CN108286792A CN201710014059.XA CN201710014059A CN108286792A CN 108286792 A CN108286792 A CN 108286792A CN 201710014059 A CN201710014059 A CN 201710014059A CN 108286792 A CN108286792 A CN 108286792A
Authority
CN
China
Prior art keywords
period
electric heater
water
water consumption
day
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710014059.XA
Other languages
Chinese (zh)
Other versions
CN108286792B (en
Inventor
李伟泺
曲绍鹤
申勇兵
邹树平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Midea Smart Kitchen Appliance Manufacturing Co Ltd
Original Assignee
Midea Group Co Ltd
Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201710014059.XA priority Critical patent/CN108286792B/en
Publication of CN108286792A publication Critical patent/CN108286792A/en
Application granted granted Critical
Publication of CN108286792B publication Critical patent/CN108286792B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/18Water-storage heaters
    • F24H1/20Water-storage heaters with immersed heating elements, e.g. electric elements or furnace tubes
    • F24H1/201Water-storage heaters with immersed heating elements, e.g. electric elements or furnace tubes using electric energy supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2014Arrangement or mounting of control or safety devices for water heaters using electrical energy supply
    • F24H9/2021Storage heaters

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The present invention discloses a kind of electric heater and its control method, wherein water heater control method includes the following steps:Receive the control instruction of user;The sleep period in the period in every day is set according to control instruction;Electric heater is adjusted to dormant state when electric heater is in sleep period.Technical solution of the present invention, user makes electric heater forced dormancy in sleep period by way of preengaging suspend mode, to reduce the energy consumption of electric heater, meanwhile, user can also eliminate prompt tone of electric heater etc. and be interfered caused by user in this way.

Description

Electric heater and its control method
Technical field
The present invention relates to technical field of water heaters, more particularly to a kind of electric heater and its control method.
Background technology
With people's improvement of living standard, people are also higher and higher to the power conservation requirement of water heater.The control of existing water heater System usually only includes booting circulating-heating and shutdown both of which, when circulating-heating pattern, often due to being carried out repeatedly to water It heats and wastes electric energy so that the energy consumption of electric heater increases, and cannot meet the needs of user uses water heater energy-saving.
Invention content
The main object of the present invention is to provide a kind of water heater, it is desirable to provide one more energy saving and meet the energy saving need of user The electric heater asked.
To achieve the above object, the control method of electric heater proposed by the present invention, includes the following steps:
Receive the control instruction of user;
The sleep period in the period in every day is set according to control instruction;
Electric heater is adjusted to dormant state when electric heater is in sleep period.
Preferably, it is also wrapped after the step of setting the sleep period in the period in every day according to control instruction described It includes:
Record the water consumption for each using the water period in simultaneously measurement period every day;
When water consumption is less than or equal to the first default water consumption, suspend mode is added to the water period by the water consumption is corresponding Period.
Preferably, the control method of the electric heater further includes:
Record the water consumption for each using the water period in simultaneously measurement period every day;
When the water consumption of water period is more than the first default water consumption, the water consumption is corresponding to be removed out not with the water period It sleeps the period.
Preferably, the control method of the electric heater further includes:
Record and count the total water consumption of first three day;
When total water consumption is less than or equal to the second default water consumption, it sets whole day to sleep period.
Preferably, described the step of adjusting electric heater to dormant state when electric heater is in sleep period it After further include:
When the water consumption on the same day, which reaches third, presets water consumption, from the time of reaching third predetermined amount, by electric hot water The water temperature heating of device is to the first preset temperature.
The present invention further provides a kind of electric heaters, including:
Receiving module, the control instruction for receiving user;
Adjustment module, for setting the sleep period in the period in every day according to control instruction;
Sleep block, for adjusting electric heater to dormant state when electric heater is in sleep period.
Preferably, the electric heater further includes:
First statistical module, the water consumption for recording and every day each uses the water period in measurement period;
First timing module is used for when water consumption is less than or equal to the first default water consumption, and the water consumption is corresponding It is added to sleep period with the water period.
Preferably, the electric heater further includes:
Second statistical module, the water consumption for recording and every day each uses the water period in measurement period;
Second timing module, when the water consumption of water period is more than the first default water consumption, the corresponding use of the water consumption The water period removes out sleep period.
Preferably, the electric heater further includes:
Third statistical module, the total water consumption for recording and counting first three day;
Third timing module, for when total water consumption is less than or equal to the second default water consumption, setting whole day to Sleep period.
Preferably, the electric heater further includes:
Heating module, for when the water consumption on the same day reach third preset water consumption when, reach certainly third predetermined amount when It carves, by the water temperature heating of electric heater to the first preset temperature.
In the present invention, in the present embodiment, electric heater receives the control instruction of user first;It is set further according to control instruction The quantity of sleep period in period in every day, sleep period can be multiple;It will when electric heater is in sleep period Electric heater is adjusted to dormant state;In the technical solution of above-described embodiment, user makes electric hot water by way of preengaging suspend mode Device forced dormancy in sleep period, to reduce the energy consumption of electric heater, meanwhile, user can also eliminate electricity in this way Prompt tone of water heater etc. is interfered caused by user.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with The structure shown according to these attached drawings obtains other attached drawings.
Fig. 1 is the structural schematic diagram of an embodiment of electric heater of the present invention;
Fig. 2 is the flow diagram of one embodiment of control method of electric heater of the present invention;
Fig. 3 is the flow diagram of another embodiment of control method of electric heater of the present invention;
Fig. 4 is the high-level schematic functional block diagram of an embodiment of electric heater of the present invention;
Fig. 5 is the high-level schematic functional block diagram of another embodiment of electric heater of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiment is only a part of the embodiment of the present invention, instead of all the embodiments.Base Embodiment in the present invention, those of ordinary skill in the art obtained without creative efforts it is all its His embodiment, shall fall within the protection scope of the present invention.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute is only used in the embodiment of the present invention In explaining relative position relation, motion conditions etc. under a certain particular pose (as shown in the picture) between each component, if should When particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In addition, the description for being related to " first ", " second " etc. in the present invention is used for description purposes only, and should not be understood as referring to Show or imply its relative importance or implicitly indicates the quantity of indicated technical characteristic." first ", " are defined as a result, Two " feature can explicitly or implicitly include at least one of the features.In addition, the technical solution between each embodiment can To be combined with each other, but must can be implemented as basis with those of ordinary skill in the art, when the combination of technical solution occurs Conflicting or cannot achieve when, will be understood that the combination of this technical solution is not present, also not the present invention claims protection model Within enclosing.
Referring to figs. 1 to Fig. 5, for the water heater that the present invention controls by taking electric heater as an example, which includes for storing water Liner 200, water supply heating heating device 300, be arranged outside liner 200, for protect liner 200 and heat preservation water Shell 100, the temperature detector for detecting water temperature and the display panel 500 for showing water temperature.Wherein, temperature is examined Device 400 is surveyed, for detecting the water temperature in water heater liner 200;Temperature-detecting device 400 can be temperature-sensing probe, Huo Zheqi It can detect the temperature sensor of water temperature.The result of water temperature detection can be the last detection as a result, can also Average value in unit interval after repeated detection.For example, the temperature that last time is detected can be by temperature-detecting device 400 Temperature is detected, can also continuously be detected in 2s 5 times, then using this 5 times testing result as detected value.
Below according to a kind of control method for electric heater that the structure of electric heater above proposes, including following step Suddenly:
S10, the control instruction for receiving user;
In the present embodiment, user is sent to electric heater there are many modes of control instruction, is moved for example, user can use Dynamic terminal (for example, remote controler, mobile phone, tablet electric energy, Intelligent bracelet, smartwatch etc.) is sent, user by wireless network Control instruction can also be sent by the physical button item electric heater that the master control borad with electric heater is electrically connected.It is appreciated that It is before user sends control instruction by mobile terminal to electric heater, to need to establish communication connection with electric heater.I.e. Only on the basis of mobile terminal and electric heater are established and communicated to connect, mobile terminal just can control electricity by control instruction Water heater, the information exchange of mobile terminal and electric heater needs are by being mutually authenticated in other words.The control for receiving user refers to After order, electric heater starts the heating schedule in following example.
S20, the sleep period in the period in every day is set according to control instruction;
In the present embodiment, the quantity of sleep period can be it is multiple, can be continuous between multiple sleep periods, can also between It is disconnected, such as 23:00~7:00,11:00~15:00 etc..Time corresponding to sleep period can carry out according to the demand of user Setting, it is of course also possible to be configured according to the water habits and current actual used water situation of user by electric heater.Its In, about the period, can be set according to the actual conditions of user, for 21 days.Certainly, electric heater obtains current time Mode can there are many, can by itself have timing device, can also be obtained by wireless network.By accurately obtaining Current time is taken, can accurately judge the current period.
S30, electric heater adjusted to dormant state when electric heater is in sleep period.
In the case where electric heater is in reservation suspend mode, when present period belongs to sleep period, by the work of electric heater It is dormant state to make status adjustment.Under dormant state, electric heater is not heated and is not kept the temperature, is in minimum power consumption state, but can To receive any operational order of user at any time.When electric heater works, the period other than sleep period is the non-sleep period, The non-sleep period includes heat preservation period and heating interval.The working condition of non-sleep period by user setting, it is of course also possible to It is currently configured according to the use habit of user and with regimen condition by electric heater.Sleep period in the present embodiment is strong Sleep period processed is only the user setting period of suspend mode, then in the period being set in the case where preengaging suspend mode Interior, electric heater will all be forced suspend mode.Sleep period is with 23:00~7:00,11:00~15:For 00, the non-sleep period is then For:7:00~11:00,15:00~23:00.Pass through the setting of dormancy time section so that the power consumption of electric heater is greatly reduced.
In the present embodiment, electric heater receives the control instruction of user first;Further according to every in the control instruction setting period The quantity of sleep period in one day, sleep period can be multiple;When electric heater is in sleep period by electric heater It adjusts to dormant state;In the technical solution of above-described embodiment, user makes electric heater in suspend mode by way of preengaging suspend mode Forced dormancy in period, to reduce the energy consumption of electric heater, meanwhile, user can also eliminate electric heater in this way Prompt tone etc. is interfered caused by user.
In order to make sleep period be more in line with the water habits of user, described according to each in the control instruction setting period Further include after the step of sleep period in it:
Every day each uses the water consumption of water period in S40, record and measurement period;
In the present embodiment, the period for 21 days, will be divided into six periods daily, and respectively 3:00~7:00、7:00~ 11:00、11:00~15:00、15:00~19:00、19:00~23:00、23:00~3:00.Within each period, record is used Family with waterside number and each water consumption.Certainly, it before statistics, needs to carry out period setting to computer heating control, and to every A cycle time length and water period are divided, and are recorded each with the use regimen condition of user in the water time, that is, are used Waterside number, with water frequency, with coolant-temperature gage and water consumption.This process, be water heater learning process in, in a cycle Interior, the others that user is not arranged water parameter is run according to parameter preset, for example, the first heating time section be preset as it is daily 19:00~22:00 and 7:00~11:00 etc..Second period excessively was then configured with reference to user's a cycle with regimen condition, Third period then being adjusted with regimen condition with reference to a cycle and second round.
S50, when water consumption is less than or equal to the first default water consumption, be added to the water period by the water consumption is corresponding Sleep period.
The water consumption for using water in all period of no using water each time is counted, is calculated in each period of no using water period Total water consumption, recycle total water consumption divided by with the total number of days of water, obtain in the period in each period being averaged with water daily Water consumption.For example, first calculating daily 11 in 21 days:00~15:00 water consumption, then by 21 period water consumptions in the period It is added, obtains the period 11:00~15:Total water consumption in 00 period, then with total water consumption divided by period number of days 21 days, then obtain Period daily average consumption.Average consumption is compared with the first default water consumption, when average consumption is small When the first default water consumption, the average consumption corresponding period is concluded in sleep period.First is pre- If water consumption is by taking 20L as an example, i.e., when the period 11:00~15:When 00 average consumption is less than or equal to 20L, the period 11:00~15:00 will be as the part in the sleep period in next period.Certainly, if being sleep period originally, work as statistics Average consumption be more than the first default water consumption when, which can be removed out sleep period, i.e., within the period, no longer will Electric heater is set as dormant state.
In the present embodiment, electric heater is by the actual used water situation that records and in the counting user period, and according to reality Sleep period is adjusted with regimen condition, this is then used into water when average consumption is less than or equal to the first default water consumption Period is added to sleep period, when this then being removed out suspend mode with the water period when average consumption is more than the first default water consumption Section.
In order to further decrease electric heater energy consumption, the control method of the electric heater further includes:
Record and count the total water consumption of first three day;
In the present embodiment, electric heater records and counts the water consumption of first three day on the same day, i.e., by each of front three days The water consumption of period is added, and obtains three days total water consumptions.
When total water consumption is less than or equal to the second default water consumption, it sets whole day to sleep period.
Second default water consumption is more than the first default water consumption, by taking 0L~10L as an example.Due to the needs of life, some when It waits, the water consumption of family can encounter the phenomenon that substantially reducing suddenly, for example, user gos out several days etc..When the total water of first three day When amount is less than or equal to the second water consumption, illustrate that the water demand of user's family in the past few days is very small.At this point, water heater is no longer It is limited by high-temperature time section, low temperature period and suspend mode etc., sets electric heater to dormant state always.
In order to improve the energy-saving efficiency of water heater, electric heater is adjusted when electric heater is in sleep period described Further include to after the step of dormant state:
When the water consumption on the same day, which reaches third, presets water consumption, from the time of reaching third predetermined amount, by electric hot water The water temperature heating of device is to the first preset temperature.
In the present embodiment, third presets water consumption and is more than the first default water consumption, by taking 50L~70L as an example.Due to life Need, some when, the water consumption of family can encounter the phenomenon that being significantly increased suddenly, for example, there is guest to come.When the same day Total water consumption is more than or equal to third when presetting water consumption, illustrates that the water demand of user family today is especially big.At this point, hot Hydrophone is no longer limited by high-temperature time section, low temperature period and suspend mode etc., always by water temperature heating to the first default water temperature.The One default water temperature can be adjusted and be arranged according to the control instruction of user.Preset the setting of water consumption by third, and The water consumption on the same day is from reaching third and presetting the time of water consumption, by the water temperature heating of electric heater to the first preset temperature, The water demand that adequately ensure that user is conducive to user and preferably uses water heater.
Present invention further propose that a kind of electric heater, including:
Receiving module 10, the control instruction for receiving user;
In the present embodiment, user is sent to electric heater there are many modes of control instruction, is moved for example, user can use Dynamic terminal (for example, remote controler, mobile phone, tablet electric energy, Intelligent bracelet, smartwatch etc.) is sent, user by wireless network Control instruction can also be sent by the physical button item electric heater that the master control borad with electric heater is electrically connected.It is appreciated that It is before user sends control instruction by mobile terminal to electric heater, to need to establish communication connection with electric heater.I.e. Only on the basis of mobile terminal and electric heater are established and communicated to connect, mobile terminal just can control electricity by control instruction Water heater, the information exchange of mobile terminal and electric heater needs are by being mutually authenticated in other words.The control for receiving user refers to After order, electric heater starts the heating schedule in following example.
Adjustment module 20, for setting the sleep period in the period in every day according to control instruction;
In the present embodiment, the quantity of sleep period can be it is multiple, can be continuous between multiple sleep periods, can also between It is disconnected, such as 23:00~7:00,11:00~15:00 etc..Time corresponding to sleep period can carry out according to the demand of user Setting, it is of course also possible to be configured according to the water habits and current actual used water situation of user by electric heater.Its In, about the period, can be set according to the actual conditions of user, for 21 days.Certainly, electric heater obtains current time Mode can there are many, can by itself have timing device, can also be obtained by wireless network.By accurately obtaining Current time is taken, can accurately judge the current period.
Sleep block 30, for adjusting electric heater to dormant state when electric heater is in sleep period.
In the case where electric heater is in reservation suspend mode, when present period belongs to sleep period, by the work of electric heater It is dormant state to make status adjustment.Under dormant state, electric heater is not heated and is not kept the temperature, is in minimum power consumption state, but can To receive any operational order of user at any time.When electric heater works, the period other than sleep period is the non-sleep period, The non-sleep period includes heat preservation period and heating interval.The working condition of non-sleep period by user setting, it is of course also possible to It is currently configured according to the use habit of user and with regimen condition by electric heater.Sleep period in the present embodiment is strong Sleep period processed is only the user setting period of suspend mode, then in the period being set in the case where preengaging suspend mode Interior, electric heater will all be forced suspend mode.Sleep period is with 23:00~7:00,11:00~15:For 00, the non-sleep period is then For:7:00~11:00,15:00~23:00.Pass through the setting of dormancy time section so that the power consumption of electric heater is greatly reduced.
In the present embodiment, electric heater receives the control instruction of user first;Further according to every in the control instruction setting period The quantity of sleep period in one day, sleep period can be multiple;When electric heater is in sleep period by electric heater It adjusts to dormant state;In the technical solution of above-described embodiment, user makes electric heater in suspend mode by way of preengaging suspend mode Forced dormancy in period, to reduce the energy consumption of electric heater, meanwhile, user can also eliminate electric heater in this way Prompt tone etc. is interfered caused by user.
In order to make sleep period be more in line with the water habits of user, the electric heater further includes:
First statistical module 40, the water consumption for recording and every day each uses the water period in measurement period;
In the present embodiment, the period for 21 days, will be divided into six periods daily, and respectively 3:00~7:00、7:00~ 11:00、11:00~15:00、15:00~19:00、19:00~23:00、23:00~3:00.Within each period, record is used Family with waterside number and each water consumption.Certainly, it before statistics, needs to carry out period setting to computer heating control, and to every A cycle time length and water period are divided, and are recorded each with the use regimen condition of user in the water time, that is, are used Waterside number, with water frequency, with coolant-temperature gage and water consumption.This process, be water heater learning process in, in a cycle Interior, the others that user is not arranged water parameter is run according to parameter preset, for example, the first heating time section be preset as it is daily 19:00~22:00 and 7:00~11:00 etc..Second period excessively was then configured with reference to user's a cycle with regimen condition, Third period then being adjusted with regimen condition with reference to a cycle and second round.
First timing module 50, for when water consumption is less than or equal to the first default water consumption, which to be corresponded to Be added to sleep period with the water period.
The water consumption for using water in all period of no using water each time is counted, is calculated in each period of no using water period Total water consumption, recycle total water consumption divided by with the total number of days of water, obtain in the period in each period being averaged with water daily Water consumption.For example, first calculating daily 11 in 21 days:00~15:00 water consumption, then by 21 period water consumptions in the period It is added, obtains the period 11:00~15:Total water consumption in 00 period, then with total water consumption divided by period number of days 21 days, then obtain Period daily average consumption.Average consumption is compared with the first default water consumption, when average consumption is small When the first default water consumption, the average consumption corresponding period is concluded in sleep period.First is pre- If water consumption is by taking 20L as an example, i.e., when the period 11:00~15:When 00 average consumption is less than or equal to 20L, the period 11:00~15:00 will be as the part in the sleep period in next period.Certainly, if being sleep period originally, work as statistics Average consumption be more than the first default water consumption when, which can be removed out sleep period, i.e., within the period, no longer will Electric heater is set as dormant state.That is, the electric heater further includes:Second statistical module, for recording simultaneously measurement period Interior every day each uses the water consumption of water period;Second timing module, when the water consumption of water period is more than the first default use Water, the water consumption is corresponding to remove out sleep period with the water period.
In the present embodiment, electric heater is by the actual used water situation that records and in the counting user period, and according to reality Sleep period is adjusted with regimen condition, this is then used into water when average consumption is less than or equal to the first default water consumption Period is added to sleep period, when this then being removed out suspend mode with the water period when average consumption is more than the first default water consumption Section.
In order to further decrease electric heater energy consumption, the electric heater further includes:
Third statistical module, the total water consumption for recording and counting first three day;
In the present embodiment, electric heater records and counts the water consumption of first three day on the same day, i.e., by each of front three days The water consumption of period is added, and obtains three days total water consumptions.
Third timing module, for when total water consumption is less than or equal to the second default water consumption, setting whole day to Sleep period.
Second default water consumption is more than the first default water consumption, by taking 0L~10L as an example.Due to the needs of life, some when It waits, the water consumption of family can encounter the phenomenon that substantially reducing suddenly, for example, user gos out several days etc..When the total water of first three day When amount is less than or equal to the second water consumption, illustrate that the water demand of user's family in the past few days is very small.At this point, water heater is no longer It is limited by high-temperature time section, low temperature period and suspend mode etc., sets electric heater to dormant state always.
In order to improve the energy-saving efficiency of water heater, the electric heater further includes:
Heating module, for when the water consumption on the same day reach third preset water consumption when, reach certainly third predetermined amount when It carves, by the water temperature heating of electric heater to the first preset temperature.
In the present embodiment, third presets water consumption and is more than the first default water consumption, by taking 50L~70L as an example.Due to life Need, some when, the water consumption of family can encounter the phenomenon that being significantly increased suddenly, for example, there is guest to come.When the same day Total water consumption is more than or equal to third when presetting water consumption, illustrates that the water demand of user family today is especially big.At this point, hot Hydrophone is no longer limited by high-temperature time section, low temperature period and suspend mode etc., always by water temperature heating to the first default water temperature.The One default water temperature can be adjusted and be arranged according to the control instruction of user.Preset the setting of water consumption by third, and The water consumption on the same day is from reaching third and presetting the time of water consumption, by the water temperature heating of electric heater to the first preset temperature, The water demand that adequately ensure that user is conducive to user and preferably uses water heater.
The foregoing is merely the preferred embodiment of the present invention, are not intended to limit the scope of the invention, every at this Under the inventive concept of invention, using equivalent structure transformation made by description of the invention and accompanying drawing content, or directly/use indirectly In the scope of patent protection that other related technical areas are included in the present invention.

Claims (10)

1. a kind of control method of electric heater, which is characterized in that include the following steps:
Receive the control instruction of user;(period of suspend mode is arranged in User Defined;Multistage suspend mode)
The sleep period in the period in every day is set according to control instruction;
Electric heater is adjusted to dormant state when electric heater is in sleep period.
2. the control method of electric heater as described in claim 1, which is characterized in that set week according to control instruction described In phase the step of sleep period in every day after further include:
Record the water consumption for each using the water period in simultaneously measurement period every day;
When water consumption be less than or equal to the first default water consumption when, by the water consumption is corresponding be added to suspend mode with the water period when Section.
3. the control method of electric heater as claimed in claim 2, which is characterized in that the control method of the electric heater is also Including:
Record the water consumption for each using the water period in simultaneously measurement period every day;
When the water consumption of water period is more than the first default water consumption, the water consumption is corresponding when removing out suspend mode with the water period Section.
4. the control method of electric heater as described in claim 1, which is characterized in that the control method of the electric heater is also Including:
Record and count the total water consumption of first three day;
When total water consumption is less than or equal to the second default water consumption, it sets whole day to sleep period.
5. the control method of electric heater as described in claim 1, which is characterized in that described when electric heater is in suspend mode Electric heater is adjusted when the period and further includes to after the step of dormant state:
When the water consumption on the same day, which reaches third, presets water consumption, from the time of reaching third predetermined amount, by electric heater Water temperature heating is to the first preset temperature.
6. a kind of electric heater, which is characterized in that including:
Receiving module, the control instruction for receiving user;
Adjustment module, for setting the sleep period in the period in every day according to control instruction;
Sleep block, for adjusting electric heater to dormant state when electric heater is in sleep period.
7. electric heater as claimed in claim 6, which is characterized in that the electric heater further includes:
First statistical module, the water consumption for recording and every day each uses the water period in measurement period;
First timing module, for when water consumption is less than or equal to the first default water consumption, using water by the water consumption is corresponding Period is added to sleep period.
8. electric heater as claimed in claim 6, which is characterized in that the electric heater further includes:
Second statistical module, the water consumption for recording and every day each uses the water period in measurement period;
Second timing module, when water period water consumption be more than the first default water consumption, the water consumption it is corresponding with water when Section removes out sleep period.
9. electric heater as claimed in claim 6, which is characterized in that the electric heater further includes:
Third statistical module, the total water consumption for recording and counting first three day;
Third timing module, for when total water consumption is less than or equal to the second default water consumption, setting whole day to suspend mode Period.
10. electric heater as claimed in claim 6, which is characterized in that the electric heater further includes:
Heating module, for when the water consumption on the same day reach third preset water consumption when, from the time of reaching third predetermined amount, By the water temperature heating of electric heater to the first preset temperature.
CN201710014059.XA 2017-01-09 2017-01-09 Electric water heater and control method thereof Active CN108286792B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710014059.XA CN108286792B (en) 2017-01-09 2017-01-09 Electric water heater and control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710014059.XA CN108286792B (en) 2017-01-09 2017-01-09 Electric water heater and control method thereof

Publications (2)

Publication Number Publication Date
CN108286792A true CN108286792A (en) 2018-07-17
CN108286792B CN108286792B (en) 2020-10-16

Family

ID=62819433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710014059.XA Active CN108286792B (en) 2017-01-09 2017-01-09 Electric water heater and control method thereof

Country Status (1)

Country Link
CN (1) CN108286792B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110285584A (en) * 2019-06-25 2019-09-27 珠海格力电器股份有限公司 Control method and device of water heater, storage medium and electronic device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6176844A (en) * 1984-09-25 1986-04-19 Mitsubishi Electric Corp Control device for electric water heater
CN101893323A (en) * 2010-07-30 2010-11-24 宁波奥克斯空调有限公司 Control method of air source heat pump water heater
CN203052988U (en) * 2013-01-07 2013-07-10 北京强进科技有限公司 Novel heat pump hot water machine
CN203310101U (en) * 2013-01-30 2013-11-27 美的集团股份有限公司 Electric water heater
CN105004056A (en) * 2014-04-22 2015-10-28 珠海格力电器股份有限公司 Water Heater Control Method
CN106052141A (en) * 2016-06-28 2016-10-26 广东美的暖通设备有限公司 Water heater, water temperature setting method of water heater and water temperature setting device of water heater

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6176844A (en) * 1984-09-25 1986-04-19 Mitsubishi Electric Corp Control device for electric water heater
CN101893323A (en) * 2010-07-30 2010-11-24 宁波奥克斯空调有限公司 Control method of air source heat pump water heater
CN203052988U (en) * 2013-01-07 2013-07-10 北京强进科技有限公司 Novel heat pump hot water machine
CN203310101U (en) * 2013-01-30 2013-11-27 美的集团股份有限公司 Electric water heater
CN105004056A (en) * 2014-04-22 2015-10-28 珠海格力电器股份有限公司 Water Heater Control Method
CN106052141A (en) * 2016-06-28 2016-10-26 广东美的暖通设备有限公司 Water heater, water temperature setting method of water heater and water temperature setting device of water heater

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110285584A (en) * 2019-06-25 2019-09-27 珠海格力电器股份有限公司 Control method and device of water heater, storage medium and electronic device

Also Published As

Publication number Publication date
CN108286792B (en) 2020-10-16

Similar Documents

Publication Publication Date Title
CN108286810A (en) Water heater and its control method
CN108286795A (en) Water heater and its control method
CN105162928B (en) Method and device for adjusting screen brightness of mobile terminal
CN108286811A (en) Water heater and its control method
CN103363671B (en) Air energy water heater and control method and device thereof
WO2019034125A1 (en) Intelligent air conditioner control method and air conditioner
CN108286814A (en) Electric heater and its control method
CN105674506A (en) Air conditioner and control device and method thereof
CN110908719A (en) Dynamic power consumption management and awakening method and application system thereof
CN104776547A (en) Control method of air conditioner, terminal and air conditioner
CN104422137A (en) Water heater appointment heating control method and system
CN104236110B (en) Water heater control method with automatic shutdown function and water heater
CN108286816A (en) Electric heater and its control method
CN112351475A (en) Data acquisition method and device based on LORA low-power-consumption wireless communication technology
CN109812936A (en) A kind of air-conditioning and its air conditioning exhausting temperature control method and device
CN104236729A (en) Temperature recorder and implement method thereof
CN104879924B (en) Control method of water heater and intelligent control terminal of water heater
CN210227673U (en) Intelligent constant temperature cup mat
CN108286812B (en) Water heater and control method thereof
CN106990844A (en) The control method and device of VR equipment
CN108286794A (en) Water heater and its control method
CN108286792A (en) Electric heater and its control method
CN106931500A (en) graphene floor heating control method and system
CN108241393A (en) Control system, control method and the household electrical appliance of radio temperature sensor
CN106332243A (en) Power consumption saving method and system and mobile terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221107

Address after: 241000 west side of 3 / F, No.5 office building, new energy and new materials gathering area, Fuzhou Road, Jiangbei District, Wuhu City, Anhui Province

Patentee after: Wuhu Midea intelligent kitchen electricity Manufacturing Co.,Ltd.

Address before: 241009 Wan Chun East Road, East District, Wuhu economic and Technological Development Zone, Anhui

Patentee before: WUHU MIDEA KITCHEN AND BATH APPLIANCES MFG. Co.,Ltd.

Patentee before: MIDEA GROUP Co.,Ltd.