water portion 826.The outlet part 825 It can be formed in the upper end of the cap 822, and can be extended to the direction of 822 square crossing of the cap.
Also, it is described enter water portion 826 can be formed in the lower end of the cap 822, can be perpendicular to the direction of cap 822 Upper extension.It is described enter water portion 826 and outlet part 825 can in the up-down direction be arranged on identical extended line.
Therefore, by it is described enter water portion 826 flow into water flow direction the boiler 80 inside be bent, and It can equably be spread by being collided with 80 medial surface of the boiler.Also, it can by the water that the outlet part 825 is discharged With inside the boiler 80 of broad space, simultaneously by flow velocity that the outlet part 825 of narrow space are kept constant It is discharged.By the internal structure and the outlet part 825 of this boiler 80 and enter 826 structure of water portion, flow into and The water that the boiler 80 is discharged can be may insure the flow rate of sufficient heating time.
It is formed by thermoplastic resin materials such as nylon in addition, the tank lid 82 is whole.The tank lid 82 can by with 81 identical material of the water tank pedestal is formed, and by injection molding can be easy to be formed multiple dispersion portions 824 with And outlet part 825 has the tank lid 82 of labyrinth with water portion 826 etc. is entered.
Hereinafter, being illustrated to the hot water flowing and heating of the water purifier of the embodiment of the present invention with reference to attached drawing.
Figure 10 is the figure for indicating water flowing and heated condition inside the boiler.
As shown, for the heat hot water in the water purifier 1, purified water passes through 80 lower end of the boiler first It is described enter water portion 826 flow into.
Enter the water in water portion 826 described in inflow with the collision with wall of the boiler 80 to disperse, and flows upward.It flows into It is described enter water portion 826 and flowing water can disperse in flow process because of dispersion portion 824 upward.
Multiple dispersion portions 824 are configured in the boiler 80, therefore, in the water of 80 flows upward inside of the boiler It equably spreads and disperses in 80 entirety of the boiler.
During flowing up, the water inside the boiler 80 is contacted with the whole surface of the heating board 84. Therefore, when the operation by the actuating coil 71 makes adstante febre due to sensing heating of the heating board 84, pass through the hot water Water inside case 80 can be rapidly heated to high temperature.
Therefore, by it is described enter water portion 826 flow to the outlet part 825 during, the water in the boiler 80 Target temperature can be heated to.Also, it is adjusted through the boiler 80 by adjusting the output of the actuating coil 71 The temperature of water.
In addition, the water for flowing to the upper end of the boiler 80 is collected in the inlet of the outlet part 825 again, and The hot water of heating can be discharged by the outlet part 825.
In addition to the above described embodiments, various other embodiments of the invention are also possible.Other implementations of the present invention Example is characterized in that, is formed as water tank pedestal 81 and tank lid 82 and can be inserted into mutually in the form of not needing additional liner 83 And the structure combined.
Other embodiments of the invention are identical as other compositions of above-described embodiment, only water tank pedestal 81 and tank lid 82 Engaging portion it is different, for the identical reference numeral of identical compositions use, and description is omitted.
Figure 11 is the longitudinal section view of the boiler of other embodiments of the present invention.
As shown, combined with tank lid 82 by water tank pedestal 81 can for the boiler 80 of other embodiments of the invention It is formed in the internal space that can house and heat water.
The back side (right side of Figure 11) of the water tank pedestal 81 is formed with the coil holding part 817 of recess, the coil It may be provided with the actuating coil 71 in holding part 817.Also, (left side of Figure 11) can pacify before the water tank pedestal 81 Equipped with the heating board 84.The actuating coil 71 and the heating board 84 can keep scheduled by the support portion 814 Interval.
Also, the medial surface edge of the water tank pedestal 81 is contacted with the medial surface of the tank lid 82 and is formed to described The first extension 852 that tank lid 82 extends.When the water tank pedestal 81 is combined with the tank lid 82, described first extends Portion 852 can be tightly attached to the inside of the edge part 821 of the tank lid 82.
Also, the lower end of first extension 852 can be formed with the board slot 851 being recessed inwardly.The board slot 851 is used It is pressed into the end for housing the heating board 84, and for the heating board 84.In addition, when the heating board 84 and the water tank Pedestal 81 together by insert-molding when form the board slot 851, can be firmer by housing the edge of the heating board 84 The heating board 84 is fixed on ground.
The outside of first extension 852 can be formed with the second extension of the periphery to form the water tank pedestal 81 853.Second extension 853 is separated with first extension 852, and first extension, 852 and second extension The edge insertion section 854 of recess can be formed between 853.The edge insertion section 854 is with the edge part 821 of the tank lid 82 The mode being inserted into is formed, and is formed in a manner of with width corresponding with the thickness of the edge part 821.
The tank lid 82 can be by plastic material injection molding identical with the water tank pedestal 81, and can be by face It is constituted to the cap 822 of the heating board 84 and along the edge part 821 that 822 edge of the cap is formed.
At this point, the development length of the edge part 821 can be identical as the depth of the edge insertion section 854, or ratio The depth of the edge insertion section 854 is longer.Therefore, the edge part 821 is inserted in the state of the edge insertion section 854 Under, the periphery of the edge part 821 can be tightly attached to first extension 852, the second extension 853 and described completely The bottom surface of edge insertion section 854.
Also, the edge part 821 and the edge insertion section 854 can be completely mutual by ultrasonic bonding or thermal weld It is combined, and as needed, adhesive or other fastening structures can be further provided for and can more firmly be combined.
Also, the outlet part 825 can be formed at the top and bottom of the cap 822 and enter water portion 826, it is described go out Water portion 825 and enters and can be formed with the dispersion portion 824 between water portion 826.

Claims (15)

1. a kind of water purifier boiler, which is characterized in that
Including:
Tank lid is formed by resin material, and is formed with the outlet part for entering water portion and water being discharged for flowing into water,
Water tank pedestal, is formed by resin material, and with the tank lid in conjunction with and form hot water accommodating space, and
Heating board is set to the water tank pedestal, to form a part for the hot water accommodating space, and by plate-shaped metal material It is formed;
The heating board is arranged with the mode that the actuating coil for generating magnetic force when power supply separates at a predetermined interval, and in the work It generates heat when the work for making coil, to be heated to the water inside the hot water accommodating space.
2. water purifier boiler according to claim 1, which is characterized in that
The heating board insert-molding is in the water tank pedestal.
3. water purifier boiler according to claim 1, which is characterized in that
On the position of the one side towards the tank lid, the water tank pedestal is formed as corresponding with the one side of the tank lid Size and shape.
4. water purifier boiler according to claim 1, which is characterized in that
In the one side of the tank lid towards the heating board, the outlet part and enter water portion with perpendicular to the tank lid The mode of one side protrude,
In the outlet part and enter to be formed between water portion the dispersion portion that the oriented heating board protrudes the flowing of disperse water.
5. water purifier boiler according to claim 1, which is characterized in that
Being provided in the periphery of the water tank pedestal makes liner airtight between the water tank pedestal and tank lid.
6. water purifier boiler according to claim 5, which is characterized in that
The angle of the tank lid is formed with lid fixed part, and the lid fixed part is formed with the fastener hole penetrated through for fastening member,
The angle of the water tank pedestal is formed with pedestal fixed part, is protruding in the pedestal fixed part tight for the fastening member Solid fixing lug boss,
The liner is pressed by the fastening of the fastening member.
7. water purifier boiler according to claim 1, which is characterized in that
On the side of the water tank pedestal towards the face for being equipped with the heating board, it is formed with to house the actuating coil The coil holding part that is recessed of mode.
8. water purifier boiler according to claim 1, which is characterized in that
The water tank pedestal includes:
Water tank frame forms the periphery of the water tank pedestal;
Support portion is formed in a manner of across the water tank frame, and supports the heating board.
9. water purifier boiler according to claim 8, which is characterized in that
The one side of the support portion supports the heating board, opposite another side to support the actuating coil.
10. water purifier boiler according to claim 8, which is characterized in that
The support portion includes the multiple openings for being externally exposed the heating board.
11. water purifier boiler according to claim 8, which is characterized in that
The support portion includes:
Central portion supports the center of the heating board, and is formed with opening in inside;
More than one interconnecting piece extends to the medial surface of the base framework from the central portion.
12. water purifier boiler according to claim 1, which is characterized in that
It is formed in the tank lid along the vertically extending edge part in periphery;
The water tank pedestal includes:
First extension is extended vertically along the water tank pedestal periphery, to be contacted with the medial surface of the edge part,
Second extension is separated with first extension, and forms the periphery of the water tank pedestal,
Edge insertion section is formed between first extension and the second extension, inserted with the edge part to combine State tank lid and water tank pedestal.
13. a kind of water purifier, which is characterized in that
Including:
Shell,
Filter is set to the enclosure interior, and purifies supplied water,
Piping, connect with the filter, and guides the flowing of water,
Actuating coil is set to the enclosure interior, and generates magnetic force when power supply,
Boiler is connected with the piping, and provides the space for heating supplied water;
The boiler includes:
Tank lid is formed by resin material, and is formed with the outlet part for entering water portion and water being discharged for flowing into water,
The water tank pedestal, is formed by resin material, and with the tank lid in conjunction with and form hot water accommodating space,
Heating board is set to the water tank pedestal, to form a part for the hot water accommodating space, and by plate-shaped metal material It is formed;
The actuating coil is set in the one side of the boiler towards the heating board, to generate heat described in sensing heating Plate.
14. water purifier according to claim 13, which is characterized in that
The boiler recess has the coil holding part housed for the actuating coil,
FERRITE CORE, in the one side of the actuating coil, is configured to module with radial arrangement with the boiler.
15. water purifier according to claim 14, which is characterized in that
The enclosure interior is provided with control assembly, includes the action of the water purifier of the actuating coil with control,
In the state of being equipped with the actuating coil, the boiler is fixedly installed in the control assembly.
CN201810031851.0A 2017-01-16 2018-01-12 Water purifier and hot water tank for water purifier Active CN108314098B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2017-0006932 2017-01-16
KR1020170006932A KR20180084196A (en) 2017-01-16 2017-01-16 Water purifier and hot water tank for water purifier

Publications (2)

Publication Number Publication Date
CN108314098A true CN108314098A (en) 2018-07-24
CN108314098B CN108314098B (en) 2021-06-29

Family

ID=62893683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810031851.0A Active CN108314098B (en) 2017-01-16 2018-01-12 Water purifier and hot water tank for water purifier

Country Status (2)

Country Link
KR (1) KR20180084196A (en)
CN (1) CN108314098B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102415500B1 (en) * 2020-03-02 2022-07-01 홍현진 Apparatus for Supplying Hot Water Instantly with Steam Emission Reduced

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102131736A (en) * 2008-07-23 2011-07-20 雀巢产品技术援助有限公司 Water treatment unit for beverage production machine
CN103270380A (en) * 2010-12-29 2013-08-28 豪威株式会社 Cold water tank and water treatment apparatus having the same
CN106132499A (en) * 2014-06-26 2016-11-16 Lg电子株式会社 Household electrical appliance

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102131736A (en) * 2008-07-23 2011-07-20 雀巢产品技术援助有限公司 Water treatment unit for beverage production machine
CN103270380A (en) * 2010-12-29 2013-08-28 豪威株式会社 Cold water tank and water treatment apparatus having the same
CN106132499A (en) * 2014-06-26 2016-11-16 Lg电子株式会社 Household electrical appliance

Also Published As

Publication number Publication date
KR20180084196A (en) 2018-07-25
CN108314098B (en) 2021-06-29

Similar Documents

Publication Publication Date Title
KR102423368B1 (en) Induction heating module and water purifier having the same
US20190315615A1 (en) Induction heater and water dispenser
KR20170125582A (en) Induction heating module and water purifier having the same
CN108314098A (en) Water purifier and water purifier boiler
CN104903658A (en) Heating apparatus for instantaneous water heating
EP2419558B1 (en) Steam generator
JP4374746B2 (en) Induction heating cooker
KR102115187B1 (en) Induction heating module and water purifier having the same
KR102065520B1 (en) Water purifier having enhanced fuse structure
JP6860907B2 (en) Water heater
KR20170022901A (en) Induction heating module
KR20180042197A (en) Induction heating module and water purifier having the same
CN208551254U (en) Heat-conducting plate, heat-generating disc and heating vessel
KR102043953B1 (en) Induction heating module and water purifier having the same
KR102112722B1 (en) Induction heating module and water purifier having the same
KR102043952B1 (en) Induction heating module and water purifier having the same
CN208952399U (en) Electromagnetic direct-heating water storage type electric water heater
JP2012034886A (en) Deodorization device
CN112030504A (en) Main unit and steam brush
CN219756696U (en) Evaporator
CN209731830U (en) Circuit board assemblies and household electrical appliance
KR20220157978A (en) High Intensity Atomization Units, Assemblies and Devices
CN213810565U (en) Steam generator, steam generating device and steam appliance
CN220242919U (en) Cooling liquid heater and new energy automobile
CN212335602U (en) Main unit and steam brush

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant