CN108237701A - A kind of processing for combining wind-proof keel and installation method - Google Patents
A kind of processing for combining wind-proof keel and installation method Download PDFInfo
- Publication number
- CN108237701A CN108237701A CN201810026362.6A CN201810026362A CN108237701A CN 108237701 A CN108237701 A CN 108237701A CN 201810026362 A CN201810026362 A CN 201810026362A CN 108237701 A CN108237701 A CN 108237701A
- Authority
- CN
- China
- Prior art keywords
- keel
- processing
- proof
- joist
- secondary joist
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C69/00—Combinations of shaping techniques not provided for in a single one of main groups B29C39/00 - B29C67/00, e.g. associations of moulding and joining techniques; Apparatus therefore
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29L—INDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
- B29L2031/00—Other particular articles
- B29L2031/10—Building elements, e.g. bricks, blocks, tiles, panels, posts, beams
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Building Environments (AREA)
Abstract
The present invention provides a kind of processing for combining wind-proof keel and installation method includes:Materials determine step:According to the real area of external wall to be installed, the piecemeal area of external wall to be installed, determine main joist, along wall surrounding L abnormity secondary joist and intermediate mesh grid secondary joist length, specially:Determine the real area S of external wall to be installed1, wherein S1=A × B determines the piecemeal area S of external wall to be installed2, wherein S2=a × b determines main joist length L1=K1S1, wherein K1=1.05~1.2;Determine secondary joist length L2=K2×S1/bL1‑A/L1, K2=1.05~1.1, determine the length L of grid secondary joist3=K1(S1/a+S1/b)‑(A+B),K1=1.05~1.2;Keel procedure of processing, the length for each keel for determining to determine in step according to materials are simultaneously processed;Keel combination step:Main joist, L abnormity secondary joist and grid secondary joist are combined to form combination wind-proof keel.The combination wind-proof keel produced using this method directly monoblock type can be disposably installed in place, and improved the efficiency of processing and installation, alleviated working strength, and consistency is good.
Description
Technical field
The present invention relates to building field, particularly a kind of processing for combining wind-proof keel and installation method.
Background technology
Building energy conservation can improve indoor thermal environment, it be influence the cold and hot feeling of human body environmental factor, suitable interior
Thermal environment can make human body be easy to keep balance, so as to make one to generate comfort.Building energy conservation can improve indoor thermal environment, accomplish
It is cool in summer and warm in winter, to meeting the Heating Residential Buildings of power conservation requirement, thermal insulation of roof ability be about general non-energy saving building 1.5~
2.6 times, the insulating power of exterior wall is about 2.0~3.0 times of non-energy saving building, and window is about 1.3~1.6 times, it can be seen that, outside
The insulating power of wall plays the role of the effect of building energy conservation very important.At present, the heat preservation construction of exterior wall is usually used
Wind-proof keel are installed as first of insulating layer, the installation methods of keel is all to have measured size by worker, then by keel
It is installed on exterior wall one by one, using this method great work intensity, time-consuming, and consistency is poor.
Invention content
A kind of method of quick production and processing combination wind-proof keel is provided in order to solve the problem of the prior art present invention,
A kind of processing for combining wind-proof keel and installation method, which is characterized in that including:Materials determine step:It is built according to be installed
Build the real area of exterior wall, the piecemeal area of external wall to be installed, determine main joist, along wall surrounding L abnormity secondary joist and
The length of the grid secondary joist of intermediate mesh, specially:Determine the real area S of external wall to be installed1, wherein S1=A × B,
Determine the piecemeal area S of external wall to be installed2, wherein S2=a × b determines main joist length L1=K1S1, wherein K1=1.05
~1.2;Determine secondary joist length L2=K2×S1/bL1-A/L1, K2=1.05~1.1, determine the length L of grid secondary joist3=K1
(S1/a+S1/b)-(A+B),K1=1.05~1.2;Keel procedure of processing determines keel length determining in step according to materials,
Main joist, L abnormity secondary joist and grid secondary joist are processed respectively;Keel combination step:By main joist, L abnormity time dragons
Bone and grid secondary joist are combined to form combination wind-proof keel.
In a preferred embodiment, the number n for determining installation node is further included1=K2S1/L4L1, wherein the length of installation node
It spends for L4, node is installed and includes mounting rod, installed part, screw and nut.
In a preferred embodiment, the infall keel branch of the main joist and L abnormity secondary joist and grid secondary joist
Support is connected, the number n of the keel rest2=2K3S1/ ab, wherein K3=0.5~1.1.
In a preferred embodiment, the keel procedure of processing is included in keel processing machine by main joist, L abnormity secondary joists
And the length of grid secondary joist is inputted as parameter preset, in the incremental encoder of the discharging transmission side of keel processing machine examining
Survey keel transmission speed and keel transmission displacement.
In a preferred embodiment, the keel procedure of processing further includes, and when keel processing machine is run, keel at the uniform velocity go out
Material, after keel discharging is detected, control system starts incremental encoder and detects keel transmission speed and keel transmission in real time
Displacement, and by displacement and speed real-time display on the display screen of keel processing machine, when the displacement that discharges reaches parameter preset,
Keel processing machine is closed, and the keel processed are subjected to blanking operation.
In a preferred embodiment, the keel combination step is included with outside a keel installation platform simulation building to be installed
Main joist is placed on keel installation platform by wall, with keel rest in preset crossover location by L abnormity secondary joist and grid
Secondary joist is fixed with main joist.
In a preferred embodiment, after the keel combination step, a keel packaging step, the keel packet are further included
Filling step will combine in wind-proof keel progress entire package to packing case.
In a preferred embodiment, a keel installation step, the keel installation are further included after the keel packaging step
Combination wind-proof keel entirety from packing case is taken out in step and is disposably installed on external wall to be installed.
The combination wind-proof keel produced using this method directly monoblock type can be disposably installed in place, and improve processing
With the efficiency of installation, working strength, and the good stability of holding consistency are alleviated.And the materials of the present invention determine that step can
Precisely to determine that materials avoid wasting.And combination wind-proof keel using the present invention can play good Windproof thermal insulation work(
Can, accomplish real building energy conservation and improve the effect of indoor thermal environment.
Description of the drawings
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or it will show below
There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
The embodiment of application, for those of ordinary skill in the art, without creative efforts, can also basis
The attached drawing of offer obtains other attached drawings.
The flow chart of the processing and installation method of combination wind-proof keel that Fig. 1 is provided by the embodiment of the present application.
Specific embodiment
Purpose, technical scheme and advantage to make the embodiment of the present application are clearer, below in conjunction with the embodiment of the present application
In attached drawing, the technical solution in the embodiment of the present application is clearly and completely described, it is clear that described embodiment is
Some embodiments of the present application, instead of all the embodiments.Based on the embodiment in the application, those of ordinary skill in the art
The all other embodiment obtained without making creative work, shall fall in the protection scope of this application.
Below in conjunction with Fig. 1, the processing for the combination wind-proof keel that Fig. 1 is provided by the embodiment of the present application and installation method
Flow chart.
A kind of method of quick production and processing combination wind-proof keel, a kind of processing for combining wind-proof keel and installation side
Method, which is characterized in that including:Materials determine step:According to the real area of external wall to be installed, external wall to be installed
Piecemeal area, determine main joist, along wall surrounding L abnormity secondary joist and intermediate mesh grid secondary joist length, specially:
Determine the real area S of external wall to be installed1, wherein S1=A × B determines the piecemeal area S of external wall to be installed2,
Middle S2=a × b determines main joist length L1=K1S1, wherein K1=1.05~1.2;Determine secondary joist length L2=K2×S1/
bL1-A/L1, K2=1.05~1.1, determine the length L of grid secondary joist3=K1(S1/a+S1/b)-(A+B),K1=1.05~
1.2;Keel procedure of processing, according to materials determine in step determine keel length, respectively to main joist, L abnormity secondary joist and
Grid secondary joist is processed;Keel combination step:Main joist, L abnormity secondary joist and grid secondary joist are combined and to be formed
Combine wind-proof keel.
In a preferred embodiment, the number n for determining installation node is further included1=K2S1/L4L1, wherein the length of installation node
It spends for L4, node is installed and includes mounting rod, installed part, screw and nut.
In a preferred embodiment, the infall keel branch of the main joist and L abnormity secondary joist and grid secondary joist
Support is connected, the number n of the keel rest2=2K3S1/ ab, wherein K3=0.5~1.1.
In a preferred embodiment, the keel procedure of processing is included in keel processing machine by main joist, L abnormity secondary joists
And the length of grid secondary joist is inputted as parameter preset, in the incremental encoder of the discharging transmission side of keel processing machine examining
Survey keel transmission speed and keel transmission displacement.
In a preferred embodiment, the keel procedure of processing further includes, and when keel processing machine is run, keel at the uniform velocity go out
Material, after keel discharging is detected, control system starts incremental encoder and detects keel transmission speed and keel transmission in real time
Displacement, and by displacement and speed real-time display on the display screen of keel processing machine, when the displacement that discharges reaches parameter preset,
Keel processing machine is closed, and the keel processed are subjected to blanking operation.
In a preferred embodiment, the keel combination step is included with outside a keel installation platform simulation building to be installed
Main joist is placed on keel installation platform by wall, with keel rest in preset crossover location by L abnormity secondary joist and grid
Secondary joist is fixed with main joist.
In a preferred embodiment, after the keel combination step, a keel packaging step, the keel packet are further included
Filling step will combine in wind-proof keel progress entire package to packing case.
In a preferred embodiment, a keel installation step, the keel installation are further included after the keel packaging step
Combination wind-proof keel entirety from packing case is taken out in step and is disposably installed on external wall to be installed.
The combination wind-proof keel produced using this method directly monoblock type can be disposably installed in place, and improve processing
With the efficiency of installation, working strength, and the good stability of holding consistency are alleviated.And the materials of the present invention determine that step can
Precisely to determine that materials avoid wasting.
Each embodiment is described by the way of progressive in specification, the highlights of each of the examples are with other realities
Apply the difference of example, just to refer each other for identical similar portion between each embodiment.For device disclosed in embodiment
Speech, since it is corresponded to the methods disclosed in the examples, so description is fairly simple, related part is referring to method part illustration
.
Professional further appreciates that, with reference to each exemplary unit of the embodiments described herein description
And algorithm steps, can be realized with the combination of electronic hardware, computer software or the two, in order to clearly demonstrate hardware and
The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These
Function is performed actually with hardware or software mode, specific application and design constraint depending on technical solution.Profession
Technical staff can realize described function to each specific application using distinct methods, but this realization should not
Think beyond scope of the present application.
The principle and implementation of this application are described for specific case used herein, and above example is said
It is bright to be merely used to help understand the present processes and its core concept.It should be pointed out that the ordinary skill for the art
For personnel, under the premise of the application principle is not departed from, can also to the application, some improvement and modification can also be carried out, these improvement
It is also fallen into the application scope of the claims with modification.It should also be noted that, in the present specification, such as the first He
Second or the like relational terms are used merely to distinguish one entity or operation from another entity or operation, without
Certain requirement implies that there are any actual relationship or orders between these entities or operation.Moreover, term " packet
Include ", "comprising" or its any other variant be intended to non-exclusive inclusion so that the mistake including a series of elements
Journey, method, article or equipment not only include those elements, but also other elements including being not explicitly listed, either
It further includes as elements inherent to such a process, method, article, or device.In the absence of more restrictions, by sentence
The element that "including a ..." limits, it is not excluded that also exist in the process including element, method, article or equipment another
Outer identical element.
Claims (8)
1. a kind of processing for combining wind-proof keel and installation method, which is characterized in that including:Materials determine step:According to treating
The real area of external wall, the piecemeal area of external wall to be installed are installed, determine main joist, the L abnormity along wall surrounding
The length of keel and the grid secondary joist of intermediate mesh, specially:Determine the real area S of external wall to be installed1, wherein S1
=A × B determines the piecemeal area S of external wall to be installed2, wherein S2=a × b determines main joist length L1=K1S1, wherein
K1=1.05~1.2;Determine secondary joist length L2=K2×S1/bL1-A/L1, K2=1.05~1.1, determine grid secondary joist
Length L3=K1(S1/a+S1/b)-(A+B),K1=1.05~1.2;Keel procedure of processing determines what is determined in step according to materials
The length of each keel is respectively processed main joist, L abnormity secondary joist and grid secondary joist;Keel combination step:It will processing
Good main joist, L abnormity secondary joist and grid secondary joist is combined to form combination wind-proof keel.
2. processing and the installation method of combination wind-proof keel according to claim 1, it is characterised in that:It further includes determining
The number n of node is installed1=K2S1/L4L1, wherein the length of installation node is L4, node is installed and includes mounting rod, installed part, spiral shell
Nail and nut.
3. processing and the installation method of combination wind-proof keel according to claim 2, it is characterised in that:The main joist
It is connected with the infall of L abnormity secondary joist, grid secondary joist with keel rest, the number n of the keel rest2=2K3S1/ ab,
Wherein K3=0.5~1.1.
4. processing and the installation method of combination wind-proof keel according to claim 3, it is characterised in that:The keel add
Work step is included in keel processing machine and inputs the length of main joist, L abnormity secondary joist and grid secondary joist as parameter preset suddenly,
In the incremental encoder of the discharging transmission side of keel processing machine displacement is transmitted to detect keel transmission speed and keel.
5. processing and the installation method of combination wind-proof keel according to claim 4, it is characterised in that:The keel add
Work step further includes suddenly, and when keel processing machine is run, keel at the uniform velocity discharge, and after keel discharging is detected, control system starts
Incremental encoder detects keel transmission speed and keel transmission displacement in real time, and displacement and speed real-time display are processed in keel
On the display screen of machine, when the displacement that discharges reaches parameter preset, keel processing machine is closed, and the keel processed are carried out down
Material operation.
6. processing and the installation method of combination wind-proof keel according to claim 5, it is characterised in that:The keel group
It closes step to include with a keel installation platform simulation external wall to be installed, main joist is placed on keel installation platform, use
Keel rest fixes L abnormity secondary joist and grid secondary joist with main joist in preset crossover location.
7. processing and the installation method of combination wind-proof keel according to claim 6, it is characterised in that:The keel group
After closing step, a keel packaging step is further included, the keel packaging step will combine wind-proof keel and carry out entire package extremely
In packing case.
8. processing and the installation method of combination wind-proof keel according to claim 7, it is characterised in that:The keel packet
A keel installation step is further included after dress step, it is whole from packing case to combine wind-proof keel in the keel installation step
It takes out and is disposably installed on external wall to be installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810026362.6A CN108237701A (en) | 2018-01-11 | 2018-01-11 | A kind of processing for combining wind-proof keel and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810026362.6A CN108237701A (en) | 2018-01-11 | 2018-01-11 | A kind of processing for combining wind-proof keel and installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108237701A true CN108237701A (en) | 2018-07-03 |
Family
ID=62699552
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810026362.6A Pending CN108237701A (en) | 2018-01-11 | 2018-01-11 | A kind of processing for combining wind-proof keel and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108237701A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1046297A (en) * | 1990-06-05 | 1990-10-24 | 北京新型建筑材料总厂 | The rolling unit of new and effective lightgage steel joist |
JPH08216265A (en) * | 1995-02-15 | 1996-08-27 | Inoac Corp | Processing method for end of molding |
US20120131875A1 (en) * | 2009-08-05 | 2012-05-31 | Zezhang Xu | Novel low-rise prefabricated steel structure house system |
CN204565620U (en) * | 2015-03-27 | 2015-08-19 | 王威 | A kind of keel formation system |
CN204584012U (en) * | 2015-02-15 | 2015-08-26 | 李和竹 | A kind of keel processing unit (plant) |
CN205764925U (en) * | 2016-07-20 | 2016-12-07 | 杨磊 | T-shaped baking vanish main joist manufactures system |
CN107217775A (en) * | 2015-09-24 | 2017-09-29 | 青岛建安建设集团有限公司 | The design and installation integral method of the reverse support system structure of furred ceiling |
CN107304592A (en) * | 2016-04-20 | 2017-10-31 | 北新集团建材股份有限公司 | A kind of special-shaped keel and combinations thereof keel |
CN206707082U (en) * | 2017-05-04 | 2017-12-05 | 四川盛邦建设股份有限公司 | Curtain skeleton unit, curtain wall unit part and curtain wall construction |
-
2018
- 2018-01-11 CN CN201810026362.6A patent/CN108237701A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1046297A (en) * | 1990-06-05 | 1990-10-24 | 北京新型建筑材料总厂 | The rolling unit of new and effective lightgage steel joist |
JPH08216265A (en) * | 1995-02-15 | 1996-08-27 | Inoac Corp | Processing method for end of molding |
US20120131875A1 (en) * | 2009-08-05 | 2012-05-31 | Zezhang Xu | Novel low-rise prefabricated steel structure house system |
CN204584012U (en) * | 2015-02-15 | 2015-08-26 | 李和竹 | A kind of keel processing unit (plant) |
CN204565620U (en) * | 2015-03-27 | 2015-08-19 | 王威 | A kind of keel formation system |
CN107217775A (en) * | 2015-09-24 | 2017-09-29 | 青岛建安建设集团有限公司 | The design and installation integral method of the reverse support system structure of furred ceiling |
CN107304592A (en) * | 2016-04-20 | 2017-10-31 | 北新集团建材股份有限公司 | A kind of special-shaped keel and combinations thereof keel |
CN205764925U (en) * | 2016-07-20 | 2016-12-07 | 杨磊 | T-shaped baking vanish main joist manufactures system |
CN206707082U (en) * | 2017-05-04 | 2017-12-05 | 四川盛邦建设股份有限公司 | Curtain skeleton unit, curtain wall unit part and curtain wall construction |
Non-Patent Citations (2)
Title |
---|
建设部干部学院: "《实用建筑节能工程施工》", 30 April 2008, 中国电力出版社 * |
杨博等: "《建筑装饰工程预算》", 28 February 1996, 安徽科学技术出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Saroglou et al. | Studies on the optimum double-skin curtain wall design for high-rise buildings in the Mediterranean climate | |
Kropf et al. | Validation of the Building Simulation Program IDA-ICE According to CEN 13791 „Thermal Performance of Buildings-Calculation of Internal Temperatures of a Room in Summer Without Mechanical Cooling-General Criteria and Validation Procedures “ | |
Ge et al. | Dynamic effect of thermal bridges on the energy performance of a low-rise residential building | |
de Angelis et al. | Light steel-frame walls: thermal insulation performances and thermal bridges | |
Ziasistani et al. | Comparative study of DSF, PV-DSF and PV-DSF/PCM building energy performance considering multiple parameters | |
Holm et al. | The hygrothermal behaviour of rooms: combining thermal building simulation and hygrothermal envelope calculation | |
Baba et al. | Dynamic effect of balcony thermal bridges on the energy performance of a high-rise residential building in Canada | |
Tettey et al. | Energy use implications of different design strategies for multi-storey residential buildings under future climates | |
Sobhy et al. | Analysis for thermal behavior and energy savings of a semi-detached house with different insulation strategies in a hot semi-arid climate | |
Han et al. | Exploring solutions to achieve carbon neutrality in China: A comparative study of a large-scale passive House district and a Green building district in Qingdao | |
Brambilla et al. | Life cycle efficiency ratio: A new performance indicator for a life cycle driven approach to evaluate the potential of ventilative cooling and thermal inertia | |
Ayegbusi et al. | Overall Thermal Transfer Value of Naturally Ventilated Double Skin Façade in Malaysia | |
Amani | Energy simulation and management of the main building component materials using comparative analysis in a mild climate zone | |
Astorqui et al. | New execution process of a panel-based façade system that reduces project duration and improves workers' working conditions | |
CN108237701A (en) | A kind of processing for combining wind-proof keel and installation method | |
Pérez-García et al. | Building's eco-efficiency improvements based on reinforced concrete multilayer structural panels | |
Mansour et al. | Applying Nano Coatings on Buildings to Improve Thermal Performance & Energy Efficiency: A Simulation of a Health Care Building in Egypt | |
Amalia et al. | Efficiency Energy on Office Building in South Jakarta | |
Zhang | Research on building energy efficiency based on energyplus software | |
Ariff et al. | Green envelope as an architectural strategy for energy efficiency in a library building | |
Song et al. | Evaluation of building envelope Performance of a dry exterior insulation system using truss insulation frame | |
Rodriguez-Muñoz | Evaluation of the thermal performance of construction systems to reduce the energy consumption in buildings: A case study in a cold semi-arid climate | |
Lekshmi et al. | THERMAL PERFORMANCE OF BUILDING COMPONENTS INSULATING BY POLYSTYRENE MATERIAL VIA OPTIMAL MACHINE LEARNING. | |
Kaczorek | Hygrothermal assessment of internally insulated brick wall based on numerical simulation | |
Giama | U-Value: A key role parameter for sustainable buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180703 |