CN108253300A - Underground pressure regulating box - Google Patents

Underground pressure regulating box Download PDF

Info

Publication number
CN108253300A
CN108253300A CN201611233399.3A CN201611233399A CN108253300A CN 108253300 A CN108253300 A CN 108253300A CN 201611233399 A CN201611233399 A CN 201611233399A CN 108253300 A CN108253300 A CN 108253300A
Authority
CN
China
Prior art keywords
box
valve
lower box
pressure
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611233399.3A
Other languages
Chinese (zh)
Inventor
王翔宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Chris Gas Equipment Co Ltd
Original Assignee
Tianjin Chris Gas Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Chris Gas Equipment Co Ltd filed Critical Tianjin Chris Gas Equipment Co Ltd
Priority to CN201611233399.3A priority Critical patent/CN108253300A/en
Publication of CN108253300A publication Critical patent/CN108253300A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D3/00Arrangements for supervising or controlling working operations
    • F17D3/01Arrangements for supervising or controlling working operations for controlling, signalling, or supervising the conveyance of a product
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D5/00Protection or supervision of installations
    • F17D5/005Protection or supervision of installations of gas pipelines, e.g. alarm

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Fluid Pressure (AREA)

Abstract

A kind of Underground pressure regulating box, including blow-down pipe and the upper box, lower box and pressure regulation core that are placed in subsurface, multiple interfaces are welded on blow-down pipe, upper box and lower box are assembled integrally, form on upper box is installed, openable upper cover is connected at the top of upper box.Upper box surrounding, which is welded with, diffuses interface and check-valves interface passes through connection by metal hose with the interface on desorption tube respectively;Lower box includes inlet valve, inlet tube, outlet, outlet valve and pressure regulation core, one end of inlet valve and inlet tube connects, the other end of inlet tube is welded with lower box, one end of outlet valve and outlet connects, the other end of outlet is welded with lower box, and pressure regulation core is mounted on inside lower box;The pressure regulation core is made of operation equipment and main voltage regulator.The apparatus structure is compact, safe and reliable, it can be achieved that gas pressure regulating voltage stabilizing, parameter are shown and superpressure diffuses cut-out.

Description

Underground pressure regulating box
Technical field:
The invention belongs to the Gas Regulator in a kind of gas transmission and distribution system, more particularly to a kind of Underground pressure regulation Case.
Background technology:
Domestic conventional gas pressure regulating box largely to arrange on the ground, and box house is by pipeline by valve, filter, pressure regulation Device etc. is connected in turn.There are following defects for this Rose Box:1st, occupied space is big, safeguards complicated.2nd, part box house Ground is moist, ventilation is not smooth, and device therefor easily corrodes, and there are security risks.3rd, most batch meters are arranged in beside road, are held Sight easily is blocked, the uncivil behavior of some passerbys in addition causes tank surface cut significantly to have spot, influences beauty.4th, exist The risk of gas leakage is caused by Vehicular impact.5th, babinet is easy to be opened, and there is be illegally modified parameter and cut-out combustion gas The risk of supply.
Invention content:
The purpose of the present invention, which is that, overcomes above-mentioned the deficiencies in the prior art, provides a kind of Underground pressure regulation dress It puts, the apparatus structure is compact, safe and reliable, it can be achieved that gas pressure regulating voltage stabilizing, parameter are shown and superpressure diffuses cut-out.
As above conceive, technical scheme is as follows:
A kind of Underground pressure regulating box, including blow-down pipe and the upper box, lower box and pressure regulation core that are placed in subsurface, emptying Multiple interfaces are welded on pipe, upper box and lower box are assembled integrally, and form is equipped on upper box, is connected at the top of upper box There is openable upper cover;It is characterized in that:Upper box surrounding be welded with diffuse interface and check-valves interface respectively on blow-down pipe Interface pass through connection by metal hose;Lower box includes inlet valve, inlet tube, outlet, outlet valve and pressure regulation core, entrance One end of valve and inlet tube connects, and the other end and the lower box of inlet tube weld, and one end of outlet valve and outlet connects, The other end of outlet is welded with lower box, and pressure regulation core is mounted on inside lower box;The pressure regulation core is by operation equipment and homophony Depressor forms, and operation equipment includes terminal pad and inlet pressure gauge mounted thereto, difference gauge, pilot valve, stop valve, ball valve And delivery gauge, main voltage regulator are made of filter core and pressure regulator, pressure regulator is used cooperatively with pilot valve, at the difference gauge two Pressure tappings are connected across filter core both sides.
Above-mentioned upper box surrounding is welded with expansion interface.
The inlet tube and outlet of above-mentioned lower box and the junction of lower box are welded with floor.
Above-mentioned lower box top is installed by Safety relief valve.
Above-mentioned inlet valve and outlet valve can be welded using buried welding ball valve with pipe network.
Hanging ring is installed in the terminal pad of aforesaid operations equipment.
Blowdown valve is installed in the terminal pad of aforesaid operations equipment.
The present invention has the advantage that and good effect:
1st, the present invention is integrally placed at underground, and only upper cover is above ground level a little, so there is no need to build needed for traditional pressure regulating box compared with Big civil engineering amount, saves floor space, and avoid the shortcomings of such as blocking sight, eliminates by the risk of Vehicular impact.
2nd, the present invention by integration of equipments such as pilot valve, stop valve, filter, pressure regulator, pipelines to together, it is compact-sized, It is small, realize efficiently using for space.
3rd, the present invention is whole makes lid-opening type babinet, and babinet is welded using steel plate, and closed place uses rubber ring Sealing, can load-bearing, explosion-proof, waterproof, anti-leak.
4th, the present invention can be equipped with transparent window under upper-opening upper cover, and opening upper cover can facilitate the every instrument of observation to read Number and equipment working condition conducive to inspection, and use seal with elastometic washer between transparent window and babinet, it is ensured that waterproof and dustproof, Anti-leak.
5th, the present invention is gas leakage caused by reply equipment fault and Rig up error, and blow-down pipe is disposed by babinet, is led to Cross metal hose on the upper box diffuse interface and check-valves interface is connected.About four meters of the blow-down pipe height, can have Effect discharges into the atmosphere leakage combustion gas dilution.
6th, openable upper cover of the present invention needs to operate using nonstandard spanner, increases the difficulty illegally uncapped, while Ensure that pilot valve be not illegally modified parameter and cut-out gas supply.
7th, using modularized design, internal unit can be proposed integrally the present invention, maintain easily and replace component.Pressure regulation core by Terminal pad and instrument mounted thereto, filter core and pressure regulator composition, can integrally propose, realize modularization repair easy to disassemble Function.
8th, the present invention is internal can connect sensor (or gas is led to external sensor by stainless steel capillary), sense Device line is connected to external integrated electronic instrument box, and can not have to unlatching pressure regulation box cover just can conveniently check equipment work feelings Condition, such as temperature, pressure and other parameters;Parameter stored record also can be copied to outside by parameter teletransmission to operating room by instrument box Storage device.
Description of the drawings:
Fig. 1 is the front view of the present invention;
Fig. 2 is the vertical view of the present invention;
Fig. 3 is present device meter diagram;
Fig. 4 is blow-down pipe schematic diagram;
Fig. 5 is integrated instrument box schematic diagram.
The title of each component is in figure:
1- inlet valves;2- inlet tubes;3- pressure regulation cores;4- upper boxes;5- upper covers;6- floors;7- outlets;8- outlet valves Door;9- lower boxes;10- forms;11- diffuses interface;12- expansion interfaces one;13- expansion interfaces two;14- check-valves interfaces;15- Inlet pressure gauge;16- terminal pads;17- difference gauges;18- Safety relief valves;19- blowdown valves;20- pressure vessels;21- pilot valves; 22- stop valves;23- hanging rings;24- ball valves;25- delivery gauges;26- interfaces;27- blow-down pipes;28- integrated electronic instrument boxs; 29- casees are locked;30- case lids;31- integrates instrument.
Specific embodiment:
A kind of Underground pressure regulating box, including blow-down pipe and the upper box, lower box and pressure regulation core that are placed in subsurface.Top box Installation and operating space of the body for instrumentation pass through bolt and lower box connecting plate installation composition one.Upper box and nowel Rubber cushion is accompanied between body connecting plate to reach sealing water-proof function.
First, upper box structure explanation:
1st, 4 top of upper box is equipped with unilateral open-type upper cover 5 by nonstandard bolt, and upper cover open side is welded with handle, Conveniently lift upper cover.5 surrounding of upper cover is sealed upper cover 5 and 4 seam crossing of upper box when upper cover covers tightly equipped with a circle sealing strip Item tamps, and reaches sealing waterproof anti-leak function.
2nd, 5 middle part of upper cover is welded with stiffener plate, can improve upper cover rigidity in the case where weightening is few, increase can load-bearing Amount.
3rd, form 10 is installed in upper box 4.Form by a general frame install water white transparency light-high-strength plate, four Week is embedded with rubber ring.Form is integrally fixed on by wing nut in upper box 4, is formed one of interlayer to internal unit, can be prevented Water and dust enter lower space, while can also prevent the combustion gas of leakage from entering form and the space in upper cover.Form 10 with it is upper Lid 5 forms two seals, improves safety.
4th, 4 surrounding of upper box, which is welded with, diffuses interface 11, check-valves interface 14, expansion interface 1, expansion interface 2 13, It can be respectively used to signal pipe of installation check-valves, the outlet connecting leg of Safety relief valve 18 and other purposes etc..
5th, check-valves is installed on check-valves interface 14, it can be ensured that internal unit occur gas leakage when combustion gas can and When spilt into air by the blow-down pipe of check-valves and connected metal hose into four meters above ground level.The peace of check-valves Dress is eliminated because internal gas leakage makes form and upper cover bear gaseous-pressure gas injection when checking maintenance opens upper cover and go out to occur Dangerous hidden danger;It can so that the combustion gas stream of leakage goes out babinet and external humid air can not flow into using check-valves, avoid Air fuel gas mixed gas is formed, reduces potential explosion danger, while also avoid equipment caused by inner air humidity Corrosion.
2nd, lower box structure explanation:
1st, lower box 9 is mainly welded by inlet valve 1, inlet tube 2, outlet 7, outlet valve 8.Inlet tube 2 goes out Mouth pipe 7 is welded with floor 6 with 9 junction of lower box, to improve integral strength, avoids because of welding pipe network sedimentation increase discrepancy nozzle Pulling force between cylinder weld seam makes the risk of welding seam breaking.Entry and exit valve uses buried welding ball valve, can be welded with pipe network It connects.
2nd, lower box top installation Safety relief valve 18, after outlet pressure is higher than and diffuses setting value, Safety relief valve 18 Action, ensures that way of escape pressure no longer rises discharging by way of combustion gas in outlet.
3rd, installation pressure regulation core 3 in lower box.Pressure regulation core 3 is made of operation equipment and main voltage regulator.Equipment is operated by connecting Disk 16 and inlet pressure gauge 15 mounted thereto, difference gauge 17, pilot valve 21, stop valve 22, hanging ring 23, ball valve 24 and outlet Pressure gauge 25 forms.Pressure regulator is separate unit indirect acting type, axial flow pressure regulator, is used cooperatively with pilot valve 21.
1. stop valve 22 can set cut-out pressure value, valve events are cut off when exit pressure levels are more than cut-out pressure value, are closed Close pressure regulator entrance.
2. pressure tappings are connected across filter core both sides at 17 liang of difference gauge, filter core both sides generate pressure drop when filter core blocks, Difference gauge 17 shows reading.Filter core clean-up performance can determine whether by reading to replace filter core in time.
Integral lifting provides lifting point when 3. hanging ring 23 is installation and checking maintenance.
4. pipe network is caused to be intake in view of slipping up in practical application there are gas ductwork because of construction, and then also big inside pressure regulating box Amount water inlet and combustion gas not dry zone water situation, therefore blowdown valve 19 is set on lower box, it is connected under blowdown valve stainless Steel pipe leads directly to babinet minimum point.Can not have to integral demounting in water entering accident can discharge sewage recovery gas supply, treat that accident is thorough Integral demounting processing is done after processing again.
5. ball valve 24 is communicated with inside, gas access way can be provided in test and checking maintenance.
6. inlet pressure gauge 15 can real-time display pressure regulating box inlet and outlet pressure with delivery gauge 25.
7. main voltage regulator is mainly made of filter core and pressure regulator, gas first enters back into pressure regulator after filter element filtering.Pressure regulation Device is single flow indirect acting type, is used cooperatively with pilot valve 21.Pressure regulator aperture can be controlled by adjusting pilot valve 21 And then outlet pressure is adjusted, and by outlet pressure stabilization in setting value.Pressure regulator is fail close formula, i.e. pressure regulator breaks down When will turn off pressure regulation access, will not cause because of failure back outlet pressure rise.
3rd, blow-down pipe 27 is after setting, and four meters above ground level of top nozzle, lower weld has interface 26, which passes through Metal hose and pressure regulating box diffuse interface 11,14 interface of check-valves connects, according to different situations also can with expansion interface 1, Expansion interface 2 13 connects.Integrated electronic instrument box 28 can be equipped on blow-down pipe simultaneously, pressure regulating box is not openedly played in realization Observation device parameters and to data carry out the functions such as Macro or mass analysis and teletransmission.The integrated electronic instrument box has following spy Point:
1st, internal integrated electronic instrument is monolithic devices, can connect multiple signals, such as temperature, pressure, flow signal, can be real When be shown on liquid crystal display;
2nd, recording frequency can be set and parameter that stored record arrives, and store operation note, can to the parameter of storage and The reading of operation note and deletion setting associated rights, conveniently check and ensure that data are true;
3rd, equipped with USB interface, movable storage device and computer can be connected, facilitates export data and modification systematic parameter;
4th, can outer signal line also can wirelessly teletransmission to monitoring room computer, be run in equipment by external equipment When there is abnormal and relevant parameter (such as temperature, pressure, interior storage capacity) and reaches setting value in situation, can integrated instrument with Sound-light alarm is realized on monitoring room computer;
5th, every integrated instrument is signed with unique hardware digital, it is ensured that modification parameter can only be by specified professional In integrated instrument or the calculating hands- operation of connection.
The present invention the course of work be:
Fuel gas from fecder system network enters from intake line and inlet valve inside the pressure regulating box of underground, through pressure regulation core Enter pressure regulator after inner filter core filtering, enter low-pressure pipe network through outlet outflow pressure regulating box after pressure regulation.It is controlled and adjusted by pilot valve Depressor adjusts setting outlet pressure.After outlet pressure is more than Safety relief valve setting pressure, Safety relief valve automatic relief, Gas enters blow-down pipe via metal hose and spills into air;When pressure regulating box outlet pressure sets pressure beyond stop valve Afterwards, valve events are cut off, close pressure regulator access.In actual use can more parallel connections in groups, separate unit failure when need to repair only This entrance valve need to be closed, without influencing whole ventilation.

Claims (7)

1. a kind of Underground pressure regulating box, including blow-down pipe and the upper box, lower box and pressure regulation core that are placed in subsurface, blow-down pipe On be welded with multiple interfaces, upper box and lower box are assembled integrally, and are equipped with form on upper box, are connected at the top of upper box Openable upper cover;It is characterized in that:Upper box surrounding be welded with diffuse interface and check-valves interface respectively on desorption tube Interface passes through connection by metal hose;Lower box includes inlet valve, inlet tube, outlet, outlet valve and pressure regulation core, inlet valve Door is connect with one end of inlet tube, and the other end and the lower box of inlet tube weld, and one end of outlet valve and outlet connects, and goes out The other end of mouth pipe is welded with lower box, and pressure regulation core is mounted on inside lower box;The pressure regulation core is by operation equipment and main pressure regulator Device forms, operation equipment include terminal pad and inlet pressure gauge mounted thereto, difference gauge, pilot valve, stop valve, ball valve and Delivery gauge, main voltage regulator are made of filter core and pressure regulator, and pressure regulator is used cooperatively with pilot valve, are taken at the difference gauge two Pressure mouth is connected across filter core both sides.
2. Underground pressure regulating box according to claim 1, it is characterised in that:Above-mentioned upper box surrounding is welded with extension and connects Mouthful.
3. Underground pressure regulating box according to claim 1, it is characterised in that:The inlet tube and outlet of above-mentioned lower box Floor is welded with the junction of lower box.
4. Underground pressure regulating box according to claim 1, it is characterised in that:Above-mentioned lower box top installation safety is diffused Valve.
5. Underground pressure regulating box according to claim 1, it is characterised in that:Above-mentioned inlet valve and outlet valve use Buried welding ball valve can be welded with pipe network.
6. Underground pressure regulating box according to claim 1, it is characterised in that:It is installed in the terminal pad of aforesaid operations equipment There is hanging ring.
7. Underground pressure regulating box according to claim 1, it is characterised in that:It is installed in the terminal pad of aforesaid operations equipment There is blowdown valve.
CN201611233399.3A 2016-12-28 2016-12-28 Underground pressure regulating box Pending CN108253300A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611233399.3A CN108253300A (en) 2016-12-28 2016-12-28 Underground pressure regulating box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611233399.3A CN108253300A (en) 2016-12-28 2016-12-28 Underground pressure regulating box

Publications (1)

Publication Number Publication Date
CN108253300A true CN108253300A (en) 2018-07-06

Family

ID=62720068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611233399.3A Pending CN108253300A (en) 2016-12-28 2016-12-28 Underground pressure regulating box

Country Status (1)

Country Link
CN (1) CN108253300A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109253395A (en) * 2018-11-15 2019-01-22 特瑞斯能源装备股份有限公司 A kind of high leakproofness underground voltage regulating station
CN110393991A (en) * 2019-08-28 2019-11-01 上海飞奥燃气设备有限公司 Buried gas filter
CN113719756A (en) * 2021-10-09 2021-11-30 河北瑞星燃气设备股份有限公司 Direct-buried underground pressure regulating box and using method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2375851Y (en) * 1998-12-31 2000-04-26 天津市天然气公司 Gas underground pressure regulator
CN203797351U (en) * 2014-04-08 2014-08-27 乐山市山鹰模具有限责任公司 Fully-balanced gas pressure regulator system
CN204647860U (en) * 2015-04-09 2015-09-16 黄金萍 Underground pressure-regulating box
CN204649248U (en) * 2015-04-09 2015-09-16 黄金萍 Underground batch meter
CN205806943U (en) * 2016-05-18 2016-12-14 王翔宇 Underground pressure regulating box

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2375851Y (en) * 1998-12-31 2000-04-26 天津市天然气公司 Gas underground pressure regulator
CN203797351U (en) * 2014-04-08 2014-08-27 乐山市山鹰模具有限责任公司 Fully-balanced gas pressure regulator system
CN204647860U (en) * 2015-04-09 2015-09-16 黄金萍 Underground pressure-regulating box
CN204649248U (en) * 2015-04-09 2015-09-16 黄金萍 Underground batch meter
CN205806943U (en) * 2016-05-18 2016-12-14 王翔宇 Underground pressure regulating box

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109253395A (en) * 2018-11-15 2019-01-22 特瑞斯能源装备股份有限公司 A kind of high leakproofness underground voltage regulating station
CN110393991A (en) * 2019-08-28 2019-11-01 上海飞奥燃气设备有限公司 Buried gas filter
CN110393991B (en) * 2019-08-28 2024-04-30 上海飞奥燃气设备有限公司 Buried gas filter
CN113719756A (en) * 2021-10-09 2021-11-30 河北瑞星燃气设备股份有限公司 Direct-buried underground pressure regulating box and using method thereof

Similar Documents

Publication Publication Date Title
CN108253293A (en) Gas underground pressure regulator
CN204647860U (en) Underground pressure-regulating box
CN205806943U (en) Underground pressure regulating box
CN108253300A (en) Underground pressure regulating box
CN205806942U (en) Gas underground pressure regulator
JPH0521589B2 (en)
CN210771447U (en) Underground pressure regulating device with radial flow valve core
CN203655344U (en) Mining water-seal fire retardance and explosion venting apparatus
CN208805519U (en) A kind of gas underlying parameter measurement device
CN214405641U (en) Intelligent buried gas metering device
CN110260158B (en) Radial flow valve core underground pressure regulating device
CN215522886U (en) Natural gas pressure regulating station for supplying gas to supercritical circulating fluidized bed boiler
CN207832249U (en) The telescopic Underground batch meter of turbine
CN209214674U (en) Generator hydrogen system hydrogen population parameter integrates on-line monitoring system
CN201933548U (en) Cutoff water tank of secondary water supply equipment
CN205745347U (en) A kind of Novel furnace top bleeding valve device
CN209214706U (en) Nitrogen charging positive pressure type inner cold water case hydrogen leakage monitor system
CN113266764A (en) Natural gas pressure regulating station and method for supercritical circulating fluidized bed boiler gas supply
CN206861255U (en) The buried solenoid valve box of rod-pulling type intelligent integrated
CN204650661U (en) A kind of Underground metering system
CN207080693U (en) The buried solenoid valve box of intelligent integrated
CN206496081U (en) Integrated buried solenoid valve box
CN206965207U (en) A kind of separator for gas-liquid two-phase separation
CN109489734A (en) Generator hydrogen system hydrogen population parameter integrates on-line monitoring system
CN220957914U (en) Air supply device for small-sized storage tank of liquefied petroleum gas

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination