CN108277713A - The roadbed laying structure and construction method extended for highway - Google Patents

The roadbed laying structure and construction method extended for highway Download PDF

Info

Publication number
CN108277713A
CN108277713A CN201810073604.7A CN201810073604A CN108277713A CN 108277713 A CN108277713 A CN 108277713A CN 201810073604 A CN201810073604 A CN 201810073604A CN 108277713 A CN108277713 A CN 108277713A
Authority
CN
China
Prior art keywords
fixed frame
face
layer
road
upper base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810073604.7A
Other languages
Chinese (zh)
Other versions
CN108277713B (en
Inventor
梁海平
刘志坚
刘春来
赵文昊
董志强
耿小华
范菊文
王辉
李晓凯
赵云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongfen Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810073604.7A priority Critical patent/CN108277713B/en
Publication of CN108277713A publication Critical patent/CN108277713A/en
Application granted granted Critical
Publication of CN108277713B publication Critical patent/CN108277713B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/06Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of roadbed laying structure extended for highway and construction methods, including:Bed course, go to a grassroots level, upper base's knead dough layer by layer, the bond strength that fixed frame increases upper base and goes to a grassroots level is set wherein between middle layer and rock ballast layer, prevent level from detaching, it simultaneously being capable of enhancing structure stability positioned at the bed course of bottom, disperse roadbed stress, prevents from sinking, traction piece is set between surface layer and upper base, traction piece increases the bond strength between level, and face layer is prevented to be detached from.Wherein, traction the inside is the one or more in steel wire, abaca fibre, carbon fiber and polytetrafluoroethylene fibre, these materials combine so that traction piece is tough and tensile corrosion-resistant, it is not easy to be corroded by cement rotten, while solve the problems, such as that polytetrafluoroethylene fibre and cement or asphalt binder power is not strong.Also set up interconnecting piece, it includes multiple dovetail grooves and the fixture block that is adapted to the dovetail groove, the dovetail groove is separately positioned on the faying face of old road and the road structure with the fixture block, prevents the relatively old road of the roadbed newly widened from sinking and cracks or detach.

