CN108271218A - A kind of network resource processing method and device - Google Patents

A kind of network resource processing method and device Download PDF

Info

Publication number
CN108271218A
CN108271218A CN201611260186.XA CN201611260186A CN108271218A CN 108271218 A CN108271218 A CN 108271218A CN 201611260186 A CN201611260186 A CN 201611260186A CN 108271218 A CN108271218 A CN 108271218A
Authority
CN
China
Prior art keywords
cell
base station
terminals
activated terminals
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611260186.XA
Other languages
Chinese (zh)
Inventor
孟忻
郭卫江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Communications Group Co Ltd
China Mobile Group Shanghai Co Ltd
Original Assignee
China Mobile Communications Group Co Ltd
China Mobile Group Shanghai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Communications Group Co Ltd, China Mobile Group Shanghai Co Ltd filed Critical China Mobile Communications Group Co Ltd
Priority to CN201611260186.XA priority Critical patent/CN108271218A/en
Publication of CN108271218A publication Critical patent/CN108271218A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/16Central resource management; Negotiation of resources or communication parameters, e.g. negotiating bandwidth or QoS [Quality of Service]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0203Power saving arrangements in the radio access network or backbone network of wireless communication networks
    • H04W52/0206Power saving arrangements in the radio access network or backbone network of wireless communication networks in access points, e.g. base stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Quality & Reliability (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The embodiment of the present invention provides a kind of network resource processing method and device.The method includes:The information of each base station in the range of control area is obtained according to predetermined period;According to the integrated load rate of each cell described in the acquisition of information of each base station;If the integrated load rate for judging to know each cell determines at least one target BS, and the target BS is controlled to close no more than the first predetermined threshold value according to preset rules.Described device is used to perform the above method.The information of each base station calculates the integrated load rate of each cell in the range of the control area that method and device provided in an embodiment of the present invention is obtained by the period, and corresponding open and close carries out the base station in the range of control area according to integrated load rate and operates, reduce the waste of Internet resources.

