CN108243505A - A kind of resource regulating method and device - Google Patents
A kind of resource regulating method and device Download PDFInfo
- Publication number
- CN108243505A CN108243505A CN201611221432.0A CN201611221432A CN108243505A CN 108243505 A CN108243505 A CN 108243505A CN 201611221432 A CN201611221432 A CN 201611221432A CN 108243505 A CN108243505 A CN 108243505A
- Authority
- CN
- China
- Prior art keywords
- resource
- base station
- cell
- downlink
- channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The present invention provides a kind of resource regulating method and device, the method includes:After terminal UE or base station initiating business request, base station determines the channel resource demand of uplink and/or downlink according to the UE buffer status report BSR reported and the cache information of the base station;When the resource of the serving cell of the UE can not meet the channel resource demand, the UE is switched to ascending resource cell, downlink resource cell or peers cell by base station according to the uplink and/or the channel resource demand of downlink.The present invention is according to the resource utilization of serving cell, the uplink and downlink timeslot proportioning of adjacent area, realize cell in and minizone scheduling of resource, it solves resource bottleneck caused by TDD system ascending resource deficiency to restrict, it realizes the maximization of the wireless resource utility efficiency of base station and meets the service resources differentiated demand of UE to the greatest extent.
Description
Technical field
The present invention relates to wireless communication technology field more particularly to a kind of resource regulating methods and device.
Background technology
In a wireless communication system, due to the shared limited channel resource of user (UE), system to the scheduling strategy of resource,
It will determine that user (UE) perceives the use of resource and system.The scheduling of resource of wireless communication system, it is necessary to be efficient, fair
, differentiation.Efficiently, the high-speed of communication system is embodied in, needs quick dispatching response;Justice is to avoid system
It is exclusive by certain specific users (UE), influence the access of other users (UE) and using system;Differentiation is then that system should
This meets the resource requirement difference of a variety of different business.
Existing resource regulating method, such as patent of invention《Resource regulating method, device and system》(the patent No.:
) and patent of invention CN201110143789.2《The resource regulating method and device of TD-LTE system》(the patent No.:
CN201110023897.6).Wherein, patent of invention《Resource regulating method, device and system》(the patent No.:
CN201110143789.2 a kind of resource regulating method for being related to LTE network, device and system) are provided, are solved non-full negative
The problem of system performance caused by SINR fluctuations declines under lotus.This method includes:Base station scheduling in non-full load condition connects
Enter the UE of the base station, distribute resource for the UE, and be one scheduling timer of UE distribution;The scheduling timer is according to pre-
The resource retention periods put carry out timing, and the length of the resource retention periods is more than TTI;In the scheduling timer then
Afterwards, the resource that the base station is UE distribution is discharged.The technical solution that the invention provides is realized suitable for LTE system
Resource behaviour in service is constant in the more long resource retention periods of duration used in an opposite scheduling.Patent of invention《TD-LTE
The resource regulating method and device of system》(the patent No.:CN201110023897.6 a kind of resource of TD-LTE system) is provided
Dispatching method, including:For different user and/or business, corresponding priority Revision weights, the priority Revision power are set
Value according to available control area resource information in subframe and, the control area resource letter needed for different user and/or business
Breath determines;Wherein, the control area carries out resource distribution according to maximum number of symbols;Obtain different user and/or business pair
Corresponding priority original value is adjusted to priority update by the priority original value answered using the priority Revision weights
Value;User and/or business are scheduled according to the priority update value in current subframe.The invention can fully dispatch number
According to resource, the resource utilization of system is improved.
Above-mentioned resource regulating method has a disadvantage that:Patent of invention《Resource regulating method, device and system》(the patent No.:
CN201110143789.2) resource regulating method of offer, device and system set resource reservation mechanism only for access UE,
It is not directed to the business characteristic of the UE, differentiation is formed to resource reservation;In technical solution described in the patent of invention, to described
UE using same resource retention periods, during resource retains, radio resource will be unavailable for other UE, reduce system
Scheduling of resource efficiency.Patent of invention《The resource regulating method and device of TD-LTE system》(the patent No.:
CN201110023897.6) the resource regulating method provided, the division of priority has been carried out for the differentiation of user and business,
Differentiation is formed in scheduling of resource, when system loading is higher, the user for easily forming high priority is frequently scheduled, low excellent
The user of first grade is difficult scheduled situation, has lost the fairness of scheduling.Its control area resource letter according to current subframe
Breath determines the mechanism of scheduling of resource, in a tdd system, since uplink and downlink timeslot matches setting difference, is susceptible to ascending resource
When nervous, the user of low priority confirms that (ACK/NACK) is sent without channel in uplink, and causes uplink overtime, causes industry
The possibility that business goes offline.
Invention content
In view of the drawbacks of the prior art, the present invention provides a kind of resource regulating method and devices, can solve existing skill
Dispatching efficiency is not high in art, do not form the problem of scheduling differentiation to different user and unresolved ascending resource deficiency causes
Certain customers it is not scheduled and the problem of business is caused to go offline.
In a first aspect, the present invention provides a kind of resource regulating method, the method includes:
After terminal UE or base station initiating business request, base station is according to the UE buffer status report BSR reported and the base
The cache information stood determines the channel resource demand of uplink and/or downlink;
When the resource of the serving cell of the UE can not meet the channel resource demand, base station is according to the uplink
And/or the channel resource demand of downlink, it is small that the UE is switched into ascending resource cell, downlink resource cell or peers
Area;
Wherein, the ascending resource cell is configured for ascending time slot more than descending time slot and ascending time slot is matched with descending time slot
The difference put be more than or equal to predetermined threshold value adjacent area, the downlink resource cell for descending time slot more than ascending time slot be configured and under
The difference of row time slot and ascending time slot configuration is more than or equal to the adjacent area of predetermined threshold value, the peers cell for ascending time slot with
The difference of descending time slot configuration is less than the adjacent area of predetermined threshold value.
Optionally, the base station is determined according to the UE buffer status report BSR reported and the cache information of the base station
After the resource requirement of downlink business, the method further includes:
When the resource of the serving cell of the UE disclosure satisfy that the channel resource demand, the base station is sent out to the UE
RRC reconfiguration messages are sent, to distribute the local resource of the serving cell to the UE.
Optionally, the base station is determined according to the UE buffer status report BSR reported and the cache information of the base station
The channel resource demand of row and/or downlink, including:
The base station determines that uplink caches byte, and is determined according to the cache information of the base station according to the BSR that UE is reported
Down buffer storage byte;
When the uplink caches byte and/or the down buffer storage byte more than the preset caching upper limit, the base station is touched
Transmit increase adjustment;
When the uplink caches byte and/or the down buffer storage byte less than preset caching lower limit, the base station is touched
Transmit reduction adjustment.
Optionally, when the serving cell in the UE disclosure satisfy that the channel resource demand, the base station is to institute
It states UE and sends RRC reconfiguration messages, to distribute the local resource of the serving cell to the UE, including:
When the base station triggers channel is reduced and adjusted, the base station sends RRC reconfiguration messages to the UE, to complete
The channel of the UE reduces adjustment;
When the base station triggers channel increases and adjusts, if the ascending resource of the serving cell and/or downlink resource energy
Enough meet the channel resource demand, the base station sends RRC reconfiguration messages to the UE, to complete the increasing of the channel of the UE
Add adjustment.
Optionally, the UE is switched to uplink by the base station according to the uplink and/or the channel resource demand of downlink
Resource cell, downlink resource cell or peers cell, including:
The base station triggers channel increase adjust when, if the ascending resource and/or downlink resource of the serving cell without
Method meets the channel resource demand, and the ascending physical signal resource block PRB utilization rates of the serving cell are more than preset first
Utilization threshold and downlink PRB utilization rates are more than preset second utilization threshold, and the base station sends the first A5 to the UE
Control message is measured, so that the UE is switched to peers cell by triggering A5 events;
If the uplink PRB utilization rates are more than first utilization threshold and the downlink PRB utilization rates are less than or equal to
Second utilization threshold, the base station sends the 2nd A5 to the UE and measures control message, so that the UE passes through triggering
A5 events are switched to ascending resource cell;
If the downlink PRB utilization rates are more than second utilization threshold and the uplink PRB utilization rates are less than or equal to
First utilization threshold, the base station sends the 3rd A5 to the UE and measures control message, so that the UE passes through triggering
A5 events are switched to downlink resource cell.
Second aspect, the present invention provides a kind of resource scheduling device, described device includes:
Resource requirement determination unit, for the caching shape after terminal UE or base station initiating business request, reported according to UE
State reports BSR and the cache information of the base station, determines the channel resource demand of uplink and/or downlink;
Cell switch unit, for when the resource of the serving cell of the UE can not meet the channel resource demand,
According to the uplink and/or the channel resource demand of downlink, by the UE switch to ascending resource cell, downlink resource cell or
Person's peers cell;
Wherein, the ascending resource cell is configured for ascending time slot more than descending time slot and ascending time slot is matched with descending time slot
The difference put be more than or equal to predetermined threshold value adjacent area, the downlink resource cell for descending time slot more than ascending time slot be configured and under
The difference of row time slot and ascending time slot configuration is more than or equal to the adjacent area of predetermined threshold value, the peers cell for ascending time slot with
The difference of descending time slot configuration is less than the adjacent area of predetermined threshold value.
Optionally, described device further includes:Resource allocation unit is used for:
When the resource of the serving cell of the UE disclosure satisfy that the channel resource demand, RRC weights are sent to the UE
Message is configured, to distribute the local resource of the serving cell to the UE.
Optionally, the resource requirement determination unit, is specifically used for:
Determine that uplink caches byte, and determines down buffer storage according to the cache information of the base station according to the BSR that UE is reported
Byte;
When the uplink caches byte and/or the down buffer storage byte more than the preset caching upper limit, triggering channel increases
Add adjustment;
When the uplink caches byte and/or the down buffer storage byte less than preset caching lower limit, triggering channel subtracts
Few adjustment.
Optionally, the resource allocation unit, is specifically used for:
When the base station triggers channel is reduced and adjusted, RRC reconfiguration messages are sent to the UE, to complete the UE's
Channel reduces adjustment;
When the base station triggers channel increases and adjusts, if the ascending resource of the serving cell and/or downlink resource energy
Enough meet the channel resource demand, then send RRC reconfiguration messages to the UE, increase tune to complete the channel of the UE
It is whole.
Optionally, the cell switch unit, is specifically used for:
The base station triggers channel increase adjust when, if the ascending resource and/or downlink resource of the serving cell without
Method meets the channel resource demand, and the ascending physical signal resource block PRB utilization rates of the serving cell are more than preset first
Utilization threshold and downlink PRB utilization rates are more than preset second utilization threshold, and the base station sends the first A5 to the UE
Control message is measured, so that the UE is switched to peers cell by triggering A5 events;
If the uplink PRB utilization rates are more than first utilization threshold and the downlink PRB utilization rates are less than or equal to
Second utilization threshold, the base station sends the 2nd A5 to the UE and measures control message, so that the UE passes through triggering
A5 events are switched to ascending resource cell;
If the downlink PRB utilization rates are more than second utilization threshold and the uplink PRB utilization rates are less than or equal to
First utilization threshold, the base station sends the 3rd A5 to the UE and measures control message, so that the UE passes through triggering
A5 events are switched to downlink resource cell.
As shown from the above technical solution, the present invention provides a kind of resource regulating method and device, according to UE and the number of base station
According to buffer status report, the channel resource demand of judgement business uplink and/or downlink, and the resource of the serving cell in the UE
When can not meet the channel resource demand, the UE is cut according to the uplink and/or the channel resource demand of downlink in base station
Shift to ascending resource cell, downlink resource cell or peers cell.In this way, the present invention combines the uplink and downlink of TDD system
The inconsistent characteristic of resource distribution, according to the resource utilization of serving cell, the uplink and downlink timeslot of adjacent area matches, and realizes cell
Interior and minizone scheduling of resource solves resource bottleneck caused by TDD system ascending resource deficiency and restricts, realizes base station
Wireless resource utility efficiency maximization and meet the service resources differentiated demand of UE to the greatest extent.
Description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, to embodiment or will show below
There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention, for those of ordinary skill in the art, without creative efforts, can be with
Other attached drawings are obtained according to these figures.
Fig. 1 is a kind of flow diagram for resource regulating method that one embodiment of the invention provides;
Fig. 2 is a kind of flow diagram for resource regulating method that another embodiment of the present invention provides;
Fig. 3 is the schematic diagram for the BSR message formats that another embodiment of the present invention provides;
Fig. 4 is that the RRC connection reconfigurations that another embodiment of the present invention provides put the signaling diagram for completing intra-cell resource adjustment;
Fig. 5 is the signaling diagram that the RRC connection reconfigurations that another embodiment of the present invention provides put failure;
Fig. 6 is the signaling diagram that the triggering A5 events that another embodiment of the present invention provides complete the adjustment of minizone resource;
Fig. 7 is a kind of flow diagram for resource regulating method that another embodiment of the present invention provides;
Fig. 8 is a kind of structure diagram for resource scheduling device that one embodiment of the invention provides;
Fig. 9 is a kind of structure diagram for resource scheduling device that another embodiment of the present invention provides;
Figure 10 is the structure diagram for a kind of electronic equipment that one embodiment of the invention provides.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work
Embodiment shall fall within the protection scope of the present invention.
Fig. 1 is a kind of flow diagram of resource regulating method in one embodiment of the invention, as shown in Figure 1, this implementation
The executive agent of example is base station, and described method includes following steps:
S1:After terminal UE or base station initiating business request, base station is according to UE buffer status report BSR reported and described
The cache information of base station determines the channel resource demand of uplink and/or downlink.
Wherein, it is described according to 36.321 6.1.3 chapters and sections of 3GPP TS, buffer status report (Buffer Status
Report, abbreviation BSR) MAC cache size of the message for logic channel group (LCG, Logic Channel Group) carrying 6bit
(Buffer Size identify the index of 64 kinds of values altogether) characterizes the size of Current MAC layers data to be sent.
Specifically, RRC (Radio Resource Control, wireless heterogeneous networks) connections are established, and UE or base station
After initiating business request, UE reports BSR to base station, base station then according to the BSR that UE is reported determine uplink channel resource demand (by
UE is sent to the channel resource needed for base station), and according to the cache information of base station in itself determine downlink channel resource demand (by
Base station is sent to the channel resource needed for UE), so that it is determined that uplink and downlink service resources demand.
S2:When the resource of the serving cell of the UE can not meet the channel resource demand, base station is according on described
The channel resource demand of row and/or downlink, ascending resource cell, downlink resource cell or peers are switched to by the UE
Cell.
Wherein, the ascending resource cell is configured for ascending time slot more than descending time slot and ascending time slot is matched with descending time slot
The difference put be more than or equal to predetermined threshold value adjacent area, the downlink resource cell for descending time slot more than ascending time slot be configured and under
The difference of row time slot and ascending time slot configuration is more than or equal to the adjacent area of predetermined threshold value, the peers cell for ascending time slot with
The difference of descending time slot configuration is less than the adjacent area of predetermined threshold value.
Specifically, when the resource of the serving cell of the UE can not meet the channel resource demand, base station then root
UE is switched into corresponding adjacent area according to the channel resource demand of the uplink and/or downlink:Specifically, when this business is uploads
Based on business, such as hair wechat circle of friends, send the mail with attachment, then in a manner that cell meets and shares, by UE points
It is fitted on the ascending resource cell based on ascending time slot;When this business be download based on business, such as download, Online Video,
Then in a manner that cell meets and shares, UE is assigned to the downlink resource cell based on descending time slot;When this business is upper
The business for carrying equity, such as VoLTE voice communications, video calling are descended, then by way of cell load sharing, UE is distributed
To the peers cell of uplink and downlink timeslot equity.
It can be seen that the present embodiment is the dispatching method based on " resource pool ", " resource pool " refers to the money except serving cell
Outside source is scheduled, scheduling of resource range is also included in adjacent area by algorithm.
Therefore, before above-mentioned steps S1, also need the partly or entirely adjacent area of three types following to serving cell configuration and
Measure thresholding:
1) downlink resource cell:LTE TDD cells descending time slot is more than the cell of ascending time slot configuration, is suitble to downlink business
Based on UE be resident;Configurable A5_DL thresholdings, after UE meets this A5 thresholding, are switched to the adjacent area.Such as when the down channel of UE
After resource requirement reaches the A5_DL thresholdings, it is switched to the adjacent area.
2) ascending resource cell:LTE TDD cells ascending time slot is more than the cell of descending time slot configuration, is suitble to uplink service
Based on UE be resident;A5_UL thresholdings are configured, after UE meets this A5 thresholding, are switched to the adjacent area.Such as when the up channel of UE provides
After source demand reaches the A5_UL thresholdings, it is switched to the adjacent area.
3) peers cell:The cell that the configuration of LTE TDD cells uplink and downlink timeslot is not much different, is suitble to uplink and downlink countermeasure
The UE of business is resident;A5_BL thresholdings are configured, after UE meets this A5 thresholding, are switched to the adjacent area.Such as when the uplink and downlink channel of UE
After resource requirement reaches the A5_BL thresholdings, it is switched to the adjacent area.
In the present embodiment, the type belonging to adjacent area is determined by the ascending time slot proportioning of cell.According to 3GPP TS36.211
4.2 chapters and sections describe, and LTE TDD systems uplink and downlink timeslot proportioning division methods, it is that ascending resource is small that agreement time slot proportion, which is 0,
Area;1st, 6 be peers cell;2nd, 3,4,5 be downlink resource cell.Cell type concordance list is as shown in table 1.
Table 1:Adjacent area Type division table corresponding with time slot proportion
Wherein, D represents ascending time slot, and U represents downlink, and S represents converted slot.Then as can be seen from Table 1, ascending resource is small
The ascending time slot in area is more than descending time slot and the two number differences are more than or equal to 3, the ascending resource cell for being 0 such as time slot proportion
Ascending time slot quantity is 6, and descending time slot quantity is 2;The descending time slot of downlink resource cell is more than ascending time slot and the two quantity
Difference is more than or equal to 3, if the descending time slot quantity for the downlink resource cell that time slot proportion is 2 is 6, ascending time slot quantity is 2, when
The descending time slot quantity for the downlink resource cell that gap proportioning is 3 is 6, ascending time slot quantity is 3, and the downlink that time slot proportion is 4 provides
The descending time slot quantity of cell-of-origin is 7, ascending time slot quantity is 2, and time slot proportion is the descending time slot number of 5 downlink resource cell
It is 1 to measure as 8, ascending time slot quantity;The ascending time slot and descending time slot of peers cell are not much different, and the two number differences are small
In 3, the ascending time slot such as the peers cell that time slot proportion is 1 is equal with descending time slot quantity, and pair that time slot proportion is 6
Etc. resources cell ascending time slot quantity for 5, descending time slot quantity is 3, and the two quantity difference is 2, i.e. uplink and downlink timeslot quantity
It is not much different.
It can be seen that the present embodiment judges business uplink and/or downlink according to UE and the data buffer storage state report of base station
Channel resource demand, and when the resource of the serving cell in the UE can not meet the channel resource demand, base station according to
The UE is switched to ascending resource cell, downlink resource cell or right by the channel resource demand of the uplink and/or downlink
Etc. resources cell.In this way, business characteristic of the present embodiment according to UE, demand of the real-time judgment to resource, are reconfigured by RRC
UE is dispatched to appropriate cell by mode, realizes the rapidly and efficiently scheduling of resource, the differentiation scheduling based on business demand, and
Realize the maximization that need satisfaction is perceived using maximization, user of Internet resources.
In an alternate embodiment of the present invention where, as shown in Fig. 2, after above-mentioned steps S1, the method further include as
Lower step:
S3:When the resource of the serving cell of the UE disclosure satisfy that the channel resource demand, the base station is to described
UE sends RRC reconfiguration messages, to distribute the local resource of the serving cell to the UE.
Specifically, uplink and/or down channel resources determined by step S1 be disclosure satisfy that in the resource of serving cell
During demand, channel resource adjustment can be completed by RRC reconfiguration courses in serving cell, distributed in serving cell for UE
Resource.
It can be seen that business characteristic of the present embodiment according to UE, demand of the real-time judgment to resource, are reconfigured by RRC
Mode, UE is dispatched to appropriate cell (serving cell or adjacent area), realize resource rapidly and efficiently scheduling, based on business need
The differentiation scheduling asked, and realize the maximization that need satisfaction is perceived using maximization, user of Internet resources.
Resource regulating method in above-described embodiment is divided into two processes:Resource requirement calculating process and resource adjusted
Journey.Detailed description is expanded with regard to two processes below:
In an alternate embodiment of the present invention where, above-mentioned steps S1 specifically may include following sub-step:
S11:The base station determines that uplink caches byte, and according to the cache information of the base station according to the BSR that UE is reported
Determine down buffer storage byte.
S12:When the uplink caches byte and/or the down buffer storage byte more than the preset caching upper limit, the base
Triggering channel of standing increases adjustment.
S13:When the uplink caches byte and/or the down buffer storage byte less than preset caching lower limit, the base
Triggering channel of standing reduces adjustment.
Specifically, as shown in figure 3, according to the Buffer Size indexes of BSR message, the byte of MAC cachings is calculated
Number BUFFER_MAC_xL.Wherein, UE is reported BSR mark uplink caching byte BUFFER_MAC_UL, under the BSR marks of base station
Row caching byte BUFFER_MAC_UL.
Correspondingly, when uplink and/or down buffer storage surpass the upper limit, i.e. BUFFER_MAC_xL>During BUFFER_MAC_MAX_xL,
Then triggering channel increases adjustment (CHANNEL_ADD processes);When uplink and/or down buffer storage are less than limit, i.e. BUFFER_MAC_xL
<During BUFFER_MAC_MIN_xL, then trigger channel and reduce adjustment (CHANNEL_DEC processes).
Further, in an alternate embodiment of the present invention where, above-mentioned steps S3 is specifically included:
S31:When the base station triggers channel is reduced and adjusted, the base station sends RRC reconfiguration messages to the UE, with
The channel for completing the UE reduces adjustment.
Specifically, the adjustment of channel resource reduction is completed in serving cell by RRC reconfiguration courses, specific signaling
As shown in Figures 4 and 5, base station issues RRC reconfiguration messages (RRC Connection Reconfiguration) completion for interaction
Channel in cell reduces adjustment:
I) base station issues RRC connection reconfigurations and puts message (RRC Connection Reconfiguration), completes UE's
Channel, which subtracts, matches;
Ii) UE, which is received, subtracts with after instruction, if successfully completing channel adjustment, replys RRC connection reconfigurations and puts and complete message
(RRC Connection Reconfiguration Complete), as shown in Figure 4.
Iii it) if UE channel adjustments fail, is rebuild by RRC and completes link repair, and reply RRC connection reconstruction message
(RRC Connection Re-establishmen) message, as shown in Figure 5.
S32:When the base station triggers channel increases and adjusts, if the ascending resource of the serving cell and/or downlink money
Source disclosure satisfy that the channel resource demand, and the base station sends RRC reconfiguration messages to the UE, to complete the letter of the UE
Road increases adjustment.
Specifically, channel resource increases the preferential trial of adjustment and is completed in serving cell, if the resource energy of serving cell
Enough meeting channel resource increases adjustment, then increases adjustment of the process with the reduction (CHANNEL_DEC) in above-mentioned steps S31, leads to
It crosses RRC and reconfigures completion.
It can be seen that the resource of the serving cell of the UE disclosure satisfy that the channel resource demand in two kinds of situation:When
When triggering channel reduction adjustment, the resource of serving cell disclosure satisfy that the channel resource demand certainly;When triggering channel increases
Preferential to attempt to complete in serving cell during adjustment, the resource of serving cell may can meet the channel resource demand.
Further, if this cell uplink and/or downlink resource are insufficient, the resource distribution adjustment between triggering cell, on
Step S2 is stated, is specifically included:
S21:When the base station triggers channel increases and adjusts, if the ascending resource of the serving cell and/or downlink money
Source can not meet the channel resource demand, and the ascending physical signal resource block PRB utilization rates of the serving cell are more than preset
First utilization threshold and downlink PRB utilization rates are more than preset second utilization threshold, and the base station sends the to the UE
One A5 measures control message, so that the UE is switched to peers cell by triggering A5 events.
Specifically, when the ascending physical signal resource block PRB utilization rates of serving cell are more than preset first utilization threshold
And downlink PRB utilization rates are more than preset second utilization threshold, then show the uplink and downlink resource of resource of serving cell not
Channel resource demand can be met, then need UE switching to peers cell.
S22:If the uplink PRB utilization rates are more than first utilization threshold and the downlink PRB utilization rates are less than
Equal to second utilization threshold, the base station sends the 2nd A5 to the UE and measures control message, so that the UE passes through
Triggering A5 events are switched to ascending resource cell.
Specifically, when the uplink PRB utilization rates are more than first utilization threshold and the downlink PRB utilization rates
Less than or equal to second utilization threshold, then channel resource need cannot be met by showing the ascending resource of the resource of serving cell
It asks, then needs UE switching to ascending resource cell.
S22:If the downlink PRB utilization rates are more than second utilization threshold and the uplink PRB utilization rates are less than
Equal to first utilization threshold, the base station sends the 3rd A5 to the UE and measures control message, so that the UE passes through
Triggering A5 events are switched to downlink resource cell.
Specifically, when the downlink PRB utilization rates are more than second utilization threshold and the uplink PRB utilization rates
Less than or equal to first utilization threshold, then channel resource need cannot be met by showing the downlink resource of the resource of serving cell
It asks, then needs UE switching to downlink resource cell.
Specifically, Fig. 6 is the signaling diagram of the present embodiment medium and small interval scheduling of resource process, as shown in fig. 6, minizone resource
Scheduling process is specific as follows:
(1) if " serving cell uplink PRB utilization rates>PRBUtilLimitUL (preset first utilization threshold) " or
" downlink PRB utilization rates>PRBUtilLimitDL (preset second utilization threshold) ", then base station is put by RRC connection reconfigurations
(RRC Connection Configuration Reconfiguration) message measures control message, tool to UE configurations A5
Body includes three kinds of situations:
If i) " serving cell uplink PRB utilization rates>PRBUtilLimitUL " and " downlink PRB utilization rates>
PRBUtilLimitDL " issues A5_BL and measures control message (the first A5 measures control message), attempts to switch to peers
Cell.
Ii) if " serving cell uplink PRB utilization rates>PRBUtilLimitUL " and " downlink PRB utilization rates≤
PRBUtilLimitDL " issues A5_UL and measures control message (the 2nd A5 measures control message), attempts to switch to ascending resource
Cell.
Iii) if " serving cell downlink PRB utilization rates>PRBUtilLimitDL " and " uplink PRB utilization rates>
PRBUtilLimitUL " issues A5_DL and measures control message (the 3rd A5 measures control message), attempts to switch to downlink resource
Cell.
(2) after UE receives measurement control message, RRC connection reconfigurations is replied and put completion message (RRC Connection
Configuration Reconfiguration Complete), and start A5 measurements.
(3) after UE completes nearby region measurement, reporting measurement reports (Measurement Report), to be closed to base station report
Suitable adjacent area carrier frequency point (earfcn) and Physical Cell Identifier (physical Cell Id) and corresponding reference signal connect
Receive power (RSRP) and Reference Signal Received Quality (RSRQ).
(4) measurement report that base station is reported according to UE judges the adjacent area assigned, (RRC is put by RRC connection reconfigurations
Connection Configuration Reconfiguration) message complete switching command issue.
(5) after UE completes handover operation, RRC connection reconfigurations is reported to put and complete message (RRC Connection
Configuration Reconfiguration Complete)。
Fig. 7 is the flow diagram of the resource regulating method in another embodiment of the present invention, as shown in fig. 7, the side
Method specifically comprises the following steps:
S701:Pass through BSR message feedback uplink and downlink service buffer states;
Specifically, BSR cache information of the BSR message including the UE BSR message reported and base station itself.
S702:Base station calculates UE uplink and downlink channel resource demands;
S703:Judge whether current service cell disclosure satisfy that UE channel resource demands, if so, step S704 is gone to,
Otherwise step S705 is gone to;
S704:Base station issues RRC connection reconfigurations to UE and puts message, to distribute the resource of serving cell to UE;
S705:Judge whether " serving cell uplink PRB utilization rates>PRBUtilLimitUL " and " downlink PRB utilization rates>
PRBUtilLimitDL " if then going to step S706, otherwise goes to step S708;
S706:Base station issues A5_BL and measures control message to UE;
S707:UE is switched to peers cell by triggering A5 events;
S708:Judge whether " serving cell downlink PRB utilization rates>PRBUtilLimitDL ", if then going to step
Otherwise S709 goes to step S711;
S709:Base station issues A5_DL and measures control message to UE;
S710:UE triggers A5 time-switchings to downlink resource cell;
S711:Judge whether " serving cell uplink PRB utilization rates>PRBUtilLimitUL ", if then going to step
Otherwise S712 terminates the scheduling of resource process;
S712:Base station issues A5_UL and measures control message to UE;
S713:UE triggers A5 time-switchings to ascending resource cell.
Across cell resource scheduling method in the present embodiment solves TDD system due to caused by ascending resource deficiency
Resource bottleneck.With the popularization of VOLTE HD video business, the increase in demand of client's uploading pictures and video, LTE TDD systems
Ascending resource it is insufficient, will be a great problem for perplexing mobile communication.The present embodiment is by the way that cell is divided by function
Row resource cell, downlink resource cell and peers cell are respectively used to carrying upload, download and uplink and downlink equity class industry
Business realizes the flexible dispatching of business, is matched by using diversified uplink and downlink timeslot, it is insufficient can to solve ascending resource
Bottleneck;And Real-Time Scheduling Police of the present embodiment based on service resources demand, it is provided according to the business real-time judgment that user is carried out
Source demand can complete the matching to user resources demand with the most fast dispatching response time, the fastest to meet business need
It asks, realizes that user's sensory experience is optimal, realize the quick and differentiation of scheduling;The scheduling strategy of the present embodiment will service small
It is interior, small to realize cell for area, the unified consideration of adjacent area resource, the multi-dimensional factors such as integrated service demand, resource requirement, cell load
The scheduling of resource in section realizes the maximization of the LTE TDD system utilizations of resources, has been effectively saved website dilatation investment, has been
A kind of efficient resource regulating method.
Fig. 8 is a kind of structure diagram of resource scheduling device in one embodiment of the invention, as shown in figure 8, the dress
Put including:Resource requirement determination unit 801 and cell switch unit 802.Wherein:
Resource requirement determination unit 801 is used for after terminal UE or base station initiating business request, the caching reported according to UE
State report BSR and the cache information of the base station determine the channel resource demand of uplink and/or downlink;Cell switch unit
802 are used for when the resource of serving cell of the UE can not meet the channel resource demand, according to the uplink and/or under
The UE is switched to ascending resource cell, downlink resource cell or peers cell by capable channel resource demand;Its
In, the ascending resource cell is configured for ascending time slot more than descending time slot and ascending time slot and difference that descending time slot is configured are big
In the adjacent area equal to predetermined threshold value, the downlink resource cell for descending time slot more than ascending time slot be configured and descending time slot with it is upper
The difference of row time slot configuration is more than or equal to the adjacent area of predetermined threshold value, and the peers cell is matched for ascending time slot with descending time slot
The difference put is less than the adjacent area of predetermined threshold value.
In the present embodiment, resource requirement determination unit 801 judges business according to UE and the data buffer storage state report of base station
The channel resource demand of uplink and/or downlink, and cell switch unit 802 can not meet in the resource of the serving cell of the UE
During the channel resource demand, the UE is switched to uplink by base station according to the uplink and/or the channel resource demand of downlink
Resource cell, downlink resource cell or peers cell.In this way, business characteristic of the present embodiment according to UE, real-time judgment
UE in a manner that RRC is reconfigured, is dispatched to appropriate cell by the demand to resource, realize resource rapidly and efficiently scheduling,
Differentiation scheduling based on business demand, and realize the maximum that need satisfaction is perceived using maximization, user of Internet resources
Change.
In an alternate embodiment of the present invention where, as shown in figure 9, described device further includes:Resource allocation unit 803,
For:
When the resource of the serving cell of the UE disclosure satisfy that the channel resource demand, RRC weights are sent to the UE
Message is configured, to distribute the local resource of the serving cell to the UE.
In an alternate embodiment of the present invention where, the resource requirement determination unit 801, is specifically used for:
Determine that uplink caches byte, and determines down buffer storage according to the cache information of the base station according to the BSR that UE is reported
Byte;
When the uplink caches byte and/or the down buffer storage byte more than the preset caching upper limit, triggering channel increases
Add adjustment;
When the uplink caches byte and/or the down buffer storage byte less than preset caching lower limit, triggering channel subtracts
Few adjustment.
In an alternate embodiment of the present invention where, the resource allocation unit 803, is specifically used for:
When the base station triggers channel is reduced and adjusted, RRC reconfiguration messages are sent to the UE, to complete the UE's
Channel reduces adjustment;
When the base station triggers channel increases and adjusts, if the ascending resource of the serving cell and/or downlink resource energy
Enough meet the channel resource demand, then send RRC reconfiguration messages to the UE, increase tune to complete the channel of the UE
It is whole.
In an alternate embodiment of the present invention where, the cell switch unit 802, is specifically used for:
The base station triggers channel increase adjust when, if the ascending resource and/or downlink resource of the serving cell without
Method meets the channel resource demand, and the ascending physical signal resource block PRB utilization rates of the serving cell are more than preset first
Utilization threshold and downlink PRB utilization rates are more than preset second utilization threshold, and the base station sends the first A5 to the UE
Control message is measured, so that the UE is switched to peers cell by triggering A5 events;
If the uplink PRB utilization rates are more than first utilization threshold and the downlink PRB utilization rates are less than or equal to
Second utilization threshold, the base station sends the 2nd A5 to the UE and measures control message, so that the UE passes through triggering
A5 events are switched to ascending resource cell;
If the downlink PRB utilization rates are more than second utilization threshold and the uplink PRB utilization rates are less than or equal to
First utilization threshold, the base station sends the 3rd A5 to the UE and measures control message, so that the UE passes through triggering
A5 events are switched to downlink resource cell.
For device embodiment, since it is basicly similar to embodiment of the method, so description is fairly simple, it is related
Part illustrates referring to the part of embodiment of the method.
Figure 10 is the structure diagram of a kind of electronic equipment in one embodiment of the invention.
Reference Figure 10, the electronic equipment, including:Processor (processor) 1001, memory (memory) 1002,
Communication interface (Communications Interface) 1003 and bus 1004;Wherein,
The processor 1001, memory 1002, communication interface 1003 complete mutual lead to by the bus 1004
Letter;
The communication interface 1003 is for the information transmission between the electronic equipment and the communication equipment of terminal UE;
The processor 1001 is used to call the program instruction in the memory 1002, is implemented with performing above-mentioned each method
The method that example is provided, such as including:After terminal UE or base station initiating business request, buffer status that base station is reported according to UE
It reports BSR and the slow breath of the base station, determines the channel resource demand of uplink and/or downlink;In the serving cell of the UE
When resource can not meet the channel resource demand, base station is according to the uplink and/or the channel resource demand of downlink, by described in
UE switches to ascending resource cell, downlink resource cell or peers cell;Wherein, the ascending resource cell is uplink
Time slot is more than the adjacent area of descending time slot configuration, and the downlink resource cell is more than the adjacent area of ascending time slot configuration for descending time slot,
The peers cell adjacent area equal with descending time slot configuration for ascending time slot.
One embodiment of the invention discloses a kind of computer program product, and the computer program product includes being stored in non-temporary
Computer program on state computer readable storage medium, the computer program include program instruction, when described program instructs
When being computer-executed, computer is able to carry out the method that above-mentioned each method embodiment is provided, such as including:When terminal UE or
After the initiating business request of base station, base station determines uplink according to the UE buffer status report BSR reported and the slow breath of the base station
And/or the channel resource demand of downlink;When the resource of the serving cell of the UE can not meet the channel resource demand, base
The UE is switched to ascending resource cell, downlink resource cell by the channel resource demand stood according to the uplink and/or downlink
Or peers cell;Wherein, the ascending resource cell is more than the adjacent area of descending time slot configuration for ascending time slot, under described
Row resource cell is more than the adjacent area of ascending time slot configuration for descending time slot, when the peers cell is ascending time slot and downlink
Equal adjacent area is configured in gap.
One embodiment of the invention discloses a kind of non-transient computer readable storage medium storing program for executing, and the non-transient computer is readable to deposit
Storage media stores computer instruction, and the computer instruction makes the computer perform the side that above-mentioned each method embodiment is provided
Method, such as including:After terminal UE or base station initiating business request, base station is according to the UE buffer status report BSR reported and institute
The slow breath of base station is stated, determines the channel resource demand of uplink and/or downlink;It can not meet in the resource of the serving cell of the UE
During the channel resource demand, the UE is switched to uplink by base station according to the uplink and/or the channel resource demand of downlink
Resource cell, downlink resource cell or peers cell;Wherein, the ascending resource cell is more than downlink for ascending time slot
The adjacent area of time slot configuration, the downlink resource cell are more than the adjacent area of ascending time slot configuration, the peers for descending time slot
The cell adjacent area equal with descending time slot configuration for ascending time slot.
One of ordinary skill in the art will appreciate that:Realizing all or part of step of above method embodiment can pass through
The relevant hardware of program instruction is completed, and aforementioned program can be stored in a computer read/write memory medium, the program
When being executed, step including the steps of the foregoing method embodiments is performed;And aforementioned storage medium includes:ROM, RAM, magnetic disc or light
The various media that can store program code such as disk.
The embodiments such as the test equipment of display device described above are only schematical, wherein described as separation
The unit of part description may or may not be it is physically separate, the component shown as unit can be or
It can not be physical unit, you can be located at a place or can also be distributed in multiple network element.It can be according to reality
Border needs to select some or all of module therein to realize the purpose of this embodiment scheme.Those of ordinary skill in the art
In the case where not paying performing creative labour, you can to understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can
It is realized by the mode of software plus required general hardware platform, naturally it is also possible to pass through hardware.Based on such understanding, on
Technical solution is stated substantially in other words to embody the part that the prior art contributes in the form of software product, it should
Computer software product can store in a computer-readable storage medium, such as ROM/RAM, magnetic disc, CD, including several fingers
It enables and (can be personal computer, server or the network equipment etc.) so that computer equipment is used to perform each implementation
Method described in certain parts of example or embodiment.
It should also be noted that, herein, relational terms such as first and second and the like are used merely to one
Entity or operation are distinguished with another entity or operation, without necessarily requiring or implying between these entities or operation
There are any actual relationship or orders.Moreover, term " comprising ", "comprising" or its any other variant are intended to contain
Lid non-exclusive inclusion, so that process, method, article or equipment including a series of elements not only will including those
Element, but also including other elements that are not explicitly listed or further include as this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
Also there are other identical elements in process, method, article or equipment including the element.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments
The present invention is described in detail, it will be understood by those of ordinary skill in the art that:It still can be to aforementioned each implementation
Technical solution recorded in example modifies or carries out equivalent replacement to which part technical characteristic;And these modification or
It replaces, the spirit and scope for various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution.
Claims (10)
1. a kind of resource regulating method, which is characterized in that the method includes:
After terminal UE or base station initiating business request, base station is according to the UE buffer status report BSR reported and the base station
Cache information determines the channel resource demand of uplink and/or downlink;
When the resource of the serving cell of the UE can not meet the channel resource demand, base station according to the uplink and/or
The UE is switched to ascending resource cell, downlink resource cell or peers cell by the channel resource demand of downlink;
Wherein, the ascending resource cell is ascending time slot more than descending time slot configuration and ascending time slot and descending time slot configuration
Difference is more than or equal to the adjacent area of predetermined threshold value, when the downlink resource cell is more than ascending time slot configuration and downlink for descending time slot
Gap and the difference of ascending time slot configuration are more than or equal to the adjacent area of predetermined threshold value, and the peers cell is ascending time slot and downlink
The difference of time slot configuration is less than the adjacent area of predetermined threshold value.
2. the according to the method described in claim 1, it is characterized in that, buffer status report BSR that the base station is reported according to UE
And the cache information of the base station, after the resource requirement for determining uplink and downlink business, the method further includes:
When the resource of the serving cell of the UE disclosure satisfy that the channel resource demand, the base station is sent to the UE
RRC reconfiguration messages, to distribute the local resource of the serving cell to the UE.
3. the according to the method described in claim 2, it is characterized in that, buffer status report BSR that the base station is reported according to UE
And the cache information of the base station, determine the channel resource demand of uplink and/or downlink, including:
The base station determines that uplink caches byte, and determines downlink according to the cache information of the base station according to the BSR that UE is reported
Cache byte;
When the uplink caches byte and/or the down buffer storage byte more than the preset caching upper limit, the base station triggers letter
Road increases adjustment;
When the uplink caches byte and/or the down buffer storage byte less than preset caching lower limit, the base station triggers letter
Reduce adjustment in road.
4. according to the method described in claim 3, it is characterized in that, the serving cell in the UE disclosure satisfy that the letter
During road resource requirement, the base station sends RRC reconfiguration messages to the UE, is arrived with the local resource for distributing the serving cell
The UE, including:
When the base station triggers channel is reduced and adjusted, the base station sends RRC reconfiguration messages to the UE, with described in completion
The channel of UE reduces adjustment;
When the base station triggers channel increases and adjusts, if the ascending resource and/or downlink resource of the serving cell can expire
The foot channel resource demand, the base station send RRC reconfiguration messages to the UE, increase tune to complete the channel of the UE
It is whole.
5. according to the method described in claim 4, it is characterized in that, the base station is according to the channel of the uplink and/or downlink
The UE is switched to ascending resource cell, downlink resource cell or peers cell by resource requirement, including:
When the base station triggers channel increases and adjusts, if the ascending resource and/or downlink resource of the serving cell can not expire
The foot channel resource demand, and the ascending physical signal resource block PRB utilization rates of the serving cell are more than preset first and utilize
Rate threshold value and downlink PRB utilization rates are more than preset second utilization threshold, and the base station sends the first A5 to the UE and measures
Control message, so that the UE is switched to peers cell by triggering A5 events;
If the uplink PRB utilization rates are more than first utilization threshold and the downlink PRB utilization rates are less than or equal to described
Second utilization threshold, the base station sends the 2nd A5 to the UE and measures control message, so that the UE is by triggering A5 things
Part is switched to ascending resource cell;
If the downlink PRB utilization rates are more than second utilization threshold and the uplink PRB utilization rates are less than or equal to described
First utilization threshold, the base station sends the 3rd A5 to the UE and measures control message, so that the UE is by triggering A5 things
Part is switched to downlink resource cell.
6. a kind of resource scheduling device, which is characterized in that described device includes:
Resource requirement determination unit, for the buffer status report after terminal UE or base station initiating business request, reported according to UE
BSR and the cache information of the base station are accused, determines the channel resource demand of uplink and/or downlink;
Cell switch unit, for when the resource of the serving cell of the UE can not meet the channel resource demand, according to
The UE is switched to ascending resource cell, downlink resource cell or right by the channel resource demand of the uplink and/or downlink
Etc. resources cell;
Wherein, the ascending resource cell is ascending time slot more than descending time slot configuration and ascending time slot and descending time slot configuration
Difference is more than or equal to the adjacent area of predetermined threshold value, when the downlink resource cell is more than ascending time slot configuration and downlink for descending time slot
Gap and the difference of ascending time slot configuration are more than or equal to the adjacent area of predetermined threshold value, and the peers cell is ascending time slot and downlink
The difference of time slot configuration is less than the adjacent area of predetermined threshold value.
7. device according to claim 6, which is characterized in that described device further includes:Resource allocation unit is used for:
When the resource of the serving cell of the UE disclosure satisfy that the channel resource demand, send RRC to the UE and reconfigure
Message, to distribute the local resource of the serving cell to the UE.
8. device according to claim 7, which is characterized in that the resource requirement determination unit is specifically used for:
Determine that uplink caches byte, and determines down buffer storage byte according to the cache information of the base station according to the BSR that UE is reported;
When the uplink caches byte and/or the down buffer storage byte more than the preset caching upper limit, triggering channel, which increases, to be adjusted
It is whole;
When the uplink caches byte and/or the down buffer storage byte less than preset caching lower limit, triggering channel, which is reduced, to be adjusted
It is whole.
9. device according to claim 8, which is characterized in that the resource allocation unit is specifically used for:
When the base station triggers channel is reduced and adjusted, RRC reconfiguration messages are sent to the UE, to complete the channel of the UE
Reduce adjustment;
When the base station triggers channel increases and adjusts, if the ascending resource and/or downlink resource of the serving cell can expire
The foot channel resource demand, then send RRC reconfiguration messages to the UE, increases adjustment to complete the channel of the UE.
10. device according to claim 9, which is characterized in that the cell switch unit is specifically used for:
When the base station triggers channel increases and adjusts, if the ascending resource and/or downlink resource of the serving cell can not expire
The foot channel resource demand, and the ascending physical signal resource block PRB utilization rates of the serving cell are more than preset first and utilize
Rate threshold value and downlink PRB utilization rates are more than preset second utilization threshold, and the base station sends the first A5 to the UE and measures
Control message, so that the UE is switched to peers cell by triggering A5 events;
If the uplink PRB utilization rates are more than first utilization threshold and the downlink PRB utilization rates are less than or equal to described
Second utilization threshold, the base station sends the 2nd A5 to the UE and measures control message, so that the UE is by triggering A5 things
Part is switched to ascending resource cell;
If the downlink PRB utilization rates are more than second utilization threshold and the uplink PRB utilization rates are less than or equal to described
First utilization threshold, the base station sends the 3rd A5 to the UE and measures control message, so that the UE is by triggering A5 things
Part is switched to downlink resource cell.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611221432.0A CN108243505B (en) | 2016-12-26 | 2016-12-26 | Resource scheduling method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611221432.0A CN108243505B (en) | 2016-12-26 | 2016-12-26 | Resource scheduling method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108243505A true CN108243505A (en) | 2018-07-03 |
CN108243505B CN108243505B (en) | 2021-09-28 |
Family
ID=62702365
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611221432.0A Active CN108243505B (en) | 2016-12-26 | 2016-12-26 | Resource scheduling method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108243505B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109451589A (en) * | 2018-12-28 | 2019-03-08 | 中国移动通信集团江苏有限公司 | LTE carrier scheduling method, device, equipment and computer storage medium |
WO2020024280A1 (en) * | 2018-08-03 | 2020-02-06 | 富士通株式会社 | Methods and apparatuses for data transmission and reception |
CN111130668A (en) * | 2018-10-30 | 2020-05-08 | 中国电信股份有限公司 | Method, device and base station for processing uplink service |
CN111225335A (en) * | 2020-01-16 | 2020-06-02 | 重庆医药高等专科学校 | Method and system for transmitting child positioning data in real time based on Internet of things |
CN111356241A (en) * | 2018-12-21 | 2020-06-30 | 海能达通信股份有限公司 | Service priority processing system and method |
CN111918310A (en) * | 2020-08-10 | 2020-11-10 | 河北电信设计咨询有限公司 | User-centered cell networking method |
CN112996003A (en) * | 2019-12-12 | 2021-06-18 | 成都鼎桥通信技术有限公司 | Resource scheduling method, device and equipment |
CN113891412A (en) * | 2021-10-20 | 2022-01-04 | 中国联合网络通信集团有限公司 | Cell switching method, communication device and readable storage medium |
CN115211220A (en) * | 2021-02-10 | 2022-10-18 | 华为技术有限公司 | Method and device for reestablishing wireless link |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100189006A1 (en) * | 2009-01-29 | 2010-07-29 | Samsung Electronics Co., Ltd. | Method and system for computing and sending resource requests and avoiding deadlock situations in mobile communication system |
CN102064879A (en) * | 2010-11-30 | 2011-05-18 | 大唐移动通信设备有限公司 | Method, system and equipment for time division duplex communication |
CN102271336A (en) * | 2010-06-04 | 2011-12-07 | 中兴通讯股份有限公司 | System and method for semi-statically configuring uplink and downlink proportion |
CN102457895A (en) * | 2010-11-01 | 2012-05-16 | 中兴通讯股份有限公司 | Method and device for feeding back BSR (Buffer Status Reports) |
CN102802219A (en) * | 2011-05-27 | 2012-11-28 | 中兴通讯股份有限公司 | Coordinated-multiple-point (Comp)-based service switching method and system |
CN102833804A (en) * | 2011-06-13 | 2012-12-19 | 中兴通讯股份有限公司 | Mobile terminal and method and system for implementing handover of same |
CN103200613A (en) * | 2012-01-05 | 2013-07-10 | 中兴通讯股份有限公司 | Decision-making method for frequency balancing of cells in same sector, base station and wireless network controller |
WO2013132415A1 (en) * | 2012-03-05 | 2013-09-12 | Renesas Mobile Corporation | Method and apparatus for acquiring uplink resources |
CN103686879A (en) * | 2012-09-07 | 2014-03-26 | 华为技术有限公司 | Uplink and downlink ratio switch method and base station |
CN103945462A (en) * | 2013-01-17 | 2014-07-23 | 电信科学技术研究院 | Assistance service cell configuration method and device |
CN105517165A (en) * | 2014-09-25 | 2016-04-20 | 普天信息技术有限公司 | Resource distribution method and device of non-GBR bearer |
-
2016
- 2016-12-26 CN CN201611221432.0A patent/CN108243505B/en active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100189006A1 (en) * | 2009-01-29 | 2010-07-29 | Samsung Electronics Co., Ltd. | Method and system for computing and sending resource requests and avoiding deadlock situations in mobile communication system |
US20160014649A1 (en) * | 2009-01-29 | 2016-01-14 | Samsung Electronics Co., Ltd. | Method and system for computing and sending resource requests and avoiding deadlock situations in mobile communication system |
CN102271336A (en) * | 2010-06-04 | 2011-12-07 | 中兴通讯股份有限公司 | System and method for semi-statically configuring uplink and downlink proportion |
CN102457895A (en) * | 2010-11-01 | 2012-05-16 | 中兴通讯股份有限公司 | Method and device for feeding back BSR (Buffer Status Reports) |
CN102064879A (en) * | 2010-11-30 | 2011-05-18 | 大唐移动通信设备有限公司 | Method, system and equipment for time division duplex communication |
CN102802219A (en) * | 2011-05-27 | 2012-11-28 | 中兴通讯股份有限公司 | Coordinated-multiple-point (Comp)-based service switching method and system |
CN102833804A (en) * | 2011-06-13 | 2012-12-19 | 中兴通讯股份有限公司 | Mobile terminal and method and system for implementing handover of same |
CN103200613A (en) * | 2012-01-05 | 2013-07-10 | 中兴通讯股份有限公司 | Decision-making method for frequency balancing of cells in same sector, base station and wireless network controller |
WO2013132415A1 (en) * | 2012-03-05 | 2013-09-12 | Renesas Mobile Corporation | Method and apparatus for acquiring uplink resources |
CN103686879A (en) * | 2012-09-07 | 2014-03-26 | 华为技术有限公司 | Uplink and downlink ratio switch method and base station |
CN103945462A (en) * | 2013-01-17 | 2014-07-23 | 电信科学技术研究院 | Assistance service cell configuration method and device |
CN105517165A (en) * | 2014-09-25 | 2016-04-20 | 普天信息技术有限公司 | Resource distribution method and device of non-GBR bearer |
Non-Patent Citations (1)
Title |
---|
IPWIRELESS: "R1-073788 "MBSFN Downlink Optimised Broadcast for 3.84Mcps TDD"" * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020024280A1 (en) * | 2018-08-03 | 2020-02-06 | 富士通株式会社 | Methods and apparatuses for data transmission and reception |
CN111130668A (en) * | 2018-10-30 | 2020-05-08 | 中国电信股份有限公司 | Method, device and base station for processing uplink service |
CN111356241A (en) * | 2018-12-21 | 2020-06-30 | 海能达通信股份有限公司 | Service priority processing system and method |
CN109451589A (en) * | 2018-12-28 | 2019-03-08 | 中国移动通信集团江苏有限公司 | LTE carrier scheduling method, device, equipment and computer storage medium |
CN109451589B (en) * | 2018-12-28 | 2022-08-12 | 中国移动通信集团江苏有限公司 | LTE carrier scheduling method, device, equipment and computer storage medium |
CN112996003A (en) * | 2019-12-12 | 2021-06-18 | 成都鼎桥通信技术有限公司 | Resource scheduling method, device and equipment |
CN111225335A (en) * | 2020-01-16 | 2020-06-02 | 重庆医药高等专科学校 | Method and system for transmitting child positioning data in real time based on Internet of things |
CN111225335B (en) * | 2020-01-16 | 2021-01-08 | 重庆医药高等专科学校 | Method and system for transmitting child positioning data in real time based on Internet of things |
CN111918310A (en) * | 2020-08-10 | 2020-11-10 | 河北电信设计咨询有限公司 | User-centered cell networking method |
CN111918310B (en) * | 2020-08-10 | 2024-04-16 | 河北电信设计咨询有限公司 | Cell networking method with user as center |
CN115211220A (en) * | 2021-02-10 | 2022-10-18 | 华为技术有限公司 | Method and device for reestablishing wireless link |
CN113891412A (en) * | 2021-10-20 | 2022-01-04 | 中国联合网络通信集团有限公司 | Cell switching method, communication device and readable storage medium |
CN113891412B (en) * | 2021-10-20 | 2023-06-06 | 中国联合网络通信集团有限公司 | Cell switching method, communication device and readable storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN108243505B (en) | 2021-09-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108243505A (en) | A kind of resource regulating method and device | |
EP1730982B1 (en) | Delivering services in a wireless communications system | |
CN110139325B (en) | Network parameter tuning method and device | |
CN102215076B (en) | Trigger and carry out method, system and the equipment of frequency spectrum perception | |
CN104918283B (en) | A kind of jamming control method and equipment | |
JP2004242227A (en) | Mobile communication system, base station, radio network controller, and resource allocation control method to be used for same | |
CN104333892B (en) | A kind of micro-base station state adjustment method and device | |
CN103078704A (en) | Method and system for managing modulation code modes | |
CN103079235A (en) | Method and device for realizing load balance in long term evolution (LTE) system | |
CN104221423A (en) | Network-controlled adaptive terminal behavior managing high-network-load scenarios | |
CN103299569B (en) | The method, apparatus and system that radio bearer controls | |
EP3962171A1 (en) | User equipment centric wide area optimization method and system thereof | |
US8711766B2 (en) | SRB enhancement on HS-DSCH during cell change | |
CN103826263B (en) | A kind of network shunt method and apparatus | |
CN103686826B (en) | A kind of acceptance controlling method in carrier aggregation system | |
CN109121164A (en) | A kind of load equalization method and device | |
TW200803541A (en) | Wireless communication method and apparatus for selecting a channel type for a call | |
US20150208277A1 (en) | Congestion management | |
CN102124803B (en) | Base station, host station, wireless communication system and wireless communication method | |
CN104219768B (en) | A kind of customer service differentiated service management method and device | |
CN111010714B (en) | Method for improving conversation quality of LTE system edge VoLTE voice user | |
CN102387546A (en) | Method and device for regulating and controlling wireless resources | |
CN102547874B (en) | Scheduling method and device, and base station | |
CN104168601B (en) | wireless network congestion control method and device | |
EP2094041A2 (en) | Radio communication system, radio communication method, and base station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |