CN108238543A - A kind of assembly moulding bed and the method for stacking vertical prefabricated components - Google Patents

A kind of assembly moulding bed and the method for stacking vertical prefabricated components Download PDF

Info

Publication number
CN108238543A
CN108238543A CN201711416231.0A CN201711416231A CN108238543A CN 108238543 A CN108238543 A CN 108238543A CN 201711416231 A CN201711416231 A CN 201711416231A CN 108238543 A CN108238543 A CN 108238543A
Authority
CN
China
Prior art keywords
vertical
bolt
prefabricated components
main frame
frame body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711416231.0A
Other languages
Chinese (zh)
Inventor
张延辉
秦立标
谈宏堃
吴炜程
张俊杰
季方
刘闪闪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201711416231.0A priority Critical patent/CN108238543A/en
Publication of CN108238543A publication Critical patent/CN108238543A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H3/00Storage means or arrangements for workshops facilitating access to, or handling of, work tools or instruments
    • B25H3/04Racks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The present invention relates to a kind of assembled moulding beds, including main frame body and several bolt fixing devices, the main frame body includes two vertical supportings and at least two horizontal pin kellies, forms horizontal card slot between adjacent horizontal pin kelly, is the stacking space of vertical prefabricated components between two vertical supportings.Each bolt fixing device includes bolt, the positioning sealing plate being fixed on bolt, and the diameter of the bolt is less than the height of horizontal card slot, and one end of bolt is pierced by from horizontal card slot, and passes through fastening of structure realization of the locating piece with location hole cooperation to bolt.The invention further relates to the methods that vertical prefabricated components are stacked using above-mentioned assembled moulding bed.The present invention can realize the vertical prefabricated components for stacking plurality of specifications, avoid the random stacking of vertical prefabricated components, reduce the damage of component, reduce construction cost, improve field and hold field looks.

Description

A kind of assembly moulding bed and the method for stacking vertical prefabricated components
Technical field
The method of vertical prefabricated components is stacked the present invention relates to assembled moulding bed and using assembled moulding bed, belongs to construction skill Art field.
Background technology
With the fast development of construction industry, Green civilization construction requirement steps up, and construction building construction technology is not yet , there are more and more prefabrications in disconnected innovation.In assembled architecture engineering, the prefabricated components type being related to is numerous More, the specification of vertical prefabricated components is again different.At present, China starts late to the research foreign countries relatively of assembled architecture, Fall behind relatively, the research of assembled arthitecutral structure antidetonation and construction technology is focused on, to the material pile of construction site or component factory It is less to put problem concern.
Construction site or component factory for the vertical prefabricated components involved in engineering due to there is no unified planning, for marching into the arena Or the stacking of the vertical prefabricated components of machine-shaping is random strong, occupied space is excessive, causes vertical prefabricated components crack, unfilled corner etc. It is serious to damage defect, field holds field looks confusion, and arbitrarily stacks and vertical prefabricated components suspension centre pole is caused to be unfavorable for on-site hoisting, leads Cause lifting work efficiency low, lifting process component damage takes place frequently.Construction cost is increased, and cause a hidden trouble to construction quality indirectly.Always It, existing stacking mode can not meet the stacking requirement of vertical prefabricated components in assembled architecture.Therefore, it is necessary to be directed to The problem of prefabricated components are stacked is taken with targetedly method and corresponding device, can be only achieved expected construction effect.
Invention content
The technical problems to be solved by the invention are to provide a kind of assembled moulding bed, can be used in stacking the perpendicular of plurality of specifications To prefabricated components, and can be according to the random assembling combination of quantity and specification of vertical prefabricated components.
To solve the above-mentioned problems, the technical solution adopted by the present invention is as follows:
A kind of assembly moulding bed, including main frame body and several bolt fixing devices,
The main frame body includes two symmetrically arranged vertical supportings and at least two are from top to bottom installed in two vertically Horizontal pin kelly between support forms horizontal card slot between adjacent horizontal pin kelly, is perpendicular between two vertical supportings To the stacking space of prefabricated components;
Each bolt fixing device includes bolt, vertical positioning sealing plate and the locating piece being fixed on bolt, the bolt Diameter be less than the height of horizontal card slot, one end of bolt opens up location hole and is pierced by from horizontal card slot, positioning sealing plate with it is horizontal Bolt kelly is in contact, and the locating piece is plugged in location hole.
Further, in order to make main frame body supporting & stablizing, the vertical supporting is triangular support configurations, two vertical supportings Between bottom affixed two it is horizontally-supported, affixed two diagonal braces, the horizontal pin kelly are fixed in perpendicular between two vertical supportings To the top of support.
Further, in order to facilitate handling, the top of two vertical supportings is installed with lifting lug respectively.
Further, it can be slided between horizontal card slot for the ease of bolt, the bolt opens up cutting for one end of location hole Face is rectangular, and the rectangular height is slightly less than the height of horizontal card slot, and the location hole vertically opens up.
Further, in order to realize that locating piece is inserted into after location hole to the fastening effect of bolt, the location hole is rectangular opening, Its length direction is extended to the axial consistent and ecto-entad of bolt in horizontal card slot.
Further, the locating piece being plugged in location hole is wedge-shaped iron block.
Further, the height of the main frame body is the half of vertical prefabricated components height.
The principle of assembly moulding bed of the invention is that assembled moulding bed is assembled by main frame body and bolt fixing device, and scene can Bolt fixing device is fastened on main frame body one by one according to the dimensions of Prefabricated vertical member and stacks vertical prefabricated components, it is real It is neatly packed component is showed, space is small occupied by stacking, and can increase this assembled moulding bed device according to the number of components;Bolt Fixing device includes bolt, positioning sealing plate and locating piece, realizes that bolt fixing device exists using the cooperation of locating piece and location hole Fastening in horizontal card slot, is conveniently operated.