Description

A kind of network resource processing method and device
Technical field
The present embodiments relate to field of communication technology more particularly to a kind of network resource processing methods and device.
Background technology
At present, the planning of mobile communication wireless network is still carried out according to traditional prcgramming ideas, in user and portfolio Greater number of fixed wireless website and Emergency communication vehicle etc. are planned with reference to maximum traffic degree of load in big place, and Personnel are super intensive and place of mostly high-value user, network operator would generally be carried out wirelessly by the way of intensive networking Covering, to ensure the unimpeded of communication service.
Existing network is planned and method for running is to carry out network planning construction according to preset network load degree, once network After the completion of construction, all websites power on open-minded, are incorporated to mobile big net, carry out communication service, will not be closed within a very long time Disconnected base station is significantly adjusted, and it is certain poor that this results in network design capacity to exist with actual traffic load situation of change It is different, lead to the waste of Internet resources, such as:Frequency, electric power etc..For example, large-scale stadium mainly undertake Large Physical Games or The activities such as concert, it is crowded during activity, and a large amount of stream of people can be assembled in a short time, network load is during activity Very high level can be maintained at, but during non-activity, wireless network load can then drop to very low level or even sky It carries.
In conclusion existing network using fixed planning, by the way of fixed operating mode, will not be to network system dynamic The business load situation of variation makes dynamic response, causes the wasting of resources.
Invention content
For the defects in the prior art, the embodiment of the present invention provides a kind of network resource processing method and device.
On the one hand, the embodiment of the present invention provides a kind of network resource processing method, including:
The information of each base station in the range of control area is obtained according to predetermined period;
According to the integrated load rate of each cell described in the acquisition of information of each base station;
If the integrated load rate for judging to know each cell is no more than the first predetermined threshold value, according to preset rules It determines at least one target BS, and the target BS is controlled to close.
On the other hand, the embodiment of the present invention provides a kind of Internet resources processing unit, including:
First acquisition unit, for obtaining the information of each base station in the range of control area according to predetermined period;
Computing unit, for the integrated load rate of each cell described in the acquisition of information according to each base station;
First processing units, if knowing the integrated load rate of each cell no more than the first default threshold for judgement Value, then determine at least one target BS according to preset rules, and the target BS is controlled to close.
The letter of each base station in the range of the control area that method and device provided in an embodiment of the present invention was obtained by the period Breath calculates the integrated load rate of each cell, and the base station in the range of control area is opened accordingly according to integrated load rate And shutoff operation, reduce the waste of Internet resources.
Description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair Some bright embodiments, for those of ordinary skill in the art, without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the flow diagram of network resource processing method provided in an embodiment of the present invention;
Fig. 2 is the overall flow schematic diagram of network resource processing method provided in an embodiment of the present invention;
Fig. 3 is the structure diagram of Internet resources processing unit that one embodiment of the invention provides;
Fig. 4 is the structure diagram of Internet resources processing unit that another embodiment of the present invention provides;
Fig. 5 is the structure diagram of Internet resources processing unit that further embodiment of this invention provides;
Fig. 6 is electronic equipment entity apparatus structure diagram provided in an embodiment of the present invention.
Specific embodiment
Purpose, technical scheme and advantage to make the embodiment of the present invention are clearer, below in conjunction with the embodiment of the present invention In attached drawing, the technical solution in the embodiment of the present invention is explicitly described, it is clear that described embodiment be the present invention Part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not having All other embodiments obtained under the premise of creative work are made, shall fall within the protection scope of the present invention.
Fig. 1 is the flow diagram of network resource processing method provided in an embodiment of the present invention, as shown in Figure 1, this implementation Example provides a kind of network resource processing method, including:
S1, the information that each base station in the range of control area is obtained according to predetermined period;
Specifically, each base station that Internet resources processing unit includes in the range of predetermined period acquisition control area Information, it is to be understood that the predetermined period could be provided as a hour, can also be adjusted according to actual conditions, It is not specifically limited herein.
S2, according to the acquisition of information of each base station each cell integrated load rate;
Specifically, described device is according to the information of each base station, the integrated load rate of calculating each cell.
If S3, judgement know the integrated load rate of each cell no more than the first predetermined threshold value, according to default Rule determines at least one target BS, and the target BS is controlled to close.
Specifically, if described device knows the control zone according to the integrated load rate judgement for calculating each cell obtained The integrated load rate of the corresponding each cell in each base station is no more than the first predetermined threshold value in the range of domain, it is determined that described The integrated load rate of each cell in the range of control area is relatively low, need to only maintain to cover substantially, at this time can be described A base station is chosen every pre-determined distance in the range of control area and maintain opening, by other in the range of the control area Base station is determined as target BS, and the target BS is controlled to close, of course, it is possible to determine at least one according to other preset rules A target BS, and the target BS is controlled to close, it is not specifically limited herein.It should be noted that described first is default Threshold value and the pre-determined distance can be adjusted according to actual conditions such as the sizes of the control area range, not done herein It is specific to limit.
For example, every a hour to obtain each base station for including in the range of control area automatically corresponding each for described device The activated terminals number of the PRB utilization rates of a cell, the total number of terminals of each cell and each cell, and according to each cell PRB utilization rates, the total number of terminals of each cell and each cell activated terminals number calculate the corresponding synthesis of each cell and bear Load rate, if judging to know that the corresponding integrated load rate of each cell is respectively less than 40%, it is determined that the control area In the range of each cell integrated load rate it is relatively low, only need to maintain substantially cover, according to the control area range Size, which is chosen, obtains a base station maintenance opening every 100 meters, by other base stations in the range of the control area It is determined as target BS, and the target BS is closed.
Network resource processing method provided in an embodiment of the present invention passes through each base in the range of the control area of period acquisition The information stood calculates the integrated load rate of each cell, and the base station in the range of control area is carried out accordingly according to integrated load rate Opening and closing operation, reduce the waste of Internet resources.
On the basis of above-described embodiment, further, the information of each base station includes at least:Each base station PRB utilization rates, total number of terminals and the activated terminals number of corresponding each cell;Correspondingly, it is described according to each base station The integrated load rate of each cell described in acquisition of information, including:
If judging, knowing that the activated terminals number of the cell is more than it is expected activated terminals number, it is determined that the synthesis of the cell Load factor is the PRB utilization rates of the cell;
If the activated terminals number for judging to know the cell it is expected to swash no more than the expectation activated terminals number by described The ratio of number of terminals living and the activated terminals number again with synthesis of the product of the PRB utilization rates of the cell as the cell Load factor;
Wherein, the product for it is expected activated terminals number for the total number of terminals and terminal activity ratio desired value, the end End activity ratio desired value is to carry out prediction acquisition according to history terminal activity ratio.
Specifically, each base station at least corresponds to a cell, and the information of each base station includes at least:Each base The activated terminals number for the PRB utilization rates of corresponding each cell, the total number of terminals of each cell and each cell of standing, can also wrap Other information is included, is not specifically limited herein;The terminal activity ratio of each cell is the activated terminals number in each cell The ratio of total number of terminals in the cell is accounted for, described device obtains history terminal of each cell in default historical time section and swashs Motility rate, can be using the average value of the history terminal activity ratio got as the terminal activity ratio of each cell Desired value can also carry out prediction by existing prediction model according to the history terminal activity ratio and obtain the terminal activation Rate desired value can also obtain the terminal activity ratio desired value by other means;Also, according to formula:It is described each small The total number of terminals × the terminal activity ratio desired value for it is expected activated terminals number=each cell in area, calculates described each The expectation activated terminals number of cell.If described device judges to know the activated terminals number of the cell>The corresponding institute of the cell It states and it is expected activated terminals number, it is determined that:The PRB utilization rates of the integrated load rate of the cell=cell;If judgement is known The corresponding expectation activated terminals number of the activated terminals number of the cell≤cell, it is determined that:The synthesis of the cell The PRB utilization rates of load factor=(described it is expected activated terminals number/activated terminals number) × cell.
Network resource processing method provided in an embodiment of the present invention passes through each base in the range of the control area of period acquisition The information stood calculates the integrated load rate of each cell, and the base station in the range of control area is carried out accordingly according to integrated load rate Opening and closing operation, reduce the waste of Internet resources.
On the basis of above-described embodiment, further, the information of each base station is further included in each cell The signal measurement report that activated terminals report;Correspondingly, the method further includes:
According to the reference signal of each activated terminals receives in each cell described in the signal measurement report acquisition Power;
Include the integrated load rate in the range of the control area higher than first predetermined threshold value if judging to know Cell, and the cell internal reference signals receive power and account for terminal in the cell less than the activated terminals number of the second predetermined threshold value The ratio of sum then reopens the target BS that is adjacent with the cell, being turned off not less than third predetermined threshold value.
Specifically, described device is after the target BS is closed, and described device in predetermined period according to every obtaining PRB utilization rates of the corresponding each cell in each base station in the control range arrived, the total number of terminals of each cell and The activated terminals number of each cell calculates the integrated load rate for obtaining each cell;Simultaneously according on activated terminals in each cell Described in the signal measurement report acquisition of report in each cell each activated terminals Reference Signal Received Power (Reference Signal Receiving Power, RSRP), and obtain the activation that RSRP is less than second predetermined threshold value Number of terminals calculates the ratio that the RSRP accounts for total number of terminals in the cell less than the activated terminals number of second predetermined threshold value Example.If judging to know and including the cell that the integrated load rate is higher than first predetermined threshold value in the range of the control area, And the RSRP is less than the activated terminals number of second predetermined threshold value and accounts for the ratio of total number of terminals in the cell not less than the Three predetermined threshold values, it is determined that the activated terminals in the cell are mostly in the area apart from the corresponding base station of the cell farther out In the range of domain, at this point, described device obtains the target BS that the cell is adjacent, is turned off, by the target BS Reopen, the activated terminals in the cell can be accessed by cell reselection described in the target BS that reopens, The target BS that can also will be reopened described in the activated terminals access of part by load balancing, does not do and has herein Body limits.
For example, described device still obtains control area automatically after the target BS is closed every a hour In the range of the PRB utilization rates of the corresponding each cell in each base station, the total number of terminals of each cell and each cell that include Activated terminals number, and it is whole according to the activation of the PRB utilization rates of each cell, the total number of terminals of each cell and each cell Number is held to calculate the corresponding integrated load rate of each cell, while is reported according to the signal measurement that activated terminals in each cell report The RSRP of each activated terminals in each cell is obtained, and obtains RSRP<The activated terminals number of -95dB calculates institute State RSRP<The activated terminals number of -95dB accounts for the ratio δ of total number of terminals in the cell.If the control is known in described device judgement Include the cell of integrated load rate >=40%, and RSRP in the cell in regional extent processed<The activated terminals number of -95dB Account for ratio δ >=50% of total number of terminals in the cell, then by the cell is adjacent, the target BS that is turned off again It opens.
Network resource processing method provided in an embodiment of the present invention passes through each base in the range of the control area of period acquisition The information stood calculates the integrated load rate of each cell, and the base station in the range of control area is carried out accordingly according to integrated load rate Opening and closing operation, reduce the waste of Internet resources.
On the basis of above-described embodiment, further, the information of each base station further includes the frequency of each base station The signal measurement report that activated terminals report in information and each cell;Correspondingly, the method further includes:
According to the reference signal of each activated terminals receives in each cell described in the signal measurement report acquisition Power;
If judging to know and including the cell that integrated load rate is higher than first predetermined threshold value in the range of the control area, And the cell internal reference signals receive the ratio that power accounts for the total number of terminals less than the activated terminals quantity of the second predetermined threshold value Example is less than the third predetermined threshold value, then opening the cell according to the frequency information of the cell respective base station corresponds to base The idle frequency point of residue stood.
Specifically, after the target BS is closed, described device in predetermined period according to described in get PRB utilization rates, the total number of terminals of each cell and each cell of the corresponding each cell in each base station in control range Activated terminals number calculate the integrated load rate for obtaining each cell;The signal reported simultaneously according to activated terminals in each cell Measurement report obtains the RSRP of each activated terminals in each cell, is less than institute so as to obtain RSRP in each cell The activated terminals number of the second predetermined threshold value is stated, calculates the activated terminals that each cell RSRP is less than second predetermined threshold value Number accounts for the ratio of total number of terminals in the cell.If judgement, which is known, includes integrated load rate height in the range of the control area In the cell of first predetermined threshold value, and RSRP accounts for institute less than the activated terminals number of second predetermined threshold value in the cell State total number of terminals in cell ratio be less than third predetermined threshold value, it is determined that the activated terminals in the cell be mostly in away from In the nearer regional extent in base station corresponding from the cell, at this point, described device is obtained then according to the cell respective base station The frequency information, that is, the at most available frequency point quantity in the base station and the frequency point quantity having turned on are obtained, if judging Know in the presence of the remaining idle frequency point do not opened, then open the remaining idle frequency point.
For example, described device still obtains control area automatically after the target BS is closed every a hour In the range of the PRB utilization rates of the corresponding each cell in each base station, the total number of terminals of each cell and each cell that include Activated terminals number, and it is whole according to the activation of the PRB utilization rates of each cell, the total number of terminals of each cell and each cell Number is held to calculate the corresponding integrated load rate of each cell, while is reported according to the signal measurement that activated terminals in each cell report The RSRP of each activated terminals in each cell is obtained, and obtains RSRP<The activated terminals number of -95dB calculates institute State RSRP<The activated terminals number of -95dB accounts for the ratio δ of total number of terminals in the cell.If the control is known in described device judgement Include the cell of integrated load rate >=40%, and the cell RSRP in regional extent processed<The activated terminals number of -95dB accounts for The ratio δ of total number of terminals in the cell<50%, then open the idle frequency point of the station spare.
Network resource processing method provided in an embodiment of the present invention passes through each base in the range of the control area of period acquisition The information stood calculates the integrated load rate of each cell, and the base station in the range of control area is carried out accordingly according to integrated load rate Opening and closing operation and the control of idle frequency point that passes through corresponding base station, reduce the waste of Internet resources.
On the basis of above-described embodiment, further, the method further includes:
If judgement knows the corresponding base station of the cell without the remaining idle frequency point, reopen with it is described small The target BS that area is adjacent, is turned off, and pass through load balancing and will again be opened described in the activated terminals access of part The target BS opened.
Specifically, it is default higher than described first including the integrated load rate in the range of the control area when judging to know The cell of threshold value, and RSRP is less than the activated terminals number of second predetermined threshold value to account for terminal in the cell total in the cell When several ratios is less than third predetermined threshold value, according to the at most available frequency point quantity of the cell respective base station and the frequency having turned on Point quantity, if judging to know that without the remaining idle frequency point, it is adjacent to obtain the cell for the corresponding base station of the cell , the target BS being turned off, the target BS is reopened, and pass through load balancing by part it is described activation eventually Terminate the target BS reopened into described in.
Network resource processing method provided in an embodiment of the present invention passes through each base in the range of the control area of period acquisition The information stood calculates the integrated load rate of each cell, and the base station in the range of control area is carried out accordingly according to integrated load rate Opening and closing operation, reduce the waste of Internet resources.
Fig. 2 is the structure diagram of Internet resources processing unit that one embodiment of the invention provides, as shown in Fig. 2, this hair Bright embodiment provides a kind of Internet resources processing unit, including:First acquisition unit 201, the processing of computing unit 202 and first are single Member 203, wherein:
First acquisition unit 201 is used to obtain the information of each base station in the range of control area according to predetermined period;It calculates Unit 202 is used for the integrated load rate of each cell according to the acquisition of information of each base station;First processing units 203 If the integrated load rate for judging to know each cell is determined no more than the first predetermined threshold value according to preset rules At least one target BS, and the target BS is controlled to close.
Specifically, each base station that first acquisition unit 201 includes in the range of predetermined period acquisition control area Information, computing unit 202 is according to PRB utilization rates, the total number of terminals of each cell of the corresponding each cell in each base station With the activated terminals number of each cell, the integrated load rate of each cell is calculated.
First processing units 203 calculate the integrated load rate of each cell obtained according to computing unit 202, if judging to obtain Know the integrated load rate of the corresponding each cell in each base station in the range of the control area no more than the first default threshold Value, then first processing units 203 determine that the integrated load rate of each cell in the range of the control area is relatively low, only need to maintain Basic covering can choose a base station every pre-determined distance in the range of the control area at this time and maintain opening state Other base stations in the range of the control area are determined as target BS by state, and the target BS is controlled to close, certainly, At least one target BS can be determined according to other preset rules, and the target BS is controlled to close, is not done herein specific It limits.It is understood that the predetermined period could be provided as a hour, can also be adjusted according to actual conditions; First predetermined threshold value and the pre-determined distance can be carried out according to actual conditions such as the sizes of the control area range Adjustment, is not specifically limited herein.
Internet resources processing unit provided in an embodiment of the present invention passes through each base in the range of the control area of period acquisition The information stood calculates the integrated load rate of each cell, and the base station in the range of control area is carried out accordingly according to integrated load rate Opening and closing operation, reduce the waste of Internet resources.
On the basis of above-described embodiment, further, the information of each base station includes at least:Each base station PRB utilization rates, total number of terminals and the activated terminals number of corresponding each cell;Correspondingly, computing unit 202 is specifically used for:
If judging, knowing that the activated terminals number of the cell is more than it is expected activated terminals number, it is determined that the synthesis of the cell Load factor is the PRB utilization rates of the cell;
If the activated terminals number for judging to know the cell it is expected to swash no more than the expectation activated terminals number by described The ratio of number of terminals living and the activated terminals number again with synthesis of the product of the PRB utilization rates of the cell as the cell Load factor;
Wherein, the product for it is expected activated terminals number for the total number of terminals and terminal activity ratio desired value, the end End activity ratio desired value is to carry out prediction acquisition according to history terminal activity ratio.
Specifically, each base station at least corresponds to a cell, and the information of each base station includes at least:Each base The activated terminals number for the PRB utilization rates of corresponding each cell, the total number of terminals of each cell and each cell of standing, can also wrap Other information is included, is not specifically limited herein;The terminal activity ratio of each cell is the activated terminals number in each cell The ratio of total number of terminals in the cell is accounted for, it is whole that computing unit 202 obtains history of each cell in default historical time section Activity ratio is held, the average value of the history terminal activity ratio got can be swashed as the terminal of each cell Motility rate desired value can also carry out prediction by existing prediction model according to the history terminal activity ratio and obtain the terminal Activity ratio desired value can also obtain the terminal activity ratio desired value by other means;Also, 202 basis of computing unit Formula:The total number of terminals for it is expected activated terminals number=each cell × terminal activity ratio of each cell it is expected Value calculates the expectation activated terminals number of each cell.If computing unit 202 judges to know the activated terminals number of the cell >The corresponding expectation activated terminals number of the cell, it is determined that:The PRB of the integrated load rate of the cell=cell Utilization rate;If computing unit 202 judges to know the corresponding expectation activation of activated terminals number≤cell of the cell Number of terminals, it is determined that:The integrated load rate of the cell=(the expectation activated terminals number/activated terminals number) × described The PRB utilization rates of cell.
Internet resources processing unit provided in an embodiment of the present invention passes through each base in the range of the control area of period acquisition The information stood calculates the integrated load rate of each cell, and the base station in the range of control area is carried out accordingly according to integrated load rate Opening and closing operation, reduce the waste of Internet resources.
On the basis of above-described embodiment, further, the information of each base station is further included in each cell The signal measurement report that activated terminals report;Correspondingly, Fig. 3 is the Internet resources processing unit that another embodiment of the present invention provides Structure diagram, as shown in figure 3, described device is in first acquisition unit 301, computing unit 302 and first processing units 303 On the basis of further include second acquisition unit 304 and second processing unit 305, the first acquisition unit 301, computing unit 302 and first processing units 303 and above-mentioned implementation in first acquisition unit 201, computing unit 202 and first processing units 203 is consistent, wherein:
Second acquisition unit 304 is used for each activation in each cell according to the signal measurement report acquisition The Reference Signal Received Power of terminal;
If second processing unit 305 is higher than for judging to know in the range of the control area including the integrated load rate The cell of first predetermined threshold value, and the cell internal reference signals receive the activated terminals that power is less than the second predetermined threshold value Number accounts for the ratios of total number of terminals in the cell not less than third predetermined threshold value, then opens again adjacent with the cell, The target BS of shutdown.
Specifically, after the target BS is closed, computing unit 302 obtains first processing units 303 according to first Unit 301 is every the PRB profits of the corresponding each cell in each base station described in the control range got in predetermined period The integrated load rate for obtaining each cell is calculated with the activated terminals number of rate, the total number of terminals of each cell and each cell;Together When second acquisition unit 304 it is each in each cell according to the signal measurement report acquisition that activated terminals in each cell report The RSRP of a activated terminals, second processing unit 305 obtain the activated terminals number that RSRP is less than second predetermined threshold value, Calculate the ratio that the RSRP accounts for total number of terminals in the cell less than the activated terminals number of second predetermined threshold value.At second If reason unit 305, which judges to know, includes the integrated load rate higher than first predetermined threshold value in the range of the control area Cell, and the RSRP be less than second predetermined threshold value activated terminals number account for total number of terminals in the cell ratio it is not small In third predetermined threshold value, it is determined that the activated terminals in the cell are mostly in apart from the corresponding base station of the cell farther out Regional extent in, at this point, second processing unit 305 obtains, the cell is adjacent, the target BS that is turned off, by institute Target BS is stated to reopen, the activated terminals in the cell can be accessed by cell reselection described in reopen described in Target BS, second processing unit 305 can also will be reopened by load balancing described in the activated terminals access of part The target BS, be not specifically limited herein.
Internet resources processing unit provided in an embodiment of the present invention passes through each base in the range of the control area of period acquisition The information stood calculates the integrated load rate of each cell, and the base station in the range of control area is carried out accordingly according to integrated load rate Opening and closing operation, reduce the waste of Internet resources.
On the basis of above-described embodiment, further, the information of each base station further includes the frequency of each base station The signal measurement report that activated terminals report in information and each cell;Correspondingly, Fig. 4 is carried for further embodiment of this invention The structure diagram of the Internet resources processing unit of confession, as shown in figure 4, described device is in first acquisition unit 401, computing unit 402 and first processing units 403 on the basis of further include third acquiring unit 404 and third processing unit 405, described first obtains Take first acquisition unit 201 in unit 401, computing unit 402 and first processing units 403 and above-mentioned implementation, computing unit 202 is consistent with first processing units 203, wherein:
Third acquiring unit 404 is used for each activation in each cell according to the signal measurement report acquisition The Reference Signal Received Power of terminal;
If third processing unit 405 includes integrated load rate higher than described for judging to know in the range of the control area The cell of first predetermined threshold value, and the cell internal reference signals receive the activated terminals quantity that power is less than the second predetermined threshold value The ratio for accounting for the total number of terminals is less than the third predetermined threshold value, then according to the frequency information of the cell respective base station Open the idle frequency point of residue of the cell respective base station.
Specifically, after the target BS is closed, computing unit 402 obtains first processing units 403 according to first Unit 401 is every the PRB profits of the corresponding each cell in each base station described in the control range got in predetermined period The integrated load rate for obtaining each cell is calculated with the activated terminals number of rate, the total number of terminals of each cell and each cell;Together When third acquiring unit 404 it is each in each cell according to the signal measurement report acquisition that activated terminals in each cell report The RSRP of a activated terminals is less than the described second default threshold so as to which third processing unit 405 obtains RSRP in each cell The activated terminals number of value, the activated terminals number for calculating each cell RSRP less than second predetermined threshold value account for the cell The ratio of interior total number of terminals.If the judgement of third processing unit 405, which is known, includes the integrated load in the range of the control area Rate is higher than the cell of first predetermined threshold value, and RSRP is less than the activated terminals number of second predetermined threshold value in the cell The ratio for accounting for total number of terminals in the cell is less than third predetermined threshold value, it is determined that at the activated terminals major part in the cell In in the regional extent nearer apart from the corresponding base station of the cell, at this point, third processing unit 405 is obtained then according to described small The frequency information of area's respective base station, that is, obtain the at most available frequency point quantity in the base station and the frequency point number having turned on If third processing unit 405 judges to know in the presence of the remaining idle frequency point do not opened, the remaining idle frequency point is opened for amount It opens.
Internet resources processing unit provided in an embodiment of the present invention passes through each base in the range of the control area of period acquisition The information stood calculates the integrated load rate of each cell, and the base station in the range of control area is carried out accordingly according to integrated load rate Opening and closing operation and the control of idle frequency point that passes through corresponding base station, reduce the waste of Internet resources.
On the basis of above-described embodiment, further, third processing unit 405 is additionally operable to:
If judgement knows the corresponding base station of the cell without the remaining idle frequency point, reopen with it is described small The target BS that area is adjacent, is turned off, and pass through load balancing and will again be opened described in the activated terminals access of part The target BS opened.
Specifically, third processing unit 405 is known when judgement includes the integrated load rate in the range of the control area Higher than the cell of first predetermined threshold value, and RSRP is accounted for less than the activated terminals number of second predetermined threshold value in the cell When the ratio of total number of terminals is less than third predetermined threshold value in the cell, third processing unit 405 corresponds to base according to the cell Most available frequency point quantity of standing and the frequency point quantity having turned on, if judging to know the corresponding base station of the cell without described Remaining free time frequency point, then obtain the target BS that the cell is adjacent, is turned off, the target BS opened again It opens, and passes through the target BS that load balancing will reopen described in the activated terminals access of part.
Internet resources processing unit provided in an embodiment of the present invention passes through each base in the range of the control area of period acquisition The information stood calculates the integrated load rate of each cell, and the base station in the range of control area is carried out accordingly according to integrated load rate Opening and closing operation, reduce the waste of Internet resources.
The embodiment of device provided by the invention specifically can be used for performing the process flow of above-mentioned each method embodiment, Details are not described herein for function, is referred to the detailed description of above method embodiment.
Fig. 5 is the schematic diagram of Internet resources processing system provided in an embodiment of the present invention, as shown in figure 5, in stadium, drilling The large-scale activities such as skill venue host city, personnel are super intensive and place of mostly high-value user, network operator would generally adopt Wireless coverage is carried out with the mode of intensive networking, terminal 505 is communicated to connect with the multiple base station 504, and multiple base stations 504 pass through 502 Access Core Network 501 of transmission device, the Internet resources processing unit 503 can be arranged on the base station 504 and transmission Between equipment 502, one end is communicated to connect with each base station 504, and the other end is communicated to connect with transmission device 502;Certainly, institute Each inside of base station can also be arranged on by stating device, and each base station is communicated by X2 interface, herein not It is specifically limited.
Fig. 6 is electronic equipment entity apparatus structure diagram provided in an embodiment of the present invention, as shown in fig. 6, the electronics Equipment can include:Processor (processor) 601, memory (memory) 602 and bus 603, wherein, processor 601, Memory 602 completes mutual communication by bus 503.Processor 601 can call the logical order in memory 602, To perform following method:The information of each base station in the range of control area, the letter of each base station are obtained according to predetermined period Breath includes at least:PRB utilization rates, total number of terminals and the activated terminals number of the corresponding each cell in each base station;According to institute State the integrated load rate of each cell described in the acquisition of information of each base station;If the integrated load of each cell is known in judgement Rate then determines at least one target BS, and control the target BS no more than the first predetermined threshold value according to preset rules It closes.
The embodiment of the present invention discloses a kind of computer program product, and the computer program product includes being stored in non-transient Computer program on computer readable storage medium, the computer program include program instruction, when described program instructs quilt When computer performs, computer is able to carry out the method that above-mentioned each method embodiment is provided, such as including:According to predetermined period The information of each base station in the range of control area is obtained, the information of each base station includes at least:Each base station corresponds to Each cell PRB utilization rates, total number of terminals and activated terminals number;It is each according to the acquisition of information of each base station The integrated load rate of cell;If the integrated load rate for judging to know each cell is no more than the first predetermined threshold value, root At least one target BS is determined according to preset rules, and the target BS is controlled to close.
The embodiment of the present invention provides a kind of non-transient computer readable storage medium storing program for executing, the non-transient computer readable storage Medium storing computer instructs, and the computer instruction makes the computer perform the side that above-mentioned each method embodiment is provided Method, such as including:The information of each base station in the range of control area is obtained according to predetermined period, the information of each base station is extremely Include less:PRB utilization rates, total number of terminals and the activated terminals number of the corresponding each cell in each base station;According to described each The integrated load rate of each cell described in the acquisition of information of a base station;If judgement knows that the integrated load rate of each cell is equal No more than the first predetermined threshold value, then at least one target BS is determined according to preset rules, and the target BS is controlled to close.
In addition, the logical order in above-mentioned memory 603 can be realized and be used as by the form of SFU software functional unit Independent product is sold or in use, can be stored in a computer read/write memory medium.Based on such understanding, sheet The part or the part of the technical solution that the technical solution of invention substantially in other words contributes to the prior art can be with The form of software product embodies, which is stored in a storage medium, including some instructions to (can be personal computer, server or the network equipment etc.) performs each implementation of the present invention so that computer equipment The all or part of step of example the method.And aforementioned storage medium includes:USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic disc or CD etc. it is various The medium of program code can be stored.
The apparatus embodiments described above are merely exemplary, wherein the unit illustrated as separating component can To be or may not be physically separate, the component shown as unit may or may not be physics list Member, you can be located at a place or can also be distributed in multiple network element.It can be selected according to the actual needs In some or all of module realize the purpose of this embodiment scheme.Those of ordinary skill in the art are not paying creativeness Labour in the case of, you can to understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can It is realized by the mode of software plus required general hardware platform, naturally it is also possible to pass through hardware.Based on such understanding, on Technical solution is stated substantially in other words to embody the part that the prior art contributes in the form of software product, it should Computer software product can store in a computer-readable storage medium, such as ROM/RAM, magnetic disc, CD, including several fingers It enables and (can be personal computer, server or the network equipment etc.) so that computer equipment is used to perform each implementation Method described in certain parts of example or embodiment.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that:It still may be used To modify to the technical solution recorded in foregoing embodiments or carry out equivalent replacement to which part technical characteristic; And these modification or replace, various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution spirit and Range.

Claims (10)

1. a kind of network resource processing method, which is characterized in that including:
The information of each base station in the range of control area is obtained according to predetermined period;
According to the integrated load rate of each cell described in the acquisition of information of each base station;
If the integrated load rate for judging to know each cell is determined no more than the first predetermined threshold value according to preset rules At least one target BS, and the target BS is controlled to close.
2. according to the method described in claim 1, it is characterized in that, the information of each base station includes at least:It is described each PRB utilization rates, total number of terminals and the activated terminals number of the corresponding each cell in base station;Correspondingly, it is described according to each base The integrated load rate of each cell described in the acquisition of information stood, including:
If judging, knowing that the activated terminals number of the cell is more than it is expected activated terminals number, it is determined that the integrated load of the cell Rate is the PRB utilization rates of the cell;
If the activated terminals number for judging to know the cell it is expected to activate eventually no more than the expectation activated terminals number by described Hold the ratio of number and the activated terminals number again with integrated load of the product of the PRB utilization rates of the cell as the cell Rate;
Wherein, the product for it is expected activated terminals number for the total number of terminals and terminal activity ratio desired value, the terminal swash Motility rate desired value is to carry out prediction acquisition according to history terminal activity ratio.
3. according to the method described in claim 1, it is characterized in that, the information of each base station further includes each cell The signal measurement report that interior activated terminals report;Correspondingly, the method further includes:
According to described in the signal measurement report acquisition in each cell each activated terminals Reference Signal Received Power;
If judging to know and including the cell that the integrated load rate is higher than first predetermined threshold value in the range of the control area, And the cell internal reference signals receive power and account for total number of terminals in the cell less than the activated terminals number of the second predetermined threshold value Ratio not less than third predetermined threshold value, then reopen the target BS that is adjacent with the cell, being turned off.
4. according to the method described in claim 1, it is characterized in that, the information of each base station further includes the frequency of each base station The signal measurement report that activated terminals report in rate information and each cell;Correspondingly, the method further includes:
According to described in the signal measurement report acquisition in each cell each activated terminals Reference Signal Received Power;
Include the cell that integrated load rate is higher than first predetermined threshold value, and institute in the range of the control area if judging to know State cell internal reference signals receive power be less than the second predetermined threshold value activated terminals quantity account for the total number of terminals ratio it is small In the third predetermined threshold value, then the cell respective base station is opened according to the frequency information of the cell respective base station Remaining free time frequency point.
5. according to the method described in claim 4, it is characterized in that, the method further includes:
If judgement knows that the corresponding base station of the cell without the remaining idle frequency point, reopens and the cell phase The target BS that is adjacent, being turned off, and pass through load balancing and will reopen described in the activated terminals access of part The target BS.
6. a kind of Internet resources processing unit, which is characterized in that including:
First acquisition unit, for obtaining the information of each base station in the range of control area according to predetermined period;
Computing unit, for the integrated load rate of each cell described in the acquisition of information according to each base station;
First processing units, if for judging to know the integrated load rate of each cell no more than the first predetermined threshold value, Then at least one target BS is determined according to preset rules, and the target BS is controlled to close.
7. device according to claim 6, which is characterized in that the information of each base station includes at least:It is described each PRB utilization rates, total number of terminals and the activated terminals number of the corresponding each cell in base station;Correspondingly, the computing unit is specifically used In:
If judging, knowing that the activated terminals number of the cell is more than it is expected activated terminals number, it is determined that the integrated load of the cell Rate is the PRB utilization rates of the cell;
If the activated terminals number for judging to know the cell it is expected to activate eventually no more than the expectation activated terminals number by described Hold the ratio of number and the activated terminals number again with integrated load of the product of the PRB utilization rates of the cell as the cell Rate;
Wherein, the product for it is expected activated terminals number for the total number of terminals and terminal activity ratio desired value, the terminal swash Motility rate desired value is to carry out prediction acquisition according to history terminal activity ratio.
8. device according to claim 6, which is characterized in that the information of each base station further includes each cell The signal measurement report that interior activated terminals report;Correspondingly, described device further includes:
Second acquisition unit, for each activated terminals in each cell according to the signal measurement report acquisition Reference Signal Received Power;
Second processing unit, if including the integrated load rate higher than described the in the range of the control area for judging to know The cell of one predetermined threshold value, and the cell internal reference signals receive power and account for institute less than the activated terminals number of the second predetermined threshold value The ratio of total number of terminals in cell is stated not less than third predetermined threshold value, then open again it is adjacent with the cell, have been turned off The target BS.
9. device according to claim 6, which is characterized in that the information of each base station further includes the frequency of each base station The signal measurement report that activated terminals report in rate information and each cell;Correspondingly, described device further includes:
Third acquiring unit, for each activated terminals in each cell according to the signal measurement report acquisition Reference Signal Received Power;
Third processing unit, if including integrated load rate higher than described first in advance in the range of the control area for judging to know If the cell of threshold value, and the cell internal reference signals receive power be less than the second predetermined threshold value activated terminals quantity account for it is described The ratio of total number of terminals is less than the third predetermined threshold value, then opens institute according to the frequency information of the cell respective base station State the idle frequency point of residue of cell respective base station.
10. device according to claim 9, which is characterized in that the third processing unit is additionally operable to:
If judgement knows that the corresponding base station of the cell without the remaining idle frequency point, reopens and the cell phase The target BS that is adjacent, being turned off, and pass through load balancing and will reopen described in the activated terminals access of part The target BS.
CN201611260186.XA 2016-12-30 2016-12-30 A kind of network resource processing method and device Pending CN108271218A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611260186.XA CN108271218A (en) 2016-12-30 2016-12-30 A kind of network resource processing method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611260186.XA CN108271218A (en) 2016-12-30 2016-12-30 A kind of network resource processing method and device

Publications (1)

Publication Number Publication Date
CN108271218A true CN108271218A (en) 2018-07-10

Family

ID=62755005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611260186.XA Pending CN108271218A (en) 2016-12-30 2016-12-30 A kind of network resource processing method and device

Country Status (1)

Country Link
CN (1) CN108271218A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111263366A (en) * 2018-11-30 2020-06-09 中国移动通信集团山东有限公司 Cloud wireless network centralized evaluation planning method and system based on user behaviors
CN111698758A (en) * 2020-04-01 2020-09-22 新华三信息安全技术有限公司 Terminal access method and device
CN112188512A (en) * 2019-07-05 2021-01-05 中国移动通信集团山东有限公司 Power coordination method, device and equipment, base station and computer readable storage medium
CN112437457A (en) * 2020-12-08 2021-03-02 中国联合网络通信集团有限公司 Cell mobile network control method, device, equipment and storage medium
WO2021139593A1 (en) * 2020-01-10 2021-07-15 京信网络系统股份有限公司 Energy saving method and apparatus, computer device and storage medium
CN113438689A (en) * 2021-06-08 2021-09-24 中国联合网络通信集团有限公司 Base station energy saving method, device, equipment and storage medium
CN114077213A (en) * 2020-08-21 2022-02-22 大唐移动通信设备有限公司 Energy-saving control method and device
CN114363952A (en) * 2020-10-14 2022-04-15 中国移动通信集团设计院有限公司 Mobile communication network resource allocation method, device and readable storage medium
CN114430559A (en) * 2021-11-23 2022-05-03 华信咨询设计研究院有限公司 5G base station intelligent turn-off method based on stepped evaluation
CN114584986A (en) * 2020-12-01 2022-06-03 中国联合网络通信集团有限公司 Resource scheduling method and device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101784065A (en) * 2009-01-21 2010-07-21 大唐移动通信设备有限公司 Method, system and device for optimizing cells
CN101873677A (en) * 2009-04-23 2010-10-27 中兴通讯股份有限公司 Method and device for controlling carrier power
CN101959292A (en) * 2009-07-20 2011-01-26 华为技术有限公司 Method, equipment and system for saving energy for base station
CN102014470A (en) * 2010-11-30 2011-04-13 中兴通讯股份有限公司 Base station power consumption control method and system
CN102083149A (en) * 2010-09-20 2011-06-01 大唐移动通信设备有限公司 Method and system for regulating energy saving parameter value as well as equipment
CN102665259A (en) * 2012-05-07 2012-09-12 中国联合网络通信集团有限公司 Energy-saving mode control method, device and system for base station
CN103269511A (en) * 2013-04-23 2013-08-28 北京邮电大学 Method for energy conservation for wireless access network
WO2013170486A1 (en) * 2012-05-18 2013-11-21 华为技术有限公司 Communication method, device and system
CN104244321A (en) * 2014-09-19 2014-12-24 京信通信系统(中国)有限公司 Cell energy saving and awakening method and device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101784065A (en) * 2009-01-21 2010-07-21 大唐移动通信设备有限公司 Method, system and device for optimizing cells
CN101873677A (en) * 2009-04-23 2010-10-27 中兴通讯股份有限公司 Method and device for controlling carrier power
CN101959292A (en) * 2009-07-20 2011-01-26 华为技术有限公司 Method, equipment and system for saving energy for base station
CN102083149A (en) * 2010-09-20 2011-06-01 大唐移动通信设备有限公司 Method and system for regulating energy saving parameter value as well as equipment
CN102014470A (en) * 2010-11-30 2011-04-13 中兴通讯股份有限公司 Base station power consumption control method and system
CN102665259A (en) * 2012-05-07 2012-09-12 中国联合网络通信集团有限公司 Energy-saving mode control method, device and system for base station
WO2013170486A1 (en) * 2012-05-18 2013-11-21 华为技术有限公司 Communication method, device and system
CN103269511A (en) * 2013-04-23 2013-08-28 北京邮电大学 Method for energy conservation for wireless access network
CN104244321A (en) * 2014-09-19 2014-12-24 京信通信系统(中国)有限公司 Cell energy saving and awakening method and device

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111263366B (en) * 2018-11-30 2022-12-09 中国移动通信集团山东有限公司 Cloud wireless network centralized evaluation planning method and system based on user behaviors
CN111263366A (en) * 2018-11-30 2020-06-09 中国移动通信集团山东有限公司 Cloud wireless network centralized evaluation planning method and system based on user behaviors
CN112188512A (en) * 2019-07-05 2021-01-05 中国移动通信集团山东有限公司 Power coordination method, device and equipment, base station and computer readable storage medium
WO2021139593A1 (en) * 2020-01-10 2021-07-15 京信网络系统股份有限公司 Energy saving method and apparatus, computer device and storage medium
CN111698758A (en) * 2020-04-01 2020-09-22 新华三信息安全技术有限公司 Terminal access method and device
CN114077213B (en) * 2020-08-21 2023-11-03 大唐移动通信设备有限公司 Energy-saving control method and device
CN114077213A (en) * 2020-08-21 2022-02-22 大唐移动通信设备有限公司 Energy-saving control method and device
CN114363952B (en) * 2020-10-14 2023-11-14 中国移动通信集团设计院有限公司 Mobile communication network resource allocation method, device and readable storage medium
CN114363952A (en) * 2020-10-14 2022-04-15 中国移动通信集团设计院有限公司 Mobile communication network resource allocation method, device and readable storage medium
CN114584986A (en) * 2020-12-01 2022-06-03 中国联合网络通信集团有限公司 Resource scheduling method and device
CN114584986B (en) * 2020-12-01 2024-04-09 中国联合网络通信集团有限公司 Resource scheduling method and device
CN112437457B (en) * 2020-12-08 2023-10-03 中国联合网络通信集团有限公司 Cell mobile network control method, device, equipment and storage medium
CN112437457A (en) * 2020-12-08 2021-03-02 中国联合网络通信集团有限公司 Cell mobile network control method, device, equipment and storage medium
CN113438689A (en) * 2021-06-08 2021-09-24 中国联合网络通信集团有限公司 Base station energy saving method, device, equipment and storage medium
CN113438689B (en) * 2021-06-08 2022-12-23 中国联合网络通信集团有限公司 Base station energy saving method, device, equipment and storage medium
CN114430559A (en) * 2021-11-23 2022-05-03 华信咨询设计研究院有限公司 5G base station intelligent turn-off method based on stepped evaluation
CN114430559B (en) * 2021-11-23 2023-08-08 华信咨询设计研究院有限公司 Intelligent 5G base station turn-off method based on step-type evaluation

Similar Documents

Publication Publication Date Title
CN108271218A (en) A kind of network resource processing method and device
CN108260075A (en) A kind of addressing method and device of base station deployment position
CN103404196B (en) Shunt processing method, control unit and system
CN104301122B (en) A kind of method and apparatus for waking up node
CN110996377B (en) Base station energy saving method, system, device and storage medium
US20190132747A1 (en) Generation of access point configuration change based on a generated coverage monitor
CN103079235A (en) Method and device for realizing load balance in long term evolution (LTE) system
CN103229530B (en) Share the processing method of community, device and server
CN108174347A (en) A kind of pet positioning device energy consumption management method, pet positioning device and server
CN106507378B (en) A kind of management method and device of cell coverage area
CN109640340A (en) Base station data processing method, device, equipment and computer readable storage medium
US9596609B2 (en) Methods and systems for determining radio coverage in wireless communication networks
CN112020098B (en) Load balancing method, device, computing equipment and computer storage medium
CN109548167A (en) Coverage area self-adapting regulation method, device, computer storage medium and equipment
CN105766012B (en) The frequency spectrum rented in spectrum systems is withdrawn
CN108804294A (en) Method, apparatus, equipment and the computer readable storage medium that electricity is reminded
CN110521231A (en) Wireless deployment in zoning
CN104244446B (en) Obtain the method and device of WLAN deployment information
CN105744592A (en) Service Access Method, Device and System Based on Heterogeneous Wireless Network
CN106900009A (en) The method and device of load balancing
CN105451301B (en) Wearable device gateway networking method and gateway management platform
CN103249118A (en) Wireless access point selection method and electronic terminals
CN105592528B (en) A kind of cut-in method of WLAN and multimode user equipment in honeycomb hybrid network
CN108449705A (en) A kind of method and device of control wireless broadband subscriber online position
CN103501231B (en) Business service method, network analyzing apparatus and charge system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180710