CN108312087A - GIL support insulator experiment assembly toolings - Google Patents

GIL support insulator experiment assembly toolings Download PDF

Info

Publication number
CN108312087A
CN108312087A CN201711483600.8A CN201711483600A CN108312087A CN 108312087 A CN108312087 A CN 108312087A CN 201711483600 A CN201711483600 A CN 201711483600A CN 108312087 A CN108312087 A CN 108312087A
Authority
CN
China
Prior art keywords
support
supporting leg
gil
insulator
assembly tooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711483600.8A
Other languages
Chinese (zh)
Other versions
CN108312087B (en
Inventor
朱朝发
王玉杰
郭明璞
陈春辉
高威昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Pinggao Group Co Ltd
Henan Pinggao Electric Co Ltd
Original Assignee
State Grid Corp of China SGCC
Pinggao Group Co Ltd
Henan Pinggao Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Pinggao Group Co Ltd, Henan Pinggao Electric Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711483600.8A priority Critical patent/CN108312087B/en
Publication of CN108312087A publication Critical patent/CN108312087A/en
Application granted granted Critical
Publication of CN108312087B publication Critical patent/CN108312087B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B11/00Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Testing Relating To Insulation (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The present invention relates to GIL support insulator experiment assembly toolings, include the tooling cylinder being packed into for support insulator to be tested, tooling cylinder is equipped with ground structure and the supporting leg connection structure for fixing the supporting leg inserts on support insulator and being conductively connected with supporting leg inserts;Assembly tooling further includes the switching electrode for be located in support tube inserts axial direction both ends on support insulator respectively, and switching electrode is equipped with conduction connecting structure compatible with the switching electrode on adjacent struts insulator.Switching electrode is installed on support insulator when experiment, support insulator is installed in tooling cylinder again, each support insulator is conductively connected by the connection structure being adapted on electrode of transferring, tooling cylinder is grounded, electrode of transferring connects the high-pressure side connection of experimental provision, can carry out industrial frequency withstand voltage experiment later.Compared with the prior art, simple in structure, primary assembly can test more than two support insulators, and test efficiency is higher.

Description

GIL support insulator experiment assembly toolings
Technical field
The present invention relates to a kind of GIL support insulators experiment assembly in gas-insulated metal closed power transmission line field Tooling.
Background technology
GXL5-1100kV fixes/slides three support insulators because supporting role is good, and materials are saved, in million volts of GXL It is the core insulating part of GIL to a large amount of application;In 1100kV power supply systems, main function is played very to conducting rod Good supporting role, however the reliability of its insulation plays a crucial role.Such as notification number is CN205384910, public affairs Announcement day is three support insulators of a kind of gas insulated bus disclosed in the Chinese utility model patent of 2016.07.13, including with In inserting the matrix connected and three insulation columns being equally spaced on matrix with conducting rod, branch is coaxially provided in matrix Cylinder inserts is supportted, the end of insulation column is equipped with supporting leg inserts;By replacing supporting leg inserts, the kind of three support insulators can be changed Class, i.e., fixed support insulator or slidingtype support insulator.It needs to carry out industrial frequency withstand voltage examination before the manufacture of three support insulators It tests and accurately measures its partial discharge quantity;It needs that experiment assembly tooling, existing experiment is used to use assembler when being tested Dress is single test, and testing efficiency is relatively low.
Invention content
The purpose of the present invention is to provide a kind of higher GIL support insulators experiment assembly toolings of testing efficiency.
To achieve the above object, the scheme 1 of GIL support insulator experiment assembly toolings of the invention is:GIL pillars are exhausted The experiment assembly tooling of edge, includes the tooling cylinder being packed into for support insulator to be tested, and tooling cylinder is equipped with ground connection Structure and supporting leg connection structure for fixing the supporting leg inserts on support insulator and being conductively connected with supporting leg inserts;Assembler Dress further includes the switching electrode for be located in support tube inserts axial direction both ends on support insulator respectively, and switching electrode is equipped with Conduction connecting structure compatible with the switching electrode on adjacent struts insulator.
Scheme 2 is, according to the assembly tooling described in scheme 1, the assembly tooling further includes for installation into the support Connect in cylinder inserts and axially the conductive pull rod of the two switching electrodes.
Scheme 3 is, according to the assembly tooling described in scheme 2, the both ends of the conduction pull rod are distinguished protruding correspondence and turned Receiving electrode, one end of conductive pull rod are equipped with the jack being inserted into for the corresponding end of conductive pull rod on adjacent pillars insulator.
Scheme 4 is, according to the assembly tooling described in scheme 3, is equipped in the periphery of the conducting rod on the switching electrode Stepped hole, stepped hole have the small diameter portion installed for nut and diameter large-diameter portion compatible with the outer diameter of the conducting rod.
Scheme 5 is, according to the assembly tooling described in scheme 4, assembly tooling further includes being arranged on the conductive pull rod The spring for the conductive pull rod connection on adjacent struts insulator in jack.
Scheme 6 is, according to the assembly tooling described in scheme 2, the switching electrode is equipped with is set to the support for detaining The groove of cylinder inserts axial end portion.
Scheme 7 is, according to 1 to 6 any one of them assembly tooling of scheme, assembly tooling further includes being filled for joint test The conducting rod of the high-pressure side set and the switching electrode.
Scheme 8 is that, according to 1 to 6 any one of them assembly tooling of scheme, the tooling cylinder is by two or more along its axis To being set up in parallel and the canister unit of releasable connection is formed.
Scheme 9 is, according to 1 to 6 any one of them assembly tooling of scheme, the tooling cylinder be equipped with it is more than two around The spaced location hole of its axis, assembly tooling further include for installation into the supporting leg link block in the location hole, supporting leg Link block has insertion section for being inserted into location hole and the outer wall being used for tooling cylinder in insertion portion end is arranged There is the centre bore for connection bolt installation, supporting leg link block and connection bolt to be formed described for the flange of block cooperation, insertion section Supporting leg connection structure.
Scheme 10 is, according to the assembly tooling described in scheme 9, the leg connection point also has exhausted for being inserted into pillar Insertion end in the cavity of correspondence supporting leg inserts on edge.
The beneficial effects of the invention are as follows:Switching electrode is installed on support insulator when experiment, then by support insulator It is installed in tooling cylinder, each support insulator is conductively connected by the connection structure being adapted on electrode of transferring, and tooling cylinder connects Ground, the high-pressure side connection of switching electrode connection experimental provision, can carry out industrial frequency withstand voltage experiment later.Compared with the prior art, it ties Structure is simple, and primary assembly can test more than two support insulators, and test efficiency is higher.
Description of the drawings
Fig. 1 is the structural schematic diagram of the embodiment one of the GIL support insulator experiment assembly toolings of the present invention;
Fig. 2 is enlarged drawing at A in Fig. 1;
Fig. 3 is enlarged drawing at B in Fig. 1;
Fig. 4 is enlarged drawing at C in Fig. 1.
In figure:Fixed three support insulators of 1-, three support insulator of 2- slidingtypes, 3- toolings cylinder, 4- canister units, The convex surfaces 5- switching electrode, the concave surfaces 6- switching electrode, 7- conductions pull rod, 8- springs, 9- fixed supporting legs inserts, 10- sliding supporting legs are embedding Part, 11- attachment screws, 12- support tubes inserts, 13- first legs link block, the second supporting legs of 14- link block, 15- nuts, 16- Conducting rod.
Specific implementation mode
Embodiments of the present invention are described further below in conjunction with the accompanying drawings.
The embodiment one of the GIL support insulator experiment assembly toolings of the present invention turns to match tooling as shown in Figures 1 to 4 It is installed for fixed three support insulator 1 and three support insulator 2 of slidingtype, fixed three support insulator 1 is equipped with solid Determine supporting leg inserts 9, sliding supporting leg inserts 10 is equipped in three support insulator 2 of slidingtype, is equipped with for even on two kinds of supporting leg inserts The threaded hole of the connection of screw 11 is connect, is additionally provided with cavity on sliding supporting leg inserts 10, threaded hole is arranged on the bottom wall of cavity.Assembly Tooling include for three support insulators installation tooling cylinder 3, the supporting leg link block for three support insulators to be fixed, For connecting the switching electrode of adjacent struts insulator, for the conductive pull rod 7 of axial tightening switching electrode and for connecting examination The conducting rod 16 of the high-pressure side of experiment device and outermost switching electrode.
Canister unit that tooling cylinder 3 is axially set up in parallel by four and releasable connection 4 is formed, the axis of canister unit 4 It is close to length with the axial length of single three support insulator, a canister unit 4 only supplies three support insulators to pacify Dress.The internal diameter of canister unit 4 is more than the outer diameter of three support insulators, is equipped at equal intervals around its axis on the side wall of canister unit 4 Three location holes are equipped with the supporting leg for the supporting leg inserts on three support insulators to be fixed and is conductively connected in location hole Link block, supporting leg link block include first leg link block 13 for fixed supporting leg inserts 9 to be fixed and for cunning The second supporting leg link block 14 that dynamic supporting leg inserts 10 is fixed.
First, second supporting leg link block 14 includes for being inserted into the insertion portion of location hole and being arranged at insertion portion end The flange for carrying out block with the outer wall of tooling cylinder 3 in portion, insertion portion have for 11 installation center hole of attachment screw;The Insertion portion length on two supporting leg link blocks 14 is longer, and the inner end of insertion portion is also set for being inserted on sliding supporting leg inserts 10 There is cavity.
Switching electrode includes being arranged in the convex surface of the left end of the support tube inserts 12 of each support insulator switching electrode 5 and setting It sets in the concave surface of left end switching electrode 6, convex, concave surface switching electrode all has and is set to the recessed of 12 end of support tube inserts for detaining Slot, convex, concave surface switching electrode are connected by 7 axial tightening of conductive pull rod being coaxially disposed in support tube inserts 12.Conductive pull rod 7 The both ends protruding convex, concave surface of difference transfer electrode, the left end of conductive pull rod 7 is for transferring 5 block of electrode with convex surface Big end, right end are connected by nut 15 and concave surface switching electrode 6.
The left end of conductive pull rod 7 is equipped with the jack being inserted into for the right end of conductive pull rod 7 on adjacent struts insulator, in jack Equipped with spring 8;Concave surface transfers and is equipped with stepped hole in the periphery of conductive pull rod 7 on electrode 6, stepped hole have small diameter portion and diameter with The large-diameter portion of the outer diameter adaptation of conducting rod 16, nut 15 are mounted in small diameter portion, and the separate large-diameter portion side of small diameter portion is equipped with interior Keep off edge.
When experiment, first convex, concave surface switching electrode is installed on three support insulators, wherein three post insulator of the leftmost side The both ends of son are respectively mounted concave surface switching electrode 6, suitable supporting leg link block are selected further according to the type of three support insulators, by three Support insulator is installed in canister unit 4, is connected by each canister unit 4, and ensureing that each conductive pull rod 7 is conductively connected can It leans on, a piece-root grafting ground wire is connected on the cylinder of the rightmost side.
Test tool is integrally placed on flat bogie, test tool is fixed with nylon cushion block, by conducting rod 16 are screwed on the concave surface switching electrode 6 of leftmost side support insulator, push flat bogie, make the height of conducting rod 16 and experimental rig Press bond later can carry out each three support insulator industrial frequency withstand voltage and test and accurately measure its partial discharge quantity.
Compared with the prior art, more than two support insulators are strung and is tested, switching electrode ensures each Support insulator is conductively connected, and test efficiency is higher.The dismounting of tooling cylinder is flexible, can be adjusted according to actual needs, adapts to Property is strong;It is different according to supporting leg inserts, two kinds of supporting leg link blocks are designed, does not have to selection tooling cylinder 3, only need to select suitably to prop up Leg link block, it is easy to assembly.
Embodiment two, embodiment two and embodiment one the difference is that:Transferring electrode can also with support tube inserts Using the connection structure of other forms;Such as holding screw connection or anchor ear connect;In addition convex-concave structure can also be arranged On switching electrode.
Embodiment three, embodiment three and embodiment one the difference is that:The length of canister unit can also be carried out Lengthening, which enables a canister unit to install two or more support insulator, is installed.

Claims (10)

1.GIL support insulator experiment assembly toolings, it is characterised in that:It include the work being packed into for support insulator to be tested Fitted tube body, tooling cylinder be equipped with ground structure and for fix the supporting leg inserts on support insulator and with supporting leg inserts it is conductive The supporting leg connection structure of connection;Assembly tooling further includes for be located in support tube inserts axial direction both ends on support insulator respectively Switching electrode, switching electrode be equipped with conduction connecting structure compatible with the switching electrode on adjacent struts insulator.
2. GIL support insulators experiment assembly tooling according to claim 1, it is characterised in that:The assembly tooling It further include the conductive pull rod for installation into the support tube inserts and axially two switching electrodes of connection.
3. GIL support insulators experiment assembly tooling according to claim 2, it is characterised in that:The conduction pull rod The protruding corresponding switching electrode of both ends difference, one end of conductive pull rod is equipped with pair for conductive pull rod on adjacent pillars insulator The jack of insertion should be held.
4. GIL support insulators experiment assembly tooling according to claim 3, it is characterised in that:The switching electrode On in the periphery of the conducting rod be equipped with stepped hole, stepped hole has small diameter portion install for nut and diameter and the conducting rod The compatible large-diameter portion of outer diameter.
5. GIL support insulators experiment assembly tooling according to claim 4, it is characterised in that:Assembly tooling is also wrapped Include the spring for the conductive pull rod connection on adjacent struts insulator in the jack being arranged on the conductive pull rod.
6. GIL support insulators experiment assembly tooling according to claim 2, it is characterised in that:The switching electrode It is equipped with for detaining the groove for being set to the support tube inserts axial end portion.
7. GIL support insulators experiment assembly tooling according to any one of claims 1 to 6, it is characterised in that:Assembly Tooling further includes the conducting rod of the high-pressure side and the switching electrode for joint test device.
8. GIL support insulators experiment assembly tooling according to any one of claims 1 to 6, it is characterised in that:It is described Tooling cylinder is set up in parallel along its axial direction by two or more and the canister unit of releasable connection is formed.
9. GIL support insulators experiment assembly tooling according to any one of claims 1 to 6, it is characterised in that:It is described Tooling cylinder is equipped with two or more around the spaced location hole of its axis, and assembly tooling further includes for installation into described fixed Supporting leg link block in the hole of position, supporting leg link block have the insertion section for being inserted into location hole with setting in insertion portion end The flange for coordinating with the outer wall block of tooling cylinder, there is the centre bore for connection bolt installation, supporting leg to connect for insertion section It connects block and connection bolt forms the supporting leg connection structure.
10. GIL support insulators experiment assembly tooling according to claim 9, it is characterised in that:The supporting leg connection Part also has the insertion end for being inserted into the cavity of the correspondence supporting leg inserts on support insulator.
CN201711483600.8A 2017-12-29 2017-12-29 Assembling tool for GIL post insulator test Active CN108312087B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711483600.8A CN108312087B (en) 2017-12-29 2017-12-29 Assembling tool for GIL post insulator test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711483600.8A CN108312087B (en) 2017-12-29 2017-12-29 Assembling tool for GIL post insulator test

Publications (2)

Publication Number Publication Date
CN108312087A true CN108312087A (en) 2018-07-24
CN108312087B CN108312087B (en) 2020-04-07

Family

ID=62893513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711483600.8A Active CN108312087B (en) 2017-12-29 2017-12-29 Assembling tool for GIL post insulator test

Country Status (1)

Country Link
CN (1) CN108312087B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111145969A (en) * 2018-11-05 2020-05-12 平高集团有限公司 GIL three-post insulator

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4562321A (en) * 1983-10-24 1985-12-31 Merlin Gerin Guiding assembly for a high-voltage circuit-breaker operating rod
JP2000253548A (en) * 1999-02-25 2000-09-14 Toshiba Corp Gas-insulated bus and its testing method
CN101446617A (en) * 2008-05-27 2009-06-03 中国电力科学研究院 Test apparatus of DC gas insulated metal enclosed transmission line (GIL)
CN202166716U (en) * 2011-06-10 2012-03-14 平高集团有限公司 Insulation test device used for superhigh voltage basin-type insulator
CN104034988A (en) * 2014-06-25 2014-09-10 中发输配电设备(平湖)有限公司 Three-phase insulator electrical performance experimental device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4562321A (en) * 1983-10-24 1985-12-31 Merlin Gerin Guiding assembly for a high-voltage circuit-breaker operating rod
JP2000253548A (en) * 1999-02-25 2000-09-14 Toshiba Corp Gas-insulated bus and its testing method
CN101446617A (en) * 2008-05-27 2009-06-03 中国电力科学研究院 Test apparatus of DC gas insulated metal enclosed transmission line (GIL)
CN202166716U (en) * 2011-06-10 2012-03-14 平高集团有限公司 Insulation test device used for superhigh voltage basin-type insulator
CN104034988A (en) * 2014-06-25 2014-09-10 中发输配电设备(平湖)有限公司 Three-phase insulator electrical performance experimental device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111145969A (en) * 2018-11-05 2020-05-12 平高集团有限公司 GIL three-post insulator

Also Published As

Publication number Publication date
CN108312087B (en) 2020-04-07

Similar Documents

Publication Publication Date Title
CN202770954U (en) Test model for simulating point discharge
CN202794439U (en) Test model simulating surface discharge
CN106840456A (en) Generating set oil groove dedicated temperature sensor
CN107634495B (en) End sealing structure of extra-high voltage direct current wall bushing
CN108312087A (en) GIL support insulator experiment assembly toolings
CN103245804B (en) Assembly type inflatable high-voltage equalizing ring
CN203589642U (en) High-voltage conductor dry-type insulating bush
CN116718811A (en) 66-220kV high-voltage cable dry-type rapid testing device
CN201600420U (en) Voltage transformer test fixture
CN205643612U (en) Detection frock that medium -tension bushing is withstand voltage
JP2014033562A (en) Cable connecting device
CN212693941U (en) Preventive test device for insulating tools
CN106054044A (en) Insulation test device for gas filled tank
CN201903555U (en) Auxiliary device for testing of transformer bushing tap
CN206532896U (en) A kind of bus tie and the switch cabinet combining structure using the connector
CN101865968B (en) Breaker vacuum pipe fracture alternative-current withstand voltage test platform
CN205374616U (en) Cable termination's electric capability test device of insulation support
CN207425494U (en) A kind of electric insulator being easily installed
CN201171143Y (en) Equipotential connector
CN219695346U (en) Flexible universal magnetic electrode
CN205353282U (en) Pillar insulator pressure resistance test installation for GIS
CN200976479Y (en) Two-purpose testing device for switch cabinet
CN112698126B (en) 500kV high-voltage outgoing line test device
CN204793983U (en) Insulating seal spare at GIS terminal
CN103730801B (en) Turning-connection system of electric power high voltage connecting wire

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant