CN108252734A - A kind of placement method of Desending slicing Drift stoping underground goaf - Google Patents

A kind of placement method of Desending slicing Drift stoping underground goaf Download PDF

Info

Publication number
CN108252734A
CN108252734A CN201711360751.4A CN201711360751A CN108252734A CN 108252734 A CN108252734 A CN 108252734A CN 201711360751 A CN201711360751 A CN 201711360751A CN 108252734 A CN108252734 A CN 108252734A
Authority
CN
China
Prior art keywords
filling
placement method
underground goaf
underground
goaf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711360751.4A
Other languages
Chinese (zh)
Inventor
杨志强
李尚勇
张超
莫亚斌
李维舟
田忠元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinchuan Group Co Ltd
Original Assignee
Jinchuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Co Ltd filed Critical Jinchuan Group Co Ltd
Priority to CN201711360751.4A priority Critical patent/CN108252734A/en
Publication of CN108252734A publication Critical patent/CN108252734A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material

Abstract

A kind of placement method of Desending slicing Drift stoping underground goaf, is related to during a kind of underground mining mineral resources, the improvement of the placement method of underground goaf.It is characterized in that using mine ore dressing crude tailings as aggregate, using portland cement as cementing agent, filling slurry is configured to, being delivered to underground goaf by pipeline self is filled.A kind of placement method of Desending slicing Drift stoping underground goaf of the present invention, being filled into the slurry in goaf has dehydration soon, the features such as early strength height, obturation good integrity, pipeline are stablized, crude tailings can be efficiently used, filling cost is low, filling filling technique is depressurized as the mould pocket type placement method and filling slurry of filling aggregate by the use of crude tailings, ensure that the lower mass intensity requirement for reaching technical standard as the obturation of work top plate into mining with stowing.Crude tailings can be efficiently used, tailings waste material is reduced to surface discharge, alleviates the pollution to environment, considerably reduce filling cost.

