CN208009864U - A kind of Steel Structure Installation scaffold - Google Patents

A kind of Steel Structure Installation scaffold Download PDF

Info

Publication number
CN208009864U
CN208009864U CN201820255697.0U CN201820255697U CN208009864U CN 208009864 U CN208009864 U CN 208009864U CN 201820255697 U CN201820255697 U CN 201820255697U CN 208009864 U CN208009864 U CN 208009864U
Authority
CN
China
Prior art keywords
fixedly connected
fixed seat
supporting table
gear
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820255697.0U
Other languages
Chinese (zh)
Inventor
贾荣静
常玲玲
张琪璇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Handan Aihua Construction Installation Co Ltd
Original Assignee
Handan Aihua Construction Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Handan Aihua Construction Installation Co Ltd filed Critical Handan Aihua Construction Installation Co Ltd
Priority to CN201820255697.0U priority Critical patent/CN208009864U/en
Application granted granted Critical
Publication of CN208009864U publication Critical patent/CN208009864U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model is related to scaffold technical fields, and disclose a kind of Steel Structure Installation scaffold, including fixed seat, opening is offered at the top of the fixed seat, the both sides of the fixed seat inner wall are installed with sliding rail, the inner bottom wall of the fixed seat is fixedly connected there are two symmetrical hydraulic device, it is fixedly connected with supporting table at the top of the hydraulic device, the both ends of the supporting table have been fixedly connected with riser, the back of two risers has been fixedly connected with slide plate, the slide plate is respectively engaged on two sliding rails, the top of the supporting table is fixedly connected sequentially from left to right the first support plate and the second support plate, the right side of first support plate is fixedly connected sequentially has first bearing seat and guide rail from top to bottom.The utility model solves the scaffold that conventional mounting has and can not move, and installation is inconvenient, and bothersome laborious, the low problem of efficiency has reached convenient retracted, conveniently moving, the efficient effect of work.

Description

A kind of Steel Structure Installation scaffold
Technical field
The utility model is related to scaffold technical field, specially a kind of Steel Structure Installation scaffold.
Background technology
Currently, the scaffold of existing installation, needs manually to be assembled in designated position, very inconvenient, waste The a large amount of time, the efficiency of construction is low, affect the progress of construction, the amount of labour of increased staff.
Utility model content
(1) the technical issues of solving
Scaffold, which is called, does scaffold, is to ensure each work progress is smoothed out and is set up workbench.By taking If position be divided into external scaffolding, internal scaffolding;It can be divided into timber scaffolding, bamboo scaffolding, steel pipe scaffold by material difference;It presses Structural form is divided into pole type scaffold, bridge scaffold, door-type scaffold, swinging scaffold, suspended scaffold, chooses formula foot Hand cradle climbs formula scaffold.
In view of the deficiencies of the prior art, the utility model provides a kind of Steel Structure Installation scaffold, solves traditional Scaffold needs manually are installed, it is bothersome arduously, schedule delays, the problem of reducing working efficiency.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions:A kind of Steel Structure Installation scaffold, including it is solid Reservation offers opening at the top of the fixed seat, and the both sides of the fixed seat inner wall are installed with sliding rail, the fixation The inner bottom wall of seat is fixedly connected there are two symmetrical hydraulic device, and supporting table is fixedly connected at the top of the hydraulic device, The both ends of the supporting table have been fixedly connected with riser, and the back of two risers has been fixedly connected with slide plate, the cunning Plate is respectively engaged on two sliding rails, and the top of the supporting table is fixedly connected sequentially has the first support plate and second from left to right Support plate, the right side of first support plate are fixedly connected sequentially have first bearing seat and guide rail from top to bottom, and described second Support plate left side is fixedly connected sequentially from top to bottom second bearing seat and motor, and the output shaft of the motor is fixedly connected with Transmission shaft, the one end of the transmission shaft far from motor are installed with first gear, the first bearing seat and second bearing seat Between be fixedly connected with bull stick, the left side fixing sleeve of the bull stick outer surface is connected to second gear, and second gear and lower section First gear is meshed, and there are two symmetrical drawstring, the one end of the drawstring far from bull stick for the outer surface winding of the bull stick It is fixedly connected with platform, sliding block is fixedly connected on the left of the platform, and sliding block is connected on guide rail.
Preferably, the edge at the top of the platform is installed with guardrail, and the right end of guardrail is located at second gear Left side.
Preferably, the top and bottom of the guide rail are fixedly connected at the top of first bearing seat and supporting table respectively.
Preferably, the slide plate is located at the lower end of riser, and the bottom of slide plate and the bottom of riser are flush.
Preferably, four edges of the fixed seat bottom have been fixedly connected with holder, and the lower end of holder passes through pin Bolt is hinged with idler wheel.
Preferably, the riser is between fixed seat open top, and the distance between two risers length value is less than The open-topped lateral length value of fixed seat.
Operation principle:When work, start hydraulic device, supporting table rises, and supporting table drives slide plate in sliding rail by riser On move up, to be supported is closed hydraulic device when rising to peak, start motor, and transmission shaft drives first gear to turn Dynamic, first gear drives bar rotation by second gear, drawstring is wound, platform moves up, and waits for that platform is moved to When construction height, motor is closed.
(3) advantageous effect
The utility model provides a kind of Steel Structure Installation scaffold.Has following advantageous effect:
(1), the utility model by the first bearing seat of setting, guide rail, second bearing seat, transmission shaft, first gear, turn Bar, second gear, drawstring, platform and sliding block can drive bull stick under the action of motor by first gear and second gear Rotation, carries out folding and unfolding by drawstring, adjusts the height of platform, to enable staff to construct higher construction point, The efficiency that ensure that construction increases the altitude range of construction.
(2), the utility model is by the fixed seat of setting, sliding rail, supporting table, riser and slide plate, in the work of hydraulic device Under, the height of supporting table can be adjusted, increase the construction height of platform, it, can be by supporting table in non-Construction State It falls, reduces the height of scaffold, convenient movement and carrying to scaffold improves the efficiency of work.
Description of the drawings
Fig. 1 is the sectional view of the utility model fixed seat front view;
Fig. 2 is the enlarged structure schematic diagram at A in the utility model Fig. 1.
In figure:1 fixed seat, 2 sliding rails, 3 hydraulic devices, 4 supporting tables, 5 risers, 6 slide plates, 7 first support plates, 8 second Fagging, 9 first bearing seats, 10 guide rails, 11 second bearing seats, 12 motors, 13 transmission shafts, 14 first gears, 15 bull sticks, 16 second Gear, 17 drawstrings, 18 platforms, 19 sliding blocks.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
As shown in Figs. 1-2, the utility model provides a kind of technical solution:A kind of Steel Structure Installation scaffold, including fixation Seat 1, the top of fixed seat 1 offers opening, and the both sides of 1 inner wall of fixed seat are installed with sliding rail 2, the interior bottom of fixed seat 1 Wall is fixedly connected there are two symmetrical hydraulic device 3, and the top of hydraulic device 3 is fixedly connected with supporting table 4, supporting table 4 Both ends have been fixedly connected with riser 5, and riser 5 is located between 1 open top of fixed seat, and the distance between two risers 5 length Value is less than 1 open-topped lateral length value of fixed seat, ensure that supporting table 4 can rise to the top of fixed seat 1, increase is applied The height of the movements and postures of actors, the back of two risers 5 have been fixedly connected with slide plate 6, and slide plate 6 is located at the lower end of riser 5, and slide plate 6 Bottom and the bottom of riser 5 are flush, and ensure that supporting table 4 rises sliding block 19 and riser 5 not by the blocking of fixed seat 1, ensure Supporting table 4 effectively lifts, and slide plate 6 is respectively engaged on two sliding rails 2, and the top of supporting table 4 fixes successively from left to right It is connected with the first support plate 7 and the second support plate 8, the right side of the first support plate 7 is fixedly connected sequentially has first from top to bottom The top and bottom of bearing block 9 and guide rail 10, guide rail 10 are fixedly connected with the top of first bearing seat 9 and supporting table 4 respectively, are kept away Exempt from the case where sliding block 19 is detached from guide rail 10 in upper and lower sliding, ensure that the stability that platform 18 lifts, the second support plate 8 Left side is fixedly connected sequentially from top to bottom second bearing seat 11 and motor 12, and the output shaft of motor 12 is fixedly connected with transmission Axis 13, the one end of transmission shaft 13 far from motor 12 are installed with first gear 14, first bearing seat 9 and second bearing seat 11 it Between be fixedly connected with bull stick 15, the left side fixing sleeve of 15 outer surface of bull stick is connected to second gear 16, and second gear 16 and lower section First gear 14 be meshed, there are two symmetrical drawstrings 17 for the winding of the outer surface of bull stick 15, and drawstring 17 is far from bull stick 15 One end is fixedly connected with platform 18, and the edge at 18 top of platform is installed with guardrail, and the right end of guardrail is located at the second tooth The left side of wheel 16 can be effectively protected the safety that staff's construction is, the left side of platform 18 is fixedly connected with sliding block 19, And sliding block 19 is connected on guide rail 10, four edges of 1 bottom of fixed seat have been fixedly connected with holder, and the lower end of holder is logical It crosses pin and is hinged with idler wheel, facilitate the movement to scaffold, solve the problems, such as the bothersome laborious of tradition assembling scaffold, carry The high efficiency of construction.
The electric elements occurred in this article are electrically connected with extraneous main controller and 220V alternating currents, and main controller can be meter Calculation machine etc. plays the conventionally known equipment of control.
Operation principle:When work, start hydraulic device 3, supporting table 4 rises, and supporting table 4 drives slide plate 6 to exist by riser 5 It is moved up on sliding rail 2, to be supported 4 is closed hydraulic device 3 when rising to peak, starts motor 12, and transmission shaft 13 drives First gear 14 rotates, and first gear 14 drives bull stick 15 to rotate by second gear 16, drawstring 17 is wound, platform 18 It moves up, when platform 18 is moved to construction height, closes motor 12.
It can to sum up obtain, the utility model passes through the first bearing seat 9 of setting, guide rail 10, second bearing seat 11, transmission shaft 13, first gear 14, bull stick 15, second gear 16, drawstring 17, platform 18 and sliding block 19, under the action of motor 12, Neng Goutong It crosses first gear 14 and second gear 16 drives bull stick 15 to rotate, drawstring 17 is subjected to folding and unfolding, adjusts the height of platform 18, to So that staff is constructed higher construction point, ensure that the efficiency of construction, increase the altitude range of construction, leads to Fixed seat 1, sliding rail 2, supporting table 4, riser 5 and the slide plate 6 for crossing setting can be by supporting tables 4 under the action of hydraulic device 3 Height be adjusted, increase platform 18 construction height supporting table 4 can be fallen in non-Construction State, reduce scaffold Height, convenient movement and carrying to scaffold improve the efficiency of work, solve traditional scaffold need manually into Row installation, bothersome laborious, schedule delays, the problem of reducing working efficiency.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence " including a reference structure ", is not arranged Except there is also other identical elements in the process, method, article or apparatus that includes the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of Steel Structure Installation scaffold, including fixed seat (1), it is characterised in that:It is offered at the top of the fixed seat (1) Opening, the both sides of fixed seat (1) inner wall are installed with sliding rail (2), and the inner bottom wall of the fixed seat (1) is fixedly connected There are two symmetrical hydraulic device (3), supporting table (4), the supporting table are fixedly connected at the top of the hydraulic device (3) (4) both ends have been fixedly connected with riser (5), and the back of two risers (5) has been fixedly connected with slide plate (6), described Slide plate (6) is respectively engaged on two sliding rails (2), and the top of the supporting table (4) is fixedly connected sequentially has first from left to right Support plate (7) and the second support plate (8), the right side of first support plate (7) are fixedly connected sequentially have first from top to bottom Bearing block (9) and guide rail (10), left side is fixedly connected sequentially second support plate (8) from top to bottom second bearing seat (11) and motor (12), the output shaft of the motor (12) are fixedly connected with transmission shaft (13), and the transmission shaft (13) is far from electricity One end of machine (12) is installed with first gear (14), fixed between the first bearing seat (9) and second bearing seat (11) It is connected with bull stick (15), the left side fixing sleeve of bull stick (15) outer surface is connected to second gear (16), and second gear (16) It is meshed with the first gear (14) of lower section, there are two symmetrical drawstring (17), institutes for the outer surface winding of the bull stick (15) It states the one end of drawstring (17) far from bull stick (15) and is fixedly connected with platform (18), cunning is fixedly connected on the left of the platform (18) Block (19), and sliding block (19) is connected on guide rail (10).
2. a kind of Steel Structure Installation scaffold according to claim 1, it is characterised in that:Side at the top of the platform (18) Guardrail is installed at edge, and the right end of guardrail is located at the left side of second gear (16).
3. a kind of Steel Structure Installation scaffold according to claim 1, it is characterised in that:The top of the guide rail (10) and Bottom is fixedly connected at the top of first bearing seat (9) and supporting table (4) respectively.
4. a kind of Steel Structure Installation scaffold according to claim 1, it is characterised in that:The slide plate (6) is located at riser (5) lower end, and the bottom of slide plate (6) and the bottom of riser (5) are flush.
5. a kind of Steel Structure Installation scaffold according to claim 1, it is characterised in that:Fixed seat (1) bottom Four edges have been fixedly connected with holder, and the lower end of holder is hinged with idler wheel by pin.
6. a kind of Steel Structure Installation scaffold according to claim 1, it is characterised in that:The riser (5), which is located at, fixes Between seat (1) open top, and the distance between two risers (5) length value is less than the open-topped laterally length of fixed seat (1) Angle value.
CN201820255697.0U 2018-02-13 2018-02-13 A kind of Steel Structure Installation scaffold Expired - Fee Related CN208009864U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820255697.0U CN208009864U (en) 2018-02-13 2018-02-13 A kind of Steel Structure Installation scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820255697.0U CN208009864U (en) 2018-02-13 2018-02-13 A kind of Steel Structure Installation scaffold

Publications (1)

Publication Number Publication Date
CN208009864U true CN208009864U (en) 2018-10-26

Family

ID=63885649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820255697.0U Expired - Fee Related CN208009864U (en) 2018-02-13 2018-02-13 A kind of Steel Structure Installation scaffold

Country Status (1)

Country Link
CN (1) CN208009864U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847076A (en) * 2019-11-28 2020-02-28 湖南青蓝文化传媒集团有限公司 Guideboard mounting equipment
CN111155750A (en) * 2020-01-16 2020-05-15 四川省泰达建设工程有限公司 Hydraulic engineering goes up and down automatic device of overhauing in advance
CN112554527A (en) * 2020-11-17 2021-03-26 浙江铠甲建筑科技有限公司 High foldable scaffold that climbs of security

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847076A (en) * 2019-11-28 2020-02-28 湖南青蓝文化传媒集团有限公司 Guideboard mounting equipment
CN111155750A (en) * 2020-01-16 2020-05-15 四川省泰达建设工程有限公司 Hydraulic engineering goes up and down automatic device of overhauing in advance
CN111155750B (en) * 2020-01-16 2021-08-10 四川省泰达建设工程有限公司 Hydraulic engineering goes up and down automatic device of overhauing in advance
CN112554527A (en) * 2020-11-17 2021-03-26 浙江铠甲建筑科技有限公司 High foldable scaffold that climbs of security

Similar Documents

Publication Publication Date Title
CN208009864U (en) A kind of Steel Structure Installation scaffold
CN208137383U (en) A kind of liftable architectural engineering scaffold
CN209618790U (en) Lifting device for building
CN112254034A (en) High-stability lighting device for building construction
CN205855907U (en) A kind of interior decoration lift
CN209099767U (en) A kind of construction mould plate supporting device
CN113605240A (en) Assembled bridge construction is with scaffold that has protective structure
CN219509125U (en) Movable scaffold
CN207944357U (en) A kind of road bridge construction support device
CN207332274U (en) Climbing type CONSTRUCTION OPERATIONS platform outside a kind of building
CN206408941U (en) A kind of liftable construction cleaning locomotive frame
CN113154194A (en) Surveying instrument support convenient for accurate adjustment and connecting method thereof
CN115262934A (en) Scaffold for building decoration
CN105822053B (en) A kind of height adjustable power construction platform
CN208749148U (en) A kind of multi-purpose road and bridge construction ladder of novel portable
CN110344554B (en) Concealed type deformation stair for loft type building
CN206016199U (en) A kind of adjustable trowel
CN211037926U (en) Support for integrated building
CN207727951U (en) The novel hanging basket that operation can be fixed and moved horizontally
CN112376922A (en) Assembled steel structure sliding frame with protection function
CN210368650U (en) Scaffold for highway bridge construction
CN211647297U (en) Light multilayer plastic building template
CN207632455U (en) A kind of construction of hydro project is ascended a height auxiliary device
CN220645101U (en) Building construction platform convenient to remove
CN213330871U (en) Ladder of ascending a height is used in room construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181026

Termination date: 20210213