- CN209214674U CN209214674U CN201822244499.7U CN201822244499U CN209214674U CN 209214674 U CN209214674 U CN 209214674U CN 201822244499 U CN201822244499 U CN 201822244499U CN 209214674 U CN209214674 U CN 209214674U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- hydrogen
- pressure
- monitoring
- normally open
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Examining Or Testing Airtightness (AREA)
Abstract
发电机氢系统氢气全参数集成在线监测系统,包括机柜,机柜内设置有过线端子盘、高压区监测管路、低压区监测管路、高点监测管路、低点监测管路、排空管路和补氢管路;过线端子盘上设置有供电电源接口、氢检漏信号输出接口、氢检漏探头输入接口、氢压高报警接口、氢压低报警接口、氢压过低报警接口、发电机内部气压监测接口、氢气湿度信号接口、氢气纯度信号接口、氢中氧信号接口和差压信号接口。本实用新型具有监测参数全面,设备集成化程度高,设备更新、维护方便、监测充足、系统操作简单易维护,有利于故障分析处理和集中控制系统。
Generator hydrogen system hydrogen full-parameter integrated online monitoring system, including cabinets, which are equipped with terminal boards, high-voltage area monitoring pipelines, low-pressure area monitoring pipelines, high-point monitoring pipelines, low-point monitoring pipelines, and emptying Pipeline and hydrogen replenishment pipeline; the terminal board is equipped with a power supply interface, a hydrogen leak detection signal output interface, a hydrogen leak detection probe input interface, a high hydrogen pressure alarm interface, a low hydrogen pressure alarm interface, and a low hydrogen pressure alarm interface , Generator internal air pressure monitoring interface, hydrogen humidity signal interface, hydrogen purity signal interface, hydrogen oxygen signal interface and differential pressure signal interface. The utility model has the advantages of comprehensive monitoring parameters, high degree of equipment integration, equipment update, convenient maintenance, sufficient monitoring, simple system operation and easy maintenance, and is beneficial to fault analysis and processing and centralized control system.
Description
技术领域technical field
本实用新型属于燃机电厂氢气在线监测技术领域,具体涉及一种气发电机氢系统氢气全参数集成在线监测系统,实现了氢气全参数(包括氢气纯度、湿度、氢中氧、漏氢、压力、压力开关报警、差压、补氢流量等)的高度集成化在线监测。The utility model belongs to the technical field of hydrogen on-line monitoring in gas turbine power plants, and specifically relates to an integrated on-line monitoring system for hydrogen full parameters of a gas generator hydrogen system, which realizes full hydrogen parameters (including hydrogen purity, humidity, oxygen in hydrogen, hydrogen leakage, and pressure) , pressure switch alarm, differential pressure, hydrogen flow, etc.) highly integrated online monitoring.
背景技术Background technique
发电机氢气的监测对保障发电机安全稳定经济的运行有重要意义。《防止电力生产事故二十五项反措》2014版等相关标准对发电机氢气在线监测提出了明确的要求。尤其在2015年华能北京热电厂“3.13”氢爆事故后,又引起了各发电集团及电厂对发电机氢冷系统安全更高层面、更大程度的重视。The monitoring of generator hydrogen is of great significance to ensure the safe, stable and economical operation of generators. Relevant standards such as "Twenty-five Countermeasures to Prevent Power Production Accidents" 2014 edition put forward clear requirements for online hydrogen monitoring of generators. Especially after the "3.13" hydrogen explosion accident of Huaneng Beijing Thermal Power Plant in 2015, it has caused various power generation groups and power plants to pay more attention to the safety of the hydrogen cooling system of generators at a higher level and to a greater extent.
现在有的电厂安装的燃机发电机氢气在线监测系统,主要存在以下问题:The gas turbine generator hydrogen online monitoring system installed in some power plants mainly has the following problems:
氢气参数监测分散。现系统的漏氢监测在6.9米层,其它参数在0米层,集成化程度不高。The hydrogen parameter monitors the dispersion. The hydrogen leakage monitoring of the current system is at the 6.9-meter level, and other parameters are at the 0-meter level, so the degree of integration is not high.
主要仪表老化落伍,日常维护不便。系统主体仪表老化、测量精度和可靠性下降严重。设备投运至今已有十年,主体测量部件老化,且由于国内监测要求,该类型产品发展换代很快,原设备已基本淘汰,后期维护困难。其他部分的监测仪表,目前市场存量较小,备件较贵。还有其他仪表比如露点仪,产品质量下降,测量准确度降低,送检常有不合格现象。氢气流量计测量补氢流量不准确。因此精确度和可靠性难以保证,无法为发电机组的安全高效运行保驾护航。The main instruments are aging and outdated, making daily maintenance inconvenient. The main instrument of the system is aging, and the measurement accuracy and reliability have declined seriously. It has been ten years since the equipment was put into operation, and the main measurement components are aging. Due to the domestic monitoring requirements, this type of product has been developed and replaced rapidly. The original equipment has been basically eliminated, and later maintenance is difficult. For other parts of monitoring instruments, the current market stock is small, and the spare parts are more expensive. There are also other instruments such as dew point meters, the product quality is degraded, the measurement accuracy is reduced, and there are often unqualified phenomena when submitted for inspection. The hydrogen flow meter measures the hydrogen replenishment flow inaccurately. Therefore, it is difficult to guarantee the accuracy and reliability, and cannot guarantee the safe and efficient operation of the generator set.
监测不足且有安全隐患。根据新的反措要求和技术规范,需增加对机组氢冷器、油箱等区域的漏氢监测,并增加微氧仪,以避免机组漏氢爆炸和加强氢气品质监督。另外,原系统管路由于早期设计原因,导致系统复杂,设备老化降低了管路的密封性增加了管路系统的泄漏率,带来了氢气安全隐患。Inadequate monitoring and potential safety hazards. According to the new countermeasure requirements and technical specifications, it is necessary to increase the monitoring of hydrogen leakage in the hydrogen cooler, fuel tank and other areas of the unit, and to increase the micro oxygen meter to avoid the hydrogen leakage explosion of the unit and strengthen the supervision of hydrogen quality. In addition, due to the early design of the pipeline in the original system, the system was complicated, and the aging of the equipment reduced the sealing of the pipeline and increased the leakage rate of the pipeline system, which brought hydrogen safety hazards.
系统操作维护复杂。监测系统流程管路纵横交错,操作复杂繁琐,不利于操作和维护。System operation and maintenance are complex. The process pipelines of the monitoring system are criss-crossed, and the operation is complicated and cumbersome, which is not conducive to operation and maintenance.
系统无数据记录和曲线保留。现系统仅传送部分数据至机组DCS,数据保留和查询极为不变,新系统设立数据输出接口,传送至化学集中控制系统,方便对历史数据保留和查询,能为仪表故障和机组补氢、泄漏、压力波动等提供数据曲线和记录,有利于故障分析处理。The system has no data record and curve retention. The current system only transmits part of the data to the DCS of the unit, and the data retention and query are extremely unchanged. The new system sets up a data output interface and transmits it to the chemical centralized control system to facilitate the retention and query of historical data. , pressure fluctuations, etc. provide data curves and records, which is conducive to fault analysis and processing.
实用新型内容Utility model content
本实用新型为了解决现有技术中的不足之处,提供一种便于操作、监测数值准确、安全可靠性强的发电机氢系统氢气全参数集成在线监测系统。In order to solve the deficiencies in the prior art, the utility model provides an integrated on-line monitoring system for hydrogen full parameters of a generator hydrogen system, which is easy to operate, accurate in monitoring values, and strong in safety and reliability.
为解决上述技术问题,本实用新型采用如下技术方案:发电机氢系统氢气全参数集成在线监测系统,包括机柜,机柜的柜体上设置有发电机风扇高压法兰接口、发电机风扇低压口法兰接口、发电机内部高点法兰接口、发电机内部低点法兰接口、尾气排空法兰接口、补氢气进气法兰接口和补氢气出气法兰接口,机柜内设置有过线端子盘、高压区监测管路、低压区监测管路、高点监测管路、低点监测管路、排空管路和补氢管路;高压区监测管路与发电机风扇高压法兰接口连接,低压区监测管路与发电机风扇低压口法兰接口连接,高点监测管路与发电机内部高点法兰接口连接,低点监测管路与发电机内部低点法兰接口连接,排空管路与尾气排空法兰接口连接,补氢管路的两端口分别与补氢气进气法兰接口和补氢气出气法兰接口连接;In order to solve the above-mentioned technical problems, the utility model adopts the following technical scheme: an integrated on-line monitoring system for all hydrogen parameters of the generator hydrogen system, including a cabinet, and the cabinet body is provided with a generator fan high-pressure flange interface and a generator fan low-pressure port method. Flange interface, high-point flange interface inside the generator, low-point flange interface inside the generator, exhaust gas exhaust flange interface, hydrogen supplementary gas inlet flange interface and hydrogen supplementary gas outlet flange interface, and there are wire-passing terminals in the cabinet Disc, high-pressure zone monitoring pipeline, low-pressure zone monitoring pipeline, high-point monitoring pipeline, low-point monitoring pipeline, emptying pipeline and hydrogen replenishing pipeline; the high-pressure zone monitoring pipeline is connected to the high-pressure flange interface of the generator fan , the low-pressure area monitoring pipeline is connected to the flange interface of the low-pressure port of the generator fan, the high-point monitoring pipeline is connected to the high-point flange interface inside the generator, and the low-point monitoring pipeline is connected to the low-point flange interface inside the generator. The empty pipeline is connected to the tail gas exhaust flange interface, and the two ports of the hydrogen replenishment pipeline are respectively connected to the hydrogen replenishment gas inlet flange port and the hydrogen replenishment gas outlet flange port;
过线端子盘上设置有供电电源接口、氢检漏信号输出接口、氢检漏探头输入接口、氢压高报警接口、氢压低报警接口、氢压过低报警接口、发电机内部气压监测接口、氢气湿度信号接口、氢气纯度信号接口、氢中氧信号接口和差压信号接口。There are power supply interface, hydrogen leak detection signal output interface, hydrogen leak detection probe input interface, high hydrogen pressure alarm interface, low hydrogen pressure alarm interface, low hydrogen pressure alarm interface, generator internal air pressure monitoring interface, Hydrogen humidity signal interface, hydrogen purity signal interface, hydrogen oxygen signal interface and differential pressure signal interface.
补氢管路上设置有质量流量计,质量流量计连接有流量显示器。A mass flow meter is arranged on the hydrogen supply pipeline, and the mass flow meter is connected with a flow display.
高压区监测管路和低压区监测管路之间并联有差压变送器、差压表和第一常闭阀门;差压变送器通过信号线与过线端子盘连接;A differential pressure transmitter, a differential pressure gauge and a first normally closed valve are connected in parallel between the monitoring pipeline in the high-pressure area and the monitoring pipeline in the low-pressure area; the differential pressure transmitter is connected to the terminal board through the signal line;
高压区监测管路上设置有第一常开阀门和第二常开阀门,第一常开阀门与发电机风扇高压法兰接口的距离小于第二常开阀门与发电机风扇高压法兰接口的距离;The first normally open valve and the second normally open valve are installed on the monitoring pipeline in the high pressure area, and the distance between the first normally open valve and the high pressure flange interface of the generator fan is smaller than the distance between the second normally open valve and the high pressure flange interface of the generator fan ;
低压区监测管路上设置有距离发电机风扇低压口法兰接口依次增大的第三常开阀门、第四常开阀门和第五常开阀门;The monitoring pipeline in the low pressure area is provided with the third normally open valve, the fourth normally open valve and the fifth normally open valve whose distance from the flange interface of the low pressure port of the generator fan increases in sequence;
差压变送器位于第二常开阀门和第五常开阀门之间,差压表及第一常闭阀门与高压区监测管路的连接点均位于第一常开阀门和第二常开阀门之间,差压表及第一常闭阀门与低压区监测管路的连接点均位于第四常开阀门和第五常开阀门之间。The differential pressure transmitter is located between the second normally open valve and the fifth normally open valve. The connection points of the differential pressure gauge, the first normally closed valve and the monitoring pipeline in the high pressure area are located between the first normally open valve and the second normally open valve. Between the valves, the connection point between the differential pressure gauge and the first normally closed valve and the monitoring pipeline in the low pressure area is located between the fourth normally open valve and the fifth normally open valve.
排空管路的一端与尾气排空法兰接口连接,低点监测管路的一端与发电机内部低点法兰接口连接,排空管路的另一端与低点监测管路的另一端连接;One end of the exhaust pipeline is connected to the exhaust gas exhaust flange interface, one end of the low point monitoring pipeline is connected to the internal low point flange interface of the generator, and the other end of the exhaust pipeline is connected to the other end of the low point monitoring pipeline ;
低点监测管路和排空管路上沿发电机内部低点法兰接口到尾气排空法兰接口的方向依次设置有第二常闭阀门、第六常开阀门、过滤器、第七常开阀门、第三常闭阀门、纯度变送器、第一流量计和第四常闭阀门;纯度变送器连接有纯度显示器,低点监测管路上在第三常闭阀门和纯度变送器之间连接有压力变送器及用于控制气路通断压力变送器的第八常开阀门,纯度变送器、纯度显示器和压力变送器均通过信号线与过线端子盘连接;On the low-point monitoring pipeline and the exhaust pipeline, along the direction from the low-point flange interface inside the generator to the exhaust gas exhaust flange interface, there are a second normally closed valve, a sixth normally open valve, a filter, and a seventh normally open valve. valve, third normally closed valve, purity transmitter, first flowmeter and fourth normally closed valve; There is a pressure transmitter and the eighth normally open valve used to control the on-off pressure transmitter of the air circuit, and the purity transmitter, purity display and pressure transmitter are all connected to the terminal board through the signal line;
高点监测管路的一端与发电机内部高点法兰接口连接,高点监测管路的另一端连接在第二常闭阀门和第六常开阀门之间的低点监测管路上,高点监测管路上设置有第五常闭阀门;One end of the high point monitoring pipeline is connected to the internal high point flange interface of the generator, and the other end of the high point monitoring pipeline is connected to the low point monitoring pipeline between the second normally closed valve and the sixth normally open valve. A fifth normally closed valve is set on the monitoring pipeline;
低点监测管路上在第七常开阀门和第三常闭阀门之间设置有取样口,取样口处设置有第六常闭阀门。A sampling port is provided between the seventh normally open valve and the third normally closed valve on the low point monitoring pipeline, and a sixth normally closed valve is provided at the sampling port.
还包括氢中氧检测管路,氢中氧检测管路的一端连接在第一流量计和第四常闭阀门之间,氢中氧检测管路的另一端连接在尾气排空法兰接口和第四常闭阀门之间,氢中氧检测管路上由第一流量计到尾气排空法兰接口的方向依次设置有第七常闭阀门、第二流量计、第九常开阀门、减压器、第三流量计、氧变送器和第十常开阀门;It also includes a hydrogen-in-oxygen detection pipeline. One end of the hydrogen-in-oxygen detection pipeline is connected between the first flowmeter and the fourth normally closed valve, and the other end of the hydrogen-in-oxygen detection pipeline is connected to the tail gas exhaust flange interface and Between the fourth normally-closed valves, the seventh normally-closed valve, the second flowmeter, the ninth normally-opened valve, the pressure-reducing device, the third flow meter, oxygen transmitter and the tenth normally open valve;
氢中氧检测管路在第二流量计和第九常开阀门之间的位置与低点监测管路在第七常开阀门和第三常闭阀门之间的位置连通;The position between the second flowmeter and the ninth normally open valve of the oxygen detection pipeline in hydrogen communicates with the position of the low point monitoring pipeline between the seventh normally open valve and the third normally closed valve;
氢中氧检测管路上在第九常开阀门和减压器之间设置有第一校准口,第一校准口处设置有第八常闭阀门;A first calibration port is provided between the ninth normally open valve and the pressure reducer on the hydrogen-in-oxygen detection pipeline, and an eighth normally closed valve is provided at the first calibration port;
氧变送器连接有氧显示器,氧变送器和氧显示器均通过信号线与过线端子盘连接。The oxygen transmitter is connected to the aerobic display, and both the oxygen transmitter and the oxygen display are connected to the terminal board through the signal line.
第三常闭阀门并联有一条湿度监测管路,湿度监测管路上依次设置有第十一常开阀门、湿度变送器和第十二常开阀门,湿度变送器连接有湿度显示器,湿度变送器和湿度显示器均通过信号线与过线端子盘连接。The third normally closed valve is connected in parallel with a humidity monitoring pipeline, the eleventh normally open valve, the humidity transmitter and the twelfth normally open valve are arranged in sequence on the humidity monitoring pipeline, the humidity transmitter is connected with a humidity display, and the humidity transmitter Both the transmitter and the humidity indicator are connected to the terminal board through the signal line.
还包括校准管路,校准管路的一端连接在发电机风扇高压法兰接口与第一常开阀门之间的高压区监测管路上,校准管路的另一端设置第九常闭阀门,校准管路分别与第二常闭阀门和第六常开阀门之间的高点监测管路及低点监测管路连接;校准管路上在高压区监测管路和低点监测管路之间设置有第十三常开阀门。It also includes a calibration pipeline. One end of the calibration pipeline is connected to the high-pressure area monitoring pipeline between the high-pressure flange interface of the generator fan and the first normally open valve. The other end of the calibration pipeline is provided with a ninth normally closed valve. The high-point monitoring pipeline and the low-point monitoring pipeline between the second normally closed valve and the sixth normally-open valve are respectively connected; the calibration pipeline is provided with a second Thirteen normally open valves.
还包括分别与排空管路和低压区监测管路连接的压力监测管路,压力监测管路与排空管路的连接处位于第一流量计和第四常闭阀门之间,压力监测管路与低压区监测管路的连接处位于第四常开阀门和第三常开阀门之间;压力监测管路上并联有第一压力监测支管路、第二压力监测支管路、第三压力监测支管路、第四压力监测支管路和排污管路,第一压力监测支管路上设置有第一压力开关和用于控制气路通断第一压力开关的第十四常开阀门,第二压力监测支管路上设置有第二压力开关和用于控制气路通断第二压力开关的第十五常开阀门,第三压力监测支管路上设置有第三压力开关和用于控制气路通断第三压力开关的第十六常开阀门,第四压力监测支管路上设置有压力表和用于控制气路通断压力表的第十七常开阀门,排污管路上设置有第十常闭阀门;排空管路和低压区监测管路连接之间的一段压力监测管路上设置有第十八常开阀门;It also includes a pressure monitoring pipeline connected to the exhaust pipeline and the low-pressure area monitoring pipeline respectively. The connection between the pressure monitoring pipeline and the exhaust pipeline is located between the first flow meter and the fourth normally closed valve. The connection between the pressure monitoring pipeline and the monitoring pipeline in the low-pressure area is located between the fourth normally open valve and the third normally open valve; the pressure monitoring pipeline is connected in parallel with the first pressure monitoring branch pipeline, the second pressure monitoring branch pipeline, and the third pressure monitoring branch pipeline pipeline, the fourth pressure monitoring branch pipeline and the sewage pipeline, the first pressure monitoring branch pipeline is provided with a first pressure switch and a fourteenth normally open valve for controlling the on-off of the first pressure switch of the gas circuit, and the second pressure monitoring branch pipeline There is a second pressure switch and a fifteenth normally open valve for controlling the on-off of the gas path, and a third pressure switch and a third pressure switch for controlling the on-off of the gas path are set on the third pressure monitoring branch pipeline. The sixteenth normally open valve of the switch, the pressure gauge and the seventeenth normally open valve used to control the on-off pressure gauge of the gas circuit are set on the fourth pressure monitoring branch pipeline, and the tenth normally closed valve is set on the sewage pipeline; An eighteenth normally open valve is arranged on a section of the pressure monitoring pipeline between the pipeline and the connection of the monitoring pipeline in the low-pressure area;
第一压力开关、第二压力开关和第三压力开关均通过信号线与过线端子盘连接。The first pressure switch, the second pressure switch and the third pressure switch are all connected to the wire passing terminal board through signal wires.
采用上述技术方案,本实用新型具有以下有益效果:By adopting the above technical scheme, the utility model has the following beneficial effects:
1、氢气全参数集成监测:集成了发电机氢系统的所有氢气参数(包括氢气纯度、湿度、氢中氧、漏氢、压力、压力开关报警、差压、补氢流量等),设备集成化程度高。1. Integrated monitoring of hydrogen full parameters: integrates all hydrogen parameters of the generator hydrogen system (including hydrogen purity, humidity, oxygen in hydrogen, hydrogen leakage, pressure, pressure switch alarm, differential pressure, hydrogen replenishment flow, etc.), equipment integration High degree.
2、设备更新、维护方便:更换氢气变送器,精度高。更换压力变送器、差压变送器、压力开关,带显示,就地观测更直观。在机柜内增加行程开关控制防爆照明灯,便用日常巡检维护。2. The equipment is updated and easy to maintain: replace the hydrogen transmitter with high precision. Replace pressure transmitter, differential pressure transmitter, pressure switch, with display, more intuitive on-site observation. A travel switch is added in the cabinet to control the explosion-proof lighting, which is convenient for daily inspection and maintenance.
3、监测充足:根据新的反措要求和技术规范,本实用新型增加对机组氢冷器、主油箱等区域的漏氢监测,并增加氧变送器(微氧仪),避免机组漏氢爆炸并加强氢气品质监督。3. Sufficient monitoring: According to the new countermeasure requirements and technical specifications, this utility model adds hydrogen leakage monitoring to the hydrogen cooler, main oil tank and other areas of the unit, and adds an oxygen transmitter (micro oxygen meter) to avoid the hydrogen leakage explosion of the unit And strengthen hydrogen quality supervision.
4、系统操作简单易维护:监测系统流程管路规范,操作简单,且机柜表面设有设计流程图,有利于操作和维护。4. The system is easy to operate and easy to maintain: the monitoring system has standardized process pipelines and is easy to operate, and there is a design flow chart on the surface of the cabinet, which is conducive to operation and maintenance.
5、数据上传化学集中控制室。不仅传送部分数据至机组DCS,还设立数据输出接口,将数据传送至化学集中控制系统,方便对历史数据保留和查询,能为仪表故障和机组补氢、泄漏、压力波动等提供数据曲线和记录,有利于故障分析处理。所有检测数据设计两路模拟输出一路送至DCS,另一路备用或送至环化集中控制系统。5. The data is uploaded to the chemical centralized control room. Not only transmit part of the data to the DCS of the unit, but also set up a data output interface to transmit the data to the chemical centralized control system, which is convenient for retaining and querying historical data, and can provide data curves and records for instrument failures and unit hydrogen replenishment, leakage, pressure fluctuations, etc. , which is conducive to fault analysis and processing. All test data are designed with two analog outputs, one of which is sent to DCS, and the other is spare or sent to the circular centralized control system.
附图说明Description of drawings
图1是本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
具体实施方式Detailed ways
如图1所示,本实用新型的发电机氢系统氢气全参数集成在线监测系统,包括机柜1,机柜1的柜体上设置有发电机风扇高压法兰接口2、发电机风扇低压口法兰接口3、发电机内部高点法兰接口4、发电机内部低点法兰接口5、尾气排空法兰接口6、补氢气进气法兰接口7和补氢气出气法兰接口8,机柜1内设置有过线端子盘9、高压区监测管路10、低压区监测管路11、高点监测管路12、低点监测管路13、排空管路14和补氢管路15;高压区监测管路10与发电机风扇高压法兰接口2连接,低压区监测管路11与发电机风扇低压口法兰接口3连接,高点监测管路12与发电机内部高点法兰接口4连接,低点监测管路13与发电机内部低点法兰接口5连接,排空管路14与尾气排空法兰接口6连接,补氢管路15的两端口分别与补氢气进气法兰接口7和补氢气出气法兰接口8连接;As shown in Figure 1, the hydrogen full-parameter integrated online monitoring system of the generator hydrogen system of the present invention includes a cabinet 1, and the cabinet body of the cabinet 1 is provided with a generator fan high-pressure flange interface 2 and a generator fan low-pressure port flange Interface 3, generator internal high point flange interface 4, generator internal low point flange interface 5, tail gas exhaust flange interface 6, hydrogen supplementary gas inlet flange interface 7 and hydrogen supplementary gas outlet flange interface 8, cabinet 1 It is equipped with a wire-passing terminal panel 9, a high-pressure area monitoring pipeline 10, a low-pressure area monitoring pipeline 11, a high-point monitoring pipeline 12, a low-point monitoring pipeline 13, an emptying pipeline 14, and a hydrogen replenishing pipeline 15; Area monitoring pipeline 10 is connected to generator fan high pressure flange interface 2, low pressure area monitoring pipeline 11 is connected to generator fan low pressure port flange interface 3, high point monitoring pipeline 12 is connected to generator internal high point flange interface 4 connection, the low-point monitoring pipeline 13 is connected to the low-point flange interface 5 inside the generator, the exhaust pipeline 14 is connected to the exhaust gas exhaust flange interface 6, and the two ports of the hydrogen supplement pipeline 15 are connected to the hydrogen supplement inlet method respectively. The flange interface 7 is connected with the hydrogen replenishing gas outlet flange interface 8;
过线端子盘9上设置有漏氢显示器57、供电电源接口16、氢检漏信号输出接口17、氢检漏探头输入接口18、氢压高报警接口19、氢压低报警接口20、氢压过低报警接口21、发电机内部气压监测接口22、氢气湿度信号接口23、氢气纯度信号接口24、氢中氧信号接口25和差压信号接口26。A hydrogen leakage display 57, a power supply interface 16, a hydrogen leak detection signal output interface 17, a hydrogen leak detection probe input interface 18, a high hydrogen pressure alarm interface 19, a low hydrogen pressure alarm interface 20, and a Low alarm interface 21, generator internal air pressure monitoring interface 22, hydrogen humidity signal interface 23, hydrogen purity signal interface 24, hydrogen in oxygen signal interface 25 and differential pressure signal interface 26.
补氢管路15上设置有质量流量计27,质量流量计27连接有流量显示器28。A mass flow meter 27 is arranged on the hydrogen supply pipeline 15 , and the mass flow meter 27 is connected with a flow display 28 .
高压区监测管路10和低压区监测管路11之间并联有差压变送器29、差压表30和第一常闭阀门88;差压变送器29通过信号线与过线端子盘9连接;A differential pressure transmitter 29, a differential pressure gauge 30 and a first normally closed valve 88 are connected in parallel between the high pressure area monitoring pipeline 10 and the low pressure area monitoring pipeline 11; 9 connections;
高压区监测管路10上设置有第一常开阀门86和第二常开阀门97,第一常开阀门86与发电机风扇高压法兰接口2的距离小于第二常开阀门97与发电机风扇高压法兰接口2的距离;A first normally open valve 86 and a second normally open valve 97 are provided on the high pressure area monitoring pipeline 10, and the distance between the first normally open valve 86 and the high pressure flange interface 2 of the generator fan is smaller than the distance between the second normally open valve 97 and the generator fan. The distance of fan high-pressure flange interface 2;
低压区监测管路11上设置有距离发电机风扇低压口法兰接口3依次增大的第三常开阀门95、第四常开阀门87和第五常开阀门96;A third normally open valve 95, a fourth normally open valve 87, and a fifth normally open valve 96 are arranged on the low pressure zone monitoring pipeline 11, which are sequentially increased in distance from the flange interface 3 of the low pressure port of the generator fan;
差压变送器29位于第二常开阀门97和第五常开阀门96之间,差压表30及第一常闭阀门88与高压区监测管路10的连接点均位于第一常开阀门86和第二常开阀门97之间,差压表30及第一常闭阀门88与低压区监测管路11的连接点均位于第四常开阀门87和第五常开阀门96之间。The differential pressure transmitter 29 is located between the second normally open valve 97 and the fifth normally open valve 96, and the connection points of the differential pressure gauge 30, the first normally closed valve 88 and the high pressure area monitoring pipeline 10 are all located at the first normally open valve. Between the valve 86 and the second normally open valve 97, the connection points of the differential pressure gauge 30, the first normally closed valve 88 and the low pressure area monitoring pipeline 11 are located between the fourth normally open valve 87 and the fifth normally open valve 96 .
排空管路14的一端与尾气排空法兰接口6连接,低点监测管路13的一端与发电机内部低点法兰接口5连接,排空管路14的另一端与低点监测管路13的另一端连接;One end of the exhaust pipeline 14 is connected to the exhaust gas exhaust flange interface 6, one end of the low point monitoring pipeline 13 is connected to the internal low point flange interface 5 of the generator, and the other end of the exhaust pipeline 14 is connected to the low point monitoring pipe The other end of road 13 is connected;
低点监测管路13和排空管路14上沿发电机内部低点法兰接口5到尾气排空法兰接口6的方向依次设置有第二常闭阀门81、第六常开阀门103、过滤器58、第七常开阀门101、第三常闭阀门106、纯度变送器31、第一流量计32和第四常闭阀门102;纯度变送器31连接有纯度显示器33,低点监测管路13上在第三常闭阀门106和纯度变送器31之间连接有压力变送器34及用于控制气路通断压力变送器34的第八常开阀门107,纯度变送器31、纯度显示器33和压力变送器34均通过信号线与过线端子盘9连接;The low point monitoring pipeline 13 and the exhaust pipeline 14 are provided with a second normally closed valve 81, a sixth normally open valve 103, Filter 58, the seventh normally open valve 101, the third normally closed valve 106, the purity transmitter 31, the first flow meter 32 and the fourth normally closed valve 102; the purity transmitter 31 is connected with a purity indicator 33, the low point On the monitoring pipeline 13, a pressure transmitter 34 and an eighth normally open valve 107 for controlling the on-off pressure transmitter 34 of the gas path are connected between the third normally closed valve 106 and the purity transmitter 31, and the purity varies. The transmitter 31, the purity indicator 33 and the pressure transmitter 34 are all connected to the wire terminal panel 9 through signal lines;
高点监测管路12的一端与发电机内部高点法兰接口4连接,高点监测管路12的另一端连接在第二常闭阀门81和第六常开阀门103之间的低点监测管路13上,高点监测管路12上设置有第五常闭阀门80;One end of the high point monitoring pipeline 12 is connected to the internal high point flange interface 4 of the generator, and the other end of the high point monitoring pipeline 12 is connected to the low point monitoring between the second normally closed valve 81 and the sixth normally open valve 103 On the pipeline 13, a fifth normally closed valve 80 is arranged on the high point monitoring pipeline 12;
低点监测管路13上在第七常开阀门101和第三常闭阀门106之间设置有取样口35,取样口35处设置有第六常闭阀门100。A sampling port 35 is provided between the seventh normally open valve 101 and the third normally closed valve 106 on the low point monitoring pipeline 13 , and a sixth normally closed valve 100 is provided at the sampling port 35 .
本实用新型还包括氢中氧检测管路36,氢中氧检测管路36的一端连接在第一流量计32和第四常闭阀门102之间,氢中氧检测管路36的另一端连接在尾气排空法兰接口6和第四常闭阀门102之间,氢中氧检测管路36上由第一流量计32到尾气排空法兰接口6的方向依次设置有第七常闭阀门82、第二流量计40、第九常开阀门83、减压器37、第三流量计38、氧变送器39和第十常开阀门94;The utility model also includes a hydrogen-in-oxygen detection pipeline 36, one end of the hydrogen-in-oxygen detection pipeline 36 is connected between the first flow meter 32 and the fourth normally closed valve 102, and the other end of the hydrogen-in-oxygen detection pipeline 36 is connected to Between the exhaust gas evacuation flange interface 6 and the fourth normally closed valve 102, a seventh normally closed valve is sequentially arranged on the oxygen detection pipeline 36 from the first flowmeter 32 to the exhaust gas evacuation flange interface 6. 82. The second flow meter 40, the ninth normally open valve 83, the pressure reducer 37, the third flow meter 38, the oxygen transmitter 39 and the tenth normally open valve 94;
氢中氧检测管路36在第二流量计40和第九常开阀门83之间的位置与低点监测管路13在第七常开阀门101和第三常闭阀门106之间的位置连通;The position between the second flow meter 40 and the ninth normally open valve 83 of the oxygen detection pipeline 36 in hydrogen communicates with the position of the low point monitoring pipeline 13 between the seventh normally open valve 101 and the third normally closed valve 106 ;
氢中氧检测管路36上在第九常开阀门83和减压器37之间设置有第一校准口41,第一校准口41处设置有第八常闭阀门105;On the hydrogen-in-oxygen detection pipeline 36, a first calibration port 41 is provided between the ninth normally open valve 83 and the pressure reducer 37, and an eighth normally closed valve 105 is provided at the first calibration port 41;
氧变送器39连接有氧显示器42,氧变送器39和氧显示器42均通过信号线与过线端子盘9连接。The oxygen transmitter 39 is connected to the aerobic display 42 , and both the oxygen transmitter 39 and the oxygen display 42 are connected to the terminal board 9 through signal lines.
第三常闭阀门106并联有一条湿度监测管路43,湿度监测管路43上依次设置有第十一常开阀门108、湿度变送器44和第十二常开阀门109,湿度变送器44连接有湿度显示器45,湿度变送器44和湿度显示器45均通过信号线与过线端子盘9连接。The third normally closed valve 106 is connected in parallel with a humidity monitoring pipeline 43, and the humidity monitoring pipeline 43 is provided with an eleventh normally open valve 108, a humidity transmitter 44 and a twelfth normally open valve 109, a humidity transmitter 44 is connected with a humidity display 45, and both the humidity transmitter 44 and the humidity display 45 are connected to the terminal board 9 through signal lines.
本实用新型还包括校准管路46,校准管路46的一端连接在发电机风扇高压法兰接口2与第一常开阀门86之间的高压区监测管路10上,校准管路46的另一端设置第九常闭阀门104,校准管路46分别与第二常闭阀门81和第六常开阀门103之间的高点监测管路12及低点监测管路13连接;校准管路46上在高压区监测管路10和低点监测管路13之间设置有第十三常开阀门84。The utility model also includes a calibration pipeline 46, one end of the calibration pipeline 46 is connected to the high pressure area monitoring pipeline 10 between the generator fan high pressure flange interface 2 and the first normally open valve 86, and the other end of the calibration pipeline 46 One end is provided with the ninth normally closed valve 104, and the calibration pipeline 46 is respectively connected with the high point monitoring pipeline 12 and the low point monitoring pipeline 13 between the second normally closed valve 81 and the sixth normally open valve 103; the calibration pipeline 46 A thirteenth normally open valve 84 is arranged between the high-pressure region monitoring pipeline 10 and the low-point monitoring pipeline 13 .
本实用新型还包括分别与排空管路14和低压区监测管路11连接的压力监测管路47,压力监测管路47与排空管路14的连接处位于第一流量计32和第四常闭阀门102之间,压力监测管路47与低压区监测管路11的连接处位于第四常开阀门87和第三常开阀门95之间;压力监测管路47上并联有第一压力监测支管路48、第二压力监测支管路49、第三压力监测支管路50、第四压力监测支管路51和排污管路52,第一压力监测支管路48上设置有第一压力开关53和用于控制气路通断第一压力开关53的第十四常开阀门89,第二压力监测支管路49上设置有第二压力开关54和用于控制气路通断第二压力开关54的第十五常开阀门90,第三压力监测支管路50上设置有第三压力开关55和用于控制气路通断第三压力开关55的第十六常开阀门91,第四压力监测支管路51上设置有压力表56和用于控制气路通断压力表56的第十七常开阀门92,排污管路52上设置有第十常闭阀门93;排空管路14和低压区监测管路11连接之间的一段压力监测管路47上设置有第十八常开阀门85;The utility model also includes a pressure monitoring pipeline 47 connected to the emptying pipeline 14 and the low-pressure zone monitoring pipeline 11 respectively. Between the normally closed valves 102, the connection between the pressure monitoring pipeline 47 and the low pressure area monitoring pipeline 11 is located between the fourth normally open valve 87 and the third normally open valve 95; the pressure monitoring pipeline 47 is connected in parallel with the first pressure Monitoring branch pipeline 48, second pressure monitoring branch pipeline 49, third pressure monitoring branch pipeline 50, fourth pressure monitoring branch pipeline 51 and sewage pipeline 52, the first pressure monitoring branch pipeline 48 is provided with a first pressure switch 53 and The fourteenth normally open valve 89 used to control the on-off of the first pressure switch 53 of the gas path, the second pressure monitoring branch pipeline 49 is provided with the second pressure switch 54 and the second pressure switch 54 used to control the on-off of the gas path The fifteenth normally open valve 90, the third pressure monitoring branch pipeline 50 is provided with the third pressure switch 55 and the sixteenth normally open valve 91 for controlling the on-off of the gas circuit on the third pressure switch 55, the fourth pressure monitoring branch pipeline The road 51 is provided with a pressure gauge 56 and the seventeenth normally open valve 92 for controlling the on-off pressure gauge 56 of the gas circuit, and the sewage pipeline 52 is provided with a tenth normally closed valve 93; the exhaust pipeline 14 and the low-pressure area An eighteenth normally open valve 85 is provided on a section of the pressure monitoring pipeline 47 between the connections of the monitoring pipeline 11;
第一压力开关53、第二压力开关54和第三压力开关55均通过信号线与过线端子盘9连接。The first pressure switch 53 , the second pressure switch 54 and the third pressure switch 55 are all connected to the wire terminal board 9 through signal wires.
本实用新型在运行时的具体过程为:The concrete process of the utility model in operation is:
1、启机前的检查1. Inspection before start-up
本实用新型在启动运行前务必保证系统管道的气密性.The utility model must ensure the airtightness of the system pipeline before starting operation.
在有危险气体环境中,设备严禁在带电情况下接线、及从事各功能仪表的开盖调试.In an environment with dangerous gases, it is strictly forbidden to connect the equipment while it is live, and to engage in the opening and debugging of various functional instruments.
差压表30、差压变送器29、第一常闭阀门88务必打开,只有在高压区监测管路10、低压区监测管路11都导通情况下方可关闭第一常闭阀门,使差压表30工作,其他阀门处于关闭状态。The differential pressure gauge 30, the differential pressure transmitter 29, and the first normally closed valve 88 must be opened, and the first normally closed valve can be closed only when the high pressure area monitoring pipeline 10 and the low pressure area monitoring pipeline 11 are all conducting. The differential pressure gauge 30 works, and other valves are in closed state.
检查过程接头气路管路是否有松动和脱离,确保无泄露。Check whether the gas line of the process joint is loose and disconnected to ensure that there is no leakage.
检查机柜1内器件是否脱落,丢失。Check whether the components in cabinet 1 are dropped or lost.
2、发电机启机气体置换的操作2. Operation of generator start-up gas replacement
当设备开始充二氧化碳置换空气时,从发电机内部高点法兰接口4取样(打开第五常闭阀门80、第六常开阀门103和第七常开阀门101,隔离湿度变送器44(关闭第十一常开阀门108、第十二常开阀门109,打开第三常闭阀门106),隔离氧变送器39 (关闭第九常开阀门83和第十常开阀门94),启动纯度变送器31(打开第四常闭阀门102,调整第一流量计32为0.5SCFH),通过纯度显示器33观察二氧化碳浓度,二氧化碳气体排入排空管路14,直到合格。When the equipment starts to fill with carbon dioxide to replace the air, take samples from the inner high point flange interface 4 of the generator (open the fifth normally closed valve 80, the sixth normally open valve 103 and the seventh normally open valve 101, isolate the humidity transmitter 44 ( Close the eleventh normally open valve 108, the twelfth normally open valve 109, open the third normally closed valve 106), isolate the oxygen transmitter 39 (close the ninth normally open valve 83 and the tenth normally open valve 94), start The purity transmitter 31 (open the fourth normally closed valve 102, adjust the first flowmeter 32 to 0.5SCFH), observe the carbon dioxide concentration through the purity monitor 33, and discharge the carbon dioxide gas into the exhaust pipeline 14 until it is qualified.
当设备开始氢气置换二氧化碳时,从发电机内部低点法兰接口5取样(关闭第五常闭阀门80,打开第二常闭阀门81),隔离湿度变送器44(关闭第十一常开阀门108、第十二常开阀门109,打开第三常闭阀门106),隔离氧变送器39 (关闭第九常开阀门83和第十常开阀门94),投入启动纯度变送器31(打开第四常闭阀门102,调整第一流量计32为0.5SCFH),通过纯度显示器33观察氢气浓度,氢气排入排空管路14,直到合格。When the equipment starts to replace carbon dioxide with hydrogen, take a sample from the inner low point flange interface 5 of the generator (close the fifth normally closed valve 80, open the second normally closed valve 81), isolate the humidity transmitter 44 (close the eleventh normally open Valve 108, the twelfth normally open valve 109, open the third normally closed valve 106), isolate the oxygen transmitter 39 (close the ninth normally open valve 83 and the tenth normally open valve 94), put in and start the purity transmitter 31 (Open the fourth normally closed valve 102, adjust the first flow meter 32 to 0.5 SCFH), observe the hydrogen concentration through the purity monitor 33, and discharge the hydrogen into the emptying pipeline 14 until it is qualified.
当氢气纯度合格时,开始进行升压,压力达到额定氢压0.4兆帕。同时打开压力表56(打开第十七常开阀门92)、压力变送器34 (打开第八常开阀门107)、第一压力开关53(打开第十四常开阀门89)、第二压力开关54(打开第十五常开阀门90)和第三压力开关55(打开第十六常开阀门91),监测氢压变化。依然从发电机内部低点法兰接口5取样,排入排空管路14,来检测氢气纯度。When the hydrogen purity is up to standard, start to increase the pressure, and the pressure reaches the rated hydrogen pressure of 0.4 MPa. Simultaneously open the pressure gauge 56 (open the seventeenth normally open valve 92), the pressure transmitter 34 (open the eighth normally open valve 107), the first pressure switch 53 (open the fourteenth normally open valve 89), the second pressure The switch 54 (opens the fifteenth normally open valve 90) and the third pressure switch 55 (opens the sixteenth normally open valve 91) to monitor changes in hydrogen pressure. Still take samples from the low point flange interface 5 inside the generator, and discharge them into the exhaust pipeline 14 to detect the hydrogen purity.
当发电机冲转达到额定转速3000转/分钟,此时高压区监测管路10和低压区监测管路11形成差压,此时投入差压表30 (打开第五常开阀门96和第二常开阀门97)及差压变送器29 (打开第一常开阀门86和第四常开阀门87,关闭第一常闭阀门88,监测差压。同时从发电机内部高点法兰接口4取样(关闭第二常闭阀门81,打开第十三常开阀门84),投运纯度变送器31,湿度变送器44(打开第十一常开阀门108、第十二常开阀门109,关闭第三常闭阀门106),气体排入低压区监测管路11(关闭第四常闭阀门102,打开第十八常开阀门85),形成内循环监测(调整第一流量计32为0.5SCFH),为在压运行。投运氧变送器39(打开第九常开阀门83和第十常开阀门94),氢中氧经减压阀,流量调节(调整第二流量计40为0.5SCFH)后排入排空管路14,为排空测量。When the generator rushes to reach the rated speed of 3000 rpm, the high-pressure zone monitoring pipeline 10 and the low-pressure zone monitoring pipeline 11 form a differential pressure, and now the differential pressure gauge 30 is put into operation (open the fifth normally open valve 96 and the second Normally open valve 97) and differential pressure transmitter 29 (open the first normally open valve 86 and the fourth normally open valve 87, close the first normally closed valve 88, and monitor the differential pressure. At the same time, from the internal high point flange interface of the generator 4 Sampling (close the second normally closed valve 81, open the thirteenth normally open valve 84), put into operation the purity transmitter 31, humidity transmitter 44 (open the eleventh normally open valve 108, the twelfth normally open valve 109, close the third normally closed valve 106), the gas is discharged into the low-pressure area monitoring pipeline 11 (close the fourth normally closed valve 102, open the eighteenth normally open valve 85), and form internal circulation monitoring (adjust the first flowmeter 32 It is 0.5SCFH), and it is running under pressure. The oxygen transmitter 39 is put into operation (open the ninth normally open valve 83 and the tenth normally open valve 94), the oxygen in the hydrogen passes through the pressure reducing valve, and the flow is adjusted (adjust the second flowmeter 40 is 0.5SCFH) and then discharged into the emptying pipeline 14 for emptying measurement.
设备正常投入运行时,可以打开第六常闭阀门100,通过取样口35进行取样化验,与在线表进行数据比对。When the equipment is put into normal operation, the sixth normally closed valve 100 can be opened, the sampling test can be carried out through the sampling port 35, and the data can be compared with the online table.
发电机正常运行时不可避免的形成氢压下降,需要补氢,此时投入流量显示器28监测质量流量计27,保证补氢过程流量可控。When the generator is running normally, the hydrogen pressure will inevitably drop, and hydrogen supplementation is required. At this time, the flow display 28 is used to monitor the mass flow meter 27, so as to ensure that the flow rate in the hydrogen supplementation process is controllable.
同时漏氢显示器57在线实时监测发电机冷却器回水管,主油箱等是否漏氢。Simultaneously, the hydrogen leakage display 57 monitors in real time whether the water return pipe of the generator cooler, the main fuel tank, etc. leak hydrogen.
这样就形成了氢气全参数集成在线监测系统。In this way, an integrated online monitoring system for hydrogen full parameters is formed.
3 、发电机停机气体置换的操作3. Operation of gas replacement when the generator is shut down
当发电机停机时,需退出差压监测(打开第一常闭阀门88),关闭差压表30 (关闭第五常开阀门96和第二常开阀门97)及差压变送器29 (关闭第一常开阀门86和第四常开阀门87)。When the generator stops, it is necessary to exit the differential pressure monitoring (open the first normally closed valve 88), close the differential pressure gauge 30 (close the fifth normally open valve 96 and the second normally open valve 97) and the differential pressure transmitter 29 ( Close the first normally open valve 86 and the fourth normally open valve 87).
退出氧变送器39(关闭第九常开阀门83和第十常开阀门94)。Exit oxygen transmitter 39 (close ninth normally open valve 83 and tenth normally open valve 94).
当氢压下降到可以开始二氧化碳置换氢气时,从发电机内部高点法兰接口4(关闭第十三常开阀门84、第十八常开阀门85和第二常闭阀门81,打开第五常闭阀门80和第四常闭阀门102),隔离湿度变送器44(关闭第十一常开阀门108、第十二常开阀门109,打开第三常闭阀门106)和隔离氧变送器39 (关闭第九常开阀门83和第十常开阀门94),投入启动纯度变送器31(打开第四常闭阀门102,调整第一流量计32为0.5SCFH),通过纯度显示器33观察氢气浓度,氢气浓度呈下降趋势,气体排入排空管路14,直到合格。When the hydrogen pressure drops to the point where carbon dioxide can be replaced by hydrogen, the internal high point flange interface 4 of the generator (close the thirteenth normally open valve 84, the eighteenth normally open valve 85 and the second normally closed valve 81, open the fifth normally closed valve 80 and the fourth normally closed valve 102), isolate the humidity transmitter 44 (close the eleventh normally open valve 108, the twelfth normally open valve 109, open the third normally closed valve 106) and isolate the oxygen transmitter Device 39 (close the ninth normally open valve 83 and the tenth normally open valve 94), put into the startup purity transmitter 31 (open the fourth normally closed valve 102, adjust the first flow meter 32 to 0.5SCFH), through the purity display 33 Observe the hydrogen concentration, the hydrogen concentration is in a downward trend, and the gas is discharged into the emptying pipeline 14 until it is qualified.
当设备开始空气置换二氧化碳时,从发电机内部低点法兰接口5取样(关闭第五常闭阀门80,打开第二常闭阀门81),隔离湿度变送器44(关闭第十一常开阀门108、第十二常开阀门109,打开第三常闭阀门106)和隔离氧变送器39 (关闭第九常开阀门83和第十常开阀门94),投入启动纯度变送器31(打开第四常闭阀门102,调整第一流量计32为0.5SCFH),通过纯度显示器33观察空气浓度,观察空气浓度呈上升趋势,气体排入总排空管道,直到合格。When the equipment starts to replace carbon dioxide with air, take samples from the internal low point flange interface 5 of the generator (close the fifth normally closed valve 80, open the second normally closed valve 81), isolate the humidity transmitter 44 (close the eleventh normally open Valve 108, the twelfth normally open valve 109, open the third normally closed valve 106) and isolate the oxygen transmitter 39 (close the ninth normally open valve 83 and the tenth normally open valve 94), put in and start the purity transmitter 31 (Open the fourth normally closed valve 102, adjust the first flow meter 32 to 0.5SCFH), observe the air concentration through the purity monitor 33, and observe that the air concentration is on the rise, and the gas is discharged into the total exhaust pipe until it is qualified.
退出氢气压力监测,关闭压力表56(关闭第十七常开阀门92)、压力变送器34 (关闭第八常开阀门107)、第一压力开关53(关闭第十四常开阀门89)、第二压力开关54(关闭第十五常开阀门90)和第三压力开关55(关闭第十六常开阀门91)。Exit hydrogen pressure monitoring, close pressure gauge 56 (close the seventeenth normally open valve 92), pressure transmitter 34 (close the eighth normally open valve 107), first pressure switch 53 (close the fourteenth normally open valve 89) , the second pressure switch 54 (close the fifteenth normally open valve 90) and the third pressure switch 55 (close the sixteenth normally open valve 91).
关闭除了第一常闭阀门88以外的所有阀门。All valves except the first normally closed valve 88 are closed.
发电机检修期间可以通过第九常闭阀门104对纯度进行标气校验,通过第八常闭阀门105对氢中氧进行标气校验。During the overhaul of the generator, the purity can be checked through the ninth normally closed valve 104 , and the oxygen in hydrogen can be checked through the eighth normally closed valve 105 .
退出漏氢显示器57的漏氢监测,关闭发电机冷却器回水管的进出口阀,主油箱测点的阀门。Exit the hydrogen leakage monitoring of the hydrogen leakage display 57, close the inlet and outlet valves of the return water pipe of the generator cooler, and the valve of the main oil tank measuring point.
本实施例并非对本实用新型的形状、材料、结构等作任何形式上的限制,凡是依据本实用新型的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均属于本实用新型技术方案的保护范围。This embodiment does not impose any formal restrictions on the shape, material, structure, etc. of the utility model. Any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the utility model belong to the technology of the utility model. protection scope of the program.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822244499.7U CN209214674U (en) | 2018-12-29 | 2018-12-29 | Generator hydrogen system hydrogen population parameter integrates on-line monitoring system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822244499.7U CN209214674U (en) | 2018-12-29 | 2018-12-29 | Generator hydrogen system hydrogen population parameter integrates on-line monitoring system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209214674U true CN209214674U (en) | 2019-08-06 |
Family
ID=67466658
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201822244499.7U Expired - Fee Related CN209214674U (en) | 2018-12-29 | 2018-12-29 | Generator hydrogen system hydrogen population parameter integrates on-line monitoring system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209214674U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109489734A (en) * | 2018-12-29 | 2019-03-19 | 河南省日立信股份有限公司 | Generator hydrogen system hydrogen population parameter integrates on-line monitoring system |
| WO2023184885A1 (en) * | 2022-03-31 | 2023-10-05 | 山东日照发电有限公司 | Hydrogen parameter monitoring and automatic control system for hydrogen-cooled generator |
-
2018
- 2018-12-29 CN CN201822244499.7U patent/CN209214674U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109489734A (en) * | 2018-12-29 | 2019-03-19 | 河南省日立信股份有限公司 | Generator hydrogen system hydrogen population parameter integrates on-line monitoring system |
| CN109489734B (en) * | 2018-12-29 | 2025-03-14 | 河南省日立信股份有限公司 | Generator hydrogen system hydrogen full parameter integrated online monitoring system |
| WO2023184885A1 (en) * | 2022-03-31 | 2023-10-05 | 山东日照发电有限公司 | Hydrogen parameter monitoring and automatic control system for hydrogen-cooled generator |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103091053B (en) | Nuclear power plant generator whole air tight test method | |
| CN101943691B (en) | Method for checking SF6 gas leakage monitoring and alarming apparatuses | |
| CN113720555B (en) | Detection device and method for oil and gas pipeline ball valve internal leakage | |
| CN202974976U (en) | System for detecting accuracy of SF6 on-line monitoring device | |
| CN207020113U (en) | For detecting the online accurate dew point sampling system of hydrogen humidity | |
| CN109916568A (en) | Electric machine controller sealing propertytest system, device and method | |
| CN206020318U (en) | A kind of gas dew point analytical equipment | |
| CN118730479A (en) | A hydrogen loop experimental device and experimental method thereof | |
| CN109884263B (en) | Dissolved oxygen sensor test device and test method thereof | |
| CN203465246U (en) | System for detecting performance of transformer oil chromatograph on-line monitoring device | |
| CN109489734B (en) | Generator hydrogen system hydrogen full parameter integrated online monitoring system | |
| CN110045200B (en) | Test calibration device of SF6 transmitter | |
| CN115166444A (en) | Online monitoring system and method suitable for high-voltage oil-filled insulating sleeve | |
| CN202083525U (en) | On-site detection device of SF6-O2 on-line leakage monitoring alarm instrument | |
| CN120426515A (en) | Hydrogen-blended natural gas pipeline leakage monitoring system, method, medium and product | |
| CN114636791A (en) | A dynamic gas distribution method and system for a multi-gas sensor online calibration platform | |
| CN220854182U (en) | Engine oil supply pressure regulating system for test bed | |
| CN201926546U (en) | On-site calibration device for SF6-O2 leakage monitoring and alarming instrument | |
| CN209821181U (en) | Dissolved oxygen sensor test device | |
| CN210719249U (en) | New blowing instrument | |
| CN221238927U (en) | A gas distribution environment calibration system | |
| CN116593669A (en) | Gas content analysis system with calibration gas circuit and control method | |
| CN209167263U (en) | Hydrogen on-line analysis separate calibrations sampling system | |
| CN219574057U (en) | Automatic distribution testing arrangement suitable for CEMS inspection | |
| CN223897406U (en) | An explosion-proof online gas analyzer with pre-treatment gas path |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190806 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |