CN108303199B - 一种用于钢管桩的新型钢筋应力计及其安装方法 - Google Patents
一种用于钢管桩的新型钢筋应力计及其安装方法 Download PDFInfo
- Publication number
- CN108303199B CN108303199B CN201810295371.5A CN201810295371A CN108303199B CN 108303199 B CN108303199 B CN 108303199B CN 201810295371 A CN201810295371 A CN 201810295371A CN 108303199 B CN108303199 B CN 108303199B
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- pipe pile
- steel pipe
- stress meter
- welding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 56
- 239000010959 steel Substances 0.000 title claims abstract description 56
- 238000000034 method Methods 0.000 title claims abstract description 14
- 238000009434 installation Methods 0.000 title claims abstract description 9
- 238000003466 welding Methods 0.000 claims description 27
- 238000005219 brazing Methods 0.000 claims description 14
- 239000010425 asbestos Substances 0.000 claims description 10
- 229910052895 riebeckite Inorganic materials 0.000 claims description 10
- 238000012360 testing method Methods 0.000 claims description 10
- 239000000945 filler Substances 0.000 claims description 6
- 239000002184 metal Substances 0.000 claims description 6
- 230000004907 flux Effects 0.000 claims description 5
- 238000005476 soldering Methods 0.000 claims description 5
- 230000000694 effects Effects 0.000 claims description 4
- 238000009736 wetting Methods 0.000 claims description 3
- 229910000679 solder Inorganic materials 0.000 claims description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 6
- 238000009413 insulation Methods 0.000 description 6
- 230000007547 defect Effects 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 235000011837 pasties Nutrition 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000035945 sensitivity Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01L—MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
- G01L1/00—Measuring force or stress, in general
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K1/00—Soldering, e.g. brazing, or unsoldering
- B23K1/0008—Soldering, e.g. brazing, or unsoldering specially adapted for particular articles or work
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明涉及建筑工程的技术领域,一种用于钢管桩的新型钢筋应力计及其安装方法,所述的应力计内设有应力计测试元件,包括与钢管桩钎焊连接的连接杆,连接杆上设有应力计,连接杆上设有两石棉隔热层,两石棉隔热层分别位于应力计的两侧,所述的连接杆两端均设有焊接刻度,连接杆两端至最近的焊接刻度距离相同。本发明结构简单,实用性强。
Description
技术领域
本发明涉及建筑工程技术领域,具体为一种用于钢管桩的新型钢筋应力计及其安装方法。
背景技术
钢筋应力计可长期埋设在钢筋混凝土等结构内部,因此,在现场试验中,可将钢筋应力计焊接在钢筋或钢管桩上,以此来测定钢筋或钢管桩的受力情况,当钢筋受力时,变形随之而来,从而带动焊接在钢管桩上的钢筋应力计也发生变形,改变钢筋应力计的频率,再通过测读仪器测出其频率,并结合公式换算成相应的应力。
但是,在现场试验中钢筋应力计通过手工电弧焊与钢筋或钢管桩焊接在一起。一般来说,手工电弧焊工均为民工,因此,不可避免的造成手弧焊接工艺质量较差,如两端焊缝过长或过短,导致钢筋应力计不能与钢筋或者钢管桩协同变形,从而影响了测量精度。
再加上焊接时,将产生大量的热,从而可能损伤或改变应力计的测试元件,例如,在实际工作工程中,热量能将应力计损毁或降低灵敏度,进而导致测试效果降低,甚至烧坏元件,导致该测试原件形同虚设。
发明内容
针对现有技术存在的不足,本发明的目的在于提供一种防损毁、用于钢管桩的新型钢筋应力计。
为实现上述目的,本发明提供了如下技术方案:一种用于钢管桩的新型钢筋应力计及其安装方法,应力计内设有应力计测试元件,包括与钢管桩钎焊连接的连接杆,连接杆内设有应力计,连接杆上设有两石棉隔热层,两石棉隔热层分别位于应力计的两侧。
进一步,所述的连接杆两端均设有焊接刻度,连接杆两端头处至最近的焊接刻度的距离相同。
本发明的目的在于还提供一种焊接后受力均匀的且用于钢管桩的新型钢筋应力计及其安装方法,
具体步骤如下:
a.将应力计安装在连接杆的中间内部;
b. 将两石棉隔热层安装在连接杆上,且两石棉隔热层分别位于应力计测试元件的两侧;
c.通过钎剂来清洗钢管桩和连接杆的表面氧化物,改善湿润作用;
d.在连接杆的两端设有两焊接刻度;
e.在拟焊接的位置,将连接杆与钢管桩以搭接的方式进行装配;
f.将膏状钎料填充至连接杆与钢管桩的缝隙中,填充的位置为连接杆两端头至最近的焊接刻度处;
g.利用钎焊机对有填充钎料的位置进行焊接。
对比现有技术的不足,本发明提供的技术方案所带来的有益效果:1. 利用两侧的石棉隔热层来阻隔焊接时产生的热量,有效的防止传递至应力计,而导致应力计损毁的现象发生。
2. 连接杆与钢管桩钎焊焊接,在连接杆的两端设置焊接刻度,使得连接杆两端至最近的焊接刻度的距离相同,即L1段与L2段相同,在L1段、L2段以及相应的钢管桩处利用钎剂来清洗钢表面氧化物,将膏状钎料填充至L1段、L2段与钢管桩的缝隙中,进行钎焊,那么焊接后的焊缝相同,受力均匀,进而造成钢筋应力计能与钢筋或者钢管桩协同变形,从而保证了测量精度。
附图说明
图1为本发明的结构示意图。
具体实施方式
参照图1对本发明做进一步说明。
如图1所示:一种用于钢管桩的新型钢筋应力计及其安装方法,应力计3内设有应力计测试元件31,包括与钢管桩1钎焊连接的连接杆2,连接杆2内设有应力计3,连接杆2上设有两石棉隔热层4,两石棉隔热层4分别位于应力计3的两侧。
利用两侧的石棉隔热层4来阻隔焊接时产生的热量,有效的防止传递至应力计3,而导致应力计3损毁的现象发生。
进一步,所述的连接杆2两端均设有焊接刻度5,连接杆2两端头处至最近的焊接刻度5的距离相同。
连接杆2与钢管桩1钎焊焊接,在连接杆2的两端设置焊接刻度5,使得连接杆2两端头处至最近的焊接刻度5的距离相同,即L1段与L2段相同,在L1段、L2段以及相应的钢管桩1处利用钎剂来清洗钢表面氧化物,将膏状钎料6填充至L1段、L2段与钢管桩1的缝隙中,进行钎焊,那么焊接后的焊缝相同,受力均匀,进而造成钢筋应力计3能与钢筋或者钢管桩1协同变形,从而保证了测量精度。
本发明的目的在于还提供一种焊接后受力均匀的且用于钢管桩1的新型钢筋应力计3及其安装方法,
具体步骤如下:
a.将应力计3安装在连接杆2的中间内部;
b. 将两石棉隔热层安装在连接杆2上,且两石棉隔热层4分别位于应力计测试元件31的两侧;
c.通过钎剂来清洗钢管桩1和连接杆2的表面氧化物,改善湿润作用,使得焊接过程中,焊接均匀,进而使得应力计3能与钢管桩1协同变形;
d.在连接杆2的两端设有两焊接刻度5;
e.在拟焊接的位置,利用夹具将连接杆2与钢管桩1以搭接的方式进行装配;
f.将膏状钎料6填充至连接杆2与钢管桩1的缝隙中,填充的位置为连接杆2两端头至最近的焊接刻度5处(即L1段和L2段);
g.利用钎焊机对有填充钎料6的位置进行焊接。
因焊接工艺的改变,降低热量,起到保护应力计测试原件。
以上所述仅为本发明的较佳实施例,并不用以限制本发明,本领域的技术人员在本发明技术方案范围内进行通常的变化和替换都应包含在本发明的保护范围内。
Claims (1)
1.一种用于钢管桩的新型钢筋应力计的安装方法,其特征在于,具体步骤如下:
a.将应力计安装在连接杆的中间内部;
b.将两石棉隔热层安装在连接杆上,且两石棉隔热层分别位于应力计测试元件的两侧;
c.通过钎剂来清洗钢管桩和连接杆的表面氧化物,改善湿润作用;
d.在连接杆的两端设有两焊接刻度;
e.在拟焊接的位置,将连接杆与钢管桩以搭接的方式进行装配;
f.将膏状钎料填充至连接杆与钢管桩的缝隙中,填充的位置为连接杆两端头至最近的焊接刻度处;
g.利用钎焊机对有填充钎料的位置进行焊接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810295371.5A CN108303199B (zh) | 2018-04-04 | 2018-04-04 | 一种用于钢管桩的新型钢筋应力计及其安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810295371.5A CN108303199B (zh) | 2018-04-04 | 2018-04-04 | 一种用于钢管桩的新型钢筋应力计及其安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108303199A CN108303199A (zh) | 2018-07-20 |
CN108303199B true CN108303199B (zh) | 2023-12-15 |
Family
ID=62848318
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810295371.5A Active CN108303199B (zh) | 2018-04-04 | 2018-04-04 | 一种用于钢管桩的新型钢筋应力计及其安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108303199B (zh) |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1540773A (en) * | 1976-07-14 | 1979-02-14 | Specht T | Heat-protective device |
JPH01275807A (ja) * | 1988-04-25 | 1989-11-06 | Nippon Steel Corp | 鋼管杭の継杭方法 |
CN2384559Y (zh) * | 1999-05-26 | 2000-06-28 | 孙继忠 | 一种新型单柄不锈钢锅的锅柄 |
CN201130069Y (zh) * | 2007-12-24 | 2008-10-08 | 中国水电顾问集团中南勘测设计研究院 | 摩阻力计 |
CN201221988Y (zh) * | 2008-06-04 | 2009-04-15 | 北京城建建设工程有限公司 | 用于试验桩施工的应力计 |
CN102114561A (zh) * | 2009-12-31 | 2011-07-06 | 南京理工大学 | 铝-钢螺柱预镀铜感应熔钎焊方法 |
CN202064984U (zh) * | 2011-02-10 | 2011-12-07 | 中国矿业大学 | 一种锚杆钢筋应力计连接头 |
CN202793654U (zh) * | 2012-09-14 | 2013-03-13 | 中国建筑第八工程局有限公司 | 钢筋应力计 |
CN103541339A (zh) * | 2012-07-17 | 2014-01-29 | 兰州理工大学 | 非饱和原状黄土边坡土压力拉杆式测试装置与测试方法 |
CN105674942A (zh) * | 2016-01-04 | 2016-06-15 | 西南交通大学 | 混凝土应变计组件及安装方法 |
CN206581253U (zh) * | 2017-03-09 | 2017-10-24 | 湖南省衡洲建设有限公司 | 一种钢筋混凝土管桩 |
CN107643138A (zh) * | 2017-09-30 | 2018-01-30 | 青岛理工大学 | 一种微型钢管桩桩身应力测试装置 |
CN208333716U (zh) * | 2018-04-04 | 2019-01-04 | 单华峰 | 一种用于钢管桩的新型钢筋应力计 |
-
2018
- 2018-04-04 CN CN201810295371.5A patent/CN108303199B/zh active Active
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1540773A (en) * | 1976-07-14 | 1979-02-14 | Specht T | Heat-protective device |
JPH01275807A (ja) * | 1988-04-25 | 1989-11-06 | Nippon Steel Corp | 鋼管杭の継杭方法 |
CN2384559Y (zh) * | 1999-05-26 | 2000-06-28 | 孙继忠 | 一种新型单柄不锈钢锅的锅柄 |
CN201130069Y (zh) * | 2007-12-24 | 2008-10-08 | 中国水电顾问集团中南勘测设计研究院 | 摩阻力计 |
CN201221988Y (zh) * | 2008-06-04 | 2009-04-15 | 北京城建建设工程有限公司 | 用于试验桩施工的应力计 |
CN102114561A (zh) * | 2009-12-31 | 2011-07-06 | 南京理工大学 | 铝-钢螺柱预镀铜感应熔钎焊方法 |
CN202064984U (zh) * | 2011-02-10 | 2011-12-07 | 中国矿业大学 | 一种锚杆钢筋应力计连接头 |
CN103541339A (zh) * | 2012-07-17 | 2014-01-29 | 兰州理工大学 | 非饱和原状黄土边坡土压力拉杆式测试装置与测试方法 |
CN202793654U (zh) * | 2012-09-14 | 2013-03-13 | 中国建筑第八工程局有限公司 | 钢筋应力计 |
CN105674942A (zh) * | 2016-01-04 | 2016-06-15 | 西南交通大学 | 混凝土应变计组件及安装方法 |
CN206581253U (zh) * | 2017-03-09 | 2017-10-24 | 湖南省衡洲建设有限公司 | 一种钢筋混凝土管桩 |
CN107643138A (zh) * | 2017-09-30 | 2018-01-30 | 青岛理工大学 | 一种微型钢管桩桩身应力测试装置 |
CN208333716U (zh) * | 2018-04-04 | 2019-01-04 | 单华峰 | 一种用于钢管桩的新型钢筋应力计 |
Also Published As
Publication number | Publication date |
---|---|
CN108303199A (zh) | 2018-07-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109604767A (zh) | 用于厚板窄间隙gma机器人的智能焊接控制系统及方法 | |
JP5442456B2 (ja) | 軸方向の大きい塑性歪みに適応する炭素鋼構造およびパイプライン中の耐食合金溶接部 | |
Zeinoddini et al. | Repair welding influence on offshore pipelines residual stress fields: An experimental study | |
CN102310291A (zh) | 一种异种钢冷裂纹敏感性试验方法 | |
CN105842034A (zh) | 一种裂纹缺陷试件的制作方法 | |
CN108303199B (zh) | 一种用于钢管桩的新型钢筋应力计及其安装方法 | |
CN202041155U (zh) | 一种焊缝检验尺 | |
CN103808796B (zh) | 一种检测采用中间层连接方式焊接的焊接质量的方法 | |
CN102506804B (zh) | 试验管中部2d长度横截面的转角测量装置及其测量方法 | |
CN102147386A (zh) | 金属焊缝的无损检测方法 | |
CN106624417A (zh) | 一种u肋内侧焊缝外观质量检测方法 | |
CN107570868A (zh) | 一种激光焊接位置误差补偿方法及激光焊接设备 | |
CN103196715B (zh) | 一种夏比冲击试样的加工方法 | |
CN208333716U (zh) | 一种用于钢管桩的新型钢筋应力计 | |
Hatifi et al. | Modal analysis of dissimilar plate metal joining with different thicknesses using MIG welding | |
JP7403949B2 (ja) | 溶接装置、溶接方法、溶接プログラム及びタンクの溶接工法 | |
CN108103501A (zh) | 一种适用于水电站机组转轮室表面的激光熔覆和检测设备及操作方法 | |
Lee et al. | Verification of validity and generality of dominant factors in high accuracy prediction of welding distortion | |
CN113714606B (zh) | 一种激光焊焊接接头缺陷tig熔修工艺方法 | |
JPH0830676B2 (ja) | 高温応力下における金属溶接部材の余寿命評価方法 | |
CN207862440U (zh) | 一种适用于水电站机组转轮室表面的激光熔覆和检测设备 | |
CN107514963A (zh) | 一种混凝土碳化深度测定仪 | |
JP2014505885A (ja) | 金属減量プローブおよび金属減量プローブの作製方法 | |
CN110076501A (zh) | 一种厚板多层多道焊接变形角度的获取方法及系统 | |
CN204524691U (zh) | 一种管道焊口卡具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240204 Address after: No. 1139, municipal Avenue, Taizhou, Zhejiang Province, Zhejiang Patentee after: TAIZHOU University Country or region after: China Address before: No. 2-78, Qinyong Village, Dongcheng Town, Linhai City, Taizhou City, Zhejiang Province, 317005 Patentee before: Shan Huafeng Country or region before: China Patentee before: TAIZHOU University |
|
TR01 | Transfer of patent right |