CN108266004A - A kind of drawer type walking construction shed and its construction method - Google Patents
A kind of drawer type walking construction shed and its construction method Download PDFInfo
- Publication number
- CN108266004A CN108266004A CN201810053766.4A CN201810053766A CN108266004A CN 108266004 A CN108266004 A CN 108266004A CN 201810053766 A CN201810053766 A CN 201810053766A CN 108266004 A CN108266004 A CN 108266004A
- Authority
- CN
- China
- Prior art keywords
- construction
- canopy
- area
- drawer type
- shed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 213
- 239000002131 composite material Substances 0.000 claims abstract description 9
- 239000000203 mixture Substances 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 238000005096 rolling process Methods 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 238000009434 installation Methods 0.000 claims description 6
- 238000004064 recycling Methods 0.000 claims description 4
- 238000000034 method Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/1205—Small buildings erected in the open air
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/34336—Structures movable as a whole, e.g. mobile home structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
- E04G21/28—Safety or protective measures preventing damage to building parts or finishing work during construction against unfavourable weather influence
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Tents Or Canopies (AREA)
Abstract
The invention discloses a kind of drawer type walking construction shed and its construction methods, the construction shed includes the Nei Peng for being located at strip construction area width direction both sides and outer canopy, Nei Peng can be moved with outer canopy respectively along the length direction of strip construction area, interior canopy is set to the inside composition drawer type composite construction of outer canopy, the inside upper part of Nei Peng and outer canopy is respectively equipped with can be along the driving of the axial movement of interior canopy or outer canopy, and the driving of the outer canopy is located at the top of the interior canopy.Nei Peng and outer canopy form a drawer type composite construction, Nei Peng and outer canopy can be moved forward successively, close region to be onstructed, ensure that enclosed environment can be with the movement carried out to carry out position of construction, it constructs suitable for long line, had not only kept the green construction superiority of construction shed, but also can guarantee that enclosed environment can be with the movement carried out to carry out position of construction, and the use coverage rate of the raising construction shed of maximum possible, achieve the purpose that make green all standing along subway work.
Description
Technical field
The invention belongs to subway work technical field more particularly to a kind of drawer type walking construction shed and its construction methods.
Background technology
Now, construction shed dust control and noise absorption is in foreign countries using widely, and especially in Japan and other countries, construction shed is not only
It is used in during the underground constructions such as subway station, it is also relatively common in Superstructure Construction.Project makes more during building
Seal treatment is carried out to foundation pit or building body with light steel frame and canvas closed net, has achieved the purpose that civilized green construction.
At home underground space construction especially constructing metro tunnel when also begin to attempt to construct using the mode of closure construction canopy
Scene with surrounding enviroment completely cut off, to avoid brought in underground construction especially earth excavation and concrete construction dirt, sound,
Light pollution.
But most domestic closure construction canopy there is no and construction form connected effect, be merely possible to a kind of construction
Additional stability maintenance device, is disagreed with the original intention of green construction.It is green as society is higher and higher to the requirement for building civilized construction
The breakthrough of construction new model is sought by comprehensive deeply universal and unit in charge of construction itself of color job specfication, and closure construction canopy is the general trend of events
Become.And subway is due to the particularity of its full underground construction, construction shed can play its maximum function.And, it would be highly desirable to one kind can fit
Answer subway strip, long linear building feature construction shed.
Invention content
The purpose of the present invention is to provide a kind of drawer type walking construction shed and its construction methods, have both kept the green of construction shed
Color constructs superiority, and can guarantee that enclosed environment can be with the movement carried out to carry out position of construction, and maximum possible carries
The use coverage rate of high construction shed achievees the purpose that make green all standing along subway work.
In order to solve the above technical problems, the present invention provides following technical solution:
A kind of drawer type is walked construction shed, including be located at the Nei Peng of strip construction area width direction both sides with it is outer
Canopy, the Nei Peng can be moved with outer canopy respectively along the length direction of strip construction area, and the interior canopy is set to described
The inside composition drawer type composite construction of outer canopy, the inside upper part of the interior canopy and the outer canopy be respectively equipped with can along interior canopy or
The driving of the axial movement of the outer canopy of person, the driving of the outer canopy are located at the top of the interior canopy.
