CN108263559A - The protection structure of side of a ship outer tube zinc coat and its guard method and production method - Google Patents

The protection structure of side of a ship outer tube zinc coat and its guard method and production method Download PDF

Info

Publication number
CN108263559A
CN108263559A CN201711383426.XA CN201711383426A CN108263559A CN 108263559 A CN108263559 A CN 108263559A CN 201711383426 A CN201711383426 A CN 201711383426A CN 108263559 A CN108263559 A CN 108263559A
Authority
CN
China
Prior art keywords
tube body
sleeve pipe
protection sleeve
outer tube
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711383426.XA
Other languages
Chinese (zh)
Inventor
周柳英
饶武江
陆佳
王永强
陈灵超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Wenchong Shipyard Co Ltd
Original Assignee
Guangzhou Wenchong Shipyard Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Wenchong Shipyard Co Ltd filed Critical Guangzhou Wenchong Shipyard Co Ltd
Priority to CN201711383426.XA priority Critical patent/CN108263559A/en
Publication of CN108263559A publication Critical patent/CN108263559A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B13/00Conduits for emptying or ballasting; Self-bailing equipment; Scuppers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B13/00Conduits for emptying or ballasting; Self-bailing equipment; Scuppers
    • B63B13/02Ports for passing water through vessels' sides

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)

Abstract

The present invention relates to ship equipment technical fields; disclose a kind of protection structure of hull side of a ship outer tube zinc coat and its guard method and manufacturing method; it protects structure to include the protection sleeve pipe being sheathed on the tube body; the tube body is fixedly connected by the protection sleeve pipe with the bracket; by the protection of the protection sleeve pipe, so as to avoid the destruction when bracket and side of a ship outside plate are installed to the zinc coat of tube body outer surface;Its guard method is that first protection sleeve pipe is set on tube body; then the tube body to side of a ship outer tube and bracket carry out zinc-plated respectively; then side of a ship outer tube is transported on hull and strengthens connecting with bracket; bracket is in direct contact with protection sleeve pipe, effective protection destruction of the bracket to the Zinc coat of the tube body of side of a ship outer tube;The production method of its protection sleeve pipe includes first cutting pipe, and further according to special angle by one of ends cutting into inclined-plane, then by two end cuts into 45 degree of slope surface, production method is simply easily realized, with larger promotional value.

Description

The protection structure of side of a ship outer tube zinc coat and its guard method and production method
Technical field
The present invention relates to ship equipment technical field, protection structure and its guarantor more particularly to a kind of side of a ship outer tube zinc coat Maintaining method and production method.
Background technology
The basic demand of the side of a ship outer tube of ship is:The tube body of side of a ship outer tube need to do galvanizing processing, go on board and be installed to outside plate When upper, tube surface zinc coat must not be destroyed.
Company's ship type is numerous at present, and the pattern of side of a ship outer tube also changes various, conventional setting-out pattern and met not therewith In terms of demand, especially length.According to code requirement, cabin majority row outboard all need under waterline, and in the ship type of part, Underwater ship side structure often has the situation in non-watertight sky cabin, to ensure the requirement for height of row's outboard, in addition structure and space Limitation, causes side of a ship outer tube to be had to across empty cabin to topside, therefore the length for just having outboard pipe reaches several meters or more of situation.
In addition, prior art as shown in Figure 1, side of a ship outer tube 1 all needs to be strengthened with bracket 2, and bracket 2 need to be with side of a ship outer tube 1 tube body 11 is whole to be welded, after galvanizing again to being installed with outside plate 3 on ship.Space on ship is difficult to meet pipe and bracket Corresponding installation site is entered back into after freezing, bracket is welded if first installing pipe and reburning, the zinc coat of tube surface can be destroyed.
Invention content
The object of the present invention is to provide a kind of protection structure of hull side of a ship outer tube zinc coat and its guard method and making sides Method, enabling the zinc coat of effective protection tube surface and be easily installed.
To achieve these goals, the embodiment of the present invention provides a kind of protection structure of hull side of a ship outer tube zinc coat, described Side of a ship outer tube includes tube body, and the tube body is fixedly mounted after being strengthened by bracket with the outside plate of hull, the protection structure packet The protection sleeve pipe being sheathed on the tube body is included, the tube body is fixedly connected by the protection sleeve pipe with the bracket.
Preferably, the protection sleeve pipe is fixedly connected by welding with the tube body, the bracket It is fixedly connected by welding with the outer surface of the protection sleeve pipe.
Preferably, the longitudinal section of the protection sleeve pipe is trapezoidal, and two on the axial direction of the protection sleeve pipe It is welded respectively with the tube body at end.
Preferably, the tube body is cylindrical, and the protection sleeve pipe is cylindrical and between the tube body Gap coordinates.
Preferably, the outer diameter spacing of the internal diameter of the protection sleeve pipe and the tube body is 2mm.
Preferably, one end of the tube body is installed with flange, and the other end of the tube body is passed through outside described Mounting hole on plate is simultaneously welded and fixed with the outside plate, and the axial line of the tube body is in an angle α with the outside plate;
The protection sleeve pipe is set between the outside plate and the flange and is disposed adjacent with the outside plate, the protective case Pipe is inclined to set close to the end face of the outside plate, and the axial line of the end face and the tube body is in an angle β;
Wherein, β=α.
Preferably, the material of the protection sleeve pipe is identical with the material of the tube body.
In addition, in order to realize identical foregoing invention purpose, it is zinc-plated that the embodiment of the present invention also provides a kind of hull side of a ship outer tube The guard method of layer, the guard method include the following steps:
S1, above-mentioned protection sleeve pipe and bracket are made according to the structure size and its intensity requirement of side of a ship outer tube;
S2, after step S1, the protection sleeve pipe is sheathed on the tube body of the side of a ship outer tube and is welded and fixed, it is right The outer surface of side of a ship outer tube and bracket carries out zinc-plated processing respectively;
The side of a ship outer tube is transported on hull and outside plate is installed by S3, upon step s 2;
S4, after step s 3, the bracket and the protection sleeve pipe on side of a ship outer tube are welded and fixed.
Preferably, step S5 is further included after step s4:Examine whether welding effect reaches standard.
In addition, in order to realize identical foregoing invention purpose, the embodiment of the present invention also provides the system of above-mentioned protection sleeve pipe Make method, the longitudinal section of the protection sleeve pipe is trapezoidal, and the protection sleeve pipe is inclined to set close to the end face of the outside plate, institute It states end face to be arranged in parallel with outside plate, the production method includes the following steps:
S1, according to the size of tube body of side of a ship outer tube and the size of bracket, choose the casing of corresponding diameter, and cut Into the cylinder-shaped sleeve of certain length;
S2, after step S1, the oblique cutting cylinder-shaped sleeve in axial direction on one of end face, make to cut The angle of the axial line of end face and tube body after cutting is equal to the angle of the axial line of the outside plate and tube body;
S3, upon step s 2, to described sleeve pipe in axial direction on two end cuts into 45 degree of slope surface, make institute The longitudinal section for stating casing is trapezoidal.
A kind of protection structure of hull side of a ship outer tube zinc coat provided in an embodiment of the present invention and its guard method and manufacturer Method, protection structure include the protection sleeve pipe being sheathed on the tube body, and the tube body passes through the protection sleeve pipe and institute It states bracket to be fixedly connected, by the protection of the protection sleeve pipe, installation can be in direct contact to avoid bracket and tube body, so as to The destruction to the zinc coat of tube body outer surface when bracket and side of a ship outside plate are installed is avoided, and especially suitable for the pipe of side of a ship outer tube The long situation of ontology because when tube body is long, need it is first zinc-plated to tube body after again on hull with bracket Installation can destroy the zinc coat on tube body so as to the reinforcement installation of bracket, and guard method is first to be set in protection sleeve pipe On tube body, then the tube body to side of a ship outer tube and bracket carry out zinc-plated respectively, are then transported to side of a ship outer tube on hull and bracket Strengthen connection, since bracket is in direct contact with the protection sleeve pipe being arranged outside tube body, so as to which effective protection bracket is to outboard The destruction of the Zinc coat of the tube body of pipe, not only protects zinc coat, also simplifies installation procedure, improves installation effect Rate, the production method of protection sleeve pipe include first cutting pipe, further according to special angle by one of ends cutting into inclined-plane, Then by two end cuts into 45 degree of slope surface, production method is simply easily realized, with larger promotional value.
Description of the drawings
Fig. 1 is the outboard pipe mounting structure schematic diagram of the prior art;
Fig. 2 is a kind of protection structure of hull side of a ship outer tube zinc coat provided in an embodiment of the present invention;
Fig. 3 is a kind of flow chart of the guard method of hull side of a ship outer tube zinc coat provided in an embodiment of the present invention;
Fig. 4 to fig. 6 is a kind of production method of the protection structure of hull side of a ship outer tube zinc coat provided in an embodiment of the present invention The structure diagram of step;
Wherein, 1- sides of a ship outer tube, 11- tube bodies, 2- brackets, 3- outside plates, 31- mounting holes, 4- protection sleeve pipes, 5- hulls.
Specific embodiment
With reference to the accompanying drawings and examples, the specific embodiment of the present invention is described in further detail.Implement below Example is used to illustrate the present invention, but be not limited to the scope of the present invention.
As shown in Fig. 2, a kind of protection structure for hull side of a ship outer tube zinc coat that the preferred embodiment of the present invention provides, outboard Pipe 1 includes tube body 11, and the tube body 11 is fixedly mounted by the outside plate 3 with hull 5 after the reinforcement of bracket 2, the protection knot Structure includes the protection sleeve pipe 4 being sheathed on the tube body 11, and the tube body 11 passes through the protection sleeve pipe 4 and the bracket 2 are fixedly connected, and by the protection of the protection sleeve pipe 4, can be in direct contact installation to avoid bracket 2 and tube body 11, so as to The destruction to the zinc coat of 11 outer surface of tube body when bracket 2 and side of a ship outside plate 1 are installed is avoided, and especially suitable for side of a ship outer tube The long situation of tube body because when tube body is long, need it is first zinc-plated to tube body after again on hull with Bracket is installed, and the zinc coat on tube body can be destroyed so as to the reinforcement installation of bracket, when using guarantor provided in an embodiment of the present invention , then can be first zinc-plated to the progress of the tube body of side of a ship outer tube after protecting pipe, then side of a ship outer tube is transported on hull and bracket is strengthened Connection, since bracket is in direct contact with the protection sleeve pipe being arranged outside tube body, so as to which effective protection bracket is to side of a ship outer tube The destruction of the Zinc coat of tube body, not only protects zinc coat, also simplifies installation procedure, improves installation effectiveness.
Specifically, the protection sleeve pipe 4 is fixedly connected by welding with the tube body 11, the bracket 2 with The outer surface of the protection sleeve pipe 4 is fixedly connected by welding, it is preferable that the longitudinal section of the protection sleeve pipe 4 is in ladder Shape, the both ends on the axial direction of the protection sleeve pipe 4 are welded respectively with the tube body, further can be by protection sleeve pipe Both ends carry out lap welding with tube body, so as to obtain more preferably fixed effect, so as to meet integrally-built intensity requirement.
Preferably, the tube body 11 is cylindrical, the protection sleeve pipe 4 it is cylindrical and with 11 gap of tube body Cooperation, specifically, the internal diameter of the protection sleeve pipe 4 and the outer diameter spacing of the tube body 11 are 2mm, so that protection sleeve pipe 4 can quickly and easily be sheathed on the tube body 11, and keep smaller gap, to facilitate welding and improve fixed steady It is qualitative.
It is further preferred that one end of the tube body 11 is installed with flange 12, the other end of the tube body 11 is described in Mounting hole 31 on outside plate 3 is simultaneously welded and fixed with the outside plate 3, and the axial line of the tube body 11 is with the outside plate 3 in a folder Angle α;The protection sleeve pipe 4 is set between the outside plate 3 and the flange 12 and is disposed adjacent with the outside plate 3, the protection Casing 4 is inclined to set close to the end face of the outside plate 3, and the axial line of the end face and the tube body 11 is in an angle β;Its In, β=α is thereby guaranteed that and the mounting hole 31 of outside plate 3 and tube body 11 is not interfered with when installing side of a ship outer tube to hull 5 Cooperation.
It is highly preferred that the material of the protection sleeve pipe 4 is identical with the material of the tube body 11, consequently facilitating processing system It makes, and is conveniently welded and fixed.
In addition, as shown in figure 3, the embodiment of the present invention also provides a kind of guard method of hull side of a ship outer tube zinc coat, it is described Guard method includes the following steps:
S1, above-mentioned protection sleeve pipe and bracket are made according to the structure size and its intensity requirement of side of a ship outer tube;Specifically, root The internal diameter of protection sleeve pipe and length are determined according to the diameter and length of the tube body of side of a ship outer tube, it will according to the reinforcement of side of a ship outer tube It asks to make bracket.
S2, after step S1, the protection sleeve pipe is sheathed on the tube body of the side of a ship outer tube and is welded and fixed, have Body carries out spot welding by both ends on protection sleeve pipe length direction and fixes, then to the outer surface of side of a ship outer tube and bracket respectively into Row zinc-plated processing;
The side of a ship outer tube is transported on hull and outside plate is installed by S3, upon step s 2;
S4, after step s 3, the bracket and the protection sleeve pipe on side of a ship outer tube is welded and fixed, specifically, by bracket Bottom and the outer surface of protection sleeve pipe be welded and fixed, the top of bracket is fixed with Hull Welding, by the side of bracket with it is outer Plate is welded and fixed.
Preferably, step S5 is further included after step s4:Examine whether welding effect reaches standard, to ensure whole knot The fastness of structure.
In addition, the production method that the embodiment of the present invention also provides above-mentioned protection sleeve pipe, the production method includes following Step:
S1, according to the size of tube body of side of a ship outer tube and the size of bracket, choose the casing of corresponding diameter, and cut Into the cylinder-shaped sleeve (as shown in Figure 4) of certain length;Cylinder-shaped sleeve is in hollow pipe, and internal diameter is outer slightly larger than tube body Diameter, so as to ensure both rational fitting, the length of cylinder-shaped sleeve should be greater than the bottom lengths of bracket, so as to ensure elbow The bottom of plate will not be contacted with tube body.
S2, after step S1, the oblique cutting cylinder-shaped sleeve in axial direction on one of end face, make to cut The angle of the axial line of end face and tube body after cutting is equal to the angle of the axial line of the outside plate and tube body;The cutting mode Conventional existing cutting technique can be used, and the cut surface that can polish after having cut, protection sleeve pipe such as Fig. 5 institutes after cutting Show.
S3, upon step s 2, to the protection sleeve pipe in axial direction on two end cuts into 45 degree of slope surface, make The longitudinal section of the protection sleeve pipe is trapezoidal, is fixed with the spot welding for being convenient to tube body, the protection sleeve pipe to complete such as Fig. 6 institutes Show.
To sum up, an embodiment of the present invention provides a kind of protection structure of hull side of a ship outer tube zinc coat and its guard method and systems Method is made, which includes the protection sleeve pipe being sheathed on the tube body, and the tube body passes through the protection sleeve pipe It is fixedly connected with the bracket, by the protection of the protection sleeve pipe, installation can be in direct contact to avoid bracket and tube body, so as to It can be to avoid the destruction when bracket and side of a ship outside plate are installed to the zinc coat of tube body outer surface, and especially suitable for side of a ship outer tube The long situation of tube body because when tube body is long, need it is first zinc-plated to tube body after again on hull with Bracket is installed, and the zinc coat on tube body can be destroyed so as to the reinforcement installation of bracket, guard method is first by protective case pipe sleeve Be located on tube body, then the tube body to side of a ship outer tube and bracket carry out zinc-plated respectively, then by side of a ship outer tube be transported on hull with Bracket strengthens connection, since bracket is in direct contact with the protection sleeve pipe being arranged outside tube body, so as to effective protection bracket pair The destruction of the Zinc coat of the tube body of side of a ship outer tube, not only protects zinc coat, also simplifies installation procedure, improves installation Efficiency, the production method of protection sleeve pipe include first cutting pipe, further according to special angle by one of ends cutting into oblique Face, then by two end cuts into 45 degree of slope surface, production method is simply easily realized, with larger promotional value.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and replacement can also be made, these improve and replace Also it should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of protection structure of hull side of a ship outer tube zinc coat, the side of a ship outer tube includes tube body, and the tube body passes through bracket It is fixedly mounted after reinforcement with the outside plate of hull, which is characterized in that the protection structure includes the guarantor being sheathed on the tube body Protecting pipe, the tube body are fixedly connected by the protection sleeve pipe with the bracket.
2. the protection structure of hull side of a ship outer tube zinc coat as described in claim 1, which is characterized in that the protection sleeve pipe and institute It states tube body to be fixedly connected by welding, the bracket and the outer surface of the protection sleeve pipe are solid by welding Fixed connection.
3. the protection structure of hull side of a ship outer tube zinc coat as claimed in claim 2, which is characterized in that the protection sleeve pipe is indulged Section is trapezoidal, and the both ends on the axial direction of the protection sleeve pipe are welded respectively with the tube body.
4. the protection structure of hull side of a ship outer tube zinc coat as described in claim 1, which is characterized in that the tube body is in pipe Shape, the protection sleeve pipe it is cylindrical and with the tube body clearance fit.
5. the protection structure of hull side of a ship outer tube zinc coat as claimed in claim 4, which is characterized in that the protection sleeve pipe it is interior The outer diameter spacing of diameter and the tube body is 2mm.
6. such as the protection structure of claim 1-5 any one of them hull side of a ship outer tube zinc coats, which is characterized in that the pipe sheet One end of body is installed with flange, and the other end of the tube body passes through the mounting hole on the outside plate and welded with the outside plate solid Fixed, the axial line of the tube body is in an angle α with the outside plate;
The protection sleeve pipe is set between the outside plate and the flange and is disposed adjacent with the outside plate, and the protection sleeve pipe is leaned on The end face of the nearly outside plate is inclined to set, and the axial line of the end face and the tube body is in an angle β;
Wherein, β=α.
7. such as the protection structure of claim 1-5 any one of them hull side of a ship outer tube zinc coats, which is characterized in that the protection The material of casing is identical with the material of the tube body.
8. a kind of guard method of hull side of a ship outer tube zinc coat, which is characterized in that include the following steps:
S1, such as claim 1-7 any one of them protection sleeve pipes are made according to the structure size and its intensity requirement of side of a ship outer tube And bracket;
S2, after step S1, the protection sleeve pipe is sheathed on the tube body of the side of a ship outer tube and is welded and fixed, to outboard The outer surface of pipe and bracket carries out zinc-plated processing respectively;
The side of a ship outer tube is transported on hull and outside plate is installed by S3, upon step s 2;
S4, after step s 3, the bracket and the protection sleeve pipe on side of a ship outer tube are welded and fixed.
9. a kind of guard method of hull side of a ship outer tube zinc coat as claimed in claim 8, which is characterized in that after step s4 Further include step S5:Examine whether welding effect reaches standard.
10. a kind of method for making protection sleeve pipe described in claim 1, the longitudinal section of the protection sleeve pipe is trapezoidal, described Protection sleeve pipe is inclined to set close to the end face of the outside plate, and the end face is arranged in parallel with the outside plate, the method includes Following steps:
S1, according to the size of tube body of side of a ship outer tube and the size of bracket, choose the casing of corresponding diameter, and cut into one The cylinder-shaped sleeve of measured length;
S2, after step S1, the oblique cutting cylinder-shaped sleeve in axial direction on one of end face, after making cutting End face and tube body axial line angle be equal to the outside plate and tube body axial line angle;
S3, upon step s 2, to described sleeve pipe in axial direction on two end cuts into 45 degree of slope surface, make the set The longitudinal section of pipe is trapezoidal.
CN201711383426.XA 2017-12-20 2017-12-20 The protection structure of side of a ship outer tube zinc coat and its guard method and production method Pending CN108263559A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711383426.XA CN108263559A (en) 2017-12-20 2017-12-20 The protection structure of side of a ship outer tube zinc coat and its guard method and production method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711383426.XA CN108263559A (en) 2017-12-20 2017-12-20 The protection structure of side of a ship outer tube zinc coat and its guard method and production method

Publications (1)

Publication Number Publication Date
CN108263559A true CN108263559A (en) 2018-07-10

Family

ID=62772411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711383426.XA Pending CN108263559A (en) 2017-12-20 2017-12-20 The protection structure of side of a ship outer tube zinc coat and its guard method and production method

Country Status (1)

Country Link
CN (1) CN108263559A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109128561A (en) * 2018-10-30 2019-01-04 广船国际有限公司 A kind of installation method of steamer pipeline
CN111457164A (en) * 2020-04-26 2020-07-28 中船黄埔文冲船舶有限公司 Desulfurization system arranges outboard tube
CN112208723A (en) * 2020-11-06 2021-01-12 伊荣德滚塑管业(深圳)有限公司 Anti-corrosion protection processing method for ship metal outboard plate with outboard pipe
CN113398509A (en) * 2021-06-23 2021-09-17 芜湖造船厂有限公司 Fire fighting installation structure of fire fighting ship and welding method thereof
CN113983241A (en) * 2021-11-10 2022-01-28 上海外高桥造船有限公司 Method of installing reinforced pipe using structural retainer and reinforced pipe assembly

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720894A (en) * 2011-03-30 2012-10-10 江苏省镇江船厂有限责任公司 Deck penetration piece for ship pipe and penetration method
CN103723266A (en) * 2013-12-27 2014-04-16 浙江造船有限公司 Ventilation device for maritime work ship special liquid cabin and implementation method
CN206984259U (en) * 2017-07-03 2018-02-09 大连船舶重工集团有限公司 A kind of outboard Tube Drain frock
CN207889935U (en) * 2017-12-20 2018-09-21 广州文冲船厂有限责任公司 A kind of protection structure of side of a ship outer tube zinc coat

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720894A (en) * 2011-03-30 2012-10-10 江苏省镇江船厂有限责任公司 Deck penetration piece for ship pipe and penetration method
CN103723266A (en) * 2013-12-27 2014-04-16 浙江造船有限公司 Ventilation device for maritime work ship special liquid cabin and implementation method
CN206984259U (en) * 2017-07-03 2018-02-09 大连船舶重工集团有限公司 A kind of outboard Tube Drain frock
CN207889935U (en) * 2017-12-20 2018-09-21 广州文冲船厂有限责任公司 A kind of protection structure of side of a ship outer tube zinc coat

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109128561A (en) * 2018-10-30 2019-01-04 广船国际有限公司 A kind of installation method of steamer pipeline
CN111457164A (en) * 2020-04-26 2020-07-28 中船黄埔文冲船舶有限公司 Desulfurization system arranges outboard tube
CN112208723A (en) * 2020-11-06 2021-01-12 伊荣德滚塑管业(深圳)有限公司 Anti-corrosion protection processing method for ship metal outboard plate with outboard pipe
CN113398509A (en) * 2021-06-23 2021-09-17 芜湖造船厂有限公司 Fire fighting installation structure of fire fighting ship and welding method thereof
CN113983241A (en) * 2021-11-10 2022-01-28 上海外高桥造船有限公司 Method of installing reinforced pipe using structural retainer and reinforced pipe assembly

Similar Documents

Publication Publication Date Title
CN108263559A (en) The protection structure of side of a ship outer tube zinc coat and its guard method and production method
CN207889935U (en) A kind of protection structure of side of a ship outer tube zinc coat
EP1612466B1 (en) Tube connection structure
CN204176159U (en) Boats and ships and upper pipeline crossing cabin part thereof
CN102720894B (en) Deck penetration piece for ship pipe and penetration method
US9434457B2 (en) Boat launch
US7201255B1 (en) Apparatus and method of forming a corrosion resistant coating on a ladder
KR101717902B1 (en) scupper for engine room deck of ships and scupper manufacturing method
CN113785151A (en) Metal pipe, in particular a pipe for transporting oil and gas, having a metal coating in the transition region
RU141409U1 (en) DEVICE FOR PROTECTION AGAINST CORROSION OF WELDED JOINT OF PIPES WITH INTERNAL COATING
CN205239877U (en) Boats and ships chimney top blast pipe and chimney roof complex structure
CN211659630U (en) Cabin penetrating structure of desulfurization system pipeline
AU2015239605B2 (en) Floating structure comprising a water intake riser bundle, method of producing a liquefied hydrocarbon stream and method producing a vaporous hydrocarbon stream
CN211342801U (en) Petroleum pipeline sleeve
EP1712757A1 (en) Exhaust system
EP1493968B1 (en) Membrane wall
CN210318867U (en) PE (polyethylene) anti-corrosion seamless natural gas pipeline with multilayer structure
Doble et al. Use of thermally sprayed aluminium in the Norwegian Offshore Industry
JP6468857B2 (en) Removal method of existing oil pipe
RU137079U1 (en) WELDED TEE TEE PROTECTED FROM INTERNAL CORROSION WITH CORROSION-RESISTANT STEEL COATING AND SHOES
CN218907570U (en) Ship pipeline penetrating device with heat insulation layer and capable of preventing pipeline coating from being damaged
RU135061U1 (en) TEE WITH BRANCHES PROTECTED FROM CORROSION BY INTERNAL COATING AND UNDERBOARD BIMETAL BUSHES
CN215293921U (en) Anti-corrosion large-diameter straight seam steel pipe
US4678692A (en) Multilayer protection system
CN202561276U (en) Oil and gas conveying pipeline

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180710

RJ01 Rejection of invention patent application after publication