Description

A kind of placement method of Desending slicing Drift stoping underground goaf
Technical field
A kind of placement method of Desending slicing Drift stoping underground goaf, is related to a kind of underground mining mineral resources process In, the improvement of the placement method of underground goaf.
Background technology
During underground mining mineral resources, underground goaf needs effectively to be filled, and CHARACTERISTICS OF TAILINGS SAND is mine enterprise The most important solid industrial waste material of industry, the stacking of CHARACTERISTICS OF TAILINGS SAND can cause environmental protection very big pressure.In existing mine In filling technique, in depth limit, the utilizations of crude tailings is on strength of filling mass far from meeting mine safety The requirement of mining.
At present, using tailing as the classified tailings filling process of aggregate, crude tailings high dense fill technique and paste body filling work Skill has technically achieved important breakthrough and has been widely applied;But the profit of middle crude tailings in depth limit With being but extremely restricted, which is because, one is the obturation that it is prepared into, laminated segregation is serious, and whole homogeneity is poor. Second is that its filling slurry dehydration prepared is slow, the early strength of obturation is low.Third, its filling slurry prepared will ensure to reach The lower intensity requirement to cemented fill, cementitious material additive amount is big, causes filling cost high, influences the economic benefit of mining. Thus the utilization rate of crude tailings is limited, can only promoted and applied on to cemented-method or open-stope method minority mine.
Ensure mining safety production, constantly reduce filling cost, be a main skill for ensureing Mine Sustainable Development Art measure.Therefore, it using crude tailings as main filling aggregate, adds a small amount of cement and is filled, be to solve crude tailings to utilize, reduce The use of back-up sand is processed, tailings is reduced and stacks pollution, reduce the important channel of filling cost.Therefore, it is necessary to further study Develop a mine tailing filling new model, to reduce filling cost and reduce discharge of the tailing waste material to earth's surface.
Therefore, it using crude tailings as main filling aggregate, adds a small amount of cement and is filled, be to solve crude tailings to utilize, subtract The use of back-up sand is processed less, is reduced tailings and is stacked pollution, reduces the important channel of filling cost.
Invention content
The purpose of the present invention aiming at insufficient existing for above-mentioned prior art, provide it is a kind of can efficiently use crude tailings, Tailings waste material is reduced to surface discharge, mitigates the pollution to environment, the Desending slicing route of filling cost expense is greatly lowered The placement method of mining underground goaf.
The purpose of the present invention is what is be achieved through the following technical solutions.
A kind of placement method of Desending slicing Drift stoping underground goaf, it is characterised in that made with mine ore dressing crude tailings For aggregate, using portland cement as cementing agent, filling slurry is configured to, being delivered to underground goaf by pipeline self is filled It fills out.
The placement method of a kind of Desending slicing Drift stoping underground goaf of the present invention, it is characterised in that be configured to fill During slurry, cement additive amount is the 12%-15% of crude tailings weight, and the weight concentration that contains admittedly into filling slurry being configured to is 70% ~75%.
The placement method of a kind of Desending slicing Drift stoping underground goaf of the present invention, it is characterised in that by pipeline certainly Stream is delivered to underground goaf and carries out stowing operation, and filling slurry is to be filled with to be placed in underground goaf and underground goaf sky Between in the matched mould bag of shape.
A kind of placement method of Desending slicing Drift stoping underground goaf of the present invention, it is characterised in that the mould bag For middle water mould bag.
A kind of placement method of Desending slicing Drift stoping underground goaf of the present invention, it is characterised in that the casting resin Slurry is that the feed pipe from mould bag bottom is filled with mould bag.
A kind of placement method of Desending slicing Drift stoping underground goaf of the present invention, Desending slicing Drift stoping underground The stowing operation in goaf, the equipment of use include being located at earth's surface tailing filling slurry preparation system and underground filling pipeline system System fills stope slurry decompressor and pressure detecting and slurry flow control valve, fills mould bag;The stope slurry decompression Device will meet filling pressure filling to mould bag and be adjusted, and the filling mould bag of use will adapt to fill route specification and stronger Resistance to compression and infiltration ability.Its arrangement form can ensure that the abundant and top of fast dewatering and the filling of mould bag and the obturation of left and right connect It touches.
Its attal meets the high concentration upper flow regime feature of filling slurry, and with relatively low with when control parameter Cement additive amount.
A kind of placement method of Desending slicing Drift stoping underground goaf of the present invention is filled into the slurry tool in goaf There is the features such as dehydration is fast, and early strength height, obturation good integrity, pipeline are stablized, crude tailings can be efficiently used, filled into This is low, depressurizes filling filling technique as the mould pocket type placement method and filling slurry of filling aggregate by the use of crude tailings, can be true Obturation under guarantor into mining with stowing as work top plate reaches the mass intensity requirement of technical standard.And it can reach effective profit With crude tailings, tailings waste material is reduced to surface discharge, mitigates the pollution to environment, the mesh of filling cost expense is greatly lowered 's.
Description of the drawings
Fig. 1 is the process equipment flow chart of the method for the present invention.
In its figure:1 is tailings storehouse, and 2 be cement bin, and 3 be fine sand storehouse, and 4 be constant feeder, and 5 be stirring motor, and 6 be stream Gauge, 7 be automatic regulating valve, and 8 be blender, and 9 be flowmeter, and 10 be densimeter, 11 regulating valves, and 12 be filling pipeline, 13 material Decompressor is pressed, 14 non-return valves, 15 be pressure gauge, and 16 be grouting pump, and 17 be mould bag, and 18 is treat exploiting field.
Specific embodiment
A kind of placement method of Desending slicing Drift stoping underground goaf, using mine ore dressing crude tailings as aggregate, with Portland cement is cementing agent, is configured to filling slurry, and when preparing filling slurry, cement additive amount is the 12%- of crude tailings weight 15%, the weight concentration that contains admittedly into filling slurry being configured to is 70%~75%.;Underground goaf is delivered to by pipeline self It is filled;Its filling slurry is to be filled with to be placed in underground goaf and the matched mould bag of underground goaf spatial form.
A kind of placement method of Desending slicing Drift stoping underground goaf of the present invention, the mould bag are middle water mould Bag;The filling slurry is that the feed pipe from mould bag bottom is filled with mould bag.
Embodiment 1
A kind of operating procedure of the placement method of Desending slicing Drift stoping underground goaf includes:
(1)Earth's surface tailing filling slurry Preparation equipment and underground filling pipeline are installed;
(2)Suitable mould bag will be made by filling route specifications design, mould bag uses water and soil work new material Co., Ltd in Wuxi The middle water mould bag of production, underground goaf and fixation are positioned over by mould bag;
(3)Start tank diameter, the water filling into tank diameter, after the material position of the water in tank diameter to agitator arm upper end, by full tail Sand(Or it is mixed with coarse sand ratio)With cement high concentration tank diameter is respectively fed to by specified rate.
(4)During filling slurry continuously prepares conveying, the filling slurry concentration value that is shown by instrument passes through confession The adjustment that water installations supply water into tank diameter, wherein cement additive amount are crude tailings(Or it is mixed with coarse sand ratio)12%.Make to stir Mix the tailing filling slurry for forming that weight concentration is 70% in slot;
(5)Tailing filling slurry operates filling slurry decompressor, controls the filling flow of slurry, pass through to when filling stope Filling slurry filling tube carries out filling filling to the filling mould bag in filling route.Mould bag is filling to ensure full of and and surrounding into It combines closely on road.
(6)After the completion of filling the filling filling of filling mould bag in route, first start water washing device cleaning conveyance conduit, then Start high-pressure blast conveying device, wind and water combined cleaning is carried out to conveyance conduit, until conveyance conduit is cleaned up.
(7)During to the filling filling of filling mould bag in filling route, the clear water of mould bag exudation is carried out in time using Pulp pump Discharge, it is ensured that the maintenance of filling stope environment and obturation.
Embodiment 2
A kind of operating procedure of the placement method of Desending slicing Drift stoping underground goaf includes:
(1)Earth's surface tailing filling slurry Preparation equipment and underground filling pipeline are installed;
(2)Suitable mould bag will be made by filling route specifications design, mould bag uses water and soil work new material Co., Ltd in Wuxi The middle water mould bag of production, underground goaf and fixation are positioned over by mould bag;
(3)Start tank diameter, the water filling into tank diameter, after the material position of the water in tank diameter to agitator arm upper end, by full tail Sand(Or it is mixed with coarse sand ratio)With cement high concentration tank diameter is respectively fed to by specified rate.
(4)During filling slurry continuously prepares conveying, the filling slurry concentration value that is shown by instrument passes through confession The adjustment that water installations supply water into tank diameter, wherein cement additive amount are crude tailings(Or it is mixed with coarse sand ratio)15%.Make stirring The tailing filling slurry that weight concentration is 75% is formed in slot;
(5)Tailing filling slurry operates filling slurry decompressor, controls the filling flow of slurry, pass through to when filling stope Filling slurry filling tube carries out filling filling to the filling mould bag in filling route.Mould bag is filling to ensure full of and and surrounding into It combines closely on road.
(6)After the completion of filling the filling filling of filling mould bag in route, first start water washing device cleaning conveyance conduit, then Start high-pressure blast conveying device, wind and water combined cleaning is carried out to conveyance conduit, until conveyance conduit is cleaned up.
(7)During to the filling filling of filling mould bag in filling route, the clear water of mould bag exudation is carried out in time using Pulp pump Discharge, it is ensured that the maintenance of filling stope environment and obturation.

Claims (5)

1. a kind of placement method of Desending slicing Drift stoping underground goaf, it is characterised in that using mine ore dressing crude tailings as Aggregate using portland cement as cementing agent, is configured to filling slurry, and being delivered to underground goaf by pipeline self is filled It fills out.
2. a kind of placement method of Desending slicing Drift stoping underground goaf according to claim 1, it is characterised in that When being configured to filling slurry, cement additive amount is the 12%-15% of crude tailings weight, and what is be configured to contains weight admittedly into filling slurry A concentration of 70%~75%.
3. a kind of placement method of Desending slicing Drift stoping underground goaf according to claim 1, it is characterised in that Underground goaf is delivered to by pipeline self and carries out stowing operation, filling slurry is to be filled with to be placed in underground goaf and well In the matched mould bag of lower goaf spatial form.
4. a kind of placement method of Desending slicing Drift stoping underground goaf according to claim 1, it is characterised in that The mould bag is middle water mould bag.
5. a kind of placement method of Desending slicing Drift stoping underground goaf according to claim 1, it is characterised in that The filling slurry is that the feed pipe from mould bag bottom is filled with mould bag.
CN201711360751.4A 2017-12-18 2017-12-18 A kind of placement method of Desending slicing Drift stoping underground goaf Pending CN108252734A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711360751.4A CN108252734A (en) 2017-12-18 2017-12-18 A kind of placement method of Desending slicing Drift stoping underground goaf

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711360751.4A CN108252734A (en) 2017-12-18 2017-12-18 A kind of placement method of Desending slicing Drift stoping underground goaf

Publications (1)

Publication Number Publication Date
CN108252734A true CN108252734A (en) 2018-07-06

Family

ID=62723393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711360751.4A Pending CN108252734A (en) 2017-12-18 2017-12-18 A kind of placement method of Desending slicing Drift stoping underground goaf

Country Status (1)

Country Link
CN (1) CN108252734A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736880A (en) * 2019-01-22 2019-05-10 长安大学 A kind of coal mining obturation and preparation method thereof and technique
CN111312344A (en) * 2020-02-12 2020-06-19 河北钢铁集团矿业有限公司 Optimization method of full-solid waste cementing material and mixed aggregate filling slurry
CN112814733A (en) * 2021-02-03 2021-05-18 烟台驰龙建筑节能科技有限公司 Mining lightweight concrete fills construction equipment
CN114772963A (en) * 2022-06-07 2022-07-22 安徽省融工博大环保技术材料研究院有限公司 Tailing curing and filling method, filling material, cementing agent, preparation method and preparation system thereof
CN115614097A (en) * 2022-11-09 2023-01-17 湖南科技大学 Reinforcement device and process in underground filling slurry flowing process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102418555A (en) * 2011-08-11 2012-04-18 安徽大昌矿业集团有限公司 Method for filling mine goaf by utilizing high-concentration all tailing cement
CN103615285A (en) * 2013-12-04 2014-03-05 南京银茂铅锌矿业有限公司 Stope route arrangement mode and method beneficial to roof-contacted filling
CN103643992A (en) * 2013-12-10 2014-03-19 中国恩菲工程技术有限公司 Filling method for mining
CN104929683A (en) * 2015-06-16 2015-09-23 北京科技大学 Total-tailings paste filling and stockpiling combined treatment method based on deep-cone thickener
CN106499435A (en) * 2016-11-29 2017-03-15 重庆大学 A kind of placement method of underground goaf and filling system
CN106884675A (en) * 2017-04-11 2017-06-23 中蓝连海设计研究院 The technique that a kind of consolidated fill slurry fills underground goaf

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102418555A (en) * 2011-08-11 2012-04-18 安徽大昌矿业集团有限公司 Method for filling mine goaf by utilizing high-concentration all tailing cement
CN103615285A (en) * 2013-12-04 2014-03-05 南京银茂铅锌矿业有限公司 Stope route arrangement mode and method beneficial to roof-contacted filling
CN103643992A (en) * 2013-12-10 2014-03-19 中国恩菲工程技术有限公司 Filling method for mining
CN104929683A (en) * 2015-06-16 2015-09-23 北京科技大学 Total-tailings paste filling and stockpiling combined treatment method based on deep-cone thickener
CN106499435A (en) * 2016-11-29 2017-03-15 重庆大学 A kind of placement method of underground goaf and filling system
CN106884675A (en) * 2017-04-11 2017-06-23 中蓝连海设计研究院 The technique that a kind of consolidated fill slurry fills underground goaf

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736880A (en) * 2019-01-22 2019-05-10 长安大学 A kind of coal mining obturation and preparation method thereof and technique
CN111312344A (en) * 2020-02-12 2020-06-19 河北钢铁集团矿业有限公司 Optimization method of full-solid waste cementing material and mixed aggregate filling slurry
CN111312344B (en) * 2020-02-12 2023-10-27 河北钢铁集团矿业有限公司 Optimization method of full-solid waste cementing material and mixed aggregate filling slurry
CN112814733A (en) * 2021-02-03 2021-05-18 烟台驰龙建筑节能科技有限公司 Mining lightweight concrete fills construction equipment
CN112814733B (en) * 2021-02-03 2022-07-08 烟台驰龙建筑节能科技有限公司 Mining lightweight concrete fills construction equipment
CN114772963A (en) * 2022-06-07 2022-07-22 安徽省融工博大环保技术材料研究院有限公司 Tailing curing and filling method, filling material, cementing agent, preparation method and preparation system thereof
CN114772963B (en) * 2022-06-07 2023-09-12 安徽省融工博大环保技术材料研究院有限公司 Tailing solidification filling method, filling material, cementing agent, preparation method and preparation system thereof
CN115614097A (en) * 2022-11-09 2023-01-17 湖南科技大学 Reinforcement device and process in underground filling slurry flowing process
CN115614097B (en) * 2022-11-09 2023-08-11 湖南科技大学 Reinforcing device and process in underground filling slurry flowing process

Similar Documents

Publication Publication Date Title
CN108252734A (en) A kind of placement method of Desending slicing Drift stoping underground goaf
CN102261262B (en) High-performance foam mortar filling method for mine stope
CN107117888B (en) A kind of mining mixing aggregate filling slurry proportion decision-making technique
Grice Recent mine fill developments in Australia
CN112814732A (en) Preparation of mixed ground paste of barren rock and tailings and pump sending filling device
CN105317458B (en) A kind of metallic ore crude tailings Grading And Zoning Paste-filling System and method
EP0988260A1 (en) High pulp density, fast setting and high early strength backfill method and material
CN101723622A (en) Foam tailings cemented filling material and manufacturing method thereof
CN110781587B (en) Multi-objective optimization method for anti-segregation waste rock filling slurry by using low-quality solid waste
CN102434204A (en) Mine waste rock and all tailing pipeline conveying filling system and filling method using same
Krupnik et al. Backfilling technology in Kazakhstan mines
CN106939796A (en) The method and system that filling slurry fills underground goaf are prepared using efflorescent sand
CN104696008A (en) Method for filling underground stope with gravels in cemented filling manner
CN103133033A (en) Mine phosphogypsum cemented fill slurrying process
Emad et al. Backfill practices for sublevel stoping system
CN103538149A (en) Ultrahigh water material composite solid waste pulping, delivering and mixing device
CN105776911A (en) Gel material for ultra-fine tailing filling and dry heaping
CN105971605B (en) A kind of underground mines exploration without waster method
CN103242024A (en) Leopoldite goaf cementation filler and filling method thereof
CN201763388U (en) Foam mortar preparation device
CN109538290B (en) Slurry pressure-soaking filling process
CN103352722B (en) Cemented filling close to back processing technology for goaf at barren rock filling background
CN203769848U (en) Tailing paste filling device
CN214303937U (en) Preparation of mixed ground paste of barren rock and tailings and pump sending filling device
CN212154857U (en) Dry-type tailing paste filling system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180706