CN108246667A - A kind of decorative board material recycling equipment - Google Patents
A kind of decorative board material recycling equipment Download PDFInfo
- Publication number
- CN108246667A CN108246667A CN201810052408.1A CN201810052408A CN108246667A CN 108246667 A CN108246667 A CN 108246667A CN 201810052408 A CN201810052408 A CN 201810052408A CN 108246667 A CN108246667 A CN 108246667A
- Authority
- CN
- China
- Prior art keywords
- shaft
- bearing seat
- frame
- belt pulley
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000463 material Substances 0.000 title claims abstract description 21
- 238000004064 recycling Methods 0.000 title claims abstract description 20
- 239000004568 cement Substances 0.000 abstract description 23
- 230000000694 effects Effects 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 5
- 238000005034 decoration Methods 0.000 description 4
- 210000003464 cuspid Anatomy 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000007711 solidification Methods 0.000 description 2
- 230000008023 solidification Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 241001465382 Physalis alkekengi Species 0.000 description 1
- 206010044565 Tremor Diseases 0.000 description 1
- 241000700647 Variola virus Species 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000005242 forging Methods 0.000 description 1
- 230000017525 heat dissipation Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B1/00—Cleaning by methods involving the use of tools
- B08B1/10—Cleaning by methods involving the use of tools characterised by the type of cleaning tool
- B08B1/16—Rigid blades, e.g. scrapers; Flexible blades, e.g. wipers
- B08B1/165—Scrapers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B13/00—Accessories or details of general applicability for machines or apparatus for cleaning
Landscapes
- Transmission Devices (AREA)
Abstract
The present invention relates to a kind of recycling equipment more particularly to a kind of decorative board material recycling equipments.The technical problem to be solved in the present invention is to provide it is a kind of cement can be struck off, strike off when conveniently decorative board material recycling equipment.In order to solve the above-mentioned technical problem, the present invention provides such a decorative board material recycling equipments, include installing plate, fixed frame, first bearing seat, first rotating shaft, the first belt pulley, rotating bar, connecting rod, pedal, cushion, installing frame, collection frame etc.;Installing plate top right side is equipped with fixed frame, and fixed frame left part is inserted to be equipped with first bearing seat, first rotating shaft is equipped in first bearing seat, first rotating shaft forepart is equipped with the first belt pulley.Invention achieves conveniently effect when cement can be struck off, be struck off, people can step on pedal, and pedal rotates so that rack drives scraper plate moves left and right, and people can manual positive direction rotating bolt.
Description
Technical field
The present invention relates to a kind of recycling equipment more particularly to a kind of decorative board material recycling equipments.
Background technology
Finishing is also known as decorate or decoration.Refer to what is carried out in certain area and range, including Hydroelectric Project Construction, wall,
What plate, ceiling, landscape etc. were realized, a whole set of arrangement and method for construction and design formed according to certain design concept and beautiful rule
Scheme.The small direction put to furniture with door, the big customized treatment to room accessories and lamps and lanterns are all the embodiments fitted up.Finishing
Different with decoration, decoration is the gimmick that artistic processing is carried out to daily necessities or living environment.Strengthen aesthetic effect, and improve it
Function, economic value and social benefit, and using environmental protection as design concept.Perfect decoration should combine closely with the function of object,
Manufacture craft is adapted to, plays the performance of material, and with good artistic effect.
Plank is made as the flattened rectangular constructional material plate of normal size, applied to building trade, for making wall, smallpox
Plate or the component on floor.Also refer to the metallic plate that forging, rolling or casting form more.Be divided into thin plate, middle plate, slab, special heavy plate,
It is commonly made to the flattened rectangular constructional material plate of normal size.
In usual finishing, people are usually required for using plank, and people can also be reused using complete plank, but
There is the cement of solidification on common plank, existing cannot strike off cement, strike off the shortcomings that time and effort consuming, therefore there is an urgent need for research and development
A kind of conveniently decorative board material recycling equipment when cement can be struck off, be struck off.
Invention content
(1)Technical problems to be solved
The present invention has the cement of solidification in order to overcome on common plank, existing cannot strike off cement, strike off time and effort consuming
The shortcomings that, the technical problem to be solved in the present invention is to provide it is a kind of cement can be struck off, strike off when conveniently decorative board material
Recycling equipment.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a decorative board material recycling equipments, include installation
Plate, fixed frame, first bearing seat, first rotating shaft, the first belt pulley, rotating bar, connecting rod, pedal, cushion, installing frame, collection
Frame, the first sliding rail, the first sliding block, rack, mobile bar, scraper plate, supporting rack, second bearing seat, the second shaft, the second belt pulley,
First flat belt, gear wheel, the first fixed block, babinet, plank, bolt and the second fixed block, installing plate top right side are equipped with solid
Determine frame, fixed frame left part is inserted to be equipped with first bearing seat, is equipped with first rotating shaft in first bearing seat, first rotating shaft forepart is set
There is the first belt pulley, first rotating shaft rear and front end is arranged with rotating bar, the rotating bar lower front in front and the rotation at rear
Bar upper back is equipped with connecting rod, and rotary type is equipped with pedal in connecting rod, and fixed frame top right side is equipped with cushion, installing plate top
Installing frame is equipped on the left of portion, installing frame is located at fixed frame left, and bottom left is equipped with collection frame, installing frame right wall top in installing frame
Portion is equipped with the first sliding rail, and left and right sides slidingtype is arranged with the first sliding block on the first sliding rail, under the first sliding block for controlling two sides
End is equipped with rack, and mobile bar is equipped on the left of rack, scraper plate is equipped on the left of mobile bar, installing frame right wall inside upper part is equipped with support
Frame, supporting rack left side is inserted to be equipped with second bearing seat, is equipped with the second shaft in second bearing seat, the second shaft forepart is equipped with
The first flat belt is wound on second belt pulley, the second belt pulley and the first belt pulley, the second shaft forepart is equipped with gear wheel, canine tooth
Wheel is located in front of the second belt pulley, and gear wheel and rack engagement, the first sliding rail top left side are equipped with the first fixed block, and installing frame is left
First through hole is symmetrically provided with equipped with two wall lower part of babinet, babinet or so at the top of wall, the first fixed block upper ends have plank, plank
Left side passes through first through hole, is provided with threaded hole among top of the box, is threadingly connected with bolt in threaded hole, under bolt
End is equipped with the second fixed block, and the second fixed block is located in babinet.
Preferably, first bevel gear, 3rd bearing seat, third shaft, second bevel gear, cam, spring, company have been further included
Fishplate bar, the second sliding rail, the second sliding block and placing frame, the second shaft front end are equipped with first bevel gear, and bottom right is set in installing frame
There is 3rd bearing seat, third shaft is installed on 3rd bearing seat, third shaft upper end is equipped with second bevel gear, under third shaft
Portion is equipped with cam, and installing frame left wall lower inside is uniformly provided with spring, and spring right end is equipped with connecting plate, bottom left in installing frame
Equipped with the second sliding rail, slidingtype is equipped with the second sliding block on the second sliding rail, and the second upper end of slide block of two sides of left and right is equipped with placing frame, puts
It puts and collection frame is placed in frame.
Preferably, first support bar, second support bar, hammer, support plate, the first fixed pulley, the second fixed cunning have been further included
Wheel, hanging rod, link and drawstring, the first sliding rail top left side are equipped with first support bar, and first support bar is located at the first fixed block right side
Side, first support bar antetheca top rotary type are equipped with second support bar, and second support bar left end is equipped with hammer, and hammer is located at plank
Top, the first sliding rail top right side are equipped with support plate, and the first sliding rail top right side is equipped with the first fixed pulley, and the first fixed pulley is located at
Support plate left, support plate upper end are equipped with the second fixed pulley, and support plate right upper portion is equipped with hanging rod, link is hung on hanging rod, the
Drawstring is equipped on the right side of two supporting rods, drawstring right end is around the first fixed pulley and the second fixed pulley and with being connect at the top of link.
Preferably, further included fourth bearing seat, the 4th shaft, third hand tap gear, blade, 5th bearing seat, the 5th turn
Axis, the 4th bevel gear, third belt pulley, the 4th belt pulley and the second flat belt, support plate lower right side are equipped with fourth bearing seat,
4th shaft is installed, the 4th shaft left part is equipped with third hand tap gear, the upper and lower both sides pair of the 4th shaft right part on fourth bearing seat
Claim to be equipped with blade, support plate lower right side is equipped with 5th bearing seat, and 5th bearing seat is located at the 4th shaft rear, 5th bearing seat
On the 5th shaft is installed, the 5th shaft front end is equipped with the 4th bevel gear, the 4th bevel gear and third hand tap gear engagement, the 5th turn
Axis forepart is equipped with third belt pulley, and first rotating shaft rear portion is equipped with the 4th belt pulley, is wound on the 4th belt pulley and third belt pulley
Second flat belt.
Preferably, handrail and fixed plate have been further included, hanging rod bottom right is equipped with handrail, and installing frame lower right side is equipped with solid
Fixed board.
Operation principle:The plank of finishing can usually recycle, and people are typically all manually by the water on plank
Mud is disposed, the method time and effort consuming, it is possible thereby to this equipment be used, when people need to strike off the cement on plank
When, people can manual negative direction rotating bolt, bolt negative direction rotate so that bolt move up, bolt moves up drive
Second fixed block moves up, and then plank is placed in first through hole on the first fixed block by people, and then people are manual
Positive direction rotating bolt so that bolt drives the second fixed block to move down, after the second fixed block is moved down into suitable position,
Plank can be fixed, then people can be sitting on cushion, then step on pedal, the pedal band of front and rear two side with double-legged positive direction
The connecting rod positive direction rotation of dynamic front and rear two sides, the rotating bar of two sides is being just before and after the connecting rod positive direction rotation of front and rear two side drives
Direction rotates, and the rotating bar positive direction rotation of front and rear two side drives the rotation of first rotating shaft positive direction, the rotation of first rotating shaft positive direction
The first belt pulley positive direction is driven to rotate, the rotation of the first belt pulley positive direction drives the second belt pulley square by the first flat belt
To rotation, the rotation of the second belt pulley positive direction drives the rotation of the second shaft positive direction, and the rotation of the second shaft positive direction drives canine tooth
Positive direction rotation is taken turns, gear wheel positive direction rotation band carry-over bar moves right, and the first sliding rail and the first sliding block can do rack
Guiding movement, rack, which moves right, drives mobile bar to move right, and mobile bar, which moves right, drives scraper plate to move right, Ran Houren
Step on pedal with both feet negative direction again, the connecting rod negative direction rotation of two sides before and after the pedal of front and rear two side drives, front and rear two
The rotating bar negative direction rotation of two sides before and after the connecting rod negative direction rotation of side drives, the rotating bar negative direction rotation of front and rear two side
The rotation of first rotating shaft negative direction is driven, the rotation of first rotating shaft negative direction drives the rotation of the first belt pulley negative direction, the first belt pulley
Negative direction rotation drives the second belt pulley negative direction to rotate by the first flat belt, and the rotation of the second belt pulley negative direction drives second
Shaft negative direction rotates, and the rotation of the second shaft negative direction drives the rotation of gear wheel negative direction, gear wheel negative direction rotation band moving teeth
Item is moved to the left, and the first sliding rail and the first sliding block can do rack guiding movement, and rack, which is moved to the left, drives mobile bar to the left
Mobile, mobile bar, which is moved to the left, drives scraper plate to be moved to the left, and the continuous positive and negative direction of people steps on pedal and scraper plate is controlled
Mobile, scraper plate, which moves left and right, to strike off the cement on plank, and the cement being stripped off can be fallen in collection frame, facilitate people
Unified cleaning, after people have struck off the cement on plank, people stop stepping on pedal, and people's positive direction rotating bolt again makes
Bolt drives the second fixed block to move up, after the second fixed block is moved upwards up to suitable position, people stop operating spiral shell again
Bolt, so that people can take out plank.
Because first bevel gear, 3rd bearing seat, third shaft, second bevel gear, cam, spring, connection are further included
Plate, the second sliding rail, the second sliding block and placing frame, the second shaft front end are equipped with first bevel gear, and bottom right is equipped in installing frame
3rd bearing seat, third shaft is equipped on 3rd bearing seat, and third shaft upper end is equipped with second bevel gear, third shaft lower part
Equipped with cam, installing frame left wall lower inside is uniformly provided with spring, and spring right end is equipped with connecting plate, and bottom left is set in installing frame
There is the second sliding rail, slidingtype is equipped with the second sliding block on the second sliding rail, and the second upper end of slide block of two sides of left and right is equipped with placing frame, places
Collection frame is placed in frame, so when the second shaft rotates, the rotation of the second shaft drives first bevel gear rotation, the first cone tooth
Wheel rotation drives second bevel gear rotation, and second bevel gear rotation drives the rotation of third shaft, third shaft rotation band moving cam
Rotation, cam rotation can tap placing frame, and placing frame, which is tapped, enables placing frame to be moved to the left, the second sliding rail and second
Sliding block can do placing frame guiding movement, and placing frame, which is moved to the left, drives connecting plate to be moved to the left, and connecting plate is moved to the left crowded
Pressing spring after cam turns to suitable position, is no longer contacted with placing frame, and spring reset drives connecting plate to move right therewith,
Connecting plate, which moves right, drives placing frame to move right, and the second sliding rail and the second sliding block can do placing frame guiding movement, convex
Wheel constantly rotation enables placing frame to move left and right, and collection frame is driven to move left and right so that placing frame moves left and right, collected
Frame moves left and right the cement that can be trembled in real collection frame.
Because further included first support bar, second support bar, hammer, support plate, the first fixed pulley, the second fixed pulley,
Hanging rod, link and drawstring, the first sliding rail top left side are equipped with first support bar, and first support bar is located at the first fixed block right,
First support bar antetheca top rotary type is equipped with second support bar, and second support bar left end is equipped with hammer, and hammer is located on plank
Side, the first sliding rail top right side are equipped with support plate, and the first sliding rail top right side is equipped with the first fixed pulley, and the first fixed pulley is located at branch
Fagging left, support plate upper end are equipped with the second fixed pulley, and support plate right upper portion is equipped with hanging rod, hang with link on hanging rod, and second
Drawstring is equipped on the right side of supporting rod, drawstring right end is around the first fixed pulley and the second fixed pulley and with being connect at the top of link, so people
When being struck off to the cement on plank, people can remove link from hanging rod, then move up and down link manually,
Link, which moves up and down, drives drawstring to move up and down, and drawstring, which moves up, drives second support bar to swing up and down, in second support bar
Lower swing drives hammer to move up and down, and plank can be tapped so that hammer moves up and down, this measure can be by right
Plank is tapped preferably to strike off cement remaining on plank, when people are not needed to being tapped to plank
When, people again hang over link on hanging rod.
Because further included fourth bearing seat, the 4th shaft, third hand tap gear, blade, 5th bearing seat, the 5th shaft,
4th bevel gear, third belt pulley, the 4th belt pulley and the second flat belt, support plate lower right side are equipped with fourth bearing seat, the
4th shaft is installed, the 4th shaft left part is equipped with third hand tap gear, and both sides are symmetrical up and down for the 4th shaft right part on four bearing blocks
Equipped with blade, support plate lower right side is equipped with 5th bearing seat, and 5th bearing seat is located at the 4th shaft rear, on 5th bearing seat
5th shaft is installed, the 5th shaft front end is equipped with the 4th bevel gear, the 4th bevel gear and third hand tap gear engagement, the 5th shaft
Forepart is equipped with third belt pulley, and first rotating shaft rear portion is equipped with the 4th belt pulley, and the is wound on the 4th belt pulley and third belt pulley
Two flat belts, so when first rotating shaft rotates, first rotating shaft rotation drives the 4th pulley rotation, and the 4th pulley rotation leads to
It crosses the second flat belt and drives third pulley rotation, third pulley rotation drives the rotation of the 5th shaft, the 5th shaft rotation band
Dynamic 4th bevel gear rotation, the rotation of the 4th bevel gear drive third hand tap gear rotation, and third hand tap gear rotation drives the 4th shaft
Rotation, the 4th shaft rotation band movable vane piece rotate, so that blade rotation can dry to people, effectively people are carried out
Heat dissipation.
Because having further included handrail and fixed plate, hanging rod bottom right is equipped with handrail, and installing frame lower right side, which is equipped with, fixes
Plate so people can be helped on handrail, is convenient for people to step on pedal, people can also step down in fixed plate rest.
(3)Advantageous effect
Invention achieves conveniently effect when cement can be struck off, be struck off, people can step on pedal, and pedal rotation makes
Rack drives scraper plate moves left and right, people can manual positive direction rotating bolt so that bolt drives the second fixed block downward
Mobile, people can manual negative direction rotating bolt so that bolt drives the second fixed block to move up.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Fig. 5 is the 5th kind of main structure diagram of the present invention.
Label in attached drawing for:1- installing plates, 2- fixed frames, 3- first bearing seats, 4- first rotating shafts, the first belts of 5-
Wheel, 6- rotating bars, 7- connecting rods, 8- pedals, 9- cushions, 10- installing frames, 11- collection frames, the first sliding rails of 12-, 13- first are slided
Block, 14- racks, 15- mobile bars, 16- scraper plates, 17- supporting racks, 18- second bearing seats, the second shafts of 19-, the second belts of 20-
Wheel, the first flat belts of 21-, 22- gear wheels, the first fixed blocks of 23-, 24- babinets, 25- first through hole, 26- planks, 27- screw threads
Hole, 28- bolts, the second fixed blocks of 29-, 30- first bevel gears, 31- 3rd bearing seats, 32- third shafts, 33- second bore tooth
Wheel, 34- cams, 35- springs, 36- connecting plates, the second sliding rails of 37-, the second sliding blocks of 38-, 39- placing frames, 40- first support bars,
41- second support bars, 42- hammers, 43- support plates, the first fixed pulleys of 44-, the second fixed pulleys of 45-, 46- hanging rods, 47- links,
48- drawstrings, 49- fourth bearing seats, the 4th shafts of 50-, 51- third hand tap gears, 52- blades, 53- 5th bearing seats, 54- the 5th
Shaft, the 4th bevel gears of 55-, 56- third belt pulleys, the 4th belt pulleys of 57-, the second flat belts of 58-, 59- handrails, 60- are fixed
Plate.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of decorative board material recycling equipment as shown in Figs. 1-5, includes installing plate 1, fixed frame 2, first bearing seat 3,
One shaft 4, the first belt pulley 5, rotating bar 6, connecting rod 7, pedal 8, cushion 9, installing frame 10, collection frame 11, the first sliding rail 12,
First sliding block 13, rack 14, mobile bar 15, scraper plate 16, supporting rack 17, second bearing seat 18, the second shaft 19, the second belt pulley
20th, the first flat belt 21, gear wheel 22, the first fixed block 23, babinet 24, plank 26,28 and second fixed block 29 of bolt, installation
1 top right side of plate is equipped with fixed frame 2, and 2 left part of fixed frame is inserted to be equipped with first bearing seat 3, and the is equipped in first bearing seat 3
One shaft 4,4 forepart of first rotating shaft are equipped with the first belt pulley 5, and 4 rear and front end of first rotating shaft is arranged with rotating bar 6, front
6 lower front of rotating bar and 6 upper back of rotating bar at rear are equipped with connecting rod 7, and rotary type is equipped with pedal 8 in connecting rod 7,
2 top right side of fixed frame is equipped with cushion 9, and 1 top left side of installing plate is equipped with installing frame 10, and installing frame 10 is located at 2 left of fixed frame,
Bottom left is equipped with collection frame 11 in installing frame 10, is equipped with the first sliding rail 12 at the top of 10 right wall of installing frame, left on the first sliding rail 12
Right both sides slidingtype is arranged with the first sliding block 13, and 13 lower end of the first sliding block of two sides of left and right is equipped with rack 14,14 left side of rack
Equipped with mobile bar 15,15 left side of mobile bar is equipped with scraper plate 16, and 10 right wall inside upper part of installing frame is equipped with supporting rack 17, supporting rack 17
Left side is inserted to be equipped with second bearing seat 18, is equipped with the second shaft 19 in second bearing seat 18,19 forepart of the second shaft is equipped with
The first flat belt 21 is wound on second belt pulley 20, the second belt pulley 20 and the first belt pulley 5,19 forepart of the second shaft is equipped with big
Gear 22, gear wheel 22 are located at 20 front of the second belt pulley, and gear wheel 22 and rack 14 engage, and 12 top left side of the first sliding rail is set
There is the first fixed block 23, be equipped with babinet 24 at the top of 10 left wall of installing frame, 24 or so two wall lower part of babinet is symmetrically provided with first through hole
25,23 upper ends of the first fixed block have plank 26, and 26 left side of plank passes through first through hole 25, and 24 crown center of babinet is provided with spiral shell
Pit 27 is threadingly connected with bolt 28 in threaded hole 27, and 28 lower end of bolt is equipped with the second fixed block 29, and second fixes
Block 29 is located in babinet 24.
Embodiment 2
A kind of decorative board material recycling equipment as shown in Figs. 1-5, includes installing plate 1, fixed frame 2, first bearing seat 3,
One shaft 4, the first belt pulley 5, rotating bar 6, connecting rod 7, pedal 8, cushion 9, installing frame 10, collection frame 11, the first sliding rail 12,
First sliding block 13, rack 14, mobile bar 15, scraper plate 16, supporting rack 17, second bearing seat 18, the second shaft 19, the second belt pulley
20th, the first flat belt 21, gear wheel 22, the first fixed block 23, babinet 24, plank 26,28 and second fixed block 29 of bolt, installation
1 top right side of plate is equipped with fixed frame 2, and 2 left part of fixed frame is inserted to be equipped with first bearing seat 3, and the is equipped in first bearing seat 3
One shaft 4,4 forepart of first rotating shaft are equipped with the first belt pulley 5, and 4 rear and front end of first rotating shaft is arranged with rotating bar 6, front
6 lower front of rotating bar and 6 upper back of rotating bar at rear are equipped with connecting rod 7, and rotary type is equipped with pedal 8 in connecting rod 7,
2 top right side of fixed frame is equipped with cushion 9, and 1 top left side of installing plate is equipped with installing frame 10, and installing frame 10 is located at 2 left of fixed frame,
Bottom left is equipped with collection frame 11 in installing frame 10, is equipped with the first sliding rail 12 at the top of 10 right wall of installing frame, left on the first sliding rail 12
Right both sides slidingtype is arranged with the first sliding block 13, and 13 lower end of the first sliding block of two sides of left and right is equipped with rack 14,14 left side of rack
Equipped with mobile bar 15,15 left side of mobile bar is equipped with scraper plate 16, and 10 right wall inside upper part of installing frame is equipped with supporting rack 17, supporting rack 17
Left side is inserted to be equipped with second bearing seat 18, is equipped with the second shaft 19 in second bearing seat 18,19 forepart of the second shaft is equipped with
The first flat belt 21 is wound on second belt pulley 20, the second belt pulley 20 and the first belt pulley 5,19 forepart of the second shaft is equipped with big
Gear 22, gear wheel 22 are located at 20 front of the second belt pulley, and gear wheel 22 and rack 14 engage, and 12 top left side of the first sliding rail is set
There is the first fixed block 23, be equipped with babinet 24 at the top of 10 left wall of installing frame, 24 or so two wall lower part of babinet is symmetrically provided with first through hole
25,23 upper ends of the first fixed block have plank 26, and 26 left side of plank passes through first through hole 25, and 24 crown center of babinet is provided with spiral shell
Pit 27 is threadingly connected with bolt 28 in threaded hole 27, and 28 lower end of bolt is equipped with the second fixed block 29, and second fixes
Block 29 is located in babinet 24.
First bevel gear 30,3rd bearing seat 31, third shaft 32, second bevel gear 33, cam 34, spring are further included
35th, connecting plate 36, the second sliding rail 37, the second sliding block 38 and placing frame 39,19 front end of the second shaft are equipped with first bevel gear 30, peace
The bottom right in 10 that frames up is equipped with 3rd bearing seat 31, is equipped with third shaft 32 on 3rd bearing seat 31, in third shaft 32
End is equipped with second bevel gear 33, and 32 lower part of third shaft is equipped with cam 34, and 10 left wall lower inside of installing frame is uniformly provided with spring
35,35 right end of spring is equipped with connecting plate 36, and bottom left is equipped with the second sliding rail 37 in installing frame 10, slidingtype on the second sliding rail 37
Equipped with the second sliding block 38,38 upper end of the second sliding block of two sides of left and right is equipped with placing frame 39, and collection frame 11 is placed in placing frame 39.
Embodiment 3
A kind of decorative board material recycling equipment as shown in Figs. 1-5, includes installing plate 1, fixed frame 2, first bearing seat 3,
One shaft 4, the first belt pulley 5, rotating bar 6, connecting rod 7, pedal 8, cushion 9, installing frame 10, collection frame 11, the first sliding rail 12,
First sliding block 13, rack 14, mobile bar 15, scraper plate 16, supporting rack 17, second bearing seat 18, the second shaft 19, the second belt pulley
20th, the first flat belt 21, gear wheel 22, the first fixed block 23, babinet 24, plank 26,28 and second fixed block 29 of bolt, installation
1 top right side of plate is equipped with fixed frame 2, and 2 left part of fixed frame is inserted to be equipped with first bearing seat 3, and the is equipped in first bearing seat 3
One shaft 4,4 forepart of first rotating shaft are equipped with the first belt pulley 5, and 4 rear and front end of first rotating shaft is arranged with rotating bar 6, front
6 lower front of rotating bar and 6 upper back of rotating bar at rear are equipped with connecting rod 7, and rotary type is equipped with pedal 8 in connecting rod 7,
2 top right side of fixed frame is equipped with cushion 9, and 1 top left side of installing plate is equipped with installing frame 10, and installing frame 10 is located at 2 left of fixed frame,
Bottom left is equipped with collection frame 11 in installing frame 10, is equipped with the first sliding rail 12 at the top of 10 right wall of installing frame, left on the first sliding rail 12
Right both sides slidingtype is arranged with the first sliding block 13, and 13 lower end of the first sliding block of two sides of left and right is equipped with rack 14,14 left side of rack
Equipped with mobile bar 15,15 left side of mobile bar is equipped with scraper plate 16, and 10 right wall inside upper part of installing frame is equipped with supporting rack 17, supporting rack 17
Left side is inserted to be equipped with second bearing seat 18, is equipped with the second shaft 19 in second bearing seat 18,19 forepart of the second shaft is equipped with
The first flat belt 21 is wound on second belt pulley 20, the second belt pulley 20 and the first belt pulley 5,19 forepart of the second shaft is equipped with big
Gear 22, gear wheel 22 are located at 20 front of the second belt pulley, and gear wheel 22 and rack 14 engage, and 12 top left side of the first sliding rail is set
There is the first fixed block 23, be equipped with babinet 24 at the top of 10 left wall of installing frame, 24 or so two wall lower part of babinet is symmetrically provided with first through hole
25,23 upper ends of the first fixed block have plank 26, and 26 left side of plank passes through first through hole 25, and 24 crown center of babinet is provided with spiral shell
Pit 27 is threadingly connected with bolt 28 in threaded hole 27, and 28 lower end of bolt is equipped with the second fixed block 29, and second fixes
Block 29 is located in babinet 24.
First bevel gear 30,3rd bearing seat 31, third shaft 32, second bevel gear 33, cam 34, spring are further included
35th, connecting plate 36, the second sliding rail 37, the second sliding block 38 and placing frame 39,19 front end of the second shaft are equipped with first bevel gear 30, peace
The bottom right in 10 that frames up is equipped with 3rd bearing seat 31, is equipped with third shaft 32 on 3rd bearing seat 31, in third shaft 32
End is equipped with second bevel gear 33, and 32 lower part of third shaft is equipped with cam 34, and 10 left wall lower inside of installing frame is uniformly provided with spring
35,35 right end of spring is equipped with connecting plate 36, and bottom left is equipped with the second sliding rail 37 in installing frame 10, slidingtype on the second sliding rail 37
Equipped with the second sliding block 38,38 upper end of the second sliding block of two sides of left and right is equipped with placing frame 39, and collection frame 11 is placed in placing frame 39.
It is fixed first support bar 40, second support bar 41, hammer 42, support plate 43, the first fixed pulley 44, second have been further included
Pulley 45, hanging rod 46, link 47 and drawstring 48,12 top left side of the first sliding rail are equipped with first support bar 40, first support bar 40
Positioned at 23 right of the first fixed block, 40 antetheca top rotary type of first support bar is equipped with second support bar 41, second support bar 41
Left end is equipped with hammer 42, and hammer 42 is located at 26 top of plank, and 12 top right side of the first sliding rail is equipped with support plate 43, the first sliding rail 12
Top right side is equipped with the first fixed pulley 44, and the first fixed pulley 44 is located at 43 left of support plate, and it is fixed that 43 upper end of support plate is equipped with second
Pulley 45,43 right upper portion of support plate are equipped with hanging rod 46, and link 47 is hung on hanging rod 46, and 41 right side of second support bar is equipped with drawstring
48,48 right end of drawstring connect around the first fixed pulley 44 and the second fixed pulley 45 and with 47 top of link.
Embodiment 4
A kind of decorative board material recycling equipment as shown in Figs. 1-5, includes installing plate 1, fixed frame 2, first bearing seat 3,
One shaft 4, the first belt pulley 5, rotating bar 6, connecting rod 7, pedal 8, cushion 9, installing frame 10, collection frame 11, the first sliding rail 12,
First sliding block 13, rack 14, mobile bar 15, scraper plate 16, supporting rack 17, second bearing seat 18, the second shaft 19, the second belt pulley
20th, the first flat belt 21, gear wheel 22, the first fixed block 23, babinet 24, plank 26,28 and second fixed block 29 of bolt, installation
1 top right side of plate is equipped with fixed frame 2, and 2 left part of fixed frame is inserted to be equipped with first bearing seat 3, and the is equipped in first bearing seat 3
One shaft 4,4 forepart of first rotating shaft are equipped with the first belt pulley 5, and 4 rear and front end of first rotating shaft is arranged with rotating bar 6, front
6 lower front of rotating bar and 6 upper back of rotating bar at rear are equipped with connecting rod 7, and rotary type is equipped with pedal 8 in connecting rod 7,
2 top right side of fixed frame is equipped with cushion 9, and 1 top left side of installing plate is equipped with installing frame 10, and installing frame 10 is located at 2 left of fixed frame,
Bottom left is equipped with collection frame 11 in installing frame 10, is equipped with the first sliding rail 12 at the top of 10 right wall of installing frame, left on the first sliding rail 12
Right both sides slidingtype is arranged with the first sliding block 13, and 13 lower end of the first sliding block of two sides of left and right is equipped with rack 14,14 left side of rack
Equipped with mobile bar 15,15 left side of mobile bar is equipped with scraper plate 16, and 10 right wall inside upper part of installing frame is equipped with supporting rack 17, supporting rack 17
Left side is inserted to be equipped with second bearing seat 18, is equipped with the second shaft 19 in second bearing seat 18,19 forepart of the second shaft is equipped with
The first flat belt 21 is wound on second belt pulley 20, the second belt pulley 20 and the first belt pulley 5,19 forepart of the second shaft is equipped with big
Gear 22, gear wheel 22 are located at 20 front of the second belt pulley, and gear wheel 22 and rack 14 engage, and 12 top left side of the first sliding rail is set
There is the first fixed block 23, be equipped with babinet 24 at the top of 10 left wall of installing frame, 24 or so two wall lower part of babinet is symmetrically provided with first through hole
25,23 upper ends of the first fixed block have plank 26, and 26 left side of plank passes through first through hole 25, and 24 crown center of babinet is provided with spiral shell
Pit 27 is threadingly connected with bolt 28 in threaded hole 27, and 28 lower end of bolt is equipped with the second fixed block 29, and second fixes
Block 29 is located in babinet 24.
First bevel gear 30,3rd bearing seat 31, third shaft 32, second bevel gear 33, cam 34, spring are further included
35th, connecting plate 36, the second sliding rail 37, the second sliding block 38 and placing frame 39,19 front end of the second shaft are equipped with first bevel gear 30, peace
The bottom right in 10 that frames up is equipped with 3rd bearing seat 31, is equipped with third shaft 32 on 3rd bearing seat 31, in third shaft 32
End is equipped with second bevel gear 33, and 32 lower part of third shaft is equipped with cam 34, and 10 left wall lower inside of installing frame is uniformly provided with spring
35,35 right end of spring is equipped with connecting plate 36, and bottom left is equipped with the second sliding rail 37 in installing frame 10, slidingtype on the second sliding rail 37
Equipped with the second sliding block 38,38 upper end of the second sliding block of two sides of left and right is equipped with placing frame 39, and collection frame 11 is placed in placing frame 39.
It is fixed first support bar 40, second support bar 41, hammer 42, support plate 43, the first fixed pulley 44, second have been further included
Pulley 45, hanging rod 46, link 47 and drawstring 48,12 top left side of the first sliding rail are equipped with first support bar 40, first support bar 40
Positioned at 23 right of the first fixed block, 40 antetheca top rotary type of first support bar is equipped with second support bar 41, second support bar 41
Left end is equipped with hammer 42, and hammer 42 is located at 26 top of plank, and 12 top right side of the first sliding rail is equipped with support plate 43, the first sliding rail 12
Top right side is equipped with the first fixed pulley 44, and the first fixed pulley 44 is located at 43 left of support plate, and it is fixed that 43 upper end of support plate is equipped with second
Pulley 45,43 right upper portion of support plate are equipped with hanging rod 46, and link 47 is hung on hanging rod 46, and 41 right side of second support bar is equipped with drawstring
48,48 right end of drawstring connect around the first fixed pulley 44 and the second fixed pulley 45 and with 47 top of link.
Fourth bearing seat 49, the 4th shaft 50, third hand tap gear 51, blade 52,5th bearing seat the 53, the 5th are further included
Shaft 54, the 4th bevel gear 55, third belt pulley 56, the 4th belt pulley 57 and the second flat belt 58,43 lower right side of support plate
Equipped with fourth bearing seat 49, the 4th shaft 50 is installed on fourth bearing seat 49,50 left part of the 4th shaft is equipped with third hand tap gear
51,50 right part of the 4th shaft is arranged with blade 52 in both sides up and down, and 43 lower right side of support plate is equipped with 5th bearing seat 53, and the 5th
Bearing block 53 is located at 50 rear of the 4th shaft, and the 5th shaft 54 is equipped on 5th bearing seat 53, and 54 front end of the 5th shaft is equipped with
4th bevel gear 55, the 4th bevel gear 55 and third hand tap gear 51 engage, and 54 forepart of the 5th shaft is equipped with third belt pulley 56, the
One shaft, 4 rear portion is equipped with the 4th belt pulley 57, and the second flat belt 58 is wound on the 4th belt pulley 57 and third belt pulley 56.
Handrail 59 and fixed plate 60 are further included, 46 bottom right of hanging rod is equipped with handrail 59, and 10 lower right side of installing frame is set
There is fixed plate 60.
Operation principle:The plank 26 of finishing can usually recycle, and people are typically all manually will be on plank 26
Cement dispose, the method time and effort consuming, it is possible thereby to use this equipment, when people need to carry out the cement on plank 26
When striking off, people can manual negative direction rotating bolt 28,28 negative direction of bolt rotate so that bolt 28 move up, bolt 28
It moves up and the second fixed block 29 is driven to move up, then plank 26 is placed in first through hole 25 by people and first fixes
On block 23, the then manual positive direction rotating bolt 28 of people so that bolt 28 drives the second fixed block 29 to move down, and second is solid
Determine after block 29 is moved down into suitable position, plank 26 can be fixed, then people can be sitting on cushion 9, then with both feet
Positive direction steps on pedal 8, and the pedal 8 of front and rear two side drives 7 positive direction of connecting rod of front and rear two side to rotate, the connection of front and rear two side
6 positive direction of the rotating bar rotation of two sides before and after the rotation of 7 positive direction of bar drives, 6 positive direction of the rotating bar rotation of front and rear two side drive
4 positive direction of first rotating shaft rotates, and the rotation of 4 positive direction of first rotating shaft drives the rotation of 5 positive direction of the first belt pulley, the first belt pulley 5
Positive direction rotation drives 20 positive direction of the second belt pulley to rotate by the first flat belt 21,20 positive direction of the second belt pulley rotation band
The 19 positive direction rotation of dynamic second shaft, the rotation of 19 positive direction of the second shaft drive the rotation of 22 positive direction of gear wheel, and gear wheel 22 is just
Rotation band carry-over bar 14 in direction moves right, and the first sliding rail 12 and the first sliding block 13 can do guiding movement, rack to rack 14
14, which move right, drives mobile bar 15 to move right, and mobile bar 15, which moves right, drives scraper plate 16 to move right, and then people are again
Pedal 8 is stepped on double-legged negative direction, the pedal 8 of front and rear two side drives 7 negative direction of connecting rod of front and rear two side to rotate, front and rear two side
The rotation of 7 negative direction of connecting rod drive before and after two sides the rotation of 6 negative direction of rotating bar, rotating bar 6 negative direction of front and rear two side turns
Dynamic to drive the rotation of 4 negative direction of first rotating shaft, the rotation of 4 negative direction of first rotating shaft drives the rotation of 5 negative direction of the first belt pulley, the first skin
The rotation of 5 negative direction of belt wheel drives 20 negative direction of the second belt pulley to rotate by the first flat belt 21,20 negative direction of the second belt pulley
Rotation drives the rotation of 19 negative direction of the second shaft, and the rotation of 19 negative direction of the second shaft drives the rotation of 22 negative direction of gear wheel, canine tooth
It takes turns 22 negative directions rotation band carry-over bar 14 to be moved to the left, the first sliding rail 12 and the first sliding block 13 can do rack 14 guiding fortune
Dynamic, rack 14, which is moved to the left, drives mobile bar 15 to be moved to the left, and mobile bar 15, which is moved to the left, drives scraper plate 16 to be moved to the left, people
Continuous positive and negative direction steps on pedal 8 and scraper plate 16 is moved left and right, and scraper plate 16 moves left and right can be by the water on plank 26
Mud strikes off, and the cement being stripped off can be fallen in collection frame 11, is convenient for people to uniformly clear up, people have been struck off on plank 26
After cement, people stop stepping on pedal 8, people's positive direction rotating bolt 28 again so that bolt 28 drive the second fixed block 29 to
Upper movement, after the second fixed block 29 is moved upwards up to suitable position, people stop operating bolt 28 again, so that people can
Plank 26 is taken out.
Because further included first bevel gear 30,3rd bearing seat 31, third shaft 32, second bevel gear 33, cam 34,
Spring 35, connecting plate 36, the second sliding rail 37, the second sliding block 38 and placing frame 39,19 front end of the second shaft are equipped with first bevel gear
30, bottom right is equipped with 3rd bearing seat 31 in installing frame 10, and third shaft 32, third shaft are equipped on 3rd bearing seat 31
32 upper ends are equipped with second bevel gear 33, and 32 lower part of third shaft is equipped with cam 34, and 10 left wall lower inside of installing frame is uniformly provided with
Spring 35,35 right end of spring are equipped with connecting plate 36, and bottom left is equipped with the second sliding rail 37 in installing frame 10, is slided on the second sliding rail 37
Dynamic formula is equipped with the second sliding block 38, and 38 upper end of the second sliding block of two sides of left and right is equipped with placing frame 39, collection is placed in placing frame 39
Frame 11, so when the second shaft 19 rotates, the rotation of the second shaft 19 drives first bevel gear 30 to rotate, 30 turns of first bevel gear
Dynamic that second bevel gear 33 is driven to rotate, the rotation of second bevel gear 33 drives third shaft 32 to rotate, and the rotation of third shaft 32 drives
Cam 34 rotates, and the rotation of cam 34 can tap placing frame 39, and placing frame 39, which is tapped, enables placing frame 39 to be moved to the left,
Second sliding rail 37 and the second sliding block 38 can do placing frame 39 guiding movement, placing frame 39 be moved to the left drive connecting plate 36 to
It moving left, connecting plate 36, which is moved to the left, squeezes spring 35, after cam 34 turns to suitable position, is no longer contacted with placing frame 39,
Spring 35 resets drives connecting plate 36 to move right therewith, and connecting plate 36, which moves right, drives placing frame 39 to move right, and second
37 and second sliding block 38 of sliding rail can do placing frame 39 guiding movement, and the constantly rotation of cam 34 enables placing frame 39 to control shifting
It is dynamic, collection frame 11 is driven to move left and right so that placing frame 39 moves left and right, collection frame 11, which moves left and right, can tremble paid collection
Cement in frame 11.
Because first support bar 40, second support bar 41, hammer 42, support plate 43, the first fixed pulley 44, are further included
Two fixed pulleys 45, hanging rod 46, link 47 and drawstring 48,12 top left side of the first sliding rail are equipped with first support bar 40, the first support
Bar 40 is located at 23 right of the first fixed block, and 40 antetheca top rotary type of first support bar is equipped with second support bar 41, the second support
41 left end of bar is equipped with hammer 42, and hammer 42 is located at 26 top of plank, and 12 top right side of the first sliding rail is equipped with support plate 43, and first slides
12 top right side of rail is equipped with the first fixed pulley 44, and the first fixed pulley 44 is located at 43 left of support plate, and 43 upper end of support plate is equipped with the
Two fixed pulleys 45,43 right upper portion of support plate are equipped with hanging rod 46, and link 47 is hung on hanging rod 46, and 41 right side of second support bar is equipped with
Drawstring 48,48 right end of drawstring connect around the first fixed pulley 44 and the second fixed pulley 45 and with 47 top of link, so people exist
When being struck off to the cement on plank 26, people can remove link 47 from hanging rod 46, then move up and down extension manually
Ring 47, link 47, which moves up and down, drives drawstring 48 to move up and down, and drawstring 48, which moves up, drives second support bar 41 to swing up and down,
Second support bar 41, which is swung up and down, drives hammer 42 to move up and down, and plank 26 can be carried out so that hammer 42 moves up and down
It taps, this measure preferably can be struck off cement remaining on plank 26 by being tapped to plank 26, work as people
When not needing to being tapped to plank 26, people again hang over link 47 on hanging rod 46.
Because further included fourth bearing seat 49, the 4th shaft 50, third hand tap gear 51, blade 52,5th bearing seat 53,
5th shaft 54, the 4th bevel gear 55, third belt pulley 56, the 4th belt pulley 57 and the second flat belt 58,43 right side of support plate
Lower part is equipped with fourth bearing seat 49, and the 4th shaft 50 is equipped on fourth bearing seat 49, and 50 left part of the 4th shaft is bored equipped with third
Gear 51, both sides are arranged with blade 52 to 50 right part of the 4th shaft up and down, and 43 lower right side of support plate is equipped with 5th bearing seat 53,
5th bearing seat 53 is located at 50 rear of the 4th shaft, and the 5th shaft 54,54 front end of the 5th shaft are equipped on 5th bearing seat 53
Equipped with the 4th bevel gear 55, the 4th bevel gear 55 and third hand tap gear 51 engage, and 54 forepart of the 5th shaft is equipped with third belt pulley
56,4 rear portion of first rotating shaft is equipped with the 4th belt pulley 57, and the second flat belt is wound on the 4th belt pulley 57 and third belt pulley 56
58, so when first rotating shaft 4 rotates, the rotation of first rotating shaft 4 drives the 4th belt pulley 57 to rotate, and the rotation of the 4th belt pulley 57 is logical
Crossing the second flat belt 58 drives third belt pulley 56 to rotate, and the rotation of third belt pulley 56 drives the 5th shaft 54 to rotate, the 5th turn
The rotation of axis 54 drives the 4th bevel gear 55 to rotate, and the rotation of the 4th bevel gear 55 drives third hand tap gear 51 to rotate, third hand tap gear
51 rotations drive the 4th shaft 50 to rotate, and the 4th shaft 50 rotation band movable vane piece 52 rotates, so that the rotation of blade 52 can
It dries people, effectively radiates to people.
Because having further included handrail 59 and fixed plate 60,46 bottom right of hanging rod is equipped with handrail 59, under the right side of installing frame 10
Portion is equipped with fixed plate 60, so people can be helped on handrail 59, is convenient for people to step on pedal 8, people can also step down in fixation
Plate 60 is rested.
Embodiment described above only expresses the preferred embodiment of the present invention, and description is more specific and detailed, but simultaneously
Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (5)
1. a kind of decorative board material recycling equipment, which is characterized in that include installing plate(1), fixed frame(2), clutch shaft bearing
Seat(3), first rotating shaft(4), the first belt pulley(5), rotating bar(6), connecting rod(7), pedal(8), cushion(9), installing frame
(10), collection frame(11), the first sliding rail(12), the first sliding block(13), rack(14), mobile bar(15), scraper plate(16), supporting rack
(17), second bearing seat(18), the second shaft(19), the second belt pulley(20), the first flat belt(21), gear wheel(22),
One fixed block(23), babinet(24), plank(26), bolt(28)With the second fixed block(29), installing plate(1)Top right side is equipped with
Fixed frame(2), fixed frame(2)Left part is inserted to be equipped with first bearing seat(3), first bearing seat(3)On first rotating shaft is installed
(4), first rotating shaft(4)Forepart is equipped with the first belt pulley(5), first rotating shaft(4)Rear and front end is arranged with rotating bar(6), it is preceding
The rotating bar of side(6)Lower front and the rotating bar at rear(6)Upper back is equipped with connecting rod(7), connecting rod(7)Upper rotation
Formula is equipped with pedal(8), fixed frame(2)Top right side is equipped with cushion(9), installing plate(1)Top left side is equipped with installing frame(10), peace
It frames up(10)Positioned at fixed frame(2)Left, installing frame(10)Interior bottom left is equipped with collection frame(11), installing frame(10)Right wall top
Portion is equipped with the first sliding rail(12), the first sliding rail(12)Upper left and right sides slidingtype is arranged with the first sliding block(13), two sides of left and right
The first sliding block(13)Lower end is equipped with rack(14), rack(14)Left side is equipped with mobile bar(15), mobile bar(15)Left side is equipped with
Scraper plate(16), installing frame(10)Right wall inside upper part is equipped with supporting rack(17), supporting rack(17)Left side is inserted to be equipped with the second axis
Bearing(18), second bearing seat(18)On the second shaft is installed(19), the second shaft(19)Forepart is equipped with the second belt pulley
(20), the second belt pulley(20)With the first belt pulley(5)On be wound with the first flat belt(21), the second shaft(19)Forepart is equipped with big
Gear(22), gear wheel(22)Positioned at the second belt pulley(20)Front, gear wheel(22)And rack(14)Engagement, the first sliding rail
(12)Top left side is equipped with the first fixed block(23), installing frame(10)Babinet is equipped at the top of left wall(24), babinet(24)Left and right two
Wall lower part is symmetrically provided with first through hole(25), the first fixed block(23)Upper ends have plank(26), plank(26)Left side passes through
First through hole(25), babinet(24)Crown center is provided with threaded hole(27), threaded hole(27)Inside threadingly it is connected with spiral shell
Bolt(28), bolt(28)Lower end is equipped with the second fixed block(29), the second fixed block(29)Positioned at babinet(24)It is interior.
2. a kind of decorative board material recycling equipment according to claim 1, which is characterized in that further included the first cone tooth
Wheel(30), 3rd bearing seat(31), third shaft(32), second bevel gear(33), cam(34), spring(35), connecting plate
(36), the second sliding rail(37), the second sliding block(38)And placing frame(39), the second shaft(19)Front end is equipped with first bevel gear
(30), installing frame(10)Interior bottom right is equipped with 3rd bearing seat(31), 3rd bearing seat(31)On third shaft is installed
(32), third shaft(32)Upper end is equipped with second bevel gear(33), third shaft(32)Lower part is equipped with cam(34), installing frame
(10)Left wall lower inside is uniformly provided with spring(35), spring(35)Right end is equipped with connecting plate(36), installing frame(10)Interior bottom
Left side is equipped with the second sliding rail(37), the second sliding rail(37)Upper slidingtype is equipped with the second sliding block(38), the second sliding block of two sides of left and right
(38)Upper end is equipped with placing frame(39), placing frame(39)Inside it is placed with collection frame(11).
3. a kind of decorative board material recycling equipment according to claim 2, which is characterized in that further included the first support
Bar(40), second support bar(41), hammer(42), support plate(43), the first fixed pulley(44), the second fixed pulley(45), hanging rod
(46), link(47)And drawstring(48), the first sliding rail(12)Top left side is equipped with first support bar(40), first support bar(40)
Positioned at the first fixed block(23)Right, first support bar(40)Antetheca top rotary type is equipped with second support bar(41), second
Strut(41)Left end is equipped with hammer(42), hammer(42)Positioned at plank(26)Top, the first sliding rail(12)Top right side is equipped with branch
Fagging(43), the first sliding rail(12)Top right side is equipped with the first fixed pulley(44), the first fixed pulley(44)Positioned at support plate(43)
Left, support plate(43)Upper end is equipped with the second fixed pulley(45), support plate(43)Right upper portion is equipped with hanging rod(46), hanging rod(46)
On hang with link(47), second support bar(41)Right side is equipped with drawstring(48), drawstring(48)Right end bypasses the first fixed pulley(44)
With the second fixed pulley(45)And and link(47)Top connects.
4. a kind of decorative board material recycling equipment according to claim 3, which is characterized in that further included fourth bearing
Seat(49), the 4th shaft(50), third hand tap gear(51), blade(52), 5th bearing seat(53), the 5th shaft(54), the 4th
Bevel gear(55), third belt pulley(56), the 4th belt pulley(57)With the second flat belt(58), support plate(43)Lower right side is set
There is fourth bearing seat(49), fourth bearing seat(49)On the 4th shaft is installed(50), the 4th shaft(50)Left part is equipped with third
Bevel gear(51), the 4th shaft(50)Right part is arranged with blade in both sides up and down(52), support plate(43)Lower right side is equipped with the
Five bearing blocks(53), 5th bearing seat(53)Positioned at the 4th shaft(50)Rear, 5th bearing seat(53)On be equipped with the 5th turn
Axis(54), the 5th shaft(54)Front end is equipped with the 4th bevel gear(55), the 4th bevel gear(55)And third hand tap gear(51)Engagement,
5th shaft(54)Forepart is equipped with third belt pulley(56), first rotating shaft(4)Rear portion is equipped with the 4th belt pulley(57), the 4th belt
Wheel(57)With third belt pulley(56)On be wound with the second flat belt(58).
5. a kind of decorative board material recycling equipment according to claim 4, which is characterized in that further included handrail(59)
And fixed plate(60), hanging rod(46)Bottom right is equipped with handrail(59), installing frame(10)Lower right side is equipped with fixed plate(60).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810052408.1A CN108246667B (en) | 2018-01-19 | 2018-01-19 | A kind of decorative board material recycling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810052408.1A CN108246667B (en) | 2018-01-19 | 2018-01-19 | A kind of decorative board material recycling equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108246667A true CN108246667A (en) | 2018-07-06 |
CN108246667B CN108246667B (en) | 2019-11-26 |
Family
ID=62741561
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810052408.1A Expired - Fee Related CN108246667B (en) | 2018-01-19 | 2018-01-19 | A kind of decorative board material recycling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108246667B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113424813A (en) * | 2021-07-16 | 2021-09-24 | 武汉轻风雨晨科技有限公司 | Corn is dried in sun and is used mechanical type animal expulsion equipment |
CN116454784A (en) * | 2023-06-19 | 2023-07-18 | 山西联讯通网络科技有限公司 | Power cable installation traction device |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202123538U (en) * | 2011-06-08 | 2012-01-25 | 济南海富塑胶有限公司 | Dust cleaning device for plates |
CN203830317U (en) * | 2014-04-01 | 2014-09-17 | 盐城东方天成机械有限公司 | Automatic cleaning device for sheet metal surface |
CN205552669U (en) * | 2016-02-04 | 2016-09-07 | 天津兰黛采妆环保科技开发有限公司 | The sheet surface removes dust device |
-
2018
- 2018-01-19 CN CN201810052408.1A patent/CN108246667B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202123538U (en) * | 2011-06-08 | 2012-01-25 | 济南海富塑胶有限公司 | Dust cleaning device for plates |
CN203830317U (en) * | 2014-04-01 | 2014-09-17 | 盐城东方天成机械有限公司 | Automatic cleaning device for sheet metal surface |
CN205552669U (en) * | 2016-02-04 | 2016-09-07 | 天津兰黛采妆环保科技开发有限公司 | The sheet surface removes dust device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113424813A (en) * | 2021-07-16 | 2021-09-24 | 武汉轻风雨晨科技有限公司 | Corn is dried in sun and is used mechanical type animal expulsion equipment |
CN116454784A (en) * | 2023-06-19 | 2023-07-18 | 山西联讯通网络科技有限公司 | Power cable installation traction device |
CN116454784B (en) * | 2023-06-19 | 2023-08-25 | 山西联讯通网络科技有限公司 | Power cable installation traction device |
Also Published As
Publication number | Publication date |
---|---|
CN108246667B (en) | 2019-11-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205761505U (en) | A kind of finishing plastic garbage quick crashing device | |
CN108246667A (en) | A kind of decorative board material recycling equipment | |
CN207364742U (en) | A kind of CFL lighting device of adjustable-angle | |
CN106402745A (en) | Swinging and heat dissipating device for stage lighting | |
CN207120479U (en) | A kind of sole Quick shaping device | |
CN110512888B (en) | Automatic shift up and clear away and more efficient removing devices for old ceramic tile | |
CN206247182U (en) | A kind of road lamp device for being convenient for changing bulb | |
CN208009864U (en) | A kind of Steel Structure Installation scaffold | |
CN206377578U (en) | It is a kind of freely to adjust the pendent lamp of height | |
CN205606371U (en) | Take ceiling lamp of function of making a video recording | |
CN107052443A (en) | A kind of ceiling lamp is installed and uses ceiling joist cutting equipment | |
CN207088815U (en) | A kind of full-automatic plank decorative pattern engraving machine | |
CN207194731U (en) | Rail type lifting window | |
CN207262133U (en) | A kind of house adjusting desk light | |
CN109011604A (en) | A kind of ventilated net used based on recreation wind tunnel equipment with buffering effect | |
CN205979347U8 (en) | A kind of automatic angle adjustable track lamp | |
CN207672971U (en) | A kind of decoration worker's finishing ceiling lifting gear | |
CN212462929U (en) | Building motor with adjustable angle | |
CN210160922U (en) | High-efficient burnishing device that uses during furniture production | |
CN208633351U (en) | One kind being convenient for clean hang ceiling panel | |
CN113965680A (en) | Light adjusting device for video shooting | |
CN207745497U (en) | Portable tennis training machine | |
CN206726164U (en) | A kind of computer cooling stand of angle adjustable | |
CN207480543U (en) | A kind of mobility kit for building | |
CN207169049U (en) | A kind of ferris wheel shape children educational toy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20191101 Address after: 317602 room 401-402, No. 150, jiefangtang Road, Kanmen street, Yuhuan City, Taizhou City, Zhejiang Province Applicant after: Zhejiang Jingtian garden Engineering Co., Ltd Address before: 336000 Yichun Xuefu Road 576 Yichun College Student Pioneering Base No. 10 mailbox Applicant before: Liu Shirong |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191126 Termination date: 20210119 |