Preferably, in above-mentioned drawer type walking construction shed, two side bottoms of the Nei Peng and outer canopy are respectively arranged in
On respective ground rail, the Nei Peng is able to move along respective ground rail with outer canopy, the Nei Peng and outer canopy
It is respectively equipped with the guide wheel to match with corresponding ground rail, the corresponding ground rail of the interior canopy is located at strip construction area
The both sides of width direction, the corresponding ground rail of the outer canopy are located at the outside of the corresponding ground rail of the interior canopy.
Preferably, in above-mentioned drawer type walking construction shed, the Nei Peng and the upper inside of the both sides of outer canopy are distinguished
Equipped with Crane Rail, the both ends of the driving are respectively arranged on corresponding Crane Rail and can be along corresponding Crane Rails
Mobile, the both ends of the driving are respectively equipped with the guide wheel to match with corresponding Crane Rail.
Preferably, in above-mentioned drawer type walking construction shed, the Nei Peng includes several doors being connected with outer canopy
Formula steelframe and the top roof truss being set to above portal frame, top roof truss weld assembled truss, door using round steel
Formula steelframe includes the lateral column braces at the top of two root posts and connection two root posts, and the correspondence column of adjacent portal frame leads to
Cross longitudinal column braces connection.
Preferably, in above-mentioned drawer type walking construction shed, the outer canopy uses modularization making, and type of attachment is adopted
It is connected with high-strength bolt, convenient for dismounting and mounting dress, transport and recycling, the outer canopy of required length can be formed.It is likewise, described
Interior canopy uses modularization making, and type of attachment is connected using high-strength bolt, can convenient for dismounting and mounting dress, transport and recycling
With canopy in length needed for formation.
Preferably, in above-mentioned drawer type walking construction shed, bracket, ox are equipped on the inside of the Nei Peng and the column of outer canopy
The length direction of leg upper edge strip construction area is equipped with Crane Rail, and the both ends of the driving are respectively arranged in corresponding driving
It can move on track and along corresponding Crane Rail, the both ends of the driving are respectively equipped with and corresponding Crane Rail phase
The guide wheel matched.
Preferably, in above-mentioned drawer type walking construction shed, if strip construction area one is divided into along its length
Dry area, is followed successively by 1st area to N areas, and N is natural number, and the length of the interior canopy is 1.2-1.6 times of the length in each area, described outer
The length of canopy is 2.2-2.6 times of the length in each area, and the whole maximum coverage range of the Nei Peng and outer canopy are more than 4
Area.
The invention also discloses a kind of construction methods of drawer type walking construction shed as described above, include the following steps:
Step 1, strip construction area is divided into several areas along its length, is followed successively by 1st area to N areas, wherein N is nature
Number installs drawer type walking construction shed so that outer canopy covers 1st area, 2nd area, and it is whole that interior canopy covers 2nd area on strip construction area
With the part in 1st area, in set the driving of canopy and the driving of outer canopy preferentially construct 1st area;
Step 2, the construction of 1st area is treated to certain phase, and when 2nd area start construction, interior canopy is protruding so that interior canopy covers 3rd area,
Continue construct 1st area and 2nd area;
Step 3, treat that certain phase, interior canopy is stretched out to greatest extent for the construction of 2nd area so that interior canopy covers 4th area, so as to
3rd area are able to start closed operation;
Step 4, after the completion of 1st area for most starting construction, outer canopy is moved towards Nei Peng directions so that Nei Peng and outer canopy
2nd area and 3rd area that driving transport power is constructed after concentrating on;
Step 5, it as above rolls and constructs forward, interior canopy preferentially forward extends out, and covers new subregion and new subregion is opened
Beginning closed operation, and outer canopy can also follow the movement of interior canopy to collapse after constructing in the region that it is covered so that interior canopy can be after
It is continuous to stretch out, until the construction of entire strip construction area finishes.
Preferably, in the construction method of above-mentioned drawer type walking construction shed, in step 1, in strip construction area
The step of drawer type walking construction shed is installed on domain, including:
Step 11, first construction ground track;
Step 12, first canopy installs outer canopy again in installation;
Step 13, bracket is welded on inside and outside canopy column, after Crane Rail is layed on bracket, is installed on Crane Rail
Driving;
Step 14, the metope affiliated facility of rolling screen door and inside and outside canopy is installed.
Preferably, in the construction method of above-mentioned drawer type walking construction shed, in step 1, after step 5, also
Including:All after construction, first manipulation construction shed is stopped locked on ground rail, will driving, rolling screen door and inside and outside canopy
Metope affiliated facility removed, outer canopy is first then torn open, then tear interior canopy open using top-down dismounting mode.
By techniques disclosed above scheme it is found that compared with prior art, beneficial effects of the present invention are as follows:
(1) drawer type walking construction shed provided by the invention, can ensure closure construction, solve what is generated in work progress
The pollution such as sound, light, dirt leads to the problem of surrounding enviroment baneful influence, while the environment closed can prevent the poles such as rain, snow, wind
Hold influence of the bad weather to construction, it is also ensured that the duration to carry on construction work at night shortens the construction period to greatest extent.
(2) drawer type walking construction shed provided by the invention, an original construction shed is changed into two construction sheds:It is interior
Canopy and outer canopy, Nei Peng and outer canopy form a drawer type composite construction, and Nei Peng and outer canopy are moved forward, closed to be onstructed successively
Region can guarantee that enclosed environment with construction can be more applicable for long line carrying out the movement of position and construct;Interior canopy and
Working driving is carried on outer canopy respectively, the driving of the outer canopy is located at the top of the interior canopy, can between driving
It runs simultaneously, so as to accelerate construction progress;The Nei Peng can be respectively along the length of strip construction area with outer canopy
Direction is moved, and can not be moved to another construction bid section from a construction bid section by dismantling the form installed again, not only be saved
A large amount of time and expense have been saved, can more keep up with allegro subway work, has expanded the applicable model of construction shed to greatest extent
It encloses and using coverage rate.
(3) construction method of drawer type walking construction shed provided by the invention, first, two rows of set Nei Peng and outer canopy
First construction bid section i.e. 1st area of the preferential construction of the capacity of vehicle;Since Nei Peng and outer canopy form a drawer type composite construction and interior
Canopy and outer canopy can move freely, and interior canopy preferentially forward extends out, and cover new subregion and new subregion is enabled to start closed operation,
And outer canopy can also follow interior canopy movement to collapse after constructing in the region that it is covered so that interior canopy can continue to stretch out, until
Entire strip construction area construction finishes, and the mode for the cross construction that as above stretches is more suitable for strip foundation pit construction;And not
It needs that another construction bid section can be moved to from a construction bid section by dismantling the form installed again, not only saves big
The time of amount and expense, can more keep up with allegro subway work, have expanded the scope of application of construction shed to greatest extent and have made
Use coverage rate.
Description of the drawings
Fig. 1 is the facade structures schematic diagram of the drawer type walking construction shed of one embodiment of the invention.
Fig. 2 is the planar structure schematic diagram of the drawer type walking construction shed of one embodiment of the invention.
Fig. 3~Fig. 6 is the construction process figure of drawer type walking construction shed in one embodiment of the invention.
In figure:1. outer canopy;Canopy in 2.;3. ground rail;4. driving;5. bracket;6. Crane Rail;7. foundation pit;8. roller shutter
Door.
Specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.According to following explanation and right
Claim, advantages and features of the invention will become apparent from.To this hair be described in detail by cited embodiment combination attached drawing below
Bright technology contents and feature.Need in addition it illustrate, attached drawing uses very simplified form and uses non-accurate ratio
Example, only for the purpose of facilitating and clarifying the purpose of the embodiments of the invention.For sake of convenience, described below " on ",
" under " the upper and lower direction with attached drawing is consistent, but this can't be the limitation of technical solution of the present invention.
It please refers to Fig.1 to Fig. 6, present embodiment discloses a kind of drawer type walking construction sheds, are applied including being located at strip
The interior canopy 2 of work peak width direction both sides and outer canopy 1, the interior canopy 2 can be respectively along strip construction areas with outer canopy 1
Length direction moves, and the interior canopy 2 is set to the inside composition drawer type composite construction of the outer canopy 1, the interior canopy 2 and described
The inside upper part of outer canopy 1 be respectively equipped with can along the driving 4 of the axial movement of interior canopy 2 or outer canopy 1, the outer canopy 1 it is described
Driving 4 is located at the top of the interior canopy 2.
The present invention changes its structural system on the basis of traditional construction canopy, and an original construction shed is changed into two
A construction shed:Interior canopy 2 and outer canopy 1, interior canopy 2 and outer canopy 1 form a drawer type composite construction, are more applicable for long line construction;
Working driving 4 is carried on interior canopy 2 and outer canopy 1 respectively, the driving 4 of the outer canopy 1 is located at the top of the interior canopy 2,
It can put into operation simultaneously between driving 4, so as to accelerate construction progress;The interior canopy 2 can be respectively along length with outer canopy 1
The length direction movement of strip construction area can not be moved to by dismantling the form installed again from a construction bid section another
A construction bid section, not only saves a large amount of time and expense, can more keep up with allegro subway work, expand to greatest extent
The scope of application of construction shed and use coverage rate.In addition, drawer type walking construction shed can ensure closure construction, construction is solved
The pollution such as sound, light, dirt for generating in the process leads to the problem of baneful influence to surrounding enviroment;The environment of closing can prevent rain,
Influence of the exceedingly odious weather such as snow, wind to construction, it is also ensured that the duration to carry on construction work at night shortens work to greatest extent
Phase.
In order to enable the interior canopy 2 can be moved with outer canopy 1 respectively along the length direction of strip construction area, preferably
, in above-mentioned drawer type walking construction shed, two side bottoms of the interior canopy 2 and outer canopy 1 are respectively arranged in respective ground
On track 3, the interior canopy 2 is able to move along respective ground rail 3 with outer canopy 1, and the interior canopy 2 is distinguished with outer canopy 1
Equipped with the guide wheel to match with corresponding ground rail 3, the interior 2 corresponding ground rail 3 of canopy is located at strip construction area
The both sides of width direction, the outer 1 corresponding ground rail 3 of canopy are located at the outside of the interior 2 corresponding ground rail 3 of canopy.
Preferably, in above-mentioned drawer type walking construction shed, the interior canopy 2 and the upper inside point of the both sides of outer canopy 1
Not She You Crane Rail 6, the both ends of the driving 4 are respectively arranged on corresponding Crane Rail 6 and can be along corresponding row
Track road 6 moves, and the both ends of the driving 4 are respectively equipped with the guide wheel to match with corresponding Crane Rail 6.Crane Rail 6, no
But driving 4 can be supported, and the movement for driving 4 provides guiding.Driving is respectively provided on the interior canopy 2 and outer canopy 1
The guide wheel driving mechanism of guide wheel.
Preferably, in above-mentioned drawer type walking construction shed, the interior canopy 2 and outer canopy 1 are connected including several
Portal frame and the top roof truss being set to above portal frame, top roof truss weld assembled truss using round steel,
Portal frame includes the lateral column braces at the top of two root posts and connection two root posts, the correspondence column of adjacent portal frame
It is connected by longitudinal column braces.The column uses H profile steel or round steel, and lateral column braces and lateral column braces are using circle
Steel.
Preferably, in above-mentioned drawer type walking construction shed, the outer canopy 1 uses modularization making, and type of attachment is equal
It is connected using high-strength bolt, convenient for dismounting and mounting dress, transport and recycling, the outer canopy 1 of required length can be formed.Likewise,
The interior canopy 2 uses modularization making, and type of attachment is connected using high-strength bolt, makes convenient for dismounting and mounting dress, transport and cycle
With, can be formed needed for length interior canopy 2.
In order to which Crane Rail 6 and driving 4 is given to provide stable support, it is preferred that in above-mentioned drawer type walking construction shed
In, bracket 5 is equipped on the inside of the interior canopy 2 and the column of outer canopy 1, the length direction of 5 upper edge strip construction area of bracket is equipped with
Crane Rail 6, the both ends of the driving 4 are respectively arranged on corresponding Crane Rail 6 and can be along corresponding Crane Rails 6
It is mobile.
Preferably, in above-mentioned drawer type walking construction shed, if strip construction area one is divided into along its length
Dry area i.e. construction bid section, is followed successively by 1st area to N areas, N is natural number, and the length of the interior canopy 2 is the 1.2- of the length in each area
1.6 times, the length of the outer canopy 1 is 2.2-2.6 times of the length in each area, and the whole maximum of the interior canopy 2 and outer canopy 1 is covered
Lid range is more than 4 areas.Above-mentioned design can both enable two drivings 4 to construct simultaneously same area, can also construct respectively
Different areas so as to improve the utilization rate of driving 4, significantly improves construction efficiency, reduces the duration.
Preferably, in above-mentioned drawer type walking construction shed, the both ends of the interior canopy 2 and outer canopy 1 are respectively equipped with for people
The rolling screen door 8 of member's goods and materials disengaging.
Please continue to refer to Fig. 1 to Fig. 6, the construction method of drawer type walking construction shed as described above includes the following steps:
Step 1, strip construction area is divided into several areas along its length to construct bid section, is followed successively by 1st area to N areas,
Wherein N is natural number, drawer type walking construction shed is installed on strip construction area so that outer canopy 1 covers 1st area, 2nd area, interior
Canopy 2 covers that 2nd area are whole and the part in 1st area, preferential 1st area of construction of the driving 4 of canopy 2 and the driving 4 of outer canopy 1 in set;
Step 2, the construction of 1st area is treated to certain phase, when 2nd area start construction, interior canopy 2 is protruding so that the interior covering of canopy 23
Area continues construct 1st area and 2nd area;
Step 3, treat that certain phase, interior canopy 2 is stretched out to greatest extent for the construction of 2nd area so that interior canopy 2 covers 4th area, from
And 3rd area are able to start closed operation;
Step 4, most start construction 1st area after the completion of, outer canopy 1 move towards interior 2 direction of canopy so that interior canopy 2 and outside
2nd area and 3rd area that 4 transport power of driving of canopy 1 is constructed after concentrating on;
Step 5, it as above rolls and constructs forward, interior canopy 2 preferentially forward extends out, and covers new subregion and new subregion is opened
Beginning closed operation, and outer canopy 1 can also follow the interior movement of canopy 2 to collapse after constructing in the region that it is covered so that interior canopy 2 can
Continue to stretch out, until the construction of entire strip construction area finishes.
First construction bid section i.e. 1 of the preferential construction of capacity that the present invention passes through two drivings 4 of canopy in set 2 and outer canopy 1
Area;Since interior canopy 2 and outer canopy 1 form a drawer type composite construction and interior canopy 2 and outer canopy 1 can move freely, interior canopy 2 can be with
It preferentially forward extends out, covers new subregion and new subregion is enabled to start closed operation, and outer canopy 1 is constructed in the region that it is covered
After the movement of interior canopy 2 can also be followed to collapse so that interior canopy 2 can continue to stretch out, until entire strip construction area is constructed
It finishes, the mode for the cross construction that as above stretches is more suitable for strip foundation pit 7 and constructs;And it does not need to by dismantling the shape installed again
Formula can be moved to another construction bid section from a construction bid section, not only save a large amount of time and expense, more can be with
Upper allegro subway work, has expanded the scope of application of construction shed and using coverage rate to greatest extent.
Preferably, in the construction method of above-mentioned drawer type walking construction shed, in step 1, in strip construction area
The step of drawer type walking construction shed is installed on domain, including:
Step 11, first construction ground track 3.
Step 12, first canopy 2 installs outer canopy 1 again in installation.
Step 13, bracket 5 is welded on 1 column of inside and outside canopy, after Crane Rail 6 is layed on bracket 5, in Crane Rail 6
Upper installation driving 4,4 included drive systems of driving a vehicle.
Step 14, the metope affiliated facility of rolling screen door 8 and inside and outside canopy 1 is installed.
After installation is complete, before construction usage, preparation of construction work is carried out, to carry out full side to drawer type walking construction shed
The inspection debugging of position.The preparation of construction work includes the following contents:
To the deviation of guide rail and guide wheel, the levelness of guide rail, the spacing of two closed slides carries out repetition measurement;
Differential settlement mark is done on column, convenient for later long-term reinspection differential settlement;
In the case where interior canopy 2 and outer canopy 1 are static, experiment 4 performances of driving.
It is required for carrying out more than preparation of construction work later it should be noted that installing or moving to finish each time
Make, to ensure the available and security performance of construction shed.
Preferably, in the construction method of above-mentioned drawer type walking construction shed, in step 1, after step 5, also
Including:On strip construction area dismantle drawer type walking construction shed the step of, that is, step 6, all construction after, first grasp
Control construction shed is stopped on ground rail 3 it is locked, by driving 4, rolling screen door 8 and interior canopy 2, outer canopy 1 metope affiliated facility into
Row is removed, and then first tears outer canopy 1 open, then tear interior canopy 2 open using top-down dismounting mode.Also drawer type walking construction shed is just said
Disassembly and installation sequence is opposite.
In conclusion the present invention can keep the green construction superiority of construction shed and enclosed environment can be with
The movement carried out to carry out position of construction, and the use coverage rate of the raising construction shed of maximum possible, reaching makes subway work
The purpose of green all standing along the line.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair
Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims
Range.
Claims (10)
- The construction shed 1. a kind of drawer type is walked, which is characterized in that including being located at strip construction area width direction both sides Nei Peng and outer canopy, the Nei Peng can be moved with outer canopy respectively along the length direction of strip construction area, and the interior canopy is set The inside composition drawer type composite construction of the outer canopy is placed in, the inside upper part of the interior canopy and the outer canopy is respectively equipped with can Along the driving of the axial movement of interior canopy or outer canopy, the driving of the outer canopy is located at the top of the interior canopy.
- The construction shed 2. drawer type as described in claim 1 is walked, which is characterized in that two side bottoms point of the Nei Peng and outer canopy It is not installed on respective ground rail, the Nei Peng is able to move along respective ground rail with outer canopy, described interior Canopy and outer canopy are respectively equipped with the guide wheel to match with corresponding ground rail, and the corresponding ground rail of the interior canopy is located at strip The both sides of construction area width direction, the corresponding ground rail of the outer canopy are located at the outer of the corresponding ground rail of the interior canopy Side.
- The construction shed 3. drawer type as described in claim 1 is walked, which is characterized in that the Nei Peng and the inside of the both sides of outer canopy Upside is respectively equipped with Crane Rail, and the both ends of the driving are respectively arranged on corresponding Crane Rail and can be along corresponding Crane Rail moves.
- The construction shed 4. drawer type as described in claim 1 is walked, which is characterized in that the Nei Peng includes several phases with outer canopy The portal frame of connection and the top roof truss being set to above portal frame, top roof truss are welded assembled using round steel Truss, portal frame include the lateral column braces at the top of two root posts and connection two root posts, pair of adjacent portal frame Column is answered to be connected by longitudinal column braces.
- The construction shed 5. drawer type as claimed in claim 4 is walked, which is characterized in that the outer canopy uses modularization making, even It connects form to connect using high-strength bolt, convenient for dismounting and mounting dress, transport and recycling.
- The construction shed 6. drawer type as claimed in claim 4 is walked, which is characterized in that set on the inside of the Nei Peng and the column of outer canopy There is bracket, the length direction of bracket upper edge strip construction area is equipped with Crane Rail, and the both ends of the driving are respectively arranged in It can move on corresponding Crane Rail and along corresponding Crane Rail, the both ends of the driving are respectively equipped with and corresponding row The guide wheel that track road matches.
- The construction shed 7. drawer type as described in claim 1 is walked, which is characterized in that by strip construction area one along length side To several areas are divided into, 1st area is followed successively by N areas, and N is natural number, and the length of the interior canopy is the 1.2-1.6 of the length in each area Times, the length of the outer canopy is 2.2-2.6 times of the length in each area, and the whole maximum coverage range of the Nei Peng and outer canopy More than 4 areas.
- 8. a kind of construction method of the drawer type walking construction shed in 1-7 such as claim as described in any one, which is characterized in that Include the following steps:Step 1, strip construction area being divided into several areas along its length, is followed successively by 1st area to N areas, wherein N is natural number, Drawer type walking construction shed is installed on strip construction area so that outer canopy covers 1st area, 2nd area, and interior canopy covers 2nd area entirety and 1 The part in area, in set the driving of canopy and the driving of outer canopy preferentially construct 1st area;Step 2, the construction of 1st area is treated to certain phase, when 2nd area start construction, interior canopy is protruding so that interior canopy covers 3rd area, continues Construct 1st area and 2nd area;Step 3, treat that certain phase, interior canopy is stretched out to greatest extent for the construction of 2nd area so that interior canopy covers 4th area, so as to 3rd area It is able to start closed operation;Step 4, after the completion of 1st area for most starting construction, outer canopy is moved towards Nei Peng directions so that the driving of Nei Peng and outer canopy 2nd area and 3rd area that transport power is constructed after concentrating on;Step 5, it as above rolls and constructs forward, interior canopy preferentially forward extends out, and covers new subregion and new subregion is enabled to start to seal Operation is closed, and outer canopy can also follow interior canopy movement to collapse after constructing in the region that it is covered so that interior canopy can continue to stretch Go out, until the construction of entire strip construction area finishes.
- 9. the construction method of drawer type walking construction shed as claimed in claim 8, which is characterized in that in step 1, in strip The step of drawer type walking construction shed is installed on shape construction area, including:Step 11, first construction ground track;Step 12, first canopy installs outer canopy again in installation;Step 13, bracket is welded on inside and outside canopy column, and after Crane Rail is layed on bracket, row is installed on Crane Rail Vehicle;Step 14, the metope affiliated facility of rolling screen door and inside and outside canopy is installed.
- 10. the construction method of drawer type walking construction shed as claimed in claim 8, which is characterized in that after step 5, also Including:All after construction, first manipulation construction shed is stopped locked on ground rail, will driving, rolling screen door and inside and outside canopy Metope affiliated facility removed, outer canopy is first then torn open, then tear interior canopy open using top-down dismounting mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810053766.4A CN108266004B (en) | 2018-01-19 | 2018-01-19 | Drawer type walking construction shed and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810053766.4A CN108266004B (en) | 2018-01-19 | 2018-01-19 | Drawer type walking construction shed and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108266004A true CN108266004A (en) | 2018-07-10 |
CN108266004B CN108266004B (en) | 2023-10-31 |
Family
ID=62776085
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810053766.4A Active CN108266004B (en) | 2018-01-19 | 2018-01-19 | Drawer type walking construction shed and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108266004B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108824121A (en) * | 2018-07-20 | 2018-11-16 | 四川瑞通工程建设集团有限公司 | A kind of rainy day asphalt pavement construction method |
CN113775207A (en) * | 2021-09-22 | 2021-12-10 | 张国锋 | Temporary door type passage design and construction method for building |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202347442U (en) * | 2011-12-02 | 2012-07-25 | 中铁七局集团郑州工程有限公司 | Protective shed for precast beam reinforcement cage binding operation |
US20120266929A1 (en) * | 2011-04-25 | 2012-10-25 | Johnson Outdoors Inc. | Insulated liner and tent having insulated liner |
CN205713167U (en) * | 2016-06-15 | 2016-11-23 | 中国电建集团铁路建设有限公司 | A kind of packaged type rain shade for main structure of subway station construction |
CN205777634U (en) * | 2016-06-29 | 2016-12-07 | 郑州市第一建筑工程集团有限公司 | Telescopic moving formula protection canopy |
CN207847164U (en) * | 2018-01-19 | 2018-09-11 | 上海建工四建集团有限公司 | A kind of drawer type walking construction shed |
-
2018
- 2018-01-19 CN CN201810053766.4A patent/CN108266004B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120266929A1 (en) * | 2011-04-25 | 2012-10-25 | Johnson Outdoors Inc. | Insulated liner and tent having insulated liner |
CN202347442U (en) * | 2011-12-02 | 2012-07-25 | 中铁七局集团郑州工程有限公司 | Protective shed for precast beam reinforcement cage binding operation |
CN205713167U (en) * | 2016-06-15 | 2016-11-23 | 中国电建集团铁路建设有限公司 | A kind of packaged type rain shade for main structure of subway station construction |
CN205777634U (en) * | 2016-06-29 | 2016-12-07 | 郑州市第一建筑工程集团有限公司 | Telescopic moving formula protection canopy |
CN207847164U (en) * | 2018-01-19 | 2018-09-11 | 上海建工四建集团有限公司 | A kind of drawer type walking construction shed |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108824121A (en) * | 2018-07-20 | 2018-11-16 | 四川瑞通工程建设集团有限公司 | A kind of rainy day asphalt pavement construction method |
CN113775207A (en) * | 2021-09-22 | 2021-12-10 | 张国锋 | Temporary door type passage design and construction method for building |
CN113775207B (en) * | 2021-09-22 | 2022-09-23 | 张国锋 | Temporary door type passage design and construction method for building |
Also Published As
Publication number | Publication date |
---|---|
CN108266004B (en) | 2023-10-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109025388B (en) | Construction device and construction method of movable expanded openable canopy | |
CN102383712B (en) | Built-in sunshade hollow glass product | |
CN103422570B (en) | Open-close type hut product | |
CN207847164U (en) | A kind of drawer type walking construction shed | |
JPH11513761A (en) | Cable-supported opening / closing daylighting roof for stadium, arena and other structures, and method of constructing the same | |
CN108266004A (en) | A kind of drawer type walking construction shed and its construction method | |
CN107178226A (en) | The whole self-propelled totally-enclosed green construction enclosing of formula and its construction method | |
CN203701601U (en) | Building maintenance shed | |
CN209585718U (en) | A kind of multi-functional foundation pit protection canopy | |
CN206917351U (en) | The whole self-propelled totally-enclosed green construction enclosing of formula | |
CN106567552A (en) | Dynamic closed construction method of subway station using fast folding shelters | |
CN205891817U (en) | Building rubbish pond device that all steel system is closed and ceiling can open and shut | |
CN104060860A (en) | Sectional telescopic rainproof shed and application method for prefabricating concrete T beam | |
CN210147306U (en) | Foldable movable windproof cover for welding penstock | |
CN107060410A (en) | A kind of Full-automatic folding garage | |
CN208897847U (en) | One kind pushing and pulling closed atomizing refuse depot entirely | |
CN106437000A (en) | Turnover sliding combined type roofing structure capable of being opened and closed | |
CN202899384U (en) | Suspended roof structural system for slide construction and opening and closing | |
CN207211786U (en) | Portable suitable for metro station construction covers canopy | |
CN206900371U (en) | Rail traffic platform door pillar combines and the platform door system using column combination | |
CN103437287B (en) | Be applied to the whole opening box girder section assembling method of bridge construction | |
CN206273957U (en) | The fast folding for being capable of achieving the construction of subway station Dynamic Closed covers canopy group | |
CN207228069U (en) | Rectangle aqueduct construction telescoping steel form | |
CN206733273U (en) | Movable folding type steam curing cover | |
CN108910369A (en) | One kind pushing and pulling closed atomizing refuse depot and its construction method entirely |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |