CN108277905A CN201810159333.7A CN201810159333A CN108277905A CN 108277905 A CN108277905 A CN 108277905A CN 201810159333 A CN201810159333 A CN 201810159333A CN 108277905 A CN108277905 A CN 108277905A
Authority
CN
China
Prior art keywords
wall
shear wall
rectangle steel
length
long sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810159333.7A
Other languages
Chinese (zh)
Inventor
曹大燕
杨仕超
徐其功
陈林
李俞谕
苍久山
刘翔
何文辉
刘春艳
李昂
朱梓健
徐翩翩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Architectural Design Institute Of Department Of Construction Co Ltd
Guangdong Provincial Academy of Building Research Group Co Ltd
Original Assignee
Guangdong Architectural Design Institute Of Department Of Construction Co Ltd
Guangdong Provincial Academy of Building Research Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Architectural Design Institute Of Department Of Construction Co Ltd, Guangdong Provincial Academy of Building Research Group Co Ltd filed Critical Guangdong Architectural Design Institute Of Department Of Construction Co Ltd
Priority to CN201810159333.7A priority Critical patent/CN108277905A/en
Publication of CN108277905A publication Critical patent/CN108277905A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/58Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
    • E04B2/60Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal characterised by special cross-section of the elongated members
    • E04B2/62Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal characterised by special cross-section of the elongated members the members being formed of two or more elements in side-by-side relationship

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

本发明公开了一种矩形钢箱式组合剪力墙,包括钢管骨架,钢管骨架包括连续设置的多个节间单元,相邻的节间单元相焊接,每一个节间单元均为一个一端开口的矩形钢箱,所述矩形钢箱内焊接有肋板,所述矩形钢箱具有相平行的两条长边和一条短边,短边与长边相垂直,长边的长度为短边的长度的2倍,所述肋板焊接在两条长边之间,且肋板与长边的焊接处位于长边的中心线上,所述的肋板与短边相平行,焊接后的多个矩形钢箱在外露处还焊接有封板,以使得钢管骨架成为具有多个内腔的封闭结构,每个内腔的截面均为正方形,每个内腔内均浇筑有混凝土,构成整个的组合剪力墙。该剪力墙用钢量经济,施工快捷,能够充分发挥混凝土及钢结构各自的优势。

The invention discloses a rectangular steel box-type combined shear wall, which comprises a steel pipe skeleton, the steel pipe skeleton includes a plurality of internode units arranged continuously, the adjacent internode units are welded, and each internode unit has an open end A rectangular steel box, the rectangular steel box is welded with ribs, the rectangular steel box has two parallel long sides and a short side, the short side is perpendicular to the long side, and the length of the long side is the length of the short side twice the length, the ribs are welded between the two long sides, and the welding place between the ribs and the long sides is located on the centerline of the long sides, the ribs are parallel to the short sides, and more A rectangular steel box is also welded with a sealing plate at the exposed part, so that the steel pipe skeleton becomes a closed structure with multiple inner cavities. The section of each inner cavity is square, and each inner cavity is poured with concrete to form the whole structure. Composite shear walls. The shear wall uses economical steel and fast construction, and can give full play to the respective advantages of concrete and steel structures.

Description

一种矩形钢箱式组合剪力墙A rectangular steel box composite shear wall

技术领域technical field

本发明属于土木工程中的一种装配式组合结构体系,具体是指一种矩形钢箱式组合剪力墙,该组合形式可用于常见高层建筑中,尤其适用于装配式住宅及公寓中。The invention belongs to a prefabricated composite structure system in civil engineering, and specifically refers to a rectangular steel box composite shear wall, which can be used in common high-rise buildings, especially in prefabricated houses and apartments.

背景技术Background technique

传统的住房建造技术生产效率低、施工速度慢、建设周期长、材料消耗多且工人劳动强度大,这一系列状况已不能适应现代社会对住宅的刚性需求。而装配式建筑具有以下特点:①设计多样化,可以根据住房要求进行设计;②功能现代化,可以采用多种节能环保等新型材料;③制造工厂化,可以使得建筑构配件统一工厂化生产,一气呵成;④施工装配化,可以大大减少劳动力,减少材料浪费;⑤时间最优化,使施工周期明显加快。装配式建筑注重对环境、资源的保护,其施工过程中有效减少了建筑污水、有害气体、粉尘的排放和建筑噪音的污染,降低了建筑施工对周边环境的各种影响,有利于提高建筑的劳动生产率,促进设计、建筑的精细化,提升建筑的整体质量和节能减排水率,促进了我国建筑业健康可持续发展,符合国家经济发展的需求。Traditional housing construction technology has low production efficiency, slow construction speed, long construction period, high material consumption and high labor intensity. These series of conditions can no longer meet the rigid demand for housing in modern society. The prefabricated building has the following characteristics: ①The design is diversified and can be designed according to the housing requirements; ②The function is modernized, and a variety of new materials such as energy saving and environmental protection can be used; ③Manufacturing is factory-based, which can make the building components and accessories uniform and factory-made. ; ④ Construction assembly can greatly reduce labor force and reduce material waste; ⑤ Time optimization can significantly speed up the construction cycle. The prefabricated building pays attention to the protection of the environment and resources. During the construction process, it effectively reduces the emission of construction sewage, harmful gases, dust and construction noise pollution, reduces the various impacts of construction on the surrounding environment, and is conducive to improving the construction efficiency. Labor productivity promotes the refinement of design and construction, improves the overall quality of buildings and the rate of energy conservation and drainage reduction, promotes the healthy and sustainable development of my country's construction industry, and meets the needs of national economic development.

装配式建筑主要分为装配式混凝土结构及装配式钢结构,装配式混凝土结构剪力墙建筑布局灵活,能提供较好的室内空间,但由于竖向构件装配质量不容易保证,整体性较现浇结构差,运输安装容易存在问题等现状限制条件,推广应用受到一定限制。装配式钢结构装配率高,节能环保,但鉴于成本造价的影响,我国目前大部分高层住宅楼采用的是钢筋混凝土剪力墙结构形式,且腐蚀及防火也制约了钢结构住宅的推广。Prefabricated buildings are mainly divided into prefabricated concrete structures and prefabricated steel structures. Prefabricated concrete structure shear wall buildings have flexible layout and can provide better indoor space. However, because the assembly quality of vertical components is not easy to guarantee, the integrity is relatively Poor pouring structure, transportation and installation are prone to problems and other current constraints, and the promotion and application are limited to a certain extent. The prefabricated steel structure has a high assembly rate, energy saving and environmental protection. However, in view of the impact of cost and cost, most high-rise residential buildings in my country currently use reinforced concrete shear wall structures, and corrosion and fire prevention also restrict the promotion of steel structure residential buildings.

如果将钢结构与混凝土结构有效的结构起来,研究一种新型装配式抗侧力构件,充分发挥混凝土及钢结构各自的优势,针对目前结构体系中的缺点,是一个很好的解决方案。If the steel structure and the concrete structure are effectively combined, a new type of assembled lateral force-resistant member is studied, and the respective advantages of the concrete and steel structures are fully utilized, which is a good solution to the shortcomings of the current structural system.

发明内容Contents of the invention

本发明的目的是提供一种矩形钢箱式组合剪力墙,该剪力墙用钢量经济,制作简单,施工快捷,能够充分发挥混凝土及钢结构各自的优势。The object of the present invention is to provide a rectangular steel box-type combined shear wall, which uses economical amount of steel, is simple to manufacture, and can be constructed quickly, and can fully utilize the respective advantages of concrete and steel structures.

本发明的上述目的通过如下技术方案实现:一种矩形钢箱式组合剪力墙,其特征在于:所述剪力墙包括钢管骨架,钢管骨架包括连续设置的多个节间单元,相邻的节间单元相焊接,每一个节间单元均为一个一端开口的矩形钢箱,所述矩形钢箱内焊接有肋板,所述矩形钢箱具有相平行的两条长边和一条短边,短边与长边相垂直,长边的长度为短边的长度的2倍,所述肋板焊接在两条长边之间,且肋板与长边的焊接处位于长边的中心线上,所述的肋板与短边相平行,焊接后的多个矩形钢箱在外露处还焊接有封板,以使得钢管骨架成为具有多个内腔的封闭结构,每个内腔的截面均为正方形,每个内腔内均浇筑有混凝土,构成整个的组合剪力墙。The above object of the present invention is achieved through the following technical solutions: a rectangular steel box-type combined shear wall, characterized in that: the shear wall includes a steel pipe skeleton, and the steel pipe skeleton includes a plurality of internode units arranged continuously, adjacent The internode units are welded together, and each internode unit is a rectangular steel box with one end open, ribs are welded inside the rectangular steel box, and the rectangular steel box has two parallel long sides and one short side, The short side is perpendicular to the long side, the length of the long side is twice the length of the short side, the ribs are welded between the two long sides, and the weld between the ribs and the long side is located on the center line of the long side , the ribs are parallel to the short sides, and the exposed parts of the welded rectangular steel boxes are also welded with sealing plates, so that the steel pipe skeleton becomes a closed structure with multiple inner cavities, and the cross-section of each inner cavity is equal to It is a square, and concrete is poured in each cavity to form the entire composite shear wall.

本发明的组合剪力墙可解决目前装配式混凝土结构及钢结构中出现的问题,通过将多个“闩”字形的矩形钢箱焊接组合成钢管骨架并内部填充混凝土组成竖向构件受力体系,矩形钢箱形成子单元且子单元之间通过焊接可实现重复装配,“闩”字形的矩形钢箱可对内填充的混凝土进行约束。该矩形钢箱式组合剪力墙能充分发挥混凝土及钢结构优势并受力性能优越的竖向构件受力体系。The combined shear wall of the present invention can solve the problems in the current prefabricated concrete structure and steel structure. A plurality of rectangular steel boxes in the shape of "bolt" are welded and combined into a steel pipe skeleton and filled with concrete to form a vertical component stress system. , the rectangular steel box forms subunits and the subunits can be assembled repeatedly through welding, and the rectangular steel box in the shape of a "bolt" can restrain the concrete filled inside. The rectangular steel box-type composite shear wall can give full play to the advantages of concrete and steel structures and is a vertical component bearing system with superior mechanical performance.

所述矩形钢箱的厚度为4mm~8mm。The thickness of the rectangular steel box is 4mm-8mm.

本发明的剪力墙可以采用多种结构,与其对应的钢管骨架和封板也不同。The shear wall of the present invention can adopt various structures, and the corresponding steel pipe skeleton and sealing plate are also different.

结构一:所述剪力墙为一字型墙,所述封板为设置在墙端位置的一字形钢板,一字形钢板的长度与肋板的长度相等,一字形钢板与墙端处的矩形钢箱的两条长边相焊接。Structure 1: The shear wall is a straight wall, the sealing plate is a straight steel plate arranged at the end of the wall, the length of the straight steel plate is equal to the length of the rib plate, and the rectangular The two long sides of the steel box are welded together.

所述的一字形钢板与墙端处的矩形钢箱的两条长边采用等强坡口焊相连接。The in-line steel plate is connected with the two long sides of the rectangular steel box at the end of the wall by equal strength groove welding.

结构二:所述剪力墙为L型墙,所述封板为设置在墙拐角位置的一字形钢板,一字形钢板的长度与肋板的长度相等,一字形钢板与墙拐角处的矩形钢箱的两条长边相焊接。Structure 2: The shear wall is an L-shaped wall, and the sealing plate is an inline steel plate arranged at the corner of the wall. The length of the inline steel plate is equal to the length of the rib plate. The two long sides of the box are welded together.

所述的一字形钢板与墙端处的矩形钢箱的两条长边采用等强坡口焊相连接。The in-line steel plate is connected with the two long sides of the rectangular steel box at the end of the wall by equal strength groove welding.

结构三:所述剪力墙为T型墙,所述封板为设置在墙端位置的一字形钢板,一字形钢板的长度与肋板的长度相等,一字形钢板与墙端处的矩形钢箱的两条长边相焊接。Structure 3: The shear wall is a T-shaped wall, the sealing plate is a straight steel plate arranged at the end of the wall, the length of the straight steel plate is equal to the length of the rib plate, and the straight steel plate and the rectangular steel The two long sides of the box are welded together.

所述的一字形钢板与墙端处的矩形钢箱的两条长边采用等强坡口焊相连接。The in-line steel plate is connected with the two long sides of the rectangular steel box at the end of the wall by equal strength groove welding.

按上述设计的矩形钢管组合剪力墙,能达到预期的效果,特别适用于住宅建筑及公寓建筑。The rectangular steel tube composite shear wall designed as above can achieve expected effects, and is especially suitable for residential buildings and apartment buildings.

与现有技术相比,本发明具有如下优点:Compared with prior art, the present invention has following advantage:

(1)本发明的组合剪力墙结构构件既作为竖向承重构件,又作为抗侧力构件。组合剪力墙结构受力性能优良,墙体截面尺寸较小,进而提高建筑空间的利用率,减轻结构自重,减小地震效应。(1) The composite shear wall structural member of the present invention is used both as a vertical load-bearing member and as a lateral force-resisting member. The composite shear wall structure has excellent mechanical performance, and the wall section size is small, thereby improving the utilization rate of the building space, reducing the structure's own weight, and reducing the earthquake effect.

(2)本发明的组合剪力墙结构构件可在工厂加工好,现场灌注混凝土及少量焊缝作业即可,相对于装配混凝土结构,生产速度快,运输方便,施工简单,施工质量得以保证,大量节省人工。(2) The combined shear wall structural member of the present invention can be processed in the factory, and concrete pouring and a small amount of welding work can be done on site. Compared with the assembled concrete structure, the production speed is fast, the transportation is convenient, the construction is simple, and the construction quality is guaranteed. Save a lot of labor.

(3)本发明的相对于其余组合墙结构,矩形钢管与混凝土协同工作,组合作用可靠,整体结构抗压、抗弯和抗剪承载力高。(3) Compared with other combined wall structures, the rectangular steel tube and concrete work together, the combined effect is reliable, and the overall structure has high compressive, bending and shear bearing capacity.

附图说明Description of drawings

下面结合附图和具体实施例对本发明做进一步详细说明。The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.

图1是本发明矩形钢箱式组合剪力墙实施例一的整体结构图;Fig. 1 is the overall structural diagram of embodiment one of rectangular steel box type composite shear wall of the present invention;

图2是本发明矩形钢箱式组合剪力墙实施例一中钢管骨架的结构示意图;Fig. 2 is the structural representation of steel pipe skeleton in embodiment one of rectangular steel box type combined shear wall of the present invention;

图3是本发明矩形钢箱式组合剪力墙实施例一中钢管骨架去除封板后的结构示意图;Fig. 3 is a structural schematic view of the steel pipe skeleton after removing the sealing plate in Embodiment 1 of the rectangular steel box-type composite shear wall of the present invention;

图4是本发明矩形钢箱式组合剪力墙实施例一中节间单元的结构示意图;Fig. 4 is the structural representation of internode unit in embodiment one of rectangular steel box type composite shear wall of the present invention;

图5是本发明矩形钢箱式组合剪力墙实施例一中一字形钢板的结构示意图;Fig. 5 is the structural representation of the inline steel plate in embodiment one of the rectangular steel box type composite shear wall of the present invention;

图6是本发明矩形钢箱式组合剪力墙实施例二的整体结构图;Fig. 6 is the overall structural diagram of the second embodiment of the rectangular steel box type composite shear wall of the present invention;

图7是本发明矩形钢箱式组合剪力墙实施例二中钢管骨架的结构示意图;Fig. 7 is the schematic structural view of the steel pipe skeleton in Embodiment 2 of the rectangular steel box-type combined shear wall of the present invention;

图8是本发明矩形钢箱式组合剪力墙实施例二中钢管骨架去除封板后的结构示意图;Fig. 8 is a schematic structural view of the steel pipe skeleton after removing the sealing plate in Embodiment 2 of the rectangular steel box-type composite shear wall of the present invention;

图9是本发明矩形钢箱式组合剪力墙实施例三的整体结构图;Fig. 9 is the overall structural diagram of Embodiment 3 of the rectangular steel box type composite shear wall of the present invention;

图10是本发明矩形钢箱式组合剪力墙实施例三中钢管骨架的结构示意图;Fig. 10 is a schematic structural view of the steel pipe skeleton in Embodiment 3 of the rectangular steel box-type combined shear wall of the present invention;

图11是本发明矩形钢箱式组合剪力墙实施例三中钢管骨架去除封板后的结构示意图。Fig. 11 is a schematic structural view of the steel pipe frame in Embodiment 3 of the rectangular steel box-type combined shear wall after removing the sealing plate.

附图标记说明:Explanation of reference signs:

1—矩形钢箱, 11—肋板,2—混凝土, 3—一字形钢板。1—rectangular steel box, 11—rib plate, 2—concrete, 3—inline steel plate.

具体实施方式Detailed ways

实施例一Embodiment one

本发明矩形钢箱式组合剪力墙的实施例一如图1至图5所示,该剪力墙包括钢管骨架,钢管骨架包括连续设置的多个节间单元,相邻的节间单元相焊接,每一个节间单元均为一个一端开口的矩形钢箱1,矩形钢箱1内焊接有肋板11,矩形钢箱1具有相平行的两条长边和一条短边,短边与长边相垂直,长边的长度为短边的长度的2倍,肋板11焊接在两条长边之间,且肋板11与长边的焊接处位于长边的中心线上,肋板11与短边相平行,焊接后的矩形钢箱1类似横卧的“闩”字形,焊接后的多个矩形钢箱1在外露处还焊接有封板,以使得钢管骨架成为具有多个内腔的封闭结构,每个内腔的截面均为正方形,每个内腔内均浇筑有混凝土2,构成整个的组合剪力墙。Embodiment 1 of the rectangular steel box-type composite shear wall of the present invention is shown in Fig. 1 to Fig. 5, and this shear force wall comprises steel pipe skeleton, and steel pipe skeleton comprises a plurality of internode units arranged continuously, and adjacent internode units are opposite to each other. Welding, each internode unit is a rectangular steel box 1 with one end open, and a rib plate 11 is welded in the rectangular steel box 1, and the rectangular steel box 1 has two long sides and a short side parallel to each other, and the short side and the long side The sides are perpendicular, the length of the long side is twice the length of the short side, the rib plate 11 is welded between the two long sides, and the welding place between the rib plate 11 and the long side is located on the center line of the long side, the rib plate 11 Parallel to the short side, the welded rectangular steel box 1 resembles a horizontal "bolt" shape, and the exposed parts of the welded rectangular steel boxes 1 are also welded with sealing plates, so that the steel pipe skeleton has multiple inner cavities. The closed structure of each inner cavity is square, and concrete 2 is poured in each inner cavity to form the entire combined shear wall.

本实施例中,矩形钢箱1的厚度为6mm,该矩形钢箱1的厚度根据计算要求确定其厚度,通常在4mm~8mm范围内取值,主要用于承担水平荷载作用及约束内填充混凝土。混凝土2强度根据计算确定,与其余构件形成预制钢管组合剪力墙体系。In this embodiment, the thickness of the rectangular steel box 1 is 6 mm. The thickness of the rectangular steel box 1 is determined according to the calculation requirements, and the value is usually in the range of 4 mm to 8 mm. It is mainly used to bear the horizontal load and fill the concrete within the constraint. . The strength of concrete 2 is determined according to calculation, and forms a prefabricated steel pipe combined shear wall system with other components.

本实施例中,剪力墙为一字型墙,封板为设置在墙端位置的一字形钢板3,一字形钢板3的长度与肋板11的长度相等,一字形钢板3与墙端处的矩形钢箱1的两条长边相焊接,一字形钢板3与墙端处的矩形钢箱1的两条长边采用等强坡口焊相连接。In this embodiment, the shear wall is an inline wall, and the sealing plate is an inline steel plate 3 arranged at the end of the wall. The length of the inline steel plate 3 is equal to the length of the rib plate 11. The two long sides of the rectangular steel box 1 are welded together, and the two long sides of the inline steel plate 3 and the rectangular steel box 1 at the end of the wall are connected by equal strength groove welding.

实施例二Embodiment two

本发明矩形钢箱式组合剪力墙的实施例二如图6至图8所示,和实施例一不同的是,该剪力墙为L型墙,封板为设置在墙拐角位置的一字形钢板3,一字形钢板3的长度与肋板11的长度相等,一字形钢板3与墙拐角处的矩形钢箱1的两条长边相焊接。Embodiment 2 of the rectangular steel box-type combined shear wall of the present invention is shown in Fig. 6 to Fig. 8. The difference from Embodiment 1 is that the shear wall is an L-shaped wall, and the sealing plate is a Glyph steel plate 3, the length of glyph steel plate 3 is equal to the length of rib 11, and two long sides of glyph steel plate 3 and the rectangular steel box 1 at the corner of the wall are welded.

本实施例中,一字形钢板3与墙端处的矩形钢箱1的两条长边采用等强坡口焊相连接。In this embodiment, the two long sides of the inline steel plate 3 and the rectangular steel box 1 at the end of the wall are connected by equal-strength groove welding.

实施例三Embodiment Three

本发明矩形钢箱式组合剪力墙的实施例三如图9至图11所示,和实施例一不同的是,该剪力墙为T型墙,封板为设置在墙端位置的一字形钢板3,一字形钢板3的长度与肋板11的长度相等,一字形钢板3与墙端处的矩形钢箱1的两条长边相焊接。Embodiment 3 of the rectangular steel box-type combined shear wall of the present invention is shown in Fig. 9 to Fig. 11. The difference from Embodiment 1 is that the shear wall is a T-shaped wall, and the sealing plate is a Glyph steel plate 3, the length of glyph steel plate 3 is equal to the length of rib 11, and two long sides of glyph steel plate 3 and the rectangular steel box 1 at wall end place are welded.

本实施例中,一字形钢板3与墙端处的矩形钢箱1的两条长边采用等强坡口焊相连接。In this embodiment, the two long sides of the inline steel plate 3 and the rectangular steel box 1 at the end of the wall are connected by equal-strength groove welding.

本发明的上述实施例并不是对本发明保护范围的限定,本发明的实施方式不限于此,凡此种种根据本发明的上述内容,按照本领域的普通技术知识和惯用手段,在不脱离本发明上述基本技术思想前提下,对本发明上述结构做出的其它多种形式的修改、替换或变更,均应落在本发明的保护范围之内。The above-mentioned embodiments of the present invention do not limit the protection scope of the present invention. Under the premise of the above-mentioned basic technical ideas, other modifications, replacements or changes made to the above-mentioned structures of the present invention in various forms shall fall within the protection scope of the present invention.

Claims (8)

1. a kind of box compound shear wall of rectangle steel, it is characterised in that:The shear wall includes steel pipe skeleton, and steel pipe skeleton includes The multiple internode units being continuously arranged, adjacent internode unit mutually weld, each internode unit is an one end open Rectangle steel case (1), is welded with floor (11) in the rectangle steel case (1), and the rectangle steel case (1) has parallel two long Side and a short side, short side is perpendicular with long side, and the length of long side is 2 times of the length of short side, and the floor (11) is welded on Between two long sides, and floor (11) and the weld of long side are located on the center line of long side, the floor (11) and short side Parallel, multiple rectangle steel casees (1) after welding are also welded with sealing plate in exposed section, so that steel pipe skeleton becomes with multiple The section of the enclosed construction of inner cavity, each inner cavity is square, and each interior intracavitary has poured concrete (2), constitutes entire Compound shear wall.
2. the box compound shear wall of rectangle steel according to claim 1, it is characterised in that:The thickness of the rectangle steel case (1) Degree is 4mm~8mm.
3. the box compound shear wall of rectangle steel according to claim 1 or 2, it is characterised in that:The shear wall is a word Type wall, the sealing plate are the linear type steel plate (3) being arranged in wall end position, length and the floor (11) of linear type steel plate (3) Equal length, linear type steel plate (3) and two long sides of the rectangle steel case (1) at wall end are mutually welded.
4. the box compound shear wall of rectangle steel according to claim 3, it is characterised in that:The linear type steel plate (3) It is connected with the strong groove welding such as two long sides of the rectangle steel case (1) at wall end use.
5. the box compound shear wall of rectangle steel according to claim 1 or 2, it is characterised in that:The shear wall is L-type Wall, the sealing plate are the linear type steel plate (3) being arranged in wall corner location, length and the floor (11) of linear type steel plate (3) Equal length, linear type steel plate (3) and two long sides of the rectangle steel case (1) of wall corner are mutually welded.
6. the box compound shear wall of rectangle steel according to claim 5, it is characterised in that:The linear type steel plate (3) It is connected with the strong groove welding such as two long sides of the rectangle steel case (1) at wall end use.
7. the box compound shear wall of rectangle steel according to claim 1 or 2, it is characterised in that:The shear wall is T-type Wall, the sealing plate are the linear type steel plate (3) being arranged in wall end position, the length of the length and floor (11) of linear type steel plate (3) Spend equal, linear type steel plate (3) and two long sides of the rectangle steel case (1) at wall end are mutually welded.
8. the box compound shear wall of rectangle steel according to claim 7, it is characterised in that:The linear type steel plate (3) It is connected with the strong groove welding such as two long sides of the rectangle steel case (1) at wall end use.
CN201810159333.7A 2018-02-26 2018-02-26 A kind of box compound shear wall of rectangle steel Pending CN108277905A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810159333.7A CN108277905A (en) 2018-02-26 2018-02-26 A kind of box compound shear wall of rectangle steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810159333.7A CN108277905A (en) 2018-02-26 2018-02-26 A kind of box compound shear wall of rectangle steel

Publications (1)

Publication Number Publication Date
CN108277905A true CN108277905A (en) 2018-07-13

Family

ID=62808641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810159333.7A Pending CN108277905A (en) 2018-02-26 2018-02-26 A kind of box compound shear wall of rectangle steel

Country Status (1)

Country Link
CN (1) CN108277905A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440971A (en) * 2018-09-28 2019-03-08 中国建筑第八工程局有限公司 The combined special-shaped skeleton of the wide limb of soldering-free type
CN109723167A (en) * 2018-12-21 2019-05-07 山东大学 A prefabricated concrete-filled steel tube edge-constrained composite shear wall combination
CN112160479A (en) * 2020-09-21 2021-01-01 中南大学 A rib skeleton concrete cast-in-place slab

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3079805U (en) * 2001-02-23 2001-08-31 永裕興業股▲ふん▼有限公司 Wall structure
CN203834802U (en) * 2014-03-31 2014-09-17 浙江杭萧钢构股份有限公司 Steel tube bundle combined structure with L-shaped web plate arranged in staggered mode
CN203834804U (en) * 2014-03-31 2014-09-17 浙江杭萧钢构股份有限公司 Steel tube bundle combined structure consisting of continuous rectangular wave shaped steel plates and provided with lap joint concave tables
CN105756244A (en) * 2016-04-18 2016-07-13 石柏林 Double-steel-plate shear wall combined structure
CN206385682U (en) * 2016-12-18 2017-08-08 浙江绿筑集成科技有限公司 A kind of modular steel plate combined shear wall being made up of rectangular steel pipe and C-type steel
CN206987110U (en) * 2017-06-28 2018-02-09 黄斌斌 A kind of shear wall, its structure building system and its rigid joint with girder steel
CN208088575U (en) * 2018-02-26 2018-11-13 广东省建筑科学研究院集团股份有限公司 A kind of box compound shear wall of rectangle steel

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3079805U (en) * 2001-02-23 2001-08-31 永裕興業股▲ふん▼有限公司 Wall structure
CN203834802U (en) * 2014-03-31 2014-09-17 浙江杭萧钢构股份有限公司 Steel tube bundle combined structure with L-shaped web plate arranged in staggered mode
CN203834804U (en) * 2014-03-31 2014-09-17 浙江杭萧钢构股份有限公司 Steel tube bundle combined structure consisting of continuous rectangular wave shaped steel plates and provided with lap joint concave tables
CN105756244A (en) * 2016-04-18 2016-07-13 石柏林 Double-steel-plate shear wall combined structure
CN206385682U (en) * 2016-12-18 2017-08-08 浙江绿筑集成科技有限公司 A kind of modular steel plate combined shear wall being made up of rectangular steel pipe and C-type steel
CN206987110U (en) * 2017-06-28 2018-02-09 黄斌斌 A kind of shear wall, its structure building system and its rigid joint with girder steel
CN208088575U (en) * 2018-02-26 2018-11-13 广东省建筑科学研究院集团股份有限公司 A kind of box compound shear wall of rectangle steel

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440971A (en) * 2018-09-28 2019-03-08 中国建筑第八工程局有限公司 The combined special-shaped skeleton of the wide limb of soldering-free type
CN109440971B (en) * 2018-09-28 2020-05-22 中国建筑第八工程局有限公司 Welding-free wide-limb combined special-shaped framework
CN109723167A (en) * 2018-12-21 2019-05-07 山东大学 A prefabricated concrete-filled steel tube edge-constrained composite shear wall combination
CN109723167B (en) * 2018-12-21 2024-03-05 山东大学 Assembled steel pipe concrete edge constraint superimposed shear wall combination
CN112160479A (en) * 2020-09-21 2021-01-01 中南大学 A rib skeleton concrete cast-in-place slab
CN112160479B (en) * 2020-09-21 2021-05-11 中南大学 Rib plate skeleton concrete cast-in-place board

Similar Documents

Publication Publication Date Title
WO2022057642A1 (en) Steel special-shaped column with corrugated plates for connection
CN101691784A (en) Steel structured wide-bay energy-saving residential building with gypsum walls and on-site layering and sectioning manufacturing method
CN108277905A (en) A kind of box compound shear wall of rectangle steel
CN107338907A (en) A kind of cross lowly reinforced external wrapping concrete shaped steel Special-Shaped Column
CN208088572U (en) A kind of double a few type rectangle steel tubular type compound shear walls
CN208088575U (en) A kind of box compound shear wall of rectangle steel
CN208088577U (en) A kind of day box compound shear wall of shaped steel
CN208088568U (en) A kind of prefabricated steel compound shear wall with groove profile batten plate
CN108547396B (en) Prefabricated truss light steel frame-reinforced mesh-foamed concrete composite wall
CN107217759A (en) A kind of prefabricated steel faced wall with stirrup
CN206784731U (en) A kind of reinforced concrete composite structure overlaps truss leg
CN208088565U (en) A kind of box compound shear wall of p-type rectangle steel
CN208088555U (en) A kind of box compound shear wall of double L-shaped rectangle steel
CN208088573U (en) A kind of double spoon type rectangle steel tubular type compound shear walls
CN208088588U (en) A kind of 5 box compound shear walls of font rectangle steel
CN208088564U (en) A kind of box compound shear wall of triangle steel
CN208088576U (en) A kind of compound shear wall based on triangle steel case
CN207003719U (en) A kind of prefabricated steel faced wall with steel bar girder
CN108316523A (en) A kind of prefabricated steel compound shear wall of band plate button
CN208137186U (en) Assembling truss type light steel frame-punching sheet metal-Combined concrete wall
CN108277904B (en) Prefabricated sash type light steel frame-reinforced mesh-foamed concrete composite wall
CN207812740U (en) One body composite board linear type wall of Fast Installation heat insulation decorative load-bearing
CN208088566U (en) A kind of box compound shear wall of double-U-shaped rectangle steel
CN207003738U (en) A kind of prefabricated steel faced wall with stirrup
CN208088569U (en) A kind of prefabricated steel compound shear wall with bolt-type batten plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180713

RJ01 Rejection of invention patent application after publication