The invention further relates to the methods that vertical prefabricated components are stacked using above-mentioned assembled moulding bed, include the following steps:
S1, processing main frame body, main frame body can weld at the scene it is integral, can also be after the direct machine-shaping of processing factory Then transport hangs main frame body 1 on ground library top plate or bed course to scene;
S2, long flitch bolster is placed between the bottom of two vertical supportings according to the specification of vertical prefabricated components Block;
S3, an assembled bolt fixing device, bolt are opened up in the horizontal card slot of one end insertion of location hole, slide bolt It is made to be close to vertical supporting, locating piece is then inserted into location hole and is fastened;
First block of S4, lifting vertical prefabricated component, its bottom is placed in long flitch pillow block, makes bolt from vertical prefabricated The hollow part of component passes through, and flitch cushion block is placed between the top of bolt and vertical prefabricated components, while makes vertical prefabricated structure Part abuts horizontal pin kelly, then another assembled bolt fixing device, and horizontal card is inserted into one end that bolt is set to location hole In slot, against first block of vertical prefabricated component after slip, and wood is placed between bolt and first block of vertical prefabricated component Then square cushion block is inserted into locating piece fastening in location hole;
S5, step S4 is repeated, until vertical prefabricated components are piled in the stacking space of main frame body;
S6, the quantity that main frame body is determined according to the stacking demand of vertical prefabricated components, then repeat step S1 to S5, until All Prefabricated vertical member stackings finish.
Further, affixed two horizontally-supported, two vertical branch between the bottom of two vertical supportings of the main frame body Affixed two diagonal braces, the horizontal pin kelly are fixed in the top of vertical supporting between support;In step S2, long flitch pillow block Highly it is slightly larger than horizontally-supported height.
Further, in the method for stacking vertical prefabricated components, the top of two vertical supportings is installed with lifting lug respectively.
To sum up, compared with prior art, the beneficial effects of the present invention are:
1st, assembled moulding bed of the invention can realize the vertical prefabricated components for stacking plurality of specifications, avoid vertical prefabricated structure The random stacking of part, reduces the damage of component, reduces construction cost, improves field and holds field looks.
2nd, assembled jig structure of the invention is simply firm, directly can lie against ground using lifting lug integral hoisting after marching into the arena On library top plate or bed course, convenient, flexible mobile moulding bed position lifts simple and reliable safety.
3rd, stacking method of the invention facilitates on-site hoisting, substantially increases lifting work efficiency, reduces during lifting by crane Component damage increases the safety of lifting and construction.
4th, stacking method using the present invention, by placing flitch pad between the top of bolt and vertical prefabricated components Block and the placement flitch cushion block between bolt and vertical prefabricated components, can reduce abrasion of the bolt to prefabricated components, into one Step reduces lifting process component damage.
Description of the drawings
Fig. 1 is the structure diagram of the present invention one preferred embodiment of assembled moulding bed.
Fig. 2 is the structure diagram of a preferred embodiment of bolt fixing device in the present invention.
Specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.According to following explanation, sheet The purpose, technical scheme and advantage of invention will be apparent from.It should be noted that described embodiment is the preferred of the present invention Embodiment, instead of all the embodiments.
With reference to shown in Fig. 1, a kind of assembly moulding bed, including main frame body 1 and several bolt fixing devices 6.
The main frame body 1 includes two symmetrically arranged vertical supportings 7 and at least two are from top to bottom installed in two and erect To the horizontal pin kelly 5 supported between 7, horizontal card slot 5a, two vertical supportings 7 are formed between adjacent horizontal pin kelly 5 Between be vertical prefabricated components stacking space.
The highly preferred half for vertical prefabricated components height of the main frame body 1 is conducive to prefabricated vertical in laydown area Component top installs mating pylon.Main frame body 1 is preferably welded using square steel or channel steel.
In order to make main frame body supporting & stablizing, preferably, the vertical supporting 7 use triangular support configurations, two Affixed two horizontally-supported 3 between the bottom of vertical supporting 7, affixed two diagonal braces 4 between two vertical supportings, the horizontal pin Kelly 5 is fixed in the top of vertical supporting 7.
With reference to shown in Fig. 2, each bolt fixing device 6 include bolt a, the vertical positioning sealing plate b being fixed on bolt a and The diameter of locating piece d, the bolt a are less than the height of horizontal card slot 5a, can arbitrarily to be slided after the horizontal card slot of bolt a insertions It is dynamic, according to the spacing of the two neighboring bolt a of Prefabricated vertical member size adjusting.One end of bolt a opens up location hole e and from level Card slot 5a is pierced by, and positioning sealing plate b is in contact with horizontal pin kelly 5, and the locating piece d is plugged in location hole e.Bolt a is excellent Using steel pipe, length of steel pipe is unsuitable long, is advisable with the half of Prefabricated vertical member width, convenient to the same of component handling for choosing When, and can meet the needs of component fixation and finished product protection.
With reference to figure 1, in order to facilitate handling, the top of two vertical supportings 7 is installed with lifting lug 2 respectively.
Continuing with Fig. 2, the section that the bolt a opens up one end of location hole e is rectangular, and the rectangular height is smaller In the height of horizontal card slot 5a, the location hole e is vertically opened up.
In order to realize that locating piece is inserted into after location hole to the fastening effect of bolt, the location hole e is rectangular opening, length Direction is extended to the axial consistent and ecto-entads of bolt a in horizontal card slot 5a.Locating piece d and positioning sealing plate b in location hole e Common clamping, the end of bolt a is made to be fastened in horizontal card slot 5a.The locating piece d being plugged in location hole e is preferably wedge Shape iron block.
The principle of assembly moulding bed of the invention is that assembled moulding bed is assembled by main frame body and bolt fixing device, and scene can Bolt fixing device is fastened on main frame body one by one according to the dimensions of Prefabricated vertical member and stacks vertical prefabricated components, it is real It is neatly packed component is showed, space is small occupied by stacking, and can increase this assembled moulding bed device according to the number of components;Bolt Fixing device includes bolt, positioning sealing plate and locating piece, realizes that bolt fixing device exists using the cooperation of locating piece and location hole Fastening in horizontal card slot, is conveniently operated.
The invention also discloses the methods that vertical prefabricated components are stacked using above-mentioned assembled moulding bed, include the following steps:
S1, processing main frame body 1, main frame body can weld at the scene it is integral, can also be in the direct machine-shaping of processing factory After transport to scene, then main frame body 1 is hung on ground library top plate or bed course;
S2, long flitch bolster is placed between the bottom of two vertical supportings 7 according to the specification of vertical prefabricated components Block (not shown);
S3, an assembled bolt fixing device 6, bolt a is opened up in the horizontal card slot 5a of one end insertion of location hole e, sliding Dynamic bolt a makes it be close to vertical supporting 7, and locating piece d is then inserted into location hole e and is fastened;
First block of S4, lifting vertical prefabricated component, its bottom is placed in long flitch pillow block, makes bolt a from vertical pre- The hollow part of component processed passes through, and flitch cushion block (not shown) is placed between the top of bolt a and vertical prefabricated components, together When make vertical prefabricated components abut horizontal pin kelly 5;Then another assembled bolt fixing device, location hole e is set by bolt One end be inserted into horizontal card slot 5a, against first block of vertical prefabricated component after slip, and bolt a with first piece vertically Flitch cushion block (not shown) is placed between prefabricated components, locating piece d fastenings are then inserted into location hole e;
S5, step S4 is repeated, until vertical prefabricated components are piled in the stacking space of main frame body 1;
S6, the quantity that main frame body is determined according to the stacking demand of vertical prefabricated components, then repeat step S1 to S5, until All Prefabricated vertical member stackings finish.
Further, affixed two horizontally-supported 3 between the bottom of two vertical supportings 7 of the main frame body 1, two vertical Affixed two diagonal braces 4, the horizontal pin kelly 5 are fixed in the top of vertical supporting 7 between support;In step S2, long flitch pillow The height of cushion block is slightly larger than horizontally-supported 3 height.
Further, in order to facilitate handling, the top of two vertical supportings 7 is installed with lifting lug 2 respectively.
When prefabricated components vertical from handling on assembled moulding bed are needed in work progress, hanging for vertical prefabricated components is first hung Then point pulls out the lifting of flitch cushion block, then removes corresponding bolt fixing device.
The above is only the description explanation of the preferred embodiment of the present invention, and not limiting the scope of the present invention, shows So, any those skilled in the art are based on above-described embodiment, can readily occur in replacement or variation to obtain other implementations Example, these are covered by the protection scope of the present invention.

Claims (10)

1. a kind of assembly moulding bed, it is characterised in that:Including main frame body (1) and several bolt fixing devices (6),
The main frame body (1) is from top to bottom installed in two including two symmetrically arranged vertical supportings (7) and at least two and erects To the horizontal pin kelly (5) supported between (7), horizontal card slot (5a) is formed between adjacent horizontal pin kelly (5), two perpendicular To support (7) between be vertical prefabricated components stacking space;
Each bolt fixing device (6) is fixed in positioning sealing plate (b) and locating piece on bolt (a) including bolt (a), vertically (d), the diameter of the bolt (a) is less than the height of horizontal card slot (5a), and one end of bolt (a) opens up location hole (e) and from water Flat card slot (5a) is pierced by, and positioning sealing plate (b) is in contact with horizontal pin kelly (5), and the locating piece (d) is plugged in location hole (e) in.
2. assembly moulding bed according to claim 1, it is characterised in that:
The vertical supporting (7) is triangular support configurations, between the bottom of two vertical supportings (7) affixed two it is horizontally-supported (3), affixed two diagonal braces (4), the horizontal pin kelly (5) are fixed in the top of vertical supporting (7) between two vertical supportings.
3. assembly moulding bed according to claim 1, it is characterised in that:
The top of two vertical supportings (7) is installed with lifting lug (2) respectively.
4. assembly moulding bed according to claim 1, it is characterised in that:
The section that the bolt (a) opens up one end of location hole (e) is rectangular, and the rectangular height is slightly less than horizontal card slot The height of (5a), the location hole (e) vertically open up.
5. assembly moulding bed according to claim 4, it is characterised in that:
The location hole (e) is rectangular opening, and length direction extends to horizontal card slot with the axial consistent and ecto-entad of bolt (a) In (5a).
6. assembly moulding bed according to claim 5, it is characterised in that:
The locating piece (d) being plugged in location hole (e) is wedge-shaped iron block.
7. assembly moulding bed according to claim 1, it is characterised in that:
The height of the main frame body (1) is the half of vertical prefabricated components height.
A kind of 8. method for stacking vertical prefabricated components, which is characterized in that include the following steps:
S1, processing main frame body (1) as described in claim 1, main frame body (1) can weld at the scene it is integral, can also be After the direct machine-shaping of processing factory then transport hangs main frame body (1) on ground library top plate or bed course to scene;
S2, long flitch pillow block is placed between the bottom of two vertical supportings (7) according to the specification of vertical prefabricated components;
Bolt (a) is opened up one end of location hole (e) by S3, an assembled bolt fixing device (6) as described in claim 1 It is inserted into horizontal card slot (5a), slide bolt (a) makes it be close to vertical supporting (7), and locating piece is then inserted into location hole (e) (d) it and fastens;
First block of S4, lifting vertical prefabricated component, its bottom is placed in long flitch pillow block, makes bolt (a) from vertical prefabricated The hollow part of component passes through, and flitch cushion block is placed between the top of bolt (a) and vertical prefabricated components, while makes vertical prefabricated Component abuts horizontal pin kelly (5);Then another assembled bolt fixing device, one end that bolt is set to location hole (e) is inserted Enter in horizontal card slot (5a), against first block of vertical prefabricated component after slip, and it is vertical prefabricated with first piece in bolt (a) Flitch cushion block is placed between component, locating piece (d) is then inserted into location hole (e) fastens;
S5, step S4 is repeated, until vertical prefabricated components are piled in the stacking space of main frame body (1);
S6, the quantity that main frame body is determined according to the stacking demand of vertical prefabricated components, then repeat step S1 to S5, until all Prefabricated vertical member stacking finish.
9. the method according to claim 8 for stacking vertical prefabricated components, it is characterised in that:
Affixed two horizontally-supported (3), two vertical supportings between the bottom of two vertical supportings (7) of the main frame body (1) Between affixed two diagonal braces (4), the horizontal pin kelly (5) is fixed in the top of vertical supporting (7);In step S2, long flitch The height of pillow block is slightly larger than the height of horizontally-supported (3).
10. the method for the vertical prefabricated components of stacking according to claim 8 or claim 9, it is characterised in that:
The top of two vertical supportings (7) is installed with lifting lug (2) respectively.
CN201711416231.0A 2017-12-25 2017-12-25 A kind of assembly moulding bed and the method for stacking vertical prefabricated components Pending CN108238543A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711416231.0A CN108238543A (en) 2017-12-25 2017-12-25 A kind of assembly moulding bed and the method for stacking vertical prefabricated components

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711416231.0A CN108238543A (en) 2017-12-25 2017-12-25 A kind of assembly moulding bed and the method for stacking vertical prefabricated components

Publications (1)

Publication Number Publication Date
CN108238543A true CN108238543A (en) 2018-07-03

Family

ID=62700249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711416231.0A Pending CN108238543A (en) 2017-12-25 2017-12-25 A kind of assembly moulding bed and the method for stacking vertical prefabricated components

Country Status (1)

Country Link
CN (1) CN108238543A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109665434A (en) * 2019-01-29 2019-04-23 中建八局轨道交通建设有限公司 Negative endless tube piece removes suspender and its method for dismounting
CN110434819A (en) * 2019-08-01 2019-11-12 上海建工七建集团有限公司 Vertical plate prefabricated member piling bin and its installation method
CN112372613A (en) * 2020-11-02 2021-02-19 上海宝冶工程技术有限公司 Novel assembled prefabricated component support frame device
CN113524420A (en) * 2021-07-26 2021-10-22 四川能达工程检测有限公司 Automatic form removal device of highway engineering concrete test block

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2960865B1 (en) * 2010-06-04 2014-01-10 Prefac Beton Environnement RADIATION MODULE
CN203865359U (en) * 2014-04-11 2014-10-08 沈阳卫德住宅工业化科技有限公司 Storage facility for housing industrialization pre-cast concrete component
CN107081725A (en) * 2017-05-27 2017-08-22 中建三局集团有限公司 Precast shear wall stacking adapter
CN206677931U (en) * 2017-02-28 2017-11-28 上海宝冶集团有限公司 Prefabricated components piling bin

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2960865B1 (en) * 2010-06-04 2014-01-10 Prefac Beton Environnement RADIATION MODULE
CN203865359U (en) * 2014-04-11 2014-10-08 沈阳卫德住宅工业化科技有限公司 Storage facility for housing industrialization pre-cast concrete component
CN206677931U (en) * 2017-02-28 2017-11-28 上海宝冶集团有限公司 Prefabricated components piling bin
CN107081725A (en) * 2017-05-27 2017-08-22 中建三局集团有限公司 Precast shear wall stacking adapter

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109665434A (en) * 2019-01-29 2019-04-23 中建八局轨道交通建设有限公司 Negative endless tube piece removes suspender and its method for dismounting
CN110434819A (en) * 2019-08-01 2019-11-12 上海建工七建集团有限公司 Vertical plate prefabricated member piling bin and its installation method
CN112372613A (en) * 2020-11-02 2021-02-19 上海宝冶工程技术有限公司 Novel assembled prefabricated component support frame device
CN113524420A (en) * 2021-07-26 2021-10-22 四川能达工程检测有限公司 Automatic form removal device of highway engineering concrete test block

Similar Documents

Publication Publication Date Title
CN108238543A (en) A kind of assembly moulding bed and the method for stacking vertical prefabricated components
CN204199297U (en) Bracing members axle force compensating device
CN211286281U (en) High-quality energy-saving steel structure box column component
CN205954716U (en) A counterforce device for foundation pile resistance to compression static test
CN104810144A (en) Iron core laminating process
CN208961968U (en) A kind of wall column reinforcing bar stacking platform
CN206376589U (en) A kind of stage bracket structure
CN205901240U (en) Height -adjustable frame of reducing expenditure for cable pit
CN214870505U (en) Stacking frame for placing vertical prefabricated components
CN211392064U (en) Storage and transportation goods shelf
CN208994149U (en) A kind of transport frock
CN212859430U (en) Adjustable prefabricated component storage rack
CN206405527U (en) A kind of saw blade storage supporting mechanism
CN204663027U (en) For the bracing or strutting arrangement that rack is installed
CN204326613U (en) A kind of 110kV transformer station installation component
CN105040991B (en) The supporting construction and method for supporting of large-span steel segmental hoisting
CN204669949U (en) A kind ofly test special edible fungus culturing layer frame
CN205418514U (en) Couple shaped steel pipe fixed baseplate
CN207266467U (en) A kind of hanging set of outdoor crate
CN206467990U (en) Adjustable truss independence support system
CN209553912U (en) A kind of assembled architecture vertical member storage rack
CN220283291U (en) Assembled floor conveyer
CN210823254U (en) Wallboard storage rack
CN211622858U (en) Safety protection net is used in municipal administration
CN206667925U (en) A kind of hedge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180703

WD01 Invention patent application deemed withdrawn after publication