CN108311858A - A kind of drilling rod processing technology - Google Patents

A kind of drilling rod processing technology Download PDF

Info

Publication number
CN108311858A
CN108311858A CN201710026709.2A CN201710026709A CN108311858A CN 108311858 A CN108311858 A CN 108311858A CN 201710026709 A CN201710026709 A CN 201710026709A CN 108311858 A CN108311858 A CN 108311858A
Authority
CN
China
Prior art keywords
steel pipe
carried out
spline
welding
drilling rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710026709.2A
Other languages
Chinese (zh)
Other versions
CN108311858B (en
Inventor
袁鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HONGXIANG ENGINEERING MACHINERY Co Ltd
Original Assignee
TIANJIN HONGXIANG ENGINEERING MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HONGXIANG ENGINEERING MACHINERY Co Ltd filed Critical TIANJIN HONGXIANG ENGINEERING MACHINERY Co Ltd
Priority to CN201710026709.2A priority Critical patent/CN108311858B/en
Publication of CN108311858A publication Critical patent/CN108311858A/en
Application granted granted Critical
Publication of CN108311858B publication Critical patent/CN108311858B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • B23P15/28Making specific metal objects by operations not covered by a single other subclass or a group in this subclass cutting tools
    • B23P15/32Making specific metal objects by operations not covered by a single other subclass or a group in this subclass cutting tools twist-drills

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Metal Extraction Processes (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention discloses a kind of drilling rod processing technologys, belong to drilling rod processing and manufacturing field, the advantages of having the straightness for improving drilling rod, improve drilling rod processing quality, its technical solution is as follows, includes the following steps:Step 1:It is piped blanking;Step 2:Process part;Step 3:Spline is processed;Step 4:One tunes up directly;Step 5:Inspection is taken over;Step 6:Second revisal straightening;Step 7:Point key;Step 8:Weld key;Step 9:Three tune up directly;Step 10:Assembling improves the straightness of steel pipe by the hot-working straightening of multi-step, reduces drill pipe buckling deformation, avoids generating the significantly straightening influence drilling rod quality of production, to improve the using effect of drilling rod.

Description

A kind of drilling rod processing technology
Technical field
The present invention relates to drilling rods to fabricate field, more particularly to a kind of drilling rod processing technology.
Background technology
The common component part of drill string has:Drill bit, drill collar, drilling rod, stabilizer, special joint and kelly bar;Its use exists On large-scale reaming drilling machine, such as disclosed a kind of crawler belt reaming drilling machine on patent network(Application number:201620469176.6), drilling rod It can effectively be stretched, to improve the turn hole depth of drilling machine, drilling rod is the steel pipe that tail portion carries a chain for binding criminals line, for connecting drilling machine Landscape apparatus and bore mill equipment or bottom outlet device positioned at drilling well bottom end, the purposes of drilling rod be drilling mud is transported to drill bit, and It improved with together with drill bit, reduce or rotate bottom outlet device, drilling rod allows for bearing huge interior external pressure, distortion, is bent and shakes Dynamic, in the exploitation and extractive process of oil gas, drilling rod can be used for multiple times.
Light pipe and raw steel tubing on its drilling rod are being made into drilling rod after multiple procedure of processing, due to the drilling rod of finished product Be socketed to form successively by more piece rod piece, inside by being welded on the shackle member of drilling rod side wall and the positive stop strip of strip, into Row connection is stretched and is connected and fixed convenient for drilling rod with guiding.
It is clamped in order to facilitate rod piece, and improves the entire length of drilling rod, need to weld more match on rod piece Part and spline, and grown during processing since drilling rod is handed over, cause to be easy to cause drilling rod generation effect width during installation The bending of degree, or the also easy state for influencing drilling rod when welding, it is interior when being used so as to cause drilling rod made of reality Portion generates larger mutual abrasion, and the power being pressurized when drilling rod drilling generates offset, and the service life of drilling rod is caused to decline.
Invention content
The object of the present invention is to provide a kind of drilling rod processing technologys, have the straightness for improving drilling rod, improve drilling rod and add The advantages of working medium amount.
The present invention above-mentioned technical purpose technical scheme is that:A kind of drilling rod processing technology, packet Include following steps:
Step 1:It is piped blanking:Pipe cutting prepares accessory, spline;
Step 2:Process part:Accessory is carried out to improve the heat treatment of intensity and the processing of shape;
Step 3:Spline is processed:Internal spline is modified;
Step 4:One tunes up directly:Straightness is carried out to the steel pipe after cutting to be straightened for the first time;
Step 5:Inspection is taken over:Opposite end steel pipe is detected to steel pipe take over;
Step 6:Second revisal straightening:Steel pipe after butt tube carries out second of alignment of straightness;
Step 7:Point key:Accessory, spline be spot welded into going on steel pipe and tentatively fixed;
Step 8:Weld key:Unified fixed welding is carried out to the accessory that tentatively welds, spline;
Step 9:Three tune up directly:Steel pipe after butt tube carries out straightness third time and is straightened;
Step 10:Assembling:Above step cycle repeatedly processes different size of rod piece, and by rod piece by diameter greatly to it is small successively Plugged and fixed.
By using above-mentioned technical proposal, with regard to carrying out first time alignment after steel pipe cutting, to make steel pipe before welding Preferable straightness can be kept, to prevent increasing the amount of bending during post-production, and steel pipe is taken over Afterwards, again second alignment can be carried out, so as to overcoming the bending generated when taking over, the straightness of steel pipe of guarantee, After having welded accessory, spline, then the alignment of third time is carried out, to effectively overcome the bending generated in welding, to The further straightness that ensure that steel pipe, due to being straightened after every step, to effectively avoid lever generation It significantly bends, preventing from disposably bending causes steel duct structure to generate damage, and steel strength is caused to decline, by more The hot-working straightening of step improves the straightness of steel pipe, reduces drill pipe buckling deformation, avoids generating significantly straightening influence drilling rod The quality of production, to improve the using effect of drilling rod.
Further, step 4:One tunes up directly:Steel pipe overall length is examined by the conveying Functional observation steel pipe bounce of turning rolls Straightness is used in combination Steel Ruler accurately to examine every meter of straightness of steel pipe;
Steel pipe is baked using oxy-acetylene neutral flame in alignment process, it is straight to carry out coarse adjustment.
By using above-mentioned technical proposal, steel pipe is placed on turning rolls and is conveyed, to by steel pipe whether The bending degree that bounce carrys out preliminary detection steel pipe is generated during conveying, when beating larger, using Steel Ruler carry out by The progress of rice measures again, to effectively raise the efficiency of detection, then by oxy-acetylene neutral flame carries out roasting steel pipe, to Prevent steel duct structure from generating variation, people are straight by straightener progress coarse adjustment, to improve the effect and efficiency of straightening.
Further, step 6:Second revisal straightening:Steel pipe overall length is examined by the conveying Functional observation steel pipe bounce of turning rolls Straightness is used in combination Steel Ruler accurately to examine every meter of straightness of steel pipe;
Steel pipe is baked using oxy-acetylene neutral flame in alignment process, progress accurate adjustment is straight, is cooled back to room temperature.
By using above-mentioned technical proposal, steel pipe is placed on turning rolls and is conveyed, to by steel pipe whether The bending degree that bounce carrys out preliminary detection steel pipe is generated during conveying, when beating larger, using Steel Ruler carry out by The progress of rice measures again, to effectively raise the efficiency of detection, then by oxy-acetylene neutral flame carries out roasting steel pipe, to Prevent steel duct structure from generating variation, people are straight by straightener progress accurate adjustment, improve the effect of straightening.
Further, step 6:Bake steel pipe using oxy-acetylene neutral flame during second revisal straightening, carry out accurate adjustment directly repeatedly into Row, straightness is up to standard after being cooled to room temperature.
Carried out by using above-mentioned technical proposal, when second revisal straightening iterative cycles heat, accurate adjustment section, cooling, often Secondary straightening 0-1 degree causes steel pipe to damage to prevent adjustment angle from spending big, and the state of straightening is more slow, greatly improves The effect of straightening.
Further, step 5:Inspection is taken over:When needing take over welding after length detection, backing welding is carried out first:Single side Weld double-faced forming;
It is filled cosmetic welding again.
By using above-mentioned technical proposal, backing welding effectively prevents angular deformation, then by filling cosmetic welding, makes welding position It sets more securely.
Further, step 7:Point key:It crosses first:Accessory and spline welding position are marked in steel tube surface;
It is installed again:Accessory respective score line position is tentatively fixed by way of spot welding;
Cloth key is carried out again:It is tentatively fixed what part spline was first spaced by way of spot welding by scribing position;
Benefit key is carried out again:Remaining spline is tentatively fixed by scribing position by way of spot welding;
It polishes again:Polishing removal of impurities is carried out with steel-pipe welding position to accessory and spline;
It is delivered for a check again:Preliminary inspection is carried out to installation site and weld strength.
It by using above-mentioned technical proposal, first crosses, effectively raises the accuracy of accessory and spline installation, The trouble for reducing later stage modification facilitates people to carry out manual welding, accessory and key is effectively improved by way of spot welding The fixed efficiency of item, convenient for followed by large-scale welding.
Further, step 8:Weld key:Manual welding is carried out first:It is welded by way of manually, it will be straight Angle, bending welding position carry out whole welding;
Mechanical welding is carried out again:Whole welding are carried out to the welding position of strip by bonding machine;
Cleaning polishing is carried out again:The waste material that butt welding is sewed on is cleared up, and carries out grinding process to weld seam;
It is delivered for a check again:Inspection again is carried out to installation site and weld strength.
By using above-mentioned technical proposal, due to can be effectively by way of human weld by right angle, bending after electric welding It is welded etc. more complicated position, then automatic welding is carried out to the position of strip by bonding machine, improve the efficiency of welding, To effectively ensure that whole rod piece can efficiently be rapidly performed by welding.
Further, step 10:Assembling:Grafting assembling is carried out first:By rod piece by diameter greatly to small plugged and fixed successively, Drill rod assemblies are mounted on drill rod end, and core bar is inserted into minimum rod piece;
It paints again:Sprayed protection paint is carried out to rod piece, drill rod assemblies, core bar surface;
It is delivered for a check again:Preliminary inspection is carried out to installation site and weld strength.
By using above-mentioned technical proposal, drilling rod is facilitated to be assembled, spray painting effectively protects rod piece appearance, has The reduction rod piece of effect gets rusty.
Further, the steel pipe cutting in the piping blanking, preparation accessory, preparation spline separately carry out.
By using above-mentioned technical proposal, separately carry out effectively raising processing efficiency.
Further, step 3:Spline is processed:It carries out cutting key first:Spline shape is cut off by cutting machine;
School key machining is carried out again:Spline qualification is examined, and carries out machining equipment and is modified;
It is heat-treated again:Reinforce spline intensity by Equipment for Heating Processing;
It is finished again:Spline qualification is examined, and carries out machining equipment and is corrected again.
By using above-mentioned technical proposal, the efficiency of processing spline is effectively raised, and keeps spline manufacture more smart Really, the using effect of spline is improved.
In conclusion the invention has the advantages that:
1, straightening precision and straightening effect are improved, and then improves the workmanship of drilling rod;
2, drilling rod straightness keeps good, by repeatedly finely tuning, improves drilling rod quality;
3, spline, accessory installation are accurate;
4, drilling life of drill pipe is long.
Description of the drawings
Fig. 1 is the process flow chart of the present invention.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.
A kind of drilling rod processing technology, it is characterized in that:Include the following steps:
Step 1:It is piped blanking:Pipe cutting prepares accessory, spline;
The preparation of the cutting of steel pipe, accessory and spline synchronous can carry out, and can also be carried out by different assembly lines to improve Processing efficiency is welded convenient for the later stage;
After steel pipe cutting, after accessory and spline taking-up, steel pipe, accessory, spline is transported to inside abrasive blasting rust-cleaning machine and sprayed Sand derusts, and is purged to store more long steel pipe, accessory, the rusty stain on spline surface and dust, ensures steel pipe, matches Part, spline surface cleannes, convenient for the later stage carry out welding processing, improve the effect of welding.
Step 2:Process part:Accessory is carried out to improve the heat treatment of intensity and the processing of shape;
Accessory improves the structural strength of accessory by way of heat treatment side, consequently facilitating the use in later stage, and accessory is carried out Polishing finishing improves the connection effect in later stage to ensure suitability when accessory installation.
Step 3:Spline is processed:Spline is processed:It carries out cutting key first:Spline shape is cut off by cutting machine;
School key machining is carried out again:Spline qualification is examined, and carries out machining equipment and is modified;
It is heat-treated again:Reinforce spline intensity by Equipment for Heating Processing;
It is finished again:Spline qualification is examined, and carries out machining equipment and is corrected again;
The manufacture of spline, spline of different shapes under being cut from steel, then preliminary machine is carried out by machining equipment and is added Work, then be heat-treated, to make spline that there is good structural strength, spline is being carried out finely by machining equipment The finishing of change, to enable spline to meet installation effect.
Step 4:One tunes up directly:Steel pipe overall length straightness is examined by the conveying Functional observation steel pipe bounce of turning rolls, and Every meter of straightness of steel pipe is accurately examined with Steel Ruler;
Steel pipe is baked using oxy-acetylene neutral flame in alignment process, it is straight to carry out coarse adjustment;
Steel pipe is placed on turning rolls and is conveyed, to whether generate bounce during conveying come preliminary by steel pipe The bending degree of detection steel pipe using Steel Ruler measure again by the progress of rice, to effective when beating larger The efficiency of detection is improved, then roasting steel pipe is carried out by oxy-acetylene neutral flame, to prevent steel duct structure from generating variation, people By straightener carry out coarse adjustment it is straight, to improve the effect and efficiency of straightening.
Step 5:Inspection is taken over:When needing take over welding after length detection, backing welding is carried out first:Single face welding and double face at Type;
It is filled cosmetic welding again;
Backing welding effectively prevents angular deformation, then by filling cosmetic welding, keeps welding position more secured.
Step 6:Second revisal straightening:Steel pipe overall length straightness is examined by the conveying Functional observation steel pipe bounce of turning rolls, and Every meter of straightness of steel pipe is accurately examined with Steel Ruler;
Steel pipe is baked using oxy-acetylene neutral flame in alignment process, progress accurate adjustment is straight, is cooled back to room temperature, is repeated, Zhi Daoleng But up to standard to straightness after room temperature;
Heat, accurate adjustment section, cooling down for iterative cycles, each straightening 0-1 degree, to prevent adjustment angle are carried out when second revisal straightening It spends big and steel pipe is caused to damage, and the state of straightening is more slow, substantially increases the effect of straightening.
Step 7:Point key:It crosses first:Accessory and spline welding position are marked in steel tube surface;
It is installed again:Accessory respective score line position is tentatively fixed by way of spot welding;
Cloth key is carried out again:It is tentatively fixed what part spline was first spaced by way of spot welding by scribing position;
Benefit key is carried out again:Remaining spline is tentatively fixed by scribing position by way of spot welding;
It polishes again:Polishing removal of impurities is carried out with steel-pipe welding position to accessory and spline;
It is delivered for a check again:Preliminary inspection is carried out to installation site and weld strength;
It is first crossed to steel pipe by marker pen, the accuracy of accessory and spline installation is effectively raised, after reducing The trouble of phase modification, facilitates people to carry out manual welding, the fixation of accessory and spline is effectively improved by way of spot welding Efficiency, convenient for followed by large-scale welding.
Step 8:Weld key:Manual welding is carried out first:Welded by way of manually, by right angle, bending Welding position carries out whole welding;
Mechanical welding is carried out again:Whole welding are carried out to the welding position of strip by bonding machine;
Cleaning polishing is carried out again:The waste material that butt welding is sewed on is cleared up, and carries out grinding process to weld seam;
It is delivered for a check again:Inspection again is carried out to installation site and weld strength;
Since effectively the more complicated position such as right angle, bending can be welded by way of human weld after electric welding, Automatic welding is carried out to the position of strip by bonding machine again, the efficiency of welding is improved, to effectively ensure whole rod piece energy Efficiently it is rapidly performed by welding.
Step 9:Three tune up directly:Steel pipe after butt tube carries out straightness third time and is straightened;
Three tune up the straightness that can directly detect drilling rod again, ensure that bull stick can keep good state, when drill pipe buckling, directly Straightening is carried out by straightener, improves straightening efficiency.
Step 10:Assembling:Grafting assembling is carried out first:By rod piece by diameter greatly to small plugged and fixed successively, by drilling rod group Part is mounted on drill rod end, and is inserted into core bar in minimum rod piece;
It paints again:Sprayed protection paint is carried out to rod piece, drill rod assemblies, core bar surface;
It is delivered for a check again:Preliminary inspection is carried out to installation site and weld strength.
Drilling rod is facilitated to be assembled, spray painting effectively protects rod piece appearance, and the effective rod piece that reduces gets rusty.
With regard to carrying out first time alignment after steel pipe cutting, to make steel pipe that can keep preferable straightness before welding, To prevent increasing the amount of bending during post-production, and after being taken over to steel pipe, second again can be carried out Alignment, so as to overcoming the bending generated when taking over, the straightness of steel pipe of guarantee, after having welded accessory, spline, then The alignment for carrying out third time, to effectively overcome the bending generated in welding, to further ensure that the straight of steel pipe Dimension significantly bends to effectively avoid lever generation, prevents disposable due to being straightened after every step Bending causes steel duct structure to generate damage, and steel strength is caused to decline, and by the hot-working straightening of multi-step, improves steel The straightness of pipe reduces drill pipe buckling deformation, avoids generating the significantly straightening influence drilling rod quality of production, to improve drilling rod Using effect.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this It is all protected by Patent Law in the right of invention.

Claims (10)

1. a kind of drilling rod processing technology, it is characterized in that:Include the following steps:
Step 1:It is piped blanking:Pipe cutting prepares accessory, spline;
Step 2:Process part:Accessory is carried out to improve the heat treatment of intensity and the processing of shape;
Step 3:Spline is processed:Internal spline is modified;
Step 4:One tunes up directly:Straightness is carried out to the steel pipe after cutting to be straightened for the first time;
Step 5:Inspection is taken over:Opposite end steel pipe is detected to steel pipe take over;
Step 6:Second revisal straightening:Steel pipe after butt tube carries out second of alignment of straightness;
Step 7:Point key:Accessory, spline be spot welded into going on steel pipe and tentatively fixed;
Step 8:Weld key:Unified fixed welding is carried out to the accessory that tentatively welds, spline;
Step 9:Three tune up directly:Steel pipe after butt tube carries out straightness third time and is straightened;
Step 10:Assembling:Above step cycle repeatedly processes different size of rod piece, and by rod piece by diameter greatly to it is small successively Plugged and fixed.
2. a kind of drilling rod processing technology according to claim 1, it is characterized in that:Step 4:One tunes up directly:Pass through turning rolls Conveying Functional observation steel pipe bounce examine steel pipe overall length straightness, be used in combination Steel Ruler accurately to examine every meter of straightness of steel pipe;
Steel pipe is baked using oxy-acetylene neutral flame in alignment process, it is straight to carry out coarse adjustment.
3. a kind of drilling rod processing technology according to claim 2, it is characterized in that:Step 6:Second revisal straightening:Pass through turning rolls Conveying Functional observation steel pipe bounce examine steel pipe overall length straightness, be used in combination Steel Ruler accurately to examine every meter of straightness of steel pipe;
Steel pipe is baked using oxy-acetylene neutral flame in alignment process, progress accurate adjustment is straight, is cooled back to room temperature.
4. a kind of drilling rod processing technology according to claim 3, it is characterized in that:Step 6:It is used during second revisal straightening Oxy-acetylene neutral flame bakes steel pipe, carries out accurate adjustment and is directly repeated, straightness is up to standard after being cooled to room temperature.
5. a kind of drilling rod processing technology according to claim 1, it is characterized in that:Step 5:Inspection is taken over:After length detection When needing take over welding, backing welding is carried out first:Single face welding and double face shaping;
It is filled cosmetic welding again.
6. a kind of drilling rod processing technology according to claim 1, it is characterized in that:Step 7:Point key:It crosses first: Accessory and spline welding position are marked in steel tube surface;
It is installed again:Accessory respective score line position is tentatively fixed by way of spot welding;
Cloth key is carried out again:It is tentatively fixed what part spline was first spaced by way of spot welding by scribing position;
Benefit key is carried out again:Remaining spline is tentatively fixed by scribing position by way of spot welding;
It polishes again:Polishing removal of impurities is carried out with steel-pipe welding position to accessory and spline;
It is delivered for a check again:Preliminary inspection is carried out to installation site and weld strength.
7. a kind of drilling rod processing technology according to claim 6, it is characterized in that:Step 8:Weld key:Manual welding is carried out first It connects:It is welded by way of manually, the welding position of right angle, bending is carried out to whole welding;
Mechanical welding is carried out again:Whole welding are carried out to the welding position of strip by bonding machine;
Cleaning polishing is carried out again:The waste material that butt welding is sewed on is cleared up, and carries out grinding process to weld seam;
It is delivered for a check again:Inspection again is carried out to installation site and weld strength.
8. a kind of drilling rod processing technology according to claim 4, it is characterized in that:Step 10:Assembling:Grafting group is carried out first Dress:Drill rod assemblies are mounted on drill rod end, and inserted in minimum rod piece by rod piece by diameter greatly to small plugged and fixed successively Enter core bar;
It paints again:Sprayed protection paint is carried out to rod piece, drill rod assemblies, core bar surface;
It is delivered for a check again:Preliminary inspection is carried out to installation site and weld strength.
9. a kind of drilling rod processing technology according to claim 1, it is characterized in that:In the piping blanking steel pipe cutting, Prepare accessory, preparation spline separately carries out.
10. a kind of drilling rod processing technology according to claim 1, it is characterized in that:Step 3:Spline is processed:It carries out first Cut key:Spline shape is cut off by cutting machine;
School key machining is carried out again:Spline qualification is examined, and carries out machining equipment and is modified;
It is heat-treated again:Reinforce spline intensity by Equipment for Heating Processing;
It is finished again:Spline qualification is examined, and carries out machining equipment and is corrected again.
CN201710026709.2A 2017-01-14 2017-01-14 Drill rod machining process Expired - Fee Related CN108311858B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710026709.2A CN108311858B (en) 2017-01-14 2017-01-14 Drill rod machining process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710026709.2A CN108311858B (en) 2017-01-14 2017-01-14 Drill rod machining process

Publications (2)

Publication Number Publication Date
CN108311858A true CN108311858A (en) 2018-07-24
CN108311858B CN108311858B (en) 2020-09-01

Family

ID=62890610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710026709.2A Expired - Fee Related CN108311858B (en) 2017-01-14 2017-01-14 Drill rod machining process

Country Status (1)

Country Link
CN (1) CN108311858B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108857285A (en) * 2018-07-26 2018-11-23 天津鸿翔工程机械有限公司 A kind of processing technology of machine locking-type drilling rod
CN108994536A (en) * 2018-07-26 2018-12-14 天津鸿翔工程机械有限公司 A kind of processing method of machine locking-type drilling rod

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101456124A (en) * 2008-11-25 2009-06-17 地质矿产部无锡钻探工具厂 Method of increasing cord drill-rod screw processing quality
JP4774489B2 (en) * 2007-10-23 2011-09-14 ペトロマテリアル株式会社 Rotating friction welding method and rotating friction welding apparatus for tubular body
CN102294571A (en) * 2010-06-25 2011-12-28 上海月月潮钢管制造有限公司 Method for manufacturing high-temperature and high-pressure steel pipe
CN102500966A (en) * 2011-11-04 2012-06-20 上海中联重科桩工机械有限公司 Method and device for welding drill rod pipe body and external key for rotary drilling
CN103707008A (en) * 2013-12-11 2014-04-09 青岛星晨机床有限公司 Processing technology of oil cylinder barrel
CN104741741A (en) * 2015-03-27 2015-07-01 西安石油大学 Automatic tube butt joint all-position TIG welding technology for coiled tubing

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4774489B2 (en) * 2007-10-23 2011-09-14 ペトロマテリアル株式会社 Rotating friction welding method and rotating friction welding apparatus for tubular body
CN101456124A (en) * 2008-11-25 2009-06-17 地质矿产部无锡钻探工具厂 Method of increasing cord drill-rod screw processing quality
CN102294571A (en) * 2010-06-25 2011-12-28 上海月月潮钢管制造有限公司 Method for manufacturing high-temperature and high-pressure steel pipe
CN102500966A (en) * 2011-11-04 2012-06-20 上海中联重科桩工机械有限公司 Method and device for welding drill rod pipe body and external key for rotary drilling
CN103707008A (en) * 2013-12-11 2014-04-09 青岛星晨机床有限公司 Processing technology of oil cylinder barrel
CN104741741A (en) * 2015-03-27 2015-07-01 西安石油大学 Automatic tube butt joint all-position TIG welding technology for coiled tubing

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《钢结构造价员一本通》编委会: "《钢结构造价员一本通》", 31 January 2009, 中国建材工业出版社 *
冯兴奎: "《过程设备焊接》", 31 January 2003, 化学工业出版社 *
翁炜,黄玉文,胡继良,史新慧: "旋挖钻机钻杆失效形式分析及制造工艺", 《探矿工程(岩土钻掘工程)》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108857285A (en) * 2018-07-26 2018-11-23 天津鸿翔工程机械有限公司 A kind of processing technology of machine locking-type drilling rod
CN108994536A (en) * 2018-07-26 2018-12-14 天津鸿翔工程机械有限公司 A kind of processing method of machine locking-type drilling rod
CN108994536B (en) * 2018-07-26 2019-09-20 天津鸿翔工程机械有限公司 A kind of processing method of machine locking-type drilling rod

Also Published As

Publication number Publication date
CN108311858B (en) 2020-09-01

Similar Documents

Publication Publication Date Title
CN102172814B (en) Method for manufacturing longitudinal submerged arc welded pipe
CN104816076B (en) A kind of pipe pipe butt weld technologies for steel method of continuous pipe
CN108311851A (en) A kind of drilling rod processing technology
CN108311858A (en) A kind of drilling rod processing technology
CN106346118A (en) Whole-position welding method of 16Cr stainless steel continuous pipe
CN101403450A (en) Method of manufacturing lined tubing
CN201685076U (en) Performance recovery system for waste oil well pipe
CN108262435A (en) A kind of titanium alloy bar stock pulls out forging method
CN103084427B (en) Manufacturing method of hardenability steel tube
ITMI932587A1 (en) ULTRA HIGH PRESSURE FAN JET NOZZLE.
JP4816015B2 (en) High-efficiency manufacturing method for ERW pipes with good weld characteristics
CN202114470U (en) High-temperature-resistant alloy furnace tube for petrochemical industry and production line of tube row
CN105234642B (en) A kind of processing method of oval mandoor doorframe
CN104416259A (en) Welding process of water feed pump of nuclear power plant conventional island
CN109226934A (en) The overlaying method of roll
CN201728453U (en) On-site butt-welding device of skid-mounted type coiled tubing
CN209110402U (en) Electric heating welding tooling
JP4682780B2 (en) ERW pipe manufacturing method with good weld characteristics
CN112975280B (en) Method for replacing three-way pipe of header of thermal power plant
CN210701861U (en) Lightning protection grounding ohm bending machining tool
CN111055035A (en) Automatic welding process for preventing deformation of steel structure
CN113172311B (en) Welding method and welding joint structure for CT80 steel-grade coiled tubing butt welding
CN107096812B (en) Steel pipe of arch bridge cold-bending method
CN216882217U (en) Plasma welding equipment for stainless steel pipe
CN215546612U (en) Martensite air valve steel bar polishing and shaping integrated equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200901

Termination date: 20220114

CF01 Termination of patent right due to non-payment of annual fee