CN108242791B - 一种风电母线安装方法 - Google Patents

一种风电母线安装方法 Download PDF

Info

Publication number
CN108242791B
CN108242791B CN201710666631.0A CN201710666631A CN108242791B CN 108242791 B CN108242791 B CN 108242791B CN 201710666631 A CN201710666631 A CN 201710666631A CN 108242791 B CN108242791 B CN 108242791B
Authority
CN
China
Prior art keywords
wind power
tower
power bus
section
sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710666631.0A
Other languages
English (en)
Other versions
CN108242791A (zh
Inventor
殷浩翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haoxiang Electric Group Co ltd
Original Assignee
Haoxiang Electric Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haoxiang Electric Group Co ltd filed Critical Haoxiang Electric Group Co ltd
Priority to CN201710666631.0A priority Critical patent/CN108242791B/zh
Publication of CN108242791A publication Critical patent/CN108242791A/zh
Application granted granted Critical
Publication of CN108242791B publication Critical patent/CN108242791B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G5/00Installations of bus-bars
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Abstract

本发明的风电母线安装方法,根据风电母线总长度分别计算下塔架、中塔架、上塔架三段塔架内支撑点距离、数量,以及伸缩单元间隔距离、数量,在各段塔架法兰处预留连接尺寸,安装前、安装中、安装后分别检测绝缘电阻,并对全段风电母线进行耐压测试;操作简单,能够抵抗风力摇摆、振动负载,防止接头部分松动,提高风电母线系统运行安全系数、安装效率,运行可靠。

Description

一种风电母线安装方法
技术领域
本发明涉及一种风电母线安装方法。
背景技术
风能资源蕴含量巨大,风力发电行业技术的迅猛发展及广阔前景对母线槽产品带来了巨大的市场需求,风电母线槽产品为风力发电机组必不可少的供电系统,风力发电系统中的母线槽产品一般安装于相当于高层建筑的风塔中,风能提供能源的同时也造成风塔内母线槽产品整体振动和摆动,因而对风电母线槽安装技术要求比较高,以抵抗风力摇摆、振动负载,防止接头部分松动,提高风电母线系统运行安全系数。
发明内容
本发明所要解决的技术问题是,提供一种操作简单,能够提高安装效率,安全系数高,运行可靠的风电母线安装方法。
本发明的风电母线安装方法,包括以下步骤:
a.确认风电塔架总高度,根据风电母线总长度分别计算下塔架、中塔架、上塔架三段塔架内支撑点距离、数量,以及伸缩单元间隔距离、数量;
b.每段母线单元现场检测绝缘电阻;
c.风电母线分段安装在各段塔架内部,在各段塔架法兰处预留连接尺寸,复测各段塔架内风电母线绝缘电阻;
d.按由下至上的次序依次分段吊装各段塔架,定位,连接,紧固;
e.填充预留连接尺寸,全段风电母线连通,再次复测全段风电母线绝缘电阻,进行耐压测试;
f.连接下下两端电缆,紧固;
所述步骤b、c、e中绝缘电阻需≥20MΩ;
所述步骤a中风电母线每间隔40m设置一段伸缩单元。
本发明的风电母线安装方法,操作简单,能够抵抗风力摇摆、振动负载,防止接头部分松动,提高风电母线系统运行安全系数、安装效率,运行可靠。
实施方式
一种风电母线安装方法,包括以下步骤:
a.确认风电塔架总高度,根据风电母线总长度分别计算下塔架、中塔架、上塔架三段塔架内支撑点距离、数量,以及伸缩单元间隔距离、数量;
b.每段母线单元现场检测绝缘电阻;
c.风电母线分段安装在各段塔架内部,在各段塔架法兰处预留连接尺寸,复测各段塔架内风电母线绝缘电阻;
d.按由下至上的次序依次分段吊装各段塔架,定位,连接,紧固;
e.填充预留连接尺寸,全段风电母线连通,再次复测全段风电母线绝缘电阻,进行耐压测试;
f.连接下下两端电缆,紧固;
所述步骤b、c、e中绝缘电阻需≥20MΩ;
所述步骤a中风电母线每间隔40m设置一段伸缩单元。
1)按风电塔架(通常为三段:下塔架、中塔架、上塔架)的吊装顺序,分别将母线槽在塔架内先行安装好,注意应保证母线槽在塔架法兰处的预留定位尺寸,以满足后续塔架内母线的安装;
2)各塔架内的母线槽安装位置需沿着统一轴线进行,以满足塔架间连接的共轴性,该轴线需在安装前在塔架上统一设置相应标记进行标注,安装时可拉线指导;
3)每段塔架内母线槽安装完成后,需复测该段的绝缘电阻,确保符合产品标准要求;
4)将各塔架内母线槽设备与塔架同时吊装,由下至上依次吊装就位并紧固安装好塔架;
5)当三段塔架均已安装就位后,将塔架间预留安装填充段母线槽,填人空隙,通过快速连接器安装就位;
6)完成塔架内母线槽全段的安装后,再次复测整段母线槽的绝缘电阻,并进行耐压测试以确保符合产品标准;
本发明的风电母线安装方法,根据风电母线总长度分别计算下塔架、中塔架、上塔架三段塔架内支撑点距离、数量,以及伸缩单元间隔距离、数量,在各段塔架法兰处预留连接尺寸,安装前、安装中、安装后分别检测绝缘电阻,并对全段风电母线进行耐压测试;操作简单,能够抵抗风力摇摆、振动负载,防止接头部分松动,提高风电母线系统运行安全系数、安装效率,运行可靠。

Claims (3)

1.一种风电母线安装方法,包括以下步骤:
a.确认风电塔架总高度,根据风电母线总长度分别计算下塔架、中塔架、上塔架三段塔架内支撑点距离、数量,以及伸缩单元间隔距离、数量;
b.每段母线单元现场检测绝缘电阻;
c.风电母线分段安装在各段塔架内部,在各段塔架法兰处预留连接尺寸,复测各段塔架内风电母线绝缘电阻;
d.按由下至上的次序依次分段吊装各段塔架,定位,连接,紧固;
e.填充预留连接尺寸,全段风电母线连通,再次复测全段风电母线绝缘电阻,进行耐压测试;
f.连接下下两端电缆,紧固。
2.根据权利要求1所述风电母线安装方法,其特征在于:所述步骤b、c、e中绝缘电阻需≥20MΩ。
3.根据权利要求1所述风电母线安装方法,其特征在于:所述步骤a中风电母线每间隔40m设置一段伸缩单元。
CN201710666631.0A 2017-08-07 2017-08-07 一种风电母线安装方法 Active CN108242791B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710666631.0A CN108242791B (zh) 2017-08-07 2017-08-07 一种风电母线安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710666631.0A CN108242791B (zh) 2017-08-07 2017-08-07 一种风电母线安装方法

Publications (2)

Publication Number Publication Date
CN108242791A CN108242791A (zh) 2018-07-03
CN108242791B true CN108242791B (zh) 2024-04-09

Family

ID=62700808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710666631.0A Active CN108242791B (zh) 2017-08-07 2017-08-07 一种风电母线安装方法

Country Status (1)

Country Link
CN (1) CN108242791B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111211527B (zh) * 2020-01-16 2021-11-02 凯宸能源科技(天津)有限公司 一种风电塔筒内的电力输出系统

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3820057A (en) * 1972-02-22 1974-06-25 Telemecanique Electrique Busway connector
AU4546889A (en) * 1988-11-22 1990-05-31 P & B Electrice Pty. Ltd. Bus bar
JP2005340582A (ja) * 2004-05-28 2005-12-08 Toshiba Corp 電気機器
CN201230182Y (zh) * 2008-05-29 2009-04-29 施耐德电气(中国)投资有限公司 风电导电装置
CN102545117A (zh) * 2010-12-18 2012-07-04 仝志红 新型电容型绝缘风电母线布置系统
CN103474928A (zh) * 2013-09-11 2013-12-25 黄吉祥 一种新型风力发电机组母线槽
CN104134959A (zh) * 2014-08-14 2014-11-05 陕西化建工程有限责任公司 全模铸式中压汇流母线的安装方法
CN106640545A (zh) * 2016-12-13 2017-05-10 北京金风科创风电设备有限公司 过渡连接件、混凝土塔架、混凝土塔架建造方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3820057A (en) * 1972-02-22 1974-06-25 Telemecanique Electrique Busway connector
AU4546889A (en) * 1988-11-22 1990-05-31 P & B Electrice Pty. Ltd. Bus bar
JP2005340582A (ja) * 2004-05-28 2005-12-08 Toshiba Corp 電気機器
CN201230182Y (zh) * 2008-05-29 2009-04-29 施耐德电气(中国)投资有限公司 风电导电装置
CN102545117A (zh) * 2010-12-18 2012-07-04 仝志红 新型电容型绝缘风电母线布置系统
CN103474928A (zh) * 2013-09-11 2013-12-25 黄吉祥 一种新型风力发电机组母线槽
CN104134959A (zh) * 2014-08-14 2014-11-05 陕西化建工程有限责任公司 全模铸式中压汇流母线的安装方法
CN106640545A (zh) * 2016-12-13 2017-05-10 北京金风科创风电设备有限公司 过渡连接件、混凝土塔架、混凝土塔架建造方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
浅谈风电场电气一次系统设计;张娜;;科技风(第23期);全文 *
风力发电塔筒大容量接地线装置创新设计;朱锴年;;机电产品开发与创新(第03期);全文 *

Also Published As

Publication number Publication date
CN108242791A (zh) 2018-07-03

Similar Documents

Publication Publication Date Title
US7199485B2 (en) Wind turbine with current conducting means, which are pre-assembled in the tower
AU2009237750B2 (en) Wind energy system comprising busbars
CN102761083B (zh) 安装线缆的布置结构和方法
CN101592133B (zh) 塔安装之前将风力涡轮机设备定位在基础上的固定装置
US10047725B2 (en) Ladder attachment system for a wind turbine
JP6921009B2 (ja) 風力発電設備のケーブルインターフェース
CN108242791B (zh) 一种风电母线安装方法
US20200088168A1 (en) A wind turbine with a cable supporting structure
CN103701071A (zh) 带电处理引流线线夹螺栓的工具及其带电作业的方法
CN102629744B (zh) 杆塔放、紧线作业平台
CN201865410U (zh) 变电站可卸式组合防护隔板
CN103218941B (zh) 室内配电线路模拟实训装置
CN201883932U (zh) 抱箍式垂直绝缘单梯
CN202258580U (zh) 110kV线路耐张复合绝缘子串进出线架
CN207069293U (zh) 一种采用复合绝缘材料制成的配电构架
CN104184071A (zh) 无人机装设110kV-500kV线路安全地线装置
CN203179365U (zh) 室内配电线路模拟实训装置
CN102064483A (zh) 塔架检修的安全装置
CN207020217U (zh) 含t型终端的电缆试验辅助工具
CN206575071U (zh) 一种330kV户外GIS配电装置树形门架出线结构
CN205544114U (zh) 用于引导架空出线构架上出线方向的活络线夹
CN105301295B (zh) 室内电缆进线变压器绕组短接装置
CN219181109U (zh) 电缆支撑结构、塔筒以及风力发电机组
CN204175175U (zh) 线路塔用电缆检修梯
CN208835590U (zh) 一种带有操作平台的电缆终端杆

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant