CN108276956A - A kind of matrix type gap-grouting material and preparation method thereof for alkaline bone material bituminous paving - Google Patents
A kind of matrix type gap-grouting material and preparation method thereof for alkaline bone material bituminous paving Download PDFInfo
- Publication number
- CN108276956A CN108276956A CN201810109413.1A CN201810109413A CN108276956A CN 108276956 A CN108276956 A CN 108276956A CN 201810109413 A CN201810109413 A CN 201810109413A CN 108276956 A CN108276956 A CN 108276956A
- Authority
- CN
- China
- Prior art keywords
- matrix type
- grouting material
- gap
- bituminous paving
- type gap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09J—ADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
- C09J195/00—Adhesives based on bituminous materials, e.g. asphalt, tar, pitch
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09J—ADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
- C09J11/00—Features of adhesives not provided for in group C09J9/00, e.g. additives
- C09J11/02—Non-macromolecular additives
- C09J11/06—Non-macromolecular additives organic
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09J—ADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
- C09J11/00—Features of adhesives not provided for in group C09J9/00, e.g. additives
- C09J11/08—Macromolecular additives
-
- C—CHEMISTRY; METALLURGY
- C08—ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
- C08L—COMPOSITIONS OF MACROMOLECULAR COMPOUNDS
- C08L2205/00—Polymer mixtures characterised by other features
- C08L2205/03—Polymer mixtures characterised by other features containing three or more polymers in a blend
- C08L2205/035—Polymer mixtures characterised by other features containing three or more polymers in a blend containing four or more polymers in a blend
Landscapes
- Chemical & Material Sciences (AREA)
- Organic Chemistry (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Road Paving Structures (AREA)
- Compositions Of Macromolecular Compounds (AREA)
Abstract
The invention discloses a kind of matrix type gap-grouting materials for alkaline bone material bituminous paving, are made of heavy traffic paving asphalt, more carboxyl organic matters, skeleton conditioning agent, cosolvent and waste rubber powder.The present invention is reacted to each other using acidic-group and basic group to be formed the mechanism that chemical bond increases adherence and adds adhesion strength between more carboxyl organic matters enhancing gap-grouting materials and sides of fracture, and gap-grouting material and the cracking again at sides of fracture are prevented;Meets the needs of different temperatures region is to gap-grouting material using the skeleton that can form varying strength between skeleton conditioning agent and pitch, rubber powder, pitch.Matrix type gap-grouting material disclosed by the invention for alkaline bone material bituminous paving realizes the monopoly of alkaline bone material asphalt pavement crack punishment material, fundamentally solves two significant deficiencies of current gap-grouting material generally existing:Adhesion property difference and self-strength are poor.Such gap-grouting material disclosed by the invention has very wide application value.
Description
Technical field
The invention belongs to asphalt pavement conserving fields, and in particular to a kind of matrix type for alkaline bone material bituminous paving fills
Stitch material and preparation method thereof.
Background technology
Due to bituminous paving compared with cement pavement with good damping effect, driving is comfortable, noise is low, to roadbed adaptability
The advantages that strong and reparation speed is fast, the ratio occupied in highway constantly increases, and accounts for about the 75% of high-grade highway at present.Due to
The pitch that binding material is served as in bituminous paving belongs to organic matter, and with temperature sensitivity and there are aging phenomena, so
Bituminous paving during being on active service after building up can gradually generate disease.Crack is that wherein occur earliest, is the most universal and can not keep away
A kind of disease form exempted from.U.S.'s SHRP projects show (Fig. 1) that timely repairing maintenance can not only for the progress of road pavement disease
The safety for enough improving pavement usage, extends its service life, is better able to save the cost of later stage maintenance of surface.
At present to the repairing of asphalt pavement crack maintenance mainly by slurry seal, micro-surface area, patch seam, cementation of fissures etc..SHRP is counted
It draws studies have shown that the cementation of fissures is highest one kind of cost performance in all slits maintenance method.Common gap-grouting material currently on the market
Mainly there are three categories:Heat use pitch class, colod-application pitch class and functional tree lipid, wherein it is hot with pitch class due to its is cheap,
It requires low reason most widely used operating personnel, accounts for about the 85% of gap-grouting material, colod-application pitch class application is taken second place, functional resin
Class application is minimum.But there are two significant deficiency needs to overcome for this currently used three categories material:Gap-grouting material is easy when high temperature
It is extruded crack and is traveling vehicle and take away;Gap-grouting material easily cracks with sides of fracture generation again when low temperature.The two significant deficiencies
Producing reason is:Gap-grouting material chassis less construction itself does not have intensity substantially, is not had at crack and transmits load force
Effect, so when high temperature road surface expands, gap-grouting material is just extruded crack and fails;Gap-grouting material and sides of fracture adhesiveness
Energy difference is the main reason for causing gap-grouting material to crack again with sides of fracture.
Since alkaline bone material is in alkalinity, pitch is in acidity, so can generate very strongization between alkaline bone material and pitch
It learns key effect and keeps the adhesive attraction power between it very strong, this is also why current most bituminous paving is using alkaline bone
The reason of material.Gap-grouting material common currently on the market noted earlier is all blanket, is there is no a kind of gap-grouting material
It is researched and developed for alkaline bone material asphalt pavement crack, this is also that gap-grouting material is caused to be repaired with alkaline bone material asphalt pavement crack
A bad major reason of maintenance effect.
In view of common gap-grouting material currently on the market, there are the significant deficiencies of self-strength difference and adhesion property difference, and simultaneously
The characteristics of not being directed to alkaline bone material bituminous paving carries out the special designing of gap-grouting material.The present invention proposes that invention is a kind of for alkalinity
The matrix type gap-grouting material of aggregate bituminous paving.Such gap-grouting material is designed for alkaline bone material bituminous paving, by adding
The more carboxyl organic matters entered improve the adhesive attraction with bituminous paving neutral and alkali aggregate;More carboxyl organic matters can also by with it is useless
The effect of old rubber powder and skeleton conditioning agent forms skeleton structure.Such matrix type gap-grouting material for alkaline bone material bituminous paving
Two significant deficiencies for improving common gap-grouting material at present simultaneously, are a kind of pavement seam filling materials with broad prospect of application
Material.
Invention content
The technical problem to be solved by the present invention is to the characteristics of for alkaline bone material asphalt pavement crack, provide a kind of tool
Targetedly matrix type gap-grouting material.Such material can form skeleton structure, and it is poor to solve gap-grouting material self-strength, place
The problem of load force cannot be transmitted at crack;More carboxyl organic matters in such material can improve gap-grouting material and sides of fracture
Between cohesive force, solve the problems, such as to crack again under cryogenic conditions.
The present invention adopts the following technical scheme that:
A kind of matrix type gap-grouting material for alkaline bone material bituminous paving adds acidic organic material in Embedding Material
With skeleton conditioning agent.
On the basis of said program, the acidic organic material is more carboxyl organic matters.More carboxyl organic matters
For carboxyl terminated potybutadiene rubber class compound, carboxyl value is 0.50~0.75mmol/g.
On the basis of said program, the skeleton conditioning agent is three aldehyde radical phloroglucins and ortho-sulfonic acid p-phenylenediamine
Mixture.The three aldehyde radicals phloroglucin and ortho-sulfonic acid p-phenylenediamine are mixed with 1/3~1/8 molar ratio.
A kind of matrix type gap-grouting material for alkaline bone material bituminous paving, by following raw materials in parts by weight numeral system at:
On the basis of said program, the heavy traffic paving asphalt be meet JTG F40-2004 standards requirement AH-70,
The mixture of one or both of AH-90 asphalt.
On the basis of said program, the cosolvent be one kind in second line of distillation tapped oil, the line tapped oil that subtracts three or
Two kinds of mixture.
On the basis of said program, the waste rubber powder mesh number is 5~80.
A kind of preparation method of matrix type gap-grouting material for alkaline bone material bituminous paving, is as follows:
(1) heavy traffic paving asphalt is heated to 100 ± 10 DEG C;
(2) under stirring, cosolvent, waste rubber powder, more carboxyl organic matters and skeleton conditioning agent are successively sequentially added;
(3) after the completion of mixing, 15~25min is stirred under conditions of 100 ± 10 DEG C;It is warming up under the conditions of 135 ± 10 DEG C
Shear 15~25min;Completion is prepared after being stirred for 10min under conditions of being cooled to 100 ± 10 DEG C.
Compared with prior art, the invention has the advantages that:
1, the present invention reacts to each other to form the mechanism admixture that chemical bond increases adherence with basic group using acidic-group
Adhesion strength between more carboxyl organic matter enhancing gap-grouting materials and sides of fracture, prevents gap-grouting material and the cracking again at sides of fracture.
2, the present invention is met not using the skeleton that can form varying strength between skeleton conditioning agent and pitch, rubber powder, pitch
Demand of the synthermal region to gap-grouting material.
3, more carboxyl organic matters and skeleton conditioning agent is added simultaneously in the present invention, while meeting to gap-grouting material adhesion property
With the requirement of intensity, the defect of current gap-grouting material generally existing is overcome.
Description of the drawings:
The relationship of Fig. 1 pavement maintenances expense and pavement usage time.
Specific implementation mode
Embodiment cited by the present invention is the further explanation to the present invention, but embodiment is not the limit to the present invention
System.
Embodiment 1
It chooses AH-90100 parts of heavy-duty road asphalt and is heated to flow regime under conditions of 100 DEG C, under agitation
Sequentially add 5 parts of second line of distillation tapped oils, 40 parts of waste rubber powders (5 mesh), 5 parts of carboxyl terminated potybutadiene rubber class compound (carboxyls
Value 0.75mmol/g) and 0.5 part of skeleton conditioning agent (three aldehyde radical phloroglucins and ortho-sulfonic acid p-phenylenediamine molar ratio are 1:8);It is mixed
25min is first stirred after the completion of closing, is warming up to 145 DEG C of condition down cut 25min;It is stirred for 10min under conditions of being cooled to 100 DEG C
After prepare completion.
Embodiment 2
It chooses AH-90100 parts of heavy-duty road asphalt and is heated to flow regime under conditions of 110 DEG C, under agitation
Sequentially add 3 parts of second line of distillation tapped oils, 5 parts of waste rubber powders (5 mesh), 3 parts of carboxyl terminated potybutadiene rubber class compound (carboxyl values
0.75mmol/g) and 0.3 part of skeleton conditioning agent (three aldehyde radical phloroglucins and ortho-sulfonic acid p-phenylenediamine molar ratio are 1:8);Mixing
25min is first stirred after the completion, is warming up to 145 DEG C of condition down cut 25min;After 10min being stirred under conditions of being cooled to 100 DEG C
It prepares and completes.
Embodiment 3
It chooses AH-70100 parts of heavy-duty road asphalt and is heated to flow regime under conditions of 110 DEG C, under agitation
Sequentially add 5 parts of second line of distillation tapped oils, 40 parts of waste rubber powders (80 mesh), 5 parts of carboxyl terminated potybutadiene rubber class compound (carboxyls
Value 0.50mmol/g) and 0.5 part of skeleton conditioning agent (three aldehyde radical phloroglucins and ortho-sulfonic acid p-phenylenediamine molar ratio are 1:3);It is mixed
20min is first stirred after the completion of closing, is warming up to 135 DEG C of condition down cut 15min;It is stirred for 10min under conditions of being cooled to 100 DEG C
After prepare completion.
Embodiment 4
Choose AH-70100 parts of heavy-duty road asphalt be heated to flow regime under conditions of 90 DEG C, under agitation according to
3 parts of second line of distillation tapped oils of secondary addition, 5 parts of waste rubber powders (80 mesh), 3 parts of carboxyl terminated potybutadiene rubber class compound (carboxyl values
0.50mmol/g) and 0.3 part of skeleton conditioning agent (three aldehyde radical phloroglucins and ortho-sulfonic acid p-phenylenediamine molar ratio are 1:5);Mixing
15min is first stirred after the completion, is warming up to 135 DEG C of condition down cut 15min;After 10min being stirred under conditions of being cooled to 100 DEG C
It prepares and completes.
Embodiment 5
Choose AH-70100 parts of heavy-duty road asphalt be heated to flow regime under conditions of 90 DEG C, under agitation according to
5 parts of second line of distillation tapped oils of secondary addition, 5 parts of waste rubber powders (80 mesh), 5 parts of carboxyl terminated potybutadiene rubber class compound (carboxyl values
0.75mmol/g) and 0.3 part of skeleton conditioning agent (three aldehyde radical phloroglucins and ortho-sulfonic acid p-phenylenediamine molar ratio are 1:3);Mixing
25min is first stirred after the completion, is warming up to 125 DEG C of condition down cut 25min;After 10min being stirred under conditions of being cooled to 100 DEG C
It prepares and completes.
Embodiment 6
Choose AH-70100 parts of heavy-duty road asphalt be heated to flow regime under conditions of 90 DEG C, under agitation according to
3 parts of second line of distillation tapped oils of secondary addition, 40 parts of waste rubber powders (5 mesh), 3 parts of carboxyl terminated potybutadiene rubber class compound (carboxyl values
0.50mmol/g) and 0.5 part of skeleton conditioning agent (three aldehyde radical phloroglucins and ortho-sulfonic acid p-phenylenediamine molar ratio are 1:8);Mixing
25min is first stirred after the completion, is warming up to 145 DEG C of condition down cut 25min;After 10min being stirred under conditions of being cooled to 100 DEG C
It prepares and completes.
The test result of above-described embodiment product is as follows:
For common gap-grouting material currently on the market, the draftability under its crush resistance, high/low temperature condition is seldom investigated
Can and adhesion property, and the performance of this several respect exactly correspond to its presently, there are significant deficiency.For the matrix type of the present invention
Gap-grouting material is exactly improved from these two aspects significant deficiency, and the data obtained from upper table can be seen that the bone of the present invention
Frame type gap-grouting material solves two significant deficiencies of current gap-grouting material well.The skeleton of the data display present invention in table
Its anti-extrusion of type gap-grouting material well meets the requirement to gap-grouting material anti-extrusion performance when pavement crack high temperature narrows;It is high
Low temperature elongation is larger when disclosure satisfy that low temperature, and crack extends the requirement to broaden to gap-grouting material;Its high/low temperature adhesion strength is larger can
Requirement when meeting high/low temperature variation to gap-grouting material cohesive force.It can be seen that the matrix type gap-grouting material of the present invention compares current city
Common gap-grouting material has largely advantage on field.
Claims (10)
1. a kind of matrix type gap-grouting material for alkaline bone material bituminous paving, it is characterised in that:Acid is added in Embedding Material
Property organic material and skeleton conditioning agent.
2. the matrix type gap-grouting material according to claim 1 for alkaline bone material bituminous paving, it is characterised in that:It is described
Acidic organic material is more carboxyl organic matters.
3. the matrix type gap-grouting material according to claim 1 for alkaline bone material bituminous paving, it is characterised in that:It is described
Skeleton conditioning agent be three aldehyde radical phloroglucins and ortho-sulfonic acid p-phenylenediamine mixture.
4. the matrix type gap-grouting material according to claim 2 for alkaline bone material bituminous paving, it is characterised in that:It is described
More carboxyl organic matters be carboxyl terminated potybutadiene rubber class compound, carboxyl value be 0.50~0.75mmol/g.
5. the matrix type gap-grouting material according to claim 3 for alkaline bone material bituminous paving, it is characterised in that:It is described
Three aldehyde radical phloroglucins and ortho-sulfonic acid p-phenylenediamine are mixed with 1/3~1/8 molar ratio.
6. being directed to the matrix type gap-grouting material of alkaline bone material bituminous paving, feature according to claim 1-5 any one of them
It is:By following raw materials in parts by weight numeral system at:
7. the matrix type gap-grouting material according to claim 6 for alkaline bone material bituminous paving, it is characterised in that:It is described
Heavy traffic paving asphalt be one or both of AH-70, AH-90 asphalt for meeting the requirement of JTG F40-2004 standards mixing
Object.
8. the matrix type gap-grouting material according to claim 6 for alkaline bone material bituminous paving, it is characterised in that:It is described
Cosolvent be second line of distillation tapped oil, one or both of the line tapped oil that subtracts three mixture.
9. the matrix type gap-grouting material according to claim 6 for alkaline bone material bituminous paving, it is characterised in that:It is described
Waste rubber powder mesh number be 5~80.
10. a kind of claim 6-9 any one of them is for the preparation of the matrix type gap-grouting material of alkaline bone material bituminous paving
Method, it is characterised in that:It is as follows:
(1) heavy traffic paving asphalt is heated to 100 ± 10 DEG C;
(2) under stirring, cosolvent, waste rubber powder, more carboxyl organic matters and skeleton conditioning agent are successively sequentially added;
(3) after the completion of mixing, 15~25min is stirred under conditions of 100 ± 10 DEG C;It is warming up to 135 ± 10 DEG C of condition down cuts
15~25min;Completion is prepared after being stirred for 10min under conditions of being cooled to 100 ± 10 DEG C.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810109413.1A CN108276956B (en) | 2018-02-05 | 2018-02-05 | A kind of matrix type gap-grouting material and preparation method thereof for alkaline bone material bituminous pavement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810109413.1A CN108276956B (en) | 2018-02-05 | 2018-02-05 | A kind of matrix type gap-grouting material and preparation method thereof for alkaline bone material bituminous pavement |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108276956A true CN108276956A (en) | 2018-07-13 |
CN108276956B CN108276956B (en) | 2019-08-20 |
Family
ID=62807483
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810109413.1A Active CN108276956B (en) | 2018-02-05 | 2018-02-05 | A kind of matrix type gap-grouting material and preparation method thereof for alkaline bone material bituminous pavement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108276956B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108997590A (en) * | 2018-07-16 | 2018-12-14 | 东华理工大学 | A kind of organic covalent framework material of the two-dimensional layer containing sulfonic acid group and preparation method thereof |
CN112679731A (en) * | 2020-12-21 | 2021-04-20 | 同济大学 | Covalent organic framework material containing sulfonic acid group and preparation and application thereof |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101235207A (en) * | 2008-01-17 | 2008-08-06 | 徐培华 | Asphalt pavement crevice embedding sealing material and preparation method thereof |
US20110060074A1 (en) * | 2008-05-20 | 2011-03-10 | Feng Xing | Self-Repairing Concrete Used Urea-Formaldehyde Resin Polymer Micro-Capsules and Method for Fabricating Same |
CN102167966A (en) * | 2010-02-26 | 2011-08-31 | 中国石油天然气股份有限公司 | Emulsified asphalt crack pouring material |
CN104046044A (en) * | 2014-06-10 | 2014-09-17 | 广东易山重工股份有限公司 | Energy-saving pavement crack repairing material and preparation method thereof |
CN105315921A (en) * | 2014-07-12 | 2016-02-10 | 卢桂才 | Reaction type composite waterproof sealing paste containing mercapto bridging agent and preparation method thereof |
CN105778533A (en) * | 2016-03-29 | 2016-07-20 | 河南省交通运输厅京珠高速公路新乡至郑州管理处 | High-permeability composite high-molecular polymer hot-melt crack filling material and preparation method |
CN106590419A (en) * | 2016-10-19 | 2017-04-26 | 天津佰思特新材料科技有限公司 | Novel asphalt pavement crack repair seam band and preparation method thereof |
CN106751958A (en) * | 2016-11-30 | 2017-05-31 | 江苏经纬技术创新咨询有限公司 | A kind of preparation method of asphalt pavement crack patching material |
-
2018
- 2018-02-05 CN CN201810109413.1A patent/CN108276956B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101235207A (en) * | 2008-01-17 | 2008-08-06 | 徐培华 | Asphalt pavement crevice embedding sealing material and preparation method thereof |
US20110060074A1 (en) * | 2008-05-20 | 2011-03-10 | Feng Xing | Self-Repairing Concrete Used Urea-Formaldehyde Resin Polymer Micro-Capsules and Method for Fabricating Same |
CN102167966A (en) * | 2010-02-26 | 2011-08-31 | 中国石油天然气股份有限公司 | Emulsified asphalt crack pouring material |
CN104046044A (en) * | 2014-06-10 | 2014-09-17 | 广东易山重工股份有限公司 | Energy-saving pavement crack repairing material and preparation method thereof |
CN105315921A (en) * | 2014-07-12 | 2016-02-10 | 卢桂才 | Reaction type composite waterproof sealing paste containing mercapto bridging agent and preparation method thereof |
CN105778533A (en) * | 2016-03-29 | 2016-07-20 | 河南省交通运输厅京珠高速公路新乡至郑州管理处 | High-permeability composite high-molecular polymer hot-melt crack filling material and preparation method |
CN106590419A (en) * | 2016-10-19 | 2017-04-26 | 天津佰思特新材料科技有限公司 | Novel asphalt pavement crack repair seam band and preparation method thereof |
CN106751958A (en) * | 2016-11-30 | 2017-05-31 | 江苏经纬技术创新咨询有限公司 | A kind of preparation method of asphalt pavement crack patching material |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108997590A (en) * | 2018-07-16 | 2018-12-14 | 东华理工大学 | A kind of organic covalent framework material of the two-dimensional layer containing sulfonic acid group and preparation method thereof |
CN112679731A (en) * | 2020-12-21 | 2021-04-20 | 同济大学 | Covalent organic framework material containing sulfonic acid group and preparation and application thereof |
Also Published As
Publication number | Publication date |
---|---|
CN108276956B (en) | 2019-08-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103613333B (en) | A kind of asphalt-base composite materials for pavement crack repair | |
CN105819751B (en) | A kind of preparation method of the composite modified asphalt mixture of highly anti-fatigue cracking performance | |
CN104312175B (en) | A kind of asphalt modifier, modified emulsifying asphalt and modified asphalt mixture and each preparation method | |
CN106186922A (en) | Semi rigid bituminous surface material and preparation method thereof | |
CN102505601B (en) | Fast repairing method for asphalt concrete pavement | |
CN105859191B (en) | A kind of composite modified asphalt mixture of highly anti-fatigue cracking performance | |
CN103964751B (en) | A kind of epoxy resin mortar bridge floor thin layer pavement material and construction method thereof | |
CN108948753A (en) | A kind of warm mix high adhered modification pitch and its preparation and application | |
CN104830075B (en) | Preparation method and use of low noise asphalt pavement cementing material | |
CN104003661B (en) | A kind of permeable reclaimed asphalt mixture pavior brick and preparation method thereof | |
CN105907114A (en) | Composite asphalt cold supplementing liquid and preparing method | |
CN104762861A (en) | Semi-flexible pavement based on cold-recycling base of bituminous pavement and construction method of semi-flexible pavement | |
CN108276956B (en) | A kind of matrix type gap-grouting material and preparation method thereof for alkaline bone material bituminous pavement | |
CN105801010A (en) | Cold patch asphalt mixture prepared from clay minerals and preparation method of cold patch asphalt mixture | |
CN106810153A (en) | It is a kind of can quick bituminous pavement cold patch material of open to traffic and preparation method thereof | |
CN107974091A (en) | A kind of noise reduction drainage pavement high viscose glue powder modified asphalt material and preparation method thereof | |
CN110952447A (en) | High-toughness, durable and anti-skid steel bridge deck pavement structure and construction method thereof | |
CN113235351B (en) | Airport pavement structure with asphalt layer paved on old cement airport runway and paving method thereof | |
CN108894073A (en) | A kind of fine antiskid wearing layer of low noise cement pavement and construction method | |
CN106927723B (en) | A kind of big gap cold mixing mixture of epoxy resins and preparation method thereof | |
CN109957374A (en) | A kind of bituminous pavement, which is mended, to be split the highway benefit of binder and its preparation and splits adhesive tape | |
CN113003985A (en) | Preparation method of anti-cracking rock rubber powder composite modified asphalt mixture | |
CN101220574A (en) | Method for paving track resistant road surface and product improving track resistant capability of road surface | |
CN111662557A (en) | Dry-process modifier for cast asphalt, dry-process modified cast asphalt mixture and preparation method | |
CN106758647B (en) | A kind of method of asphalt pavement pit repairing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20180713 Assignee: Daokedao (Laizhou) Technology Development Co.,Ltd. Assignor: SHANDONG JIAOTONG University Contract record no.: X2022980000083 Denomination of invention: The invention relates to a skeleton joint filling material for alkaline aggregate asphalt pavement and a preparation method thereof Granted publication date: 20190820 License type: Common License Record date: 20220106 |
|
EE01 | Entry into force of recordation of patent licensing contract |