CN108252397A - Pond body wet method is capped constructing device and construction method - Google Patents

Pond body wet method is capped constructing device and construction method Download PDF

Info

Publication number
CN108252397A
CN108252397A CN201810045398.9A CN201810045398A CN108252397A CN 108252397 A CN108252397 A CN 108252397A CN 201810045398 A CN201810045398 A CN 201810045398A CN 108252397 A CN108252397 A CN 108252397A
Authority
CN
China
Prior art keywords
pond body
packaged type
construction platform
type construction
wet method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810045398.9A
Other languages
Chinese (zh)
Inventor
李远文
李建明
黄秋莹
欧阳静达
陈达文
李寿才
梁欢
陈海斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU MUNICIPAL ENGINEERING MACHINERY CONSTRUCTION CO LTD
Original Assignee
GUANGZHOU MUNICIPAL ENGINEERING MACHINERY CONSTRUCTION CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU MUNICIPAL ENGINEERING MACHINERY CONSTRUCTION CO LTD filed Critical GUANGZHOU MUNICIPAL ENGINEERING MACHINERY CONSTRUCTION CO LTD
Priority to CN201810045398.9A priority Critical patent/CN108252397A/en
Publication of CN108252397A publication Critical patent/CN108252397A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to pond body wet methods to be capped constructing device, including packaged type construction platform, rope, hoist engine;Hoist engine is fixed on pond body bank, and packaged type construction platform swims in liquid level, and hoist engine pulls packaged type construction platform to be translated in liquid level by rope;Packaged type construction platform is made of the connection of multiple module detachable types, the shape swap modules of pond body position according to where packaged type construction platform, so as to make packaged type construction platform shape corresponding to pond body.Further relate to pond body wet method capping construction method.The present invention has the advantages of low cost, assembly and disassembly are flexible, and speed of application is fast, belongs to pond body technical field of construction.

Description

Pond body wet method is capped constructing device and construction method
Technical field
The present invention relates to pond body construction technologies, and in particular to pond body wet method is capped constructing device and construction method.
Background technology
The poverty-stricken condition of " garbage-surrounded city " allows of no optimist at present, it is necessary to complete the construction of garbage sanitary filling field in time.By It is located at landfill yard bottom storehouse in old leachate equalization basin, the percolate outward transport progress for being stored in old pond is slow, directly affects reservoir area Construction speed, to accelerate progress, it is desirable that in the case where newly-built regulating reservoir not yet implements capping construction, just take out percolate Drain into newly-built uncapped regulating reservoir.In the case of not yet implementing closed capping in leachate equalization basin, just come into operation State, the landfill leachate of a large amount of high concentrations ferment under open-air atmosphere, and foul odour is more serious, to the harmony of surrounding enviroment Stabilization affects.It is therefore desirable to have the wet method to regulating reservoir is capped technology.Regulating reservoir is not only, it is existing to be equipped with The pond body capping technology of liquid is all to build fixed construction platform on bank or pond center to construct, and the prior art exists such as Lower shortcoming:1. fixed construction platform difficulty of construction is big, it is possible to be built in liquid;2. fixed construction platform assembly and disassembly week Phase is long, so as to extend the construction time of entire engineering;3. flexibility is poor, it is flat to design several constructions according to the size of regulating reservoir Platform will redesign every time;4. in order to ensure the stability of construction platform, mostly using metal framework structure, material weight is big, It is not readily transportable.
Invention content
For the technical problems in the prior art, the purpose of the present invention is:It provides a kind of flexibility by force and is easy to apply The pond body wet method capping constructing device and construction method of work.
In order to achieve the above object, the present invention adopts the following technical scheme that:
Pond body wet method is capped constructing device, including packaged type construction platform, rope, hoist engine;Hoist engine is fixed on pond Body bank, packaged type construction platform swim in liquid level, and hoist engine pulls packaged type construction platform to be put down in liquid level by rope It moves;Packaged type construction platform is made of the connection of multiple module detachable types, the pond body position according to where packaged type construction platform The shape swap modules put, so as to make packaged type construction platform shape corresponding to pond body.
As a preferred embodiment, packaged type construction platform includes multiple modules, more bundled pieces, polylith panel and multigroup company Fitting;Bundled piece tightens multiple modules successively, and panel is covered in the top of module, is connected between panel by connector.
As a preferred embodiment, one piece of panel covers polylith module, abut and arrange in triangle disposition between panel;Connector packet Include the metallic aluminium fastener that is covered in above adjacent panels and across metallic aluminium fastener, panel, module wood screw.
As a preferred embodiment, all modules are the identical rectangular module of size;Packaged type construction platform further includes more A shape is different from the edge floating block of module, and the shape selection edge of pond body position according to where packaged type construction platform floats Block, so as to make packaged type construction platform shape corresponding to pond body;All panels are the identical rectangular panel of size.
As a preferred embodiment, being equipped with built-in fitting in packaged type construction platform, steel pipe is fixed on built-in fitting, rope End connects with steel pipe;Steel pipe extends along the width direction of pond body;The quantity of rope is more, along the length direction of steel pipe It is uniformly distributed, a rope corresponds to a hoist engine;Packaged type construction platform is translated along the length direction of pond body.
Pond body wet method is capped construction method, is capped constructing device using pond body wet method, includes the following steps:A. on liquid level Packaged type construction platform is built, the capping of one section of pond body is carried out using packaged type construction platform as construction platform;B. one section After the completion of the capping of pond body, packaged type construction platform is translated to the next position by hoist engine and rope, adjusts packaged type The size of construction platform is allowed to corresponding to pond body the next position shape, and next section of pond body is capped in the next position;C. not It is disconnected to repeat step b, until completing the capping of entire pond body.
As a preferred embodiment, packaged type construction platform extends along the width direction of pond body, along the length side of pond body To translation.
As a preferred embodiment, pond body is divided into expansion area, centre along the direction of travel of packaged type construction platform Area, closing in area;In the packaged type construction platform build process in expansion area, it is therefore an objective to which whether inspection module layout area closes Reason, whether overall stability meets the requirements when packaged type construction platform moves, and otherwise, takes measures to carry out local directed complete set; Middle area pond body change width is relatively small, and when ensureing the movement of packaged type construction platform, overall stability simultaneously, is accelerated flat Platform movement speed;During in closing in area, packaged type construction platform is built, to strengthen divulging information.
It is pressed from both sides as a preferred embodiment, the local directed complete set measure in expansion area includes the adjustment of module arrangement region, rope and liquid level Angle adjusts, the adjustment of packaged type construction platform speed.
As a preferred embodiment, a set of pond body wet method capping constructing device includes multiple modules, polylith panel, multiple edges and floats Block, multigroup connector, more bundled pieces, so as to which a set of pond body wet method capping constructing device is common to the pond of different shape and size Body.
The principle of the present invention is:Pond body come into operation it is internal need capping equipped with liquid in the case of, by taking One section of packaged type construction platform is built, capping construction operation is carried out in packaged type construction platform, that is, completes pond body capping system The process such as system, gas guide system, gravity pressure guard system, cover film floating system, dredging inspection hole and maintenance channel, it is complete It is drawn again by small winch into one section and packaged type construction platform is moved to next section of construction location, be gradually completing pond body Capping construction.
Generally speaking, the invention has the advantages that:
1. packaged type construction platform is assemblied to form using small size floating body material, low cost, dismounting is easy for construction, can fit Pond body of different shapes is answered, it is versatile.
2. small size floating body material module splices and removes convenient, flexible, speed of application is fast, can maximum meet it is variously-shaped Irregular pond body platform building, and it is light-weight, convenient for packing and transporting.
3. the connecting sewing between panel and panel is arranged in a manner of triangle disposition, it is therefore an objective to which connecting sewing is staggered, with this into one The globality and stability of step enhancing flat top structure.
4. in platform tethered sliding, manual control small winch tethered sliding is only needed, speed controllability is strong.
5. pond body, which carries out scientific and reasonable divide, is unfolded area, middle area, three, closing in area plane domain, bright for different zones Really each region construction emphasis and difficult point, ensure construction safety, ensure construction quality.
6. setting edge floating block, the edge corner that module can not be installed is filled up, is applicable in variously-shaped pond body.
Description of the drawings
Fig. 1 is the vertical view that pond body wet method capping constructing device is mounted on pond body.
Fig. 2 is the partial enlarged view in packaged type construction platform overlook direction.
Fig. 3 is the schematic diagram on packaged type construction platform main view direction.
Fig. 4 is the schematic diagram on packaged type construction platform left view direction.
Fig. 5 is construction flow chart.
Wherein, 1 is packaged type construction platform, and 2 be rope, and 3 be hoist engine, and 4 be panel, and 5 be metallic aluminium fastener, and 6 are Wood screw, 7 be edge floating block, and 8 be built-in fitting, and 9 be steel pipe, and 10 be liquid level, and 11 be geomembrane block, and 12 be expansion area, during 13 are Between area, 14 be closing in area.
Specific embodiment
It is next below that the present invention will be further described in detail.
Pond body wet method is capped constructing device, including packaged type construction platform, rope, hoist engine.In the present embodiment, pond body For regulating reservoir.
Packaged type construction platform includes multiple modules, more bundled pieces, polylith panel and multigroup connector.Module uses The floating body material on liquid level can be floated on, all modules are the identical rectangular module of size.Bundled piece is strap, by adjacent mould Block bundles.Panel is plank, and all panels are the identical rectangular panel of size.One piece of panel covers polylith module, The present embodiment covers three pieces, in triangle disposition against arrangement between panel.Panel uses blocks of large material, whole to strengthen its Body.Connector include being covered in metallic aluminium fastener above adjacent panels and across metallic aluminium fastener, panel, module wood snail Nail.Packaged type construction platform further includes the edge floating block that multiple shapes are different from module, according to packaged type construction platform institute Shape in pond body position selects edge floating block, can prefabricated more moneys so as to make packaged type construction platform shape corresponding to pond body Edge floating block.Multiple built-in fittings are installed, steel pipe is fixed on built-in fitting, the end of rope and steel in packaged type construction platform Pipe connects;Steel pipe extends along the width direction of pond body;The quantity of rope is more, is uniformly divided along the length direction of steel pipe Cloth, a rope corresponds to a hoist engine, so as to which entire packaged type construction platform can obtain uniform pulling force;Packaged type is applied Work platform is translated along the length direction of pond body.The full payload of packaged type construction platform need to meet the weight of itself, smooth surface HDPE cover films weight, the total weight of construction loads (people+mechanical equipment) weight three.When packaged type construction platform is in maximum When calculating load, when draft is met the requirements, it is ensured that platform meets safety requirements.
Rope is steel wire rope.
Hoist engine is fixed on pond body bank, and hoist engine is arranged in a one-to-one correspondence with rope.According to on-site actual situations, in bank side Reinforced concrete gravity abutment is set, steel pipe is embedded in gravity abutment, using steel wire rope as main rope, one end of main rope is fixed In on steel pipe, the other end is then fixed on the steel pipe of stage apparatus connection built-in fitting, finally, main rope is drawn by manual hoist Entire packaged type construction platform is moved to next section of construction location.
Pond body wet method is capped construction method, is capped constructing device using pond body wet method, includes the following steps:A. on liquid level Packaged type construction platform is built, the capping of one section of pond body is carried out using packaged type construction platform as construction platform, that is, is completed Pond body capped system, gas guide system, gravity pressure guard system, cover film floating system, dredging inspection hole and maintenance channel etc. Process;Wherein pond body capped system is that smooth surface HDPE cover films are covered on liquid level, passes through welding between smooth surface HDPE cover films Connection;B. after the completion of the capping of one section of pond body, packaged type construction platform is translated to the next position by hoist engine and rope, is adjusted The size of whole packaged type construction platform is allowed to corresponding to pond body the next position shape, and next section of pond body is carried out in the next position Capping;C. step b is constantly repeated, until completing the capping of entire pond body;The floating head of a closing is finally formed in pond body, is kept away Exempt from Leachate site exposure, it is effective that Leachate site is prevented to evaporate, it gives an offensive smell.Cover film is generally welded using the HDPE film of 2.0mm thickness It forms, using, as possible using the larger coiled material of breadth, to reduce welding times, reduction manual operation risk subtracts during wet construction Small leakage probability.
Packaged type construction platform extends along the width direction of pond body, is translated along the length direction of pond body.By pond body Along the direction of travel of packaged type construction platform, expansion area, middle area, closing in area are divided into, preferably can clearly be controlled Make each region construction emphasis and difficult point;In the packaged type construction platform build process in expansion area, it is therefore an objective to inspection module cloth Whether reasonable put region, whether overall stability meets the requirements when packaged type construction platform moves, and otherwise, takes measures to carry out Local directed complete set, and provide theories integration for next step middle area and the construction of closing in area job platform;Middle area packaged type is applied Work platform both sides will reserve safe enough distance, ensure in construction operation on workbench personnel safety and geomembrane overlap joint, Welding job face, in pond body middle area, change width is relatively small, and when ensureing platform movement, overall stability simultaneously, can be accelerated Platform movement speed;During packaged type construction platform is built in closing in area, pond body percolate biogas concentrations are avoided, therefore When pond body capping construction is carried out in closing in area, to adopt an effective measure, strengthen ventilation.Local directed complete set measure in expansion area includes The adjustment of module arrangement region, rope and liquid level angle adjust, packaged type construction platform speed adjustment, until reaching preferable shape State.
A set of pond body wet method capping constructing device includes multiple modules, polylith panel, multiple edge floating blocks, multigroup connection Part, more bundled pieces, so as to which a set of pond body wet method capping constructing device is common to the pond body of different shape and size.It applies every time Work only need to use some of modules, panel, edge floating block, connector, bundled piece.
Other than the mode that the present embodiment refers to, liquid is housed it is also possible to apply the invention to other different shapes and size Pond body, module can flexible combination into different shape and the packaged type construction platform of size, make itself and pond body cap position to be added Shape is corresponding.
Above-described embodiment is the preferable embodiment of the present invention, but embodiments of the present invention are not by above-described embodiment Limitation, other any Spirit Essences without departing from the present invention with made under principle change, modification, replacement, combine, simplification, Equivalent substitute mode is should be, is included within protection scope of the present invention.

Claims (10)

1. pond body wet method is capped constructing device, it is characterised in that:Including packaged type construction platform, rope, hoist engine;Hoist engine Pond body bank is fixed on, packaged type construction platform swims in liquid level, and hoist engine pulls packaged type construction platform by rope It is translated in liquid level;Packaged type construction platform is made of the connection of multiple module detachable types, according to packaged type construction platform institute Shape swap modules in pond body position, so as to make packaged type construction platform shape corresponding to pond body.
2. pond body wet method described in accordance with the claim 1 is capped constructing device, it is characterised in that:Packaged type construction platform includes Multiple modules, more bundled pieces, polylith panel and multigroup connector;Bundled piece tightens multiple modules successively, and panel is covered in The top of module is connected by connector between panel.
3. pond body wet method described in accordance with the claim 2 is capped constructing device, it is characterised in that:One piece of panel covers polylith mould Block, in triangle disposition against arrangement between panel;Connector includes being covered in the metallic aluminium fastener above adjacent panels and passing through Metallic aluminium fastener, panel, module wood screw.
4. pond body wet method described in accordance with the claim 2 is capped constructing device, it is characterised in that:All modules are that size is identical Rectangular module;Packaged type construction platform further includes the edge floating block that multiple shapes are different from module, is applied according to packaged type The shape selection edge floating block of pond body position where work platform, so as to make packaged type construction platform shape corresponding to pond body;Institute It is the identical rectangular panel of size to have panel.
5. pond body wet method described in accordance with the claim 1 is capped constructing device, it is characterised in that:Pacify in packaged type construction platform Equipped with built-in fitting, steel pipe is fixed on built-in fitting, and the end of rope connects with steel pipe;Steel pipe prolongs along the width direction of pond body It stretches;The quantity of rope is more, is uniformly distributed along the length direction of steel pipe, and a rope corresponds to a hoist engine;It is removable Formula construction platform is translated along the length direction of pond body.
6. pond body wet method is capped construction method, the pond body wet method capping construction dress described in any one of claim 1 to 5 is used It puts, it is characterised in that:Include the following steps:
A. packaged type construction platform is built on liquid level, one section of pond body is carried out using packaged type construction platform as construction platform Capping;
B. after the completion of the capping of one section of pond body, packaged type construction platform is translated to the next position by hoist engine and rope, is adjusted The size of whole packaged type construction platform is allowed to corresponding to pond body the next position shape, and next section of pond body is carried out in the next position Capping;
C. step b is constantly repeated, until completing the capping of entire pond body.
7. it is capped construction method according to the pond body wet method described in claim 6, it is characterised in that:Packaged type construction platform along The width direction extension of pond body, translates along the length direction of pond body.
8. it is capped construction method according to the pond body wet method described in claim 7, it is characterised in that:Pond body is applied along packaged type The direction of travel of work platform is divided into expansion area, middle area, closing in area;Packaged type construction platform in expansion area is built In the process, it is therefore an objective to which whether inspection module layout area is reasonable, and whether overall stability accords with when packaged type construction platform moves Requirement is closed, otherwise, takes measures to carry out local directed complete set;In middle area, pond body change width is relatively small, is ensureing packaged type Overall stability simultaneously, accelerates platform movement speed when construction platform moves;During in closing in area, packaged type construction platform is built, Strengthen divulging information.
9. it is capped construction method according to pond body wet method according to any one of claims 8, it is characterised in that:Local directed complete set in expansion area is arranged It applies and is adjusted including the adjustment of module arrangement region, rope and liquid level angle, the adjustment of packaged type construction platform speed.
10. it is capped construction method according to the pond body wet method described in claim 6, it is characterised in that:A set of pond body wet method capping is applied Tooling is put including multiple modules, polylith panel, multiple edge floating blocks, multigroup connector, more bundled pieces, so as to which a set of pond body is wet Method capping constructing device is common to the pond body of different shape and size.
CN201810045398.9A 2018-01-17 2018-01-17 Pond body wet method is capped constructing device and construction method Pending CN108252397A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810045398.9A CN108252397A (en) 2018-01-17 2018-01-17 Pond body wet method is capped constructing device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810045398.9A CN108252397A (en) 2018-01-17 2018-01-17 Pond body wet method is capped constructing device and construction method

Publications (1)

Publication Number Publication Date
CN108252397A true CN108252397A (en) 2018-07-06

Family

ID=62740867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810045398.9A Pending CN108252397A (en) 2018-01-17 2018-01-17 Pond body wet method is capped constructing device and construction method

Country Status (1)

Country Link
CN (1) CN108252397A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110303023A (en) * 2019-07-02 2019-10-08 北京高能时代环境技术股份有限公司 Detachable flexible floating cover

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102079549A (en) * 2010-12-03 2011-06-01 深圳市胜义环保有限公司 Wet construction method for coverage system of refuse landfill sewage adjusting tank
CN105947131A (en) * 2016-05-26 2016-09-21 中铁上海工程局集团有限公司 Movable steel pipe inserting-piling anchoring type drilling floating construction platform and construction method thereof
WO2017080260A1 (en) * 2015-11-11 2017-05-18 深圳市博德维环境技术股份有限公司 Liquid level gas film structure
CN207776078U (en) * 2018-01-17 2018-08-28 广州市市政工程机械施工有限公司 Pond body wet method is capped constructing device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102079549A (en) * 2010-12-03 2011-06-01 深圳市胜义环保有限公司 Wet construction method for coverage system of refuse landfill sewage adjusting tank
WO2017080260A1 (en) * 2015-11-11 2017-05-18 深圳市博德维环境技术股份有限公司 Liquid level gas film structure
CN105947131A (en) * 2016-05-26 2016-09-21 中铁上海工程局集团有限公司 Movable steel pipe inserting-piling anchoring type drilling floating construction platform and construction method thereof
CN207776078U (en) * 2018-01-17 2018-08-28 广州市市政工程机械施工有限公司 Pond body wet method is capped constructing device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梁欢: "渗滤液调节池湿法加盖施工技术研究", 广东土木与建筑, no. 11, 15 November 2014 (2014-11-15), pages 51 - 53 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110303023A (en) * 2019-07-02 2019-10-08 北京高能时代环境技术股份有限公司 Detachable flexible floating cover
CN110303023B (en) * 2019-07-02 2021-06-11 北京高能时代环境技术股份有限公司 Detachable flexible floating cover

Similar Documents

Publication Publication Date Title
US20210164183A1 (en) Underwater repair system for cavity region of concrete panel rock-fill dam panel
CN105926669A (en) Construction method of subway station
CN109235499A (en) A kind of open cut hypogee Standard formula construction method
CN104563573B (en) A kind of Modular spliced pond
CN103225513A (en) Integral pouring construction method of ventilation inclined shaft provided with mid-partition and integral trolleys
CN107254869A (en) A kind of ship booster supporting compartment enters water and floating and transportation method
CN108342993B (en) Underwater bearing platform suspension supporting platform and construction method thereof
CN103104091A (en) Sliding mold whole lifting platform and construction method
CN207776078U (en) Pond body wet method is capped constructing device
CN205398730U (en) Sour pond closed hood is collected to parallel translation formula negative pressure
CN207700068U (en) A kind of modularization Bridge Pier Construction job platform
CN108252397A (en) Pond body wet method is capped constructing device and construction method
CN106087899B (en) Aperture width can adjust float type maintenance steel-slag sand
CN205443975U (en) A sliding template device that is used for box culvert, passageway to be under construction
CN102841020A (en) Test model and method for simulating capacity of resisting cracking caused by high-pressure water of flexible impermeable material
CN103952979A (en) Bracket-free construction device and construction method for steel-concrete superposed beam top plate
CN113957802A (en) Construction method for long-span upper beam of single-tower asymmetric cable-stayed bridge high tower
CN206173906U (en) Steel gate is overhauld to width adjustable body formula in drill way
CN207536826U (en) Prefabricated guardrail is unloaded and the integrated table system of installation
CN106437000A (en) Turnover sliding combined type roofing structure capable of being opened and closed
CN205413861U (en) A flexible sealing deodorization cover for driving a vehicle formula water treatment facilities
CN115262497A (en) Underwater concrete repairing method for trash rack gate slot of hydropower station
CN212926150U (en) Vertical post-cast strip structure of retaining wall
CN108194111A (en) A kind of umbrella arch splash guard, reinforced mesh are laid with ancillary equipment
CN205275229U (en) Water processing system with deodorization function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination