CN108249277A - The lifting transfer tooling of dirigible utricule - Google Patents
The lifting transfer tooling of dirigible utricule Download PDFInfo
- Publication number
- CN108249277A CN108249277A CN201711310477.XA CN201711310477A CN108249277A CN 108249277 A CN108249277 A CN 108249277A CN 201711310477 A CN201711310477 A CN 201711310477A CN 108249277 A CN108249277 A CN 108249277A
- Authority
- CN
- China
- Prior art keywords
- utricule
- hanging ring
- suspender belt
- shaped hook
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
- B66C1/18—Band-type slings
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
The invention belongs to hoisting fixture technical fields, and in particular to a kind of dirigible lifts transfer tooling.The lifting transfer tooling of dirigible utricule of the present invention, including:Mandril, the mandril are used to be connected with suspender;Multiple links, multiple links are connected to the bottom of the mandril by multiple first connection units, are arranged at intervals between multiple links respectively;Utricule support element, the utricule support element are connected to the bottom of multiple links by multiple second connection units, and the utricule support element is used to support and transports dirigible utricule.By using the lifting transfer tooling of dirigible utricule of the present invention, can lifting carrying effectively be carried out to utricule, reduce the folding times of utricule, and in the lifting transport process of utricule, entire utricule is wrapped up by flexible material, is reduced the damage probability of utricule, is improved transfer efficiency.
Description
Technical field
The invention belongs to hoisting fixture technical fields, and in particular to a kind of lifting transfer tooling of dirigible utricule.
Background technology
The utricule of stratospheric airship is combined by weathering layer, resistance heliosphere, main structural, adhered layer etc., expensive.
In workshop, dirigible utricule can fold after having produced and be transported to test site, it is common practice to be folded to utricule back and forth
Minimum dimension, then the utricule of about 1T or so weight is transferred on transport vehicle with more people.In utricule transfer process, utricule
Easily utricule layers of material damages, and injury region is not easy to find, repaiies caused by the modes such as squeezed, rubbed, pulled by external force
Difficulty is mended, transport process efficiency is low.
Invention content
The purpose of the present invention is to solve above-mentioned at least one problem, which is by the following technical programs
It realizes.
The present invention proposes a kind of lifting transfer tooling of dirigible utricule, including:
Mandril, the mandril are used to be connected with suspender;
Multiple links, multiple links are connected to the bottom of the mandril by multiple first connection units respectively
Portion is arranged at intervals between multiple links;
Utricule support element, the utricule support element are connected to the bottom of multiple links by multiple second connection units
Portion, the utricule support element are used to support and transport dirigible utricule, after the dirigible utricule is placed on the utricule support element,
The lifting transport process of the dirigible utricule is completed by mandril described in suspender handling.
Further, the link include the first suspender belt, the second suspender belt and supporting rod, the top of first suspender belt and
The top of second suspender belt is connected to the bottom of the mandril by first connection unit respectively, first suspender belt
Bottom end and the bottom end of second suspender belt are connected to the both ends of the supporting rod by third connection unit respectively.
Further, first suspender belt is identical with the specification of second suspender belt.
Further, the third connection unit includes hanging ring and U-shaped hook, and the hanging ring is equipped with helicitic texture
External part, the supporting rod are equipped with the first threaded hole that connection can be matched with the external part of the hanging ring, the hanging ring
External part is connected through a screw thread with the first threaded hole on the supporting rod, and the U-shaped hook passes through the hanging ring, the U-shaped hook
Both ends be equipped with through-hole, the bottom end of the bottom end of first suspender belt and second suspender belt is respectively equipped with connecting hole, the connection
Hole is placed between the both ends through-hole of the U-shaped hook, and is passed through bolt and passed through the both ends through-hole of the U-shaped hook and the connecting hole will
First suspender belt, second suspender belt are connected respectively with the U-shaped hook.
Further, first connection unit includes the first connect base, hanging ring and U-shaped hook, the first connection bottom
Seat is bolted to the bottom of the mandril, and the hanging ring is equipped with the external part with helicitic texture, and described first connects
It connects pedestal and is equipped with the threaded hole that connection can be matched with the external part of the hanging ring, the external part of the hanging ring and described first
The threaded hole of connect base is connected through a screw thread, and the U-shaped hook passes through the hanging ring, and the both ends of the U-shaped hook are equipped with through-hole, institute
It states the top of the first suspender belt and the top of second suspender belt and is respectively equipped with connecting hole, the connecting hole is placed in the U-shaped hook
Between the through-hole of both ends, and pass through bolt across the both ends through-hole of the U-shaped hook and the connecting hole by first suspender belt, described
Second suspender belt is connected respectively with the U-shaped hook.
Further, second connection unit includes hanging ring and quick connection is linked up with, and the hanging ring, which is equipped with, has spiral shell
The external part of line structure, the supporting rod are equipped with the second threaded hole that connection can be matched with the external part of the hanging ring, institute
It states the external part of hanging ring to be connected through a screw thread with the second threaded hole on the supporting rod, the utricule support element is equipped with can
Through-hole in mating connection is linked up with the quick connection, the quick connection hook can be also cross the utricule support element
Through-hole and the hanging ring, so that the utricule support element be connected with the hanging ring.
Further, the third suspender belt for the mandril to be connected with the suspender, the third suspender belt are further included
Bottom end the top of the mandril is connected to by the 4th connection unit, the top of the third suspender belt is connected to the suspender.
Further, the 4th connection unit includes the second connect base, hanging ring and U-shaped hook, the second connection bottom
Seat is bolted to the top of the mandril, and the hanging ring is equipped with the external part with helicitic texture, and described second connects
It connects pedestal and is equipped with the threaded hole that connection can be matched with the external part of the hanging ring, the external part of the hanging ring and described second
The threaded hole of connect base is connected through a screw thread, and the U-shaped hook passes through the hanging ring, and the both ends of the U-shaped hook are equipped with through-hole, institute
The bottom end for stating third suspender belt is equipped with connecting hole, and the connecting hole is placed between the both ends through-hole of the U-shaped hook, and is passed through bolt and worn
The third suspender belt is connected by the both ends through-hole for crossing the U-shaped hook with the connecting hole with the U-shaped hook.
Further, the utricule support element is flexible Tobe.
Further, the mandril is I-steel.
By using the lifting transfer tooling of dirigible utricule of the present invention, lifting can be effectively carried out to utricule and removed
Fortune reduces the folding times of utricule, and in the lifting transport process of utricule, entire utricule is wrapped up by flexible material, is reduced
The damage probability of utricule, improves transfer efficiency.
Description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this field
Technical staff will become clear.Attached drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention
Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the overall structure diagram of the embodiment of the present invention;
Fig. 2 is the enlarged view in the A portions of embodiment in Fig. 1;
Fig. 3 is the enlarged view in the B portions of embodiment in Fig. 1;
Fig. 4 is the enlarged view in the C portions of embodiment in Fig. 1;
Respectively label represents as follows in attached drawing:
10:Mandril, 11:First connect base, 12:Second connect base, 20:First suspender belt, 30:Second suspender belt, 40:Branch
Strut, 50:Utricule support element, 60:Third suspender belt, 70:Hanging ring, 80:U-shaped hook, 90:Quick connection hook.
Specific embodiment
The illustrative embodiments of the disclosure are more fully described below with reference to accompanying drawings.Although this public affairs is shown in attached drawing
The illustrative embodiments opened, it being understood, however, that may be realized in various forms the disclosure without the reality that should be illustrated here
The mode of applying is limited.It is to be able to be best understood from the disclosure, and can be by this public affairs on the contrary, providing these embodiments
The range opened completely is communicated to those skilled in the art.
Fig. 1 is the overall structure diagram of the embodiment of the present invention.Fig. 2 is the enlarged view in the A portions of embodiment in Fig. 1.Fig. 3
Enlarged view for the B portions of embodiment in Fig. 1.Fig. 4 is the enlarged view in the C portions of embodiment in Fig. 1.As shown in Figure 1, this implementation
The lifting transfer tooling of dirigible utricule in example, including mandril 10, multiple links and utricule support element 50.Mandril 10 be used for
Suspender is connected.Multiple links are connected to the bottom of mandril 10 by multiple first connection units respectively, multiple links it
Between be arranged at intervals.Utricule support element 50 is connected to the bottom of multiple links, utricule support element by multiple second connection units
50 are used to support and transport dirigible utricule, complete by suspender handling mandril 10 after dirigible utricule is placed on utricule support element 50
Into the lifting transport process of dirigible utricule.
In the present embodiment, mandril 10 uses I-steel, according to the whole stressing conditions of tooling, selects the steel of appropriate model
Material.Utricule support element 50 uses high tensile flexible Tobe, and hard point is strengthened in the both sides setting of high tensile flexible Tobe, and load mode is in spoke
Penetrate shape.Due to the supporting role of link, in the lifting transport process of utricule, utricule is high-strength in larger arcwall face always
On flexible Tobe, utricule is prevented to be damaged in transport process.
Link in the present embodiment includes the first suspender belt 20, the second suspender belt 30 and supporting rod 40.The top of first suspender belt 20
End and the top of the second suspender belt 30 are connected to the bottom of mandril 10 by the first connection unit respectively.The bottom end of first suspender belt 20 and
The bottom end of second suspender belt 30 is connected to the both ends of supporting rod 40 by third connection unit respectively.
Wherein, the first suspender belt 20 is identical with specification with the length of the second suspender belt 30, and supporting rod 40 is tubing.
As shown in figure 4, the third connection unit in the present embodiment includes hanging ring 70 and U-shaped hook 80.Hanging ring 70 is equipped with tool
There is the external part of helicitic texture, supporting rod 40 is equipped with the first threaded hole that connection can be matched with the external part of hanging ring 70, hangs
The external part of ring 70 is connected through a screw thread with the first threaded hole on supporting rod 40.U-shaped hook 80 passes through hanging ring 70, U-shaped hook 80
Both ends are equipped with through-hole, and the bottom end of the bottom end of the first suspender belt 20 and the second suspender belt 30 is respectively equipped with connecting hole, and connecting hole is placed in U-shaped hook
Between 80 both ends through-hole, and pass through bolt across the both ends through-hole and connecting hole of U-shaped hook 80 by the first suspender belt 20, the second suspender belt
30 are connected respectively with U-shaped hook 80.
By using hanging ring 70 and the connection mode of U-shaped hook 80, it is possible to reduce the stress concentration of tooling during the connection process,
Ensure the safety and reliability of tooling when in use.
As shown in figure 3, the first connection unit in the present embodiment includes the first connect base 11, hanging ring 70 and U-shaped hook 80.
First connect base 11 is bolted to the bottom of mandril 10, and hanging ring 70 is equipped with the external part with helicitic texture, the
One connect base 11 is equipped with the threaded hole that connection can be matched with the external part of hanging ring 70, and the external part of hanging ring 70 and first connect
The threaded hole for connecing pedestal 11 is connected through a screw thread.U-shaped hook 80 passes through hanging ring 70, and the both ends of U-shaped hook 80 are equipped with through-hole, the first suspender belt
20 top and the top of the second suspender belt 30 are respectively equipped with connecting hole, and connecting hole is placed between the both ends through-hole of U-shaped hook 80, and is led to
First suspender belt 20, the second suspender belt 30 are connected by the both ends through-hole for crossing bolt across U-shaped hook 80 with U-shaped hook 80 respectively with connecting hole
It connects.
As shown in figure 4, the second connection unit in the present embodiment includes hanging ring 70 and quick connection links up with 90.It is set on hanging ring
There is the external part with helicitic texture, supporting rod 40 is equipped with the second screw thread that connection can be matched with the external part of hanging ring 70
Hole, the external part of hanging ring 70 are connected through a screw thread with the second threaded hole on supporting rod 40.Utricule support element 50 is equipped with can
90 through-holes in mating connection of hook are connect with quick, quick connection hook 90 can be also cross the through-hole of utricule support element 50
With hanging ring 70, so that utricule support element 50 be connected with hanging ring 70.
90 connection utricule support elements 50 and hanging ring 70 are linked up with by using quick connection, can be turned in the lifting of dirigible utricule
It is quickly dismantled during fortune, improves transfer efficiency.
Further, the top of mandril 10 is additionally provided with the third suspender belt 60 for being connected with suspender.The bottom of third suspender belt 60
End is connected to the top of mandril 10 by the 4th connection unit, and the top of third suspender belt 60 is connected to suspender.
As shown in Fig. 2, the 4th connection unit in the present embodiment includes the second connect base 12, hanging ring 70 and U-shaped hook 80.
Second connect base 12 is bolted to the top of mandril 10, and hanging ring 70 is equipped with the external part with helicitic texture, the
Two connect bases 12 are equipped with the threaded hole that connection can be matched with the external part of hanging ring 70.The external part of hanging ring 70 and second connects
The threaded hole for connecing pedestal 12 is connected through a screw thread, and U-shaped hook 80 passes through hanging ring 70, and the both ends of U-shaped hook 80 are equipped with through-hole, third suspender belt
60 bottom end is equipped with connecting hole, and connecting hole is placed between the both ends through-hole of U-shaped hook 80, and passes through bolt passes through U-shaped hook 80 two
Third suspender belt 60 is connected by end through-hole with connecting hole with U-shaped hook 80.
In the present embodiment, the top of mandril 10 sets the third suspender belt 60 there are two same size, will by third suspender belt 60
Mandril 10 is connected with suspender.Span between two third suspender belts 60 can have according to the entire length and stressing conditions of mandril 10
Body is set, steady to meet the overall operation that can ensure to lift transfer tooling.
When the present embodiment is used to carry out the lifting transhipment of dirigible utricule, dirigible utricule is carried out on high tensile flexible Tobe
It folds.Hoisting structure more than high tensile flexible Tobe is transferred on Tobe by crane by connecting the top of third suspender belt 60
The top of the utricule folded, by the hanging ring 70 of 40 lower section of the connecting hole on Tobe and supporting rod by quickly connect hook 90 into
Row connection.It is slowly lifted by crane after checking the connection status of each interface, during lifting, the flexible utricule on Tobe is because of supporting rod 40
Supporting role so that it is entire fold after utricule always on the high tensile flexible Tobe in larger arcwall face.After the completion of lifting,
The fast joint structure between supporting rod 40 and high tensile flexible Tobe is released, shifts hoisting structure more than Tobe.Tobe pads
It is convenient that next transfer is carried out to utricule in the underface of utricule.After the dismounting of remaining hoisting structure, transported with vehicle.
By using the lifting transfer tooling of dirigible utricule of the present invention, lifting can be effectively carried out to utricule and removed
Fortune reduces the folding times of utricule, and in the lifting transport process of utricule, entire utricule is wrapped up by flexible material, is reduced
The damage probability of utricule, improves transfer efficiency.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto,
Any one skilled in the art in the technical scope disclosed by the present invention, the change or replacement that can be readily occurred in,
It should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with the protection model of the claim
Subject to enclosing.
Claims (10)
1. a kind of lifting transfer tooling of dirigible utricule, which is characterized in that including:
Mandril, the mandril are used to be connected with suspender;
Multiple links, multiple links are connected to the bottom of the mandril by multiple first connection units respectively, more
It is arranged at intervals between a link;
Utricule support element, the utricule support element are connected to the bottom of multiple links by multiple second connection units,
The utricule support element is used to support and transports dirigible utricule, after the dirigible utricule is placed on the utricule support element, leads to
Cross the lifting transport process that mandril described in suspender handling completes the dirigible utricule.
2. the lifting transfer tooling of dirigible utricule according to claim 1, which is characterized in that the link includes first
The top of suspender belt, the second suspender belt and supporting rod, the top of first suspender belt and second suspender belt passes through described first respectively
Connection unit is connected to the bottom of the mandril, and the bottom end of the bottom end of first suspender belt and second suspender belt passes through respectively
Three connection units are connected to the both ends of the supporting rod.
3. the lifting transfer tooling of dirigible utricule according to claim 2, which is characterized in that first suspender belt and institute
The specification for stating the second suspender belt is identical.
4. the lifting transfer tooling of dirigible utricule according to claim 2, which is characterized in that the third connection unit packet
Hanging ring and U-shaped hook are included, the hanging ring is equipped with the external part with helicitic texture, and the supporting rod is equipped with and can be hung with described
First threaded hole of the external part matching connection of ring, the external part of the hanging ring pass through with the first threaded hole on the supporting rod
It is threadedly coupled, the U-shaped hook passes through the hanging ring, and the both ends of the U-shaped hook are equipped with through-hole, the bottom end of first suspender belt and institute
The bottom end for stating the second suspender belt is respectively equipped with connecting hole, and the connecting hole is placed between the both ends through-hole of the U-shaped hook, and passes through spiral shell
Bolt pass through the U-shaped hook both ends through-hole and the connecting hole by first suspender belt, second suspender belt respectively with it is described U-shaped
Hook is connected.
5. the lifting transfer tooling of dirigible utricule according to claim 2, which is characterized in that the first connection unit packet
The first connect base, hanging ring and U-shaped hook are included, first connect base is bolted to the bottom of the mandril, described
Hanging ring is equipped with the external part with helicitic texture, and first connect base is equipped with can be with the external part of the hanging ring
Threaded hole with connection, the external part of the hanging ring and the threaded hole of first connect base are connected through a screw thread, described U-shaped
Hook passes through the hanging ring, and the both ends of the U-shaped hook are equipped with the top of through-hole, the top of first suspender belt and second suspender belt
Connecting hole is respectively equipped with, the connecting hole is placed between the both ends through-hole of the U-shaped hook, and passes through bolt across the U-shaped hook
Both ends through-hole first suspender belt, second suspender belt are connected respectively with the U-shaped hook with the connecting hole.
6. the lifting transfer tooling of dirigible utricule according to claim 2, which is characterized in that the second connection unit packet
It includes hanging ring and quick connection is linked up with, the hanging ring is equipped with the external part with helicitic texture, and the supporting rod is equipped with can
The second threaded hole of connection, the external part of the hanging ring and the second spiral shell on the supporting rod are matched with the external part of the hanging ring
Pit is connected through a screw thread, and the utricule support element, which is equipped with, to link up with through-hole in mating connection with the quick connection,
Through-hole and the hanging ring that can be also cross the utricule support element is linked up in the quick connection, so as to which the utricule be supported
Part is connected with the hanging ring.
7. the lifting transfer tooling of dirigible utricule according to claim 2, which is characterized in that further include for by the top
The third suspender belt that bar is connected with the suspender, the bottom end of the third suspender belt are connected to the mandril by the 4th connection unit
Top, the top of the third suspender belt is connected to the suspender.
8. the lifting transfer tooling of dirigible utricule according to claim 7, which is characterized in that the 4th connection unit packet
The second connect base, hanging ring and U-shaped hook are included, second connect base is bolted to the top of the mandril, described
Hanging ring is equipped with the external part with helicitic texture, and second connect base is equipped with can be with the external part of the hanging ring
Threaded hole with connection, the external part of the hanging ring and the threaded hole of second connect base are connected through a screw thread, described U-shaped
Hook passes through the hanging ring, and the both ends of the U-shaped hook are equipped with through-hole, and the bottom end of the third suspender belt is equipped with connecting hole, the connection
Hole is placed between the both ends through-hole of the U-shaped hook, and is passed through bolt and passed through the both ends through-hole of the U-shaped hook and the connecting hole will
The third suspender belt is connected with the U-shaped hook.
9. the lifting transfer tooling of the dirigible utricule according to any one of claim 1-4, which is characterized in that the utricule
Support element is flexible Tobe.
10. the lifting transfer tooling of the dirigible utricule according to any one of claim 1-4, which is characterized in that the top
Bar is I-steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711310477.XA CN108249277B (en) | 2017-12-11 | 2017-12-11 | Frock is transported in hoist and mount of airship utricule |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711310477.XA CN108249277B (en) | 2017-12-11 | 2017-12-11 | Frock is transported in hoist and mount of airship utricule |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108249277A true CN108249277A (en) | 2018-07-06 |
CN108249277B CN108249277B (en) | 2019-12-10 |
Family
ID=62722369
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711310477.XA Active CN108249277B (en) | 2017-12-11 | 2017-12-11 | Frock is transported in hoist and mount of airship utricule |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108249277B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29605224U1 (en) * | 1996-03-22 | 1996-07-11 | Amlang, Heinrich, 45133 Essen | Housing unit and support structure for a housing unit |
US6824346B2 (en) * | 2002-12-14 | 2004-11-30 | W. Sam Coblentz | Method and apparatus for handling bagged cargo |
CN200978179Y (en) * | 2006-10-11 | 2007-11-21 | 西安飞机工业(集团)有限责任公司 | Wall board hanging apparatus |
CN202369248U (en) * | 2011-09-28 | 2012-08-08 | 李荣田 | Rescue hoisting device for aircraft |
CN203269315U (en) * | 2013-01-22 | 2013-11-06 | 宝钢特种材料有限公司 | Chain connecting rod type rectangular suspension cable and auxiliary tool thereof |
CN203855299U (en) * | 2014-03-19 | 2014-10-01 | 北京航天发射技术研究所 | Lifting appliance suitable for one-hook slinging |
EP2808287A2 (en) * | 2013-05-27 | 2014-12-03 | Rimatem GmbH | Method and device for transporting prefabricated brick wall |
-
2017
- 2017-12-11 CN CN201711310477.XA patent/CN108249277B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29605224U1 (en) * | 1996-03-22 | 1996-07-11 | Amlang, Heinrich, 45133 Essen | Housing unit and support structure for a housing unit |
US6824346B2 (en) * | 2002-12-14 | 2004-11-30 | W. Sam Coblentz | Method and apparatus for handling bagged cargo |
CN200978179Y (en) * | 2006-10-11 | 2007-11-21 | 西安飞机工业(集团)有限责任公司 | Wall board hanging apparatus |
CN202369248U (en) * | 2011-09-28 | 2012-08-08 | 李荣田 | Rescue hoisting device for aircraft |
CN203269315U (en) * | 2013-01-22 | 2013-11-06 | 宝钢特种材料有限公司 | Chain connecting rod type rectangular suspension cable and auxiliary tool thereof |
EP2808287A2 (en) * | 2013-05-27 | 2014-12-03 | Rimatem GmbH | Method and device for transporting prefabricated brick wall |
CN203855299U (en) * | 2014-03-19 | 2014-10-01 | 北京航天发射技术研究所 | Lifting appliance suitable for one-hook slinging |
Also Published As
Publication number | Publication date |
---|---|
CN108249277B (en) | 2019-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107963548A (en) | Hoisting steel plate fixture | |
CN108249277A (en) | The lifting transfer tooling of dirigible utricule | |
CN201890717U (en) | Special hanger for H-shaped steel | |
CN103287966B (en) | A kind of chopping machine guide wheel suspender | |
CN204897143U (en) | Wheel crane counter weight special lifting device | |
CN206278819U (en) | Frame assembly suspender | |
CN205499267U (en) | A detachable automobile walking springboard for transport ship is refuted | |
CN202369248U (en) | Rescue hoisting device for aircraft | |
CN204162277U (en) | A kind of mechanical gripper | |
CN104444780A (en) | Synchronous anti-slip balanced lifting clamp forceps | |
CN207537004U (en) | A kind of steel billet hanging device | |
CN203946779U (en) | Loose steel pipe operation combined sling | |
CN105712183B (en) | A kind of high angle belt conveyer special hanger | |
CN206692202U (en) | One kind lifting transporting device | |
CN205849669U (en) | Mine accident rescue device | |
CN203806932U (en) | Guy cable type portable drum-shaped joint component lifting clamping tool | |
CN203037439U (en) | Falling-prevention object performance-test apparatus for large-scale mining self-discharging vehicle cabin | |
CN203806931U (en) | Chain-type convenient-to-disassemble lifting camp for spherical components | |
CA2860061A1 (en) | Safety appliance for a downhaul weight | |
CN106144885A (en) | A kind of suspender for lifting fork truck integrated hub | |
CN101402435A (en) | Special sling for inner bore of step and its use method | |
CN206456278U (en) | Vehicle-mounted simple assembly and disassembling device | |
CN203699660U (en) | Chain type portable drum-shaped joint component lifting clamp | |
CN205527321U (en) | I -shaped track lifts by crane hoist | |
CN104444769A (en) | Wire rope sling for pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Xiong Nian Inventor after: Guo Ta Inventor before: Xiong Nian |
|
CB03 | Change of inventor or designer information |