Description

The roadbed laying structure and construction method extended for highway
Technical field
The present invention relates to Expressway Extension Project fields, it is more particularly related to which a kind of prolong for highway The roadbed laying structure and construction method stretched.
Background technology
With the fast development of scientific and technological progress and economic society, people’s lives level is continuously improved, and high speed is gone on a journey More and more frequently, need to expand road passage capability to meet the trip needs of people.In original turnpike driving road On the basis of extended, it is not only cost-effective, and test technology, when road cannot adapt to the increasingly increased volume of traffic, need By original road widening.Existing road widening construction method is typically to spread sand after the road edge widened will be needed to even out Then the materials such as stone and cement or pitch compress and form new roadbed.Since material and structure etc. have differences, and The treatment process of engaging portion is not good enough, cracking can occur between new-old concrete bond, sedimentation is even caved in.To solve the problems, such as cracking, And still, often flatness is poor for cement concrete pavement, and the water permeability of cement concrete is poor thus more in sleet The season of hair, road surface are easier to ponding, influence the comfort of vehicle traveling, and traffic accident is taken place frequently, therefore research and develop a kind of knot Structure is firm, and well-drained road structure is necessary.
Invention content
It is an object of the invention to solve at least the above, and provide the advantages of at least will be described later.
It is a still further object of the present invention to provide a kind of roadbed laying structure extended for highway and construction method, energy It is enough that fastening will be being connected between each layer of roadbase, it is that road structure is more firm, widening road road pavement is avoided to cause to crack And the danger collapsed.
In order to realize these purposes and other advantages according to the present invention, a kind of roadbed paving extended for highway is provided If structure, including:
Bed course is laid with after the stone, slag, building waste and the sand mixing that are 8-10 centimetres of diameter and is formed, described Multiple convex blocks are arranged in the upper surface of bed course.
It goes to a grassroots level, is located above the bed course, the lower surface gone to a grassroots level, which is arranged, multiple to be adapted to the convex block Pit, so that described go to a grassroots level is combined more secured, the bed course convex block insertion pit with bed course, it is described to go to a grassroots level as grain It is laid with and is formed after rubble, pitch, glass fibre and the sand mixing that 8-20 millimeter of diameter.
Upper base, is located at the top gone to a grassroots level, and the upper base is mixed by graded broken stone, lime, old asphalt etc. It is laid with and is formed after conjunction.
Fixed frame, cross section are I-shaped, and the first half of the fixed frame submerges in the upper base, and lower half is submerged It is described go to a grassroots level in, and the first half of the fixed frame at least submerges on one half thickness of upper base;Wherein, described solid Determine frame to be specifically configured to:The upper surface of described fixed frame, following and intermediate joint face are disposed as rectangle reinforcing bar grid.
Face layer constitutes the surface of the road, and the face layer is located above the upper base, and the face layer is in road surface Mandrel line is the arc that peak extends to road surface both sides, and radian is 5-8 degree, and the face layer is cement concrete or asphalt road Face.
Interconnecting piece comprising multiple dovetail grooves and the fixture block being adapted to the dovetail groove, the dovetail groove and the card Block is separately positioned on the faying face of old road and the road structure.
Preferably, further include drainage blanket, the drainage blanket setting is below the layer of the face, and the drainage blanket is by multiple interior The hollow PP-R in portion manages laterally homogeneous arrangement composition, and the PP-R pipes side wall opens up leakage hole, and PP-R pipes both ends connect The gutter of both sides of the road.
Preferably, the width of the face layer is less than the upper base, so as to form groove, institute in the side of face layer It states in groove and maintains an equal level filled with the pervious bed being made of pervious concrete, the height of the pervious bed and the edge of face layer.
Preferably, the grizzly bar gap of grid is 10-30 centimetres above the fixed frame and below, the connection of the centre The grizzly bar gap of face grid is 20-50 centimetres.
Preferably, a diameter of 3-8 centimetres of the PP-R pipes.
Preferably, further include traction piece, one end of the traction piece is connected on the grid above the fixed frame, separately One end submerge in the layer of the face be coupled the face layer and with the upper base, the traction material is steel wire, bamboo fibre, carbon fiber Peacekeeping polytetrafluoroethylene fibre is mixed.
Preferably, the aperture width of 10-35 millimeters of the depth of the pit, the pit is 20-50 millimeters.
Preferably, the appearance spray on polymer epoxy resin and pitch of the fixed frame.
A kind of construction method of the roadbed laying structure extended for highway, wherein include the following steps:
Step 1: the old both sides of the road widened will be needed, which to excavate, exposes old road side, flattens soil and form face of mating formation, paving Dress face is less than or maintains an equal level the old road foundation structure bottom;Show the dovetail groove by the sawing of old road side.
Step 2: the bed course of 15-25 cm thicks is laid on the face of mating formation, in the upper table of bed course before bed course is unhardened Face is poured out multiple convex blocks.
Step 3: setting base on the bed course upper berth, 25-35 centimetres high of fixed frame is made, is put above bed course The fixed frame is set, the fixed frame is located at the centre position for width direction of going to a grassroots level;It, will using old material of asphalt pavement when laying Fixed frame wraps up or coats macromolecule epoxy resin and pitch for fixed frame, goes to a grassroots level and buries to the position of fixed frame half height Postpone pressing.
Step 4: forming upper base in the upper joints cement concrete of going to a grassroots level, cement concrete buries fixed frame, Multiple pores are pierced out in the upper surface gone to a grassroots level before upper base is unhardened, the one end for drawing material is fixed on the fixed frame The upper surface of, the other end exposes the upper surface of upper base.
Step 5: the PP-R pipes in the upper laterally homogeneous multiple inner hollows of arrangement in base upper surface form drainage blanket.
Step 6: continuing joints cement concrete or bituminous concrete to predetermined altitude and width in the upper surface of upper base It completes after degree forming face layer, in the face, the side of layer opens up groove, and groove is interior permeable filled with being made of pervious concrete Layer, the height and the edge of face layer of pervious bed maintain an equal level.
The present invention includes at least following advantageous effect:
The present invention road structure set gradually bed course, go to a grassroots level, upper base's knead dough layer by layer, wherein in middle layer and rock ballast The bond strength that setting fixed frame increases upper base and goes to a grassroots level between layer, prevents level from detaching, while positioned at the bed course of bottom Can enhancing structure stability, disperse roadbed stress, prevent from sinking, traction piece, traction piece be set between surface layer and upper base Increase the bond strength between level, face layer is prevented to be detached from.Wherein, traction the inside is steel wire, bamboo fibre, carbon fiber and polytetrafluoro Vinyl fiber is mixed, these materials combine so that traction piece is tough and tensile corrosion-resistant, it is not easy to be corroded by cement rotten, solve simultaneously The polytetrafluoroethylene fibre problem not strong with cement or asphalt binder power.Also set up interconnecting piece comprising multiple dovetail grooves And the fixture block being adapted to the dovetail groove, the dovetail groove are separately positioned on old road and the road structure with the fixture block Faying face, prevent the relatively old road of the roadbed newly widened sink cracking or separation.
Part is illustrated to embody by further advantage, target and the feature of the present invention by following, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Description of the drawings
Fig. 1 is the roadbed laying structure of the present invention extended for highway and the structural schematic diagram of construction method;
Fig. 2 is the overlooking structure diagram of the new and old road interconnecting piece of roadbed laying structure of the present invention.
Specific implementation mode
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art with reference to specification text Word can be implemented according to this.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein are not precluded one or more The presence or addition of a other elements or combinations thereof.
As shown in Figures 1 and 2, the present invention provides a kind of roadbed laying structure extended for highway, including:
Bed course 18 is laid with after the stone, slag, building waste and the sand mixing that are 8-10 centimetres of diameter and is formed, institute Multiple convex blocks are arranged in the upper surface for stating bed course.
It goes to a grassroots level 17, is located above the bed course, the lower surface setting gone to a grassroots level is multiple to be adapted to the convex block Pit so that described go to a grassroots level is combined more secured with bed course, the bed course convex block is embedded in the pit, it is described go to a grassroots level for It is laid with and is formed after rubble, pitch, glass fibre and the sand mixing that 8-20 millimeter of grain size.
Upper base 16 is located at the top gone to a grassroots level, and the upper base is by mixing such as graded broken stone, lime, pitches It is laid with and is formed afterwards.
Fixed frame 15, cross section are I-shaped, and the first half of the fixed frame submerges in the upper base, and lower half does not have Enter in described go to a grassroots level, and the first half of the fixed frame at least submerges on one half thickness of upper base;Wherein, described Fixed frame is specifically configured to:The upper surface of described fixed frame, following and intermediate joint face are disposed as rectangle reinforcing bar grid.
Face layer 13, constitutes the surface of the road, and the face layer 13 is located at 16 top of the upper base, the face layer 13 Using the arc that road center axis extends as peak to road surface both sides, radian is 5-8 degree, and the face layer 13 is cement concrete Or bituminous paving.
Interconnecting piece 12 comprising multiple dovetail grooves and the fixture block being adapted to the dovetail groove, the dovetail groove with it is described Fixture block is separately positioned on the faying face of old road 10 and the road structure 11.
In the above scheme, bed course 18 are stone, slag, building waste and the sand mixing of 8-10 centimetres of diameter It is laid with and is formed afterwards, multiple convex blocks are arranged in the upper surface of the bed course 18;Traditional foundations directly use rubble pad as bottom, rubble grain Diameter is too small, and forced area is small, is easy to sink, the grain size of stone is big, big with the contact area in soil, can subtract force dispersion It is few to sink, it keeps stablizing, the grade of bed course 18 is equipped with subject to actual conditions.For example the mass ratio of stone, rubble, sand is 4:2:1, It goes to a grassroots level 17, is located at 18 top of bed course, multiple pits being adapted to the convex block are arranged in 17 lower surface of going to a grassroots level, so that institute State to go to a grassroots level 17 is combined more secured with bed course 18, and 18 convex block of bed course is embedded in pit, can enhance bed course 18 and go to a grassroots level 17 Bond strength prevents two separate, goes to a grassroots level 17 as the rubble of 8-20 millimeters of grain size, pitch, glass fibre and sand mixing It is laid with and is formed afterwards;Upper base 16, be located at go to a grassroots level 17 top, upper base 16 is mixed by graded broken stone, lime, old asphalt etc. It is laid with and is formed after conjunction;Old material can be recycled using old material of asphalt pavement, reduces cost, while old asphalt can increase The leakproofness of upper base 16 reduces infiltration, the oxidation corrosion for reducing infiltration and leaking out to fixed frame 15.Traditional road structure layer Be easily separated between layer, for example, graded broken stone, lime, old material of asphalt pavement and sand mass ratio be 1:1:1:1, it is fixed Frame 15, as shown in Figure 1, its cross section is I-shaped, the first half of the fixed frame 15 submerges in the upper base 16, lower half Submerge it is described go to a grassroots level in 17, and the first half of the fixed frame 15 is at least submerged on 16 general thickness of upper base and is protected Demonstrate,proving 16 layers of fixed frame 15 and upper base has enough bond strengths;Fixed frame 15 can increase the bond strength and structure of levels Intensity prevents tomography and level to be detached from, face layer 13, forms the surface of the road, and face layer 13 can be cement concrete layer, Can also be asphalt concrete layer, could be provided as conventional thickness, can also be arranged to according to actual conditions it is slightly thick or Slightly thin thickness, for example it is set as the cement concrete layer after 20-40 centimetres.
In one preferred embodiment, the width of the face layer 13 is less than the upper base 16, so that the one of face layer 13 Side forms groove, and the pervious bed 19 being made of pervious concrete, the height of the pervious bed 19 and institute are filled in the groove The edge for stating face layer maintains an equal level.
In the above scheme, by the way that groove and pervious bed 19 is arranged, surface gathered water can be made to concentrate in groove, unified row It puts, the service life that reduction ponding crosses road pavement impacts.
Further include drainage blanket 14, the setting of the drainage blanket 14 is below face layer 13, the row in one preferred embodiment Water layer 14 is made of the laterally homogeneous arrangement of PP-R pipes of multiple inner hollows, and the PP-R pipes side wall opens up leakage hole, and described The gutter of PP-R pipes both ends linking-up road both sides.
In the above scheme, by the way that drainage blanket 14 is arranged, and pervious bed 19 is filled above so that the moisture warp on road surface The leakage hole of PP-R pipes is infiltrated by the pervious bed 19 of road surface both sides so that road surface moisture is discharged by PP-R pipes in gutter, The risk of surface gathered water is reduced, while also avoiding oozing the cementability for influencing each layer in pavement structure under moisture.
In one preferred embodiment, the grizzly bar gap of grid is 10-30 centimetres to the fixed frame 15 above and below, in described Between joint face grid grizzly bar gap be 20-50 centimetres.
In the above scheme, by fixed frame 15, the grizzly bar gap of grid is 10-30 centimetres, preferred 20 lis above and below The grizzly bar gap of rice, intermediate joint face grid is 20-50 centimetres, preferably 35 centimetres, not only may be implemented to confine level up and down, but also It can prevent from cracking.
In one preferred embodiment, a diameter of 3-8 centimetres of the PP-R pipes.
Further include traction piece in one preferred embodiment, one end of the traction piece is connected to above the fixed frame 15 On grid, the other end submerge in the layer of the face be coupled the face layer 13 and with the upper base 16, the traction material is steel Silk, bamboo fibre, carbon fiber and polytetrafluoroethylene fibre are mixed.
In the above scheme, polytetrafluoroethylene fibre and steel wire are screwed and is combined as wire rope core, be equipped with bamboo fibre and carbon fiber Dimension screws or is compiled into rope and obtains the traction material.Increase the friction coefficient of traction material surface, enhancing traction material energy With cement concrete adhesive strength.
In one preferred embodiment, the aperture width of 10-35 millimeters of the depth of the pit, the pit is 20-50 millimeters.
In the above scheme, the aperture width of 10-35 millimeters of the depth of the pit, preferably 25 millimeters, pit is 20-50 Millimeter, preferably 35 millimeters.
In one preferred embodiment, the appearance spray on polymer epoxy resin and pitch of the fixed frame 15.
In the above scheme, the appearance spray on polymer epoxy resin and pitch of the fixed frame 5.It buries 5 part of fixed frame It does not go to a grassroots level in 17 upper, there are gaps between the particle above gone to a grassroots level, and are easy infiltration and gas leakage, therefore are easy oxidation and fix Frame, the adhesion strength that spraying pitch not only enhances fixed frame 15 and above goes to a grassroots level, macromolecule epoxy resin have excellent glue Intensity is connect, and hardness is high, flexibility is good, while also good water resistance, moreover it is possible to make interlayer that there is certain elasticity and prolong Malleability reduces the passage harm of interlayer, improves the service life of pavement structure, moreover it is possible to prevent fixed frame by oxidation corrosion.
A kind of construction method of the roadbed laying structure extended for highway, wherein include the following steps:
Step 1: the old both sides of the road widened will be needed, which to excavate, exposes old road side, flattens soil and form face of mating formation, paving Dress face is less than or maintains an equal level the old road foundation structure bottom;Depending on as the case may be, if old road than relatively thin, in order to new The surface of old road maintains an equal level, face of mating formation can dig it is deep a bit, if old road is sufficiently thick, face of mating formation can maintain an equal level or slightly It is lower;Show the dovetail groove by the sawing of old road side.
Step 2: the bed course 18 of 15-25 cm thicks is laid on the face of mating formation, in bed course 18 before bed course 18 is unhardened Upper surface be poured out multiple convex blocks, convex block may be configured as cone, and bump height is prevented at least below 17 thickness half of going to a grassroots level Only convex block is excessively high, and but road surface formation crackle bad with 17 materials bonding of going to a grassroots level.
Step 3: setting base 19 on 18 upper berth of the bed course, 25-35 centimetres high of fixed frame 15, fixed frame 15 are made Height may be configured as 30 centimetres, go to a grassroots level accordingly 17 thickness may be configured as 40 centimetres bed course top place it is described solid Determine frame 15, the fixed frame 15 is located at the centre position for 17 width directions of going to a grassroots level;When laying, it will be consolidated using old material of asphalt pavement Determine the package of frame 15 or coat macromolecule epoxy resin and pitch for fixed frame 15, going to a grassroots level 17 buries to 15 half the height of fixed frame It is flattened behind the position of degree.
Step 4: pouring the concrete such as graded broken stone, lime, pitch in described go to a grassroots level on 17 and forming upper base 16, water Cement concrete buries fixed frame 15, pierces out multiple pores in 17 upper surface of going to a grassroots level before upper base 16 is unhardened, will lead The one end for drawing material is fixed on the upper surface of described fixed frame 15, and the other end exposes the upper surface of upper 16 layers of base by pore.
Step 5: the PP-R pipes in the laterally homogeneous multiple inner hollows of arrangement in 16 upper surface of upper base form drainage blanket 14。
Step 6: the upper surface of upper base 16 continue joints cement concrete or bituminous concrete to predetermined altitude and It completes after width forming face layer 13, in the face, the side of layer 13 opens up groove, is filled in groove and is made of pervious concrete Pervious bed 19, the height of pervious bed 19 and the edge of face layer 13 maintain an equal level.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and legend shown and described herein.

Claims (9)

1. a kind of roadbed laying structure extended for highway and its construction method, wherein including:
Bed course is laid with after the stone, slag, building waste and the sand mixing that are 8-10 centimetres of diameter and is formed, the bed course Upper surface multiple convex blocks are set;
It goes to a grassroots level, is located above the bed course, multiple pits being adapted to the convex block are arranged in the lower surface gone to a grassroots level, So that described go to a grassroots level is combined more secured, the bed course convex block insertion pit with bed course, it is described to go to a grassroots level as grain size 8- 20 millimeters of rubble, pitch, glass fibre and sand is laid with after mixing and is formed;
Upper base is located at the top gone to a grassroots level, after the upper base is by mixing such as graded broken stone, lime, old asphalts It is laid with and is formed;
Fixed frame, cross section are I-shaped, and the first half of the fixed frame submerges in the upper base, and lower half is submerged described In going to a grassroots level, and the first half of the fixed frame at least submerges on one half thickness of upper base;Wherein, the fixed frame It is specifically configured to:The upper surface of described fixed frame, following and intermediate joint face are disposed as rectangle reinforcing bar grid;
Face layer constitutes the surface of the road, and the face layer is located above the upper base, and the face layer is with road center axis Line is the arc that peak extends to road surface both sides, and radian is 5-8 degree, and the face layer is cement concrete or bituminous paving;
Interconnecting piece comprising multiple dovetail grooves and the fixture block being adapted to the dovetail groove, the dovetail groove and the fixture block point Faying face in old road and the road structure is not set.
2. the roadbed laying structure extended as described in claim 1 for highway, wherein further include drainage blanket, the draining Layer setting is below the layer of the face, and the drainage blanket is made of the laterally homogeneous arrangement of PP-R pipes of multiple inner hollows, the PP- R pipe side walls open up leakage hole, and the gutter of PP-R pipes both ends linking-up road both sides.
3. the roadbed laying structure extended as described in claim 1 for highway, wherein the width of the face layer is less than described Upper base is filled with the pervious bed being made of pervious concrete so as to form groove in the side of face layer in the groove, The height of the pervious bed and the edge of face layer maintain an equal level.
4. the roadbed laying structure extended as described in claim 1 for highway, wherein above the fixed frame and following lattice The grizzly bar gap of grid is 10-30 centimetres, and the grizzly bar gap of the joint face grid of the centre is 20-50 centimetres.
5. the roadbed laying structure of road widening as claimed in claim 2, wherein a diameter of 3-8 centimetres of the PP-R pipes.
6. the roadbed laying structure extended as described in claim 1 for highway, wherein further include traction piece, the traction One end of part is connected on the grid above the fixed frame, and the other end submerges in the face layer to be coupled the face layer and and institute Shu Shang bases, the traction material are that steel wire, bamboo fibre, carbon fiber and polytetrafluoroethylene fibre are mixed.
7. the roadbed laying structure extended as described in claim 1 for highway, wherein the depth 10-35 millis of the pit The aperture width of rice, the pit is 20-50 millimeters.
8. the roadbed laying structure extended as described in claim 1 for highway, wherein the appearance spraying of the fixed frame is high Molecule epoxy resin and pitch.
9. a kind of construction method of the roadbed laying structure extended for highway, wherein include the following steps:
Step 1: the old both sides of the road widened will be needed, which to excavate, exposes old road side, flattens soil and form face of mating formation, face of mating formation It is less than or maintains an equal level the old road foundation structure bottom;Show the dovetail groove by the sawing of old road side;
Step 2: being laid with the bed course of 15-25 cm thicks on the face of mating formation, filled in the upper surface of bed course before bed course is unhardened Outpour multiple convex blocks;
Step 3: setting base on the bed course upper berth, 25-35 centimetres high of fixed frame is made, institute is placed in the top of bed course Fixed frame is stated, the fixed frame is located at the centre position for width direction of going to a grassroots level;When laying, it will be fixed using old material of asphalt pavement Frame wraps up or coats macromolecule epoxy resin and pitch for fixed frame, goes to a grassroots level and buries to after the position of fixed frame half height It flattens;
Step 4: pouring the concrete such as graded broken stone, lime, old asphalt on described go to a grassroots level forms upper base, concrete Fixed frame is buried, multiple pores is pierced out in the upper surface gone to a grassroots level before upper base is unhardened, the one end for drawing material is consolidated It is scheduled on the upper surface of described fixed frame, the other end exposes the upper surface of upper base;
Step 5: the PP-R pipes in the upper laterally homogeneous multiple inner hollows of arrangement in base upper surface form drainage blanket;
Step 6: continuing joints cement concrete or bituminous concrete to predetermined altitude and width shape in the upper surface of upper base At completing after the layer of face, in the face, the side of layer opens up groove, is filled with the pervious bed being made of pervious concrete in groove, thoroughly The height of water layer and the edge of face layer maintain an equal level.
CN201810073604.7A 2018-01-25 2018-01-25 Roadbed laying structure for highway extension and construction method Active CN108277713B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810073604.7A CN108277713B (en) 2018-01-25 2018-01-25 Roadbed laying structure for highway extension and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810073604.7A CN108277713B (en) 2018-01-25 2018-01-25 Roadbed laying structure for highway extension and construction method

Publications (2)

Publication Number Publication Date
CN108277713A true CN108277713A (en) 2018-07-13
CN108277713B CN108277713B (en) 2020-11-24

Family

ID=62805147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810073604.7A Active CN108277713B (en) 2018-01-25 2018-01-25 Roadbed laying structure for highway extension and construction method

Country Status (1)

Country Link
CN (1) CN108277713B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067166A (en) * 2019-04-12 2019-07-30 新疆北新路桥集团股份有限公司 A kind of antidetonation road structure and its construction method
CN110644321A (en) * 2019-09-27 2020-01-03 浙江万瑞建设有限公司 Road paving method
CN110644309A (en) * 2019-09-26 2020-01-03 山东大学 Roadbed drainage structure, system and construction method
CN112411291A (en) * 2020-11-26 2021-02-26 南通市市政工程设计院有限责任公司 Town road laying structure
CN113026473A (en) * 2021-03-24 2021-06-25 上海瀛盛市政工程有限公司 Road widening construction method
CN113550188A (en) * 2021-07-02 2021-10-26 山东昆嵛路桥工程有限公司 Shock-proof type anti-cracking highway
CN113981765A (en) * 2021-09-15 2022-01-28 湖北力天生态景观有限公司 Colored concrete garden road with water permeability and construction method thereof
CN115893936A (en) * 2022-11-01 2023-04-04 山东高速股份有限公司 Pouring type large-thickness water-stable gravel base course and paving method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741569A (en) * 2013-12-18 2014-04-23 山东省交通科学研究所 Drainage crack resistance based old road expansion splicing structure and method
JP2016132981A (en) * 2015-01-20 2016-07-25 元 町川 Expansion and contraction device for bridge
KR20170036921A (en) * 2015-09-24 2017-04-04 (재)한국건설생활환경시험연구원 Pavement of road having steel mesh and construction method therof
KR20170091380A (en) * 2016-02-01 2017-08-09 신계호 Overspeed preventing system for children protection zone
CN107254817A (en) * 2017-06-16 2017-10-17 江苏省镇江市路桥工程总公司 Splice the construction method of widened structure based on assembled template new and old roadbed light soil
CN107268374A (en) * 2017-07-14 2017-10-20 成都翼添科技有限公司 A kind of pavement structure with stability bearing capacity

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741569A (en) * 2013-12-18 2014-04-23 山东省交通科学研究所 Drainage crack resistance based old road expansion splicing structure and method
JP2016132981A (en) * 2015-01-20 2016-07-25 元 町川 Expansion and contraction device for bridge
KR20170036921A (en) * 2015-09-24 2017-04-04 (재)한국건설생활환경시험연구원 Pavement of road having steel mesh and construction method therof
KR20170091380A (en) * 2016-02-01 2017-08-09 신계호 Overspeed preventing system for children protection zone
CN107254817A (en) * 2017-06-16 2017-10-17 江苏省镇江市路桥工程总公司 Splice the construction method of widened structure based on assembled template new and old roadbed light soil
CN107268374A (en) * 2017-07-14 2017-10-20 成都翼添科技有限公司 A kind of pavement structure with stability bearing capacity

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067166A (en) * 2019-04-12 2019-07-30 新疆北新路桥集团股份有限公司 A kind of antidetonation road structure and its construction method
CN110644309A (en) * 2019-09-26 2020-01-03 山东大学 Roadbed drainage structure, system and construction method
CN110644309B (en) * 2019-09-26 2022-01-18 山东大学 Roadbed drainage structure, system and construction method
CN110644321A (en) * 2019-09-27 2020-01-03 浙江万瑞建设有限公司 Road paving method
CN112411291A (en) * 2020-11-26 2021-02-26 南通市市政工程设计院有限责任公司 Town road laying structure
CN113026473A (en) * 2021-03-24 2021-06-25 上海瀛盛市政工程有限公司 Road widening construction method
CN113550188A (en) * 2021-07-02 2021-10-26 山东昆嵛路桥工程有限公司 Shock-proof type anti-cracking highway
CN113981765A (en) * 2021-09-15 2022-01-28 湖北力天生态景观有限公司 Colored concrete garden road with water permeability and construction method thereof
CN115893936A (en) * 2022-11-01 2023-04-04 山东高速股份有限公司 Pouring type large-thickness water-stable gravel base course and paving method thereof
CN115893936B (en) * 2022-11-01 2024-04-16 山东高速股份有限公司 Pouring type large-thickness water-stabilized macadam base layer and paving method thereof

Also Published As

Publication number Publication date
CN108277713B (en) 2020-11-24

Similar Documents

Publication Publication Date Title
CN108277713A (en) The roadbed laying structure and construction method extended for highway
CN104674627B (en) A kind of seam construction method preventing old cement concrete road to add black top reflection crack
CN105019365B (en) Structure for rapidly restoring hinge joint of hollow slab bridge and construction method thereof
CN206928165U (en) A kind of water penetration armored concrete basic unit
CN108486963B (en) Ballastless track waterproof roadbed bed structure and paving method thereof
CN108411752A (en) The restorative procedure of asphalt pavement pit
CN106638294A (en) Steel bridge deck pavement structure
CN206956487U (en) Cement concrete pavement paving structure
CN203947406U (en) The flexible splicing construction of new and old bridge longitudinal elasticity concrete
CN103696366B (en) Pavement structure and pavement method of combined steel bridge deck
CN208649826U (en) The pervious asphalt road of Collapsible Loess District
CN209307882U (en) It is a kind of for improving the cushion cap device on pile foundation reinforcement basis
CN208104942U (en) A kind of anti-rutting asphalt pavement structure
CN104927759B (en) A kind of interface adhesive material and black overlay structure and its construction technology of changing in vain based on the material
CN207017093U (en) New-old concrete bond widens seam-line removal structure
CN109457610A (en) A kind of paving structure and construction method for Orthotropic Steel Bridge Deck reinforcement
CN103334365B (en) The paving structure of a kind of fast quick-recovery road surface and bridge floor function and paving method
CN209493776U (en) A kind of new-old concrete bond connected structure
CN104499399A (en) Ultrathin composite structure layer for preventing reflection cracks and preparation method of ultrathin composite structure layer
KR20130078996A (en) Reinforcing fiber and asphalt composition using the same
CN208777143U (en) A kind of oblique prestressing force cement concrete cracks repairing structure
CN211815250U (en) Road widening roadbed splicing structure
AU2004202692B2 (en) Concrete for Paving
CN108193573B (en) Road structure and construction method for road widening
CN209114269U (en) A kind of high-strength anticracking asphalt concrete pavement structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201106

Address after: 233399 4th floor, industrial Acceleration Center, Wuhe Economic Development Zone, Bengbu City, Anhui Province

Applicant after: WUHE ZHIKAI ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd.

Address before: 050100 1, unit 1, 1 Lane two, Fu Nan two lane, Jingxing, Hebei.

Applicant before: Liang Haiping

Applicant before: Zhao Yun

Applicant before: Liu Zhijian

Applicant before: Liu Chunlai

Applicant before: Zhao Wenhao

Applicant before: Dong Zhiqiang

Applicant before: Geng Xiaohua

Applicant before: Fan Juwen

Applicant before: Wang Hui

Applicant before: Li Xiaokai

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210506

Address after: 211800 No.8, North jujube Road, Tangquan street, Pukou District, Nanjing City, Jiangsu Province

Patentee after: Zhongfen Construction Co.,Ltd.

Address before: 233399 Anhui Bengbu Wuhe County Economic Development Zone Industrial Acceleration Center 3, 4 level

Patentee before: WUHE ZHIKAI ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd.