Invention content
In view of this, the purpose of the present invention is to provide a kind of shale gas well collecting method and device, effectively to change
Kind drawbacks described above.
The embodiment of the present invention is realized in the following way:
In a first aspect, an embodiment of the present invention provides a kind of shale gas well collecting methods.The method includes:It obtains
The newer shale gas well data of needs of M shale gas well, M are the integer more than or equal to 1;Newer shale gas is needed from described
Well extracting data goes out the creation data of each shale gas well in the M shale gas well, the production number of common M shale gas well
According to;Creation data based on the newer shale gas well data of the needs and the M shale gas well, update and each page
Figure and data in the production curve chart of the corresponding shale gas well of creation data of rock gas well.
Further, it is described newer shale gas well extracting data to be needed to go out in the M shale gas well often from described
The creation data of a shale gas well, the creation data of common M shale gas well.Including:Newer shale gas well number is needed from described
The daily paper file of morning newspaper file and i-th of shale gas well in extracts the creation data of i-th of shale gas well, and i is integer,
0 < i≤M, i is currently extracted for characterizing to i-th of shale gas well;Judge that current extraction is right to i-th of shale gas well institute
Whether the extracted shale gas well quantity i answered is M;When to be, obtain and store every described in the M shale gas well
The creation data for storing up the M shale gas well coexists in the creation data of a shale gas well;When being no, add 1 by 1, return and perform
Step:It is extracted from the daily paper file of the morning newspaper file needed in newer shale gas well data and i-th of shale gas well
The creation data of i-th of shale gas well.
Further, the production number based on the newer shale gas well data of the needs and the M shale gas well
According to the figure sum number in the production curve chart of update shale gas well corresponding with the creation data of each shale gas well
According to.Including:It needs described in newer shale gas well data the daily paper file of i-th shale gas well based on described and is based on
The creation data of i-th of shale gas well described in the creation data of the M shale gas well updates the life of i-th of shale gas well
The figure and data in the production curve chart of corresponding i-th of the shale gas well of data are produced, i is integer, and 0 < i≤M, i is used for table
Sign is currently updated to i-th of shale gas well;Judge currently to be updated to the newer page corresponding to i-th of the shale gas well
Whether rock gas well quantity i is M;When to be, judge that the production curve chart of each shale gas well updates completion;It is being no
When, by i plus 1, return and perform step:Based on the day for needing i-th of shale gas well described in newer shale gas well data
The creation data of i-th of shale gas well described in message part and creation data based on the M shale gas well, update i-th
Figure and data in the production curve chart of corresponding i-th of the shale gas well of creation data of a shale gas well.
Further, it is described based on the daily paper for needing i-th of shale gas well described in newer shale gas well data
The creation data of i-th of shale gas well described in file and creation data based on the M shale gas well, updates i-th
Before figure and data in the production curve chart of corresponding i-th of the shale gas well of creation data of shale gas well.The side
Method further includes:Multiple charts corresponding to i-th of the shale gas well are obtained, wherein, multiple figures of i-th of the shale gas well
Table includes:Well log interpretation achievement parameter list, i-th of the shale of the data summary table of i-th of shale gas well, i-th shale gas well
The production curve chart of gas well fracturing construction parameter table and i-th of shale gas well;From multiple charts of i-th of the shale gas well
In determine the production curve chart of i-th of the shale gas well.
Further, after the newer shale gas well data of needs for obtaining M shale gas well.The method is also wrapped
It includes:The data summarization of each shale gas well is obtained from the newer shale gas well data of the needs of the M shale gas well
Data in table obtain the data in the data summary table of M shale gas well altogether, wherein, the data of the M shale gas well are converged
Data in summary table obtained in the data summary table of i-th of shale gas well include i-th shale gas well:Walk data, AB
Target vertical depth and oblique depth, gas testing test result data, yield data, pressing crack construction data and return number of rows evidence.
Second aspect, an embodiment of the present invention provides a kind of shale gas well data acquisition device, described device includes:It obtains
Module, for obtaining the newer shale gas well data of the needs of M shale gas well, M is the integer more than or equal to 1.Data are extracted
Module, for newer shale gas well extracting data being needed to go out each shale gas well in the M shale gas well from described
Creation data, the creation data of common M shale gas well.Data update module, for being based on the newer shale gas well of needs
The creation data of data and the M shale gas well updates shale gas corresponding with the creation data of each shale gas well
Figure and data in the production curve chart of well.
Further, the data extraction module includes:Extraction unit, for needing newer shale gas well number from described
The daily paper file of morning newspaper file and i-th of shale gas well in extracts the creation data of i-th of shale gas well, and i is integer,
0 < i≤M, i is currently extracted for characterizing to i-th of shale gas well.First judging unit, for judging currently to extract to described
Whether the extracted shale gas well quantity i corresponding to i-th of shale gas well is M.First execution unit, for being yes
When, the creation data of each shale gas well described in the M shale gas well is obtained and stored, the storage M shale gas coexists
The creation data of well;When being no, add 1 by 1, return and perform step:From the morning needed in newer shale gas well data
The daily paper file of message part and i-th of shale gas well extracts the creation data of i-th of shale gas well.
Further, the data update module includes:Updating unit, for being based on the newer shale gas well of needs
I-th described in the daily paper file of i-th shale gas well described in data and the creation data based on the M shale gas well
The creation data of a shale gas well updates the production curve of corresponding i-th of the shale gas well of creation data of i-th of shale gas well
Figure and data in chart, i are integer, and 0 < i≤M, i is currently updated to i-th of shale gas well for characterizing.Second judges
Unit, for judge currently to be updated to newer shale gas well quantity i corresponding to i-th of the shale gas well whether be
M.Second execution unit, the production curve chart for when to be, judging each shale gas well update completion;It is being no
When, by i plus 1, return and perform step:Based on the day for needing i-th of shale gas well described in newer shale gas well data
The creation data of i-th of shale gas well described in message part and creation data based on the M shale gas well, update i-th
Figure and data in the production curve chart of corresponding i-th of the shale gas well of creation data of a shale gas well.
Further, the data update module further includes:Obtaining unit, for obtaining i-th of the shale gas well institute
Corresponding multiple charts, wherein, multiple charts of i-th of the shale gas well include:The data summarization of i-th of shale gas well
Well log interpretation achievement parameter list, i-th of shale gas well fracturing parameter table and i-th of the shale gas of table, i-th shale gas well
The production curve chart of well.Determination unit, for being determined described i-th from multiple charts of i-th of the shale gas well
The production curve chart of shale gas well.
Further, described device further includes:Acquisition module, for needing to update from the described of the M shale gas well
Shale gas well data in obtain data in the data summary table of each shale gas well, obtain the data of M shale gas well altogether
Data in summary sheet, wherein, in the data summary table of the M shale gas well in the data summary table of i-th of shale gas well
The data obtained include i-th shale gas well:Walk data, AB targets vertical depth and oblique depth, gas testing test result data, yield
Data, pressing crack construction data and return number of rows evidence.
The advantageous effect of the embodiment of the present invention is:
The newer shale gas well data of needs of M shale gas well of the terminal device based on acquisition, and then from needing to update
Shale gas well extracting data go out the creation data of each shale gas well in M shale gas well.Further, terminal device
Based on the creation data for needing newer shale gas well data and M shale gas well, then update and each shale gas well are removed automatically
The corresponding shale gas well of creation data production curve chart in figure and data.Therefore, by terminal device to data
Automatically analyze, handle and extract, the data for automatically updating shale gas well are realized, without artificial bothersome laborious.
For the above objects, features and advantages of the present invention is enable to be clearer and more comprehensible, preferred embodiment cited below particularly, and coordinate
Appended attached drawing, is described in detail below.
Specific embodiment
Below in conjunction with attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Ground describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.Usually exist
The component of the embodiment of the present invention described and illustrated in attached drawing can be configured to arrange and design with a variety of different herein.Cause
This, the detailed description of the embodiment of the present invention to providing in the accompanying drawings is not intended to limit claimed invention below
Range, but it is merely representative of the selected embodiment of the present invention.Based on the embodiment of the present invention, those skilled in the art are not doing
Go out all other embodiments obtained under the premise of creative work, shall fall within the protection scope of the present invention.
Referring to Fig. 1, Fig. 1 is the block diagram of terminal device 10.The terminal device 10 includes:Shale gas well data
Harvester, memory 101, storage control 102, processor 103, Peripheral Interface 104, input-output unit 105, display are single
Member 106.
The memory 101, processor 103, Peripheral Interface 104, input-output unit 105, is shown storage control 102
Show unit 106, each element is directly or indirectly electrically connected between each other, to realize the transmission of data or interaction.For example, these
Element can be realized by one or more communication bus or signal wire be electrically connected between each other.The shale gas well data acquisition
Device include it is at least one can be stored in the memory or be solidificated in the form of software or firmware (firmware) it is described
Software function module in the Windows operating system of terminal device 10.The processor 103 is used to perform in memory 101
The executable module of storage, such as the software function module or computer program that the shale gas well data acquisition device includes.
Wherein, memory 101 may be, but not limited to, random access memory (Random Access Memory,
RAM), read-only memory (Read Only Memory, ROM), programmable read only memory (Programmable Read-Only
Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only Memory, EPROM),
Electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only Memory, EEPROM) etc..
Wherein, for memory 101 for storing program, the processor 103 performs described program, subsequently after execute instruction is received
The method performed by terminal device 10 that the process that any embodiment of the embodiment of the present invention discloses defines can be applied to processor
It is realized in 103 or by processor 103.
Processor 103 can be a kind of IC chip, have the processing capacity of signal.Above-mentioned processor can be
General processor, including central processing unit (Central Processing Unit, abbreviation CPU), network processing unit (Network
Processor, abbreviation NP) etc.;It can also be digital signal processor (DSP), application-specific integrated circuit (ASIC), ready-made programmable
Gate array (FPGA) either other programmable logic device, discrete gate or transistor logic, discrete hardware components, can be with
Realize or perform disclosed each method, step and the logic diagram in the embodiment of the present invention.General processor 103 can be micro-
Processor or the processor can also be any conventional processors etc..
Various input-output units 105 are coupled to processor 103 and memory 101 by the Peripheral Interface 104.One
In a little embodiments, Peripheral Interface, processor and storage control can be realized in one single chip.In some other example
In, they can be realized by independent chip respectively.
Input-output unit 105 is used for the interaction that user input data is supplied to realize user and data collection station.Institute
It states input-output unit may be, but not limited to, mouse and keyboard etc..
Display unit 106 provides an interactive interface, such as user interface between the mobile terminal and user,
Or it is referred to for display image data to user.In the present embodiment, the display unit can be liquid crystal display or touch-control
Display.Can be the capacitance type touch control screen or electric resistance touch-control for supporting single-point and multi-point touch operation if touch control display
Screen etc..Single-point and multi-point touch operation is supported to refer to that touch control display can sense the one or more on the touch control display
The touch control operation generated simultaneously at position, and processor is transferred to be calculated and handled the touch control operation that this is sensed.
First embodiment
Referring to Fig. 2, a kind of side of the shale gas well collecting method provided Fig. 2 shows first embodiment of the invention
Method flow, the shale gas well collecting method are applied to terminal device.Shale gas well collecting method includes:Step
S100, step S200 and step S300.
Step S100:The newer shale gas well data of needs of M shale gas well are obtained, M is the integer more than or equal to 1.
In a shale gas Tanaka, which can have M shale gas well, therefore terminal device can be to M shale
The data of gas well are managed, wherein, M is the integer more than or equal to 1.
Terminal device can obtain the newer shale gas well data of needs of M shale gas well.Wherein, newer shale is needed
Gas well data can be the data collected in artificial slave database and download in movable equipment.It is set later by removable
It is standby to be connect with terminal device, such as USB flash disk connect with terminal device, therefore terminal device is then needed by copying or pasting
Newer shale gas well data.In the present embodiment, newer shale gas well data packet is needed to include the M shale gas well:Production
Daily paper, individual well daily paper, morning newspaper, fracturing parameter summary sheet, pressure break gas testing, which are returned and arrange summary sheet, flow measurement pressure summarizes, survey static pressure summarizes, nothing
Hinder volume computation table and row layer position statistical form etc..
Obtain need newer shale gas well data when, terminal device need to need newer shale gas well data into
The certain processing of row, for example, be ranked up or compressed package decompression etc., in order to which the form of data after handling can be convenient for follow-up process
Execution.Specifically, terminal device can calculate daily production report, production monthly magazine, monofile version individual well daily paper file, open-flow capacity
Destination file, fracturing parameter summary sheet, pressure break gas testing, which return row's summary sheet and return drain statistics file, is converted into Excel forms simultaneously
Specified region storage in memory block.Terminal device can decompress multifile version individual well daily paper compressing file packet, fracturing parameter
Compressing file packet and decompression hole deviation data file compression packet, and the specified region storage in memory block.Terminal device can
Specified region of the morning newspaper Bulk Rename Utility for title and in memory block is stored.Terminal device, which can decompress, to contract in memory block
Interior specified region storage.Terminal device can by flow measurement press and survey static pressure summarize after data are ranked up by " pound sign+date "
Specified region storage in memory block.Terminal device can also deposit the specified region walked in the statistical form file storage area of layer position
Storage.
After completing to the sequence of each data file, decompression and storage, terminal device is considered to be finally obtained M page
The newer shale gas well data of needs of rock gas well.
Step S200:Newer shale gas well extracting data is needed to go out each page in the M shale gas well from described
The creation data of rock gas well, the creation data of common M shale gas well.
Newer shale gas well data are needed obtaining, it is also to contain M to need newer shale gas well data accordingly
The data of each shale gas well in a shale gas well.Further, terminal device is based on the newer shale gas well number of the needs
According to then can be from the creation data that newer shale gas well data is needed to extract each shale gas well in M shale gas well.
Specifically, terminal device is first turned on needing the morning newspaper file in newer shale gas well data, in morning newspaper file
Contain all data of M shale gas well.Terminal device is determined further according to the time of current time and last acquisition
The period residing for data that this needs acquires, i.e., residing period are located at current time and the time of last acquisition
Between.According to the residing period, and under the opening state of morning newspaper file and the daily paper file of each shale gas well, then
Terminal device can go to acquire the creation data of each shale gas well according to preset data acquisition sequence, wherein, data acquisition is suitable
Number order of the sequence for shale gas well each in M shale gas well from small to large.For example, terminal device is collecting some page
During rock gas well, terminal device opens the daily paper file of the shale gas well, and then terminal device root according to the number of the shale gas well
According to the residing period, the life of the shale gas well is extracted and is calculated from the daily paper file of morning newspaper file and the shale gas well
Produce data.Wherein, the creation data of each shale gas well extracted includes each shale gas well:Initial stage with production data, when
Preceding pressure, Current production, commissioning date and actual production number of days etc..
According to preset data acquisition sequence during extracting successively, when terminal device is from needing newer shale
When the daily paper file of morning newspaper file and i-th of shale gas well in gas well data extracts the creation data of i-th shale gas well,
Wherein, i is that integer, 0 < i≤M, and i are currently extracted for characterizing to i-th of shale gas well.Terminal device judges current extraction
Whether it is M to the extracted shale gas well quantity i corresponding to i-th of shale gas well.
When terminal device is judged as NO, then illustrate there be the production number of at least one shale gas well in M shale gas well
According to not extracting also, therefore the numerical value of i is increased by 1 by terminal device, and is returned and performed step:Newer shale gas well number is needed from described
The daily paper file of morning newspaper file and i-th of shale gas well in extracts the creation data of i-th of shale gas well, with continue into
The extraction of row generation data.
When terminal device is judged as YES, then illustrate that the creation data of all shale gas wells of M shale gas well has extracted.
And then terminal device also obtains and stores the creation data of each shale gas well in M shale gas well accordingly, i.e., stores M altogether
The creation data of a shale gas well.
Step S300:Creation data based on the newer shale gas well data of the needs and the M shale gas well, more
The newly figure and data in the production curve chart of shale gas well corresponding with the creation data of each shale gas well.
Corresponding multiple charts of each shale gas well are stored in the present embodiment, in terminal device, wherein, each page
Multiple charts of rock gas well are used to from different angles characterize the various production run situations of the shale gas well, for example, passing through
The mode of table or by way of chart etc.;And multiple charts corresponding to each shale gas well include each shale gas well
's:Data summary table, well log interpretation achievement parameter list, fracturing parameter table and production curve chart.
And then it can be gone according to the creation data and the newer shale gas well data of needs, terminal device of each shale gas well
Update the production curve chart of each shale gas well.And during the production curve chart for updating each shale gas well, eventually
End equipment also goes to update the production curve chart of each shale gas well according to preset update acquisition order, wherein, data acquisition
Sequence is also the number order of each shale gas well from small to large in M shale gas well.Since the production of each shale gas well is bent
The more new technological process all same of line diagram, the present embodiment are described in detail with any one shale gas well in more new technological process.
Specifically, when terminal device update is to i-th of shale gas well in M shale gas well, terminal device first from
It needs to open the daily paper file of i-th of shale gas well in newer shale gas well data, and also opens the life of i-th of shale gas well
Produce data.At this point, multiple charts due to the terminal device include:The data summary table of i-th of shale gas well, i-th of shale
The production curve of the well log interpretation achievement parameter list of gas well, i-th of shale gas well fracturing parameter table and i-th of shale gas well
Chart.Therefore terminal device can determine the production of i-th of shale gas well from corresponding multiple charts according to the feature of chart title
Curve chart.And then terminal device is just extracted from the creation data of the daily paper file of i-th shale gas well and i shale gas well
Corresponding data update the figure and data in the production curve chart of i-th of shale gas well, for example, i-th page of update
In the production curve chart of rock gas well:Summarize creation data, individual well daily paper data life production curve chart, root in word in bottom
It is replaced in lantern slide according to the horizontal axis scale interval and newly-generated production curve chart of producing days adjustment production curve chart
Curve graph etc..
According to preset data update sequence during extracting successively, when terminal device is being updated to i shale gas
During the production curve chart of well, wherein, i is that integer, 0 < i≤M, and i are currently updated to i-th of shale gas well for characterizing.Eventually
Whether the newer shale gas well quantity i corresponding to i shale gas well that end equipment judgement is currently updated to is M.
When terminal device is judged as NO, then illustrate the production song for also having at least one shale gas well in M shale gas well
Line diagram does not update also, therefore the numerical value of i is increased by 1 by terminal device, and is returned and performed step:Newer shale is needed based on described
Described in the daily paper file of i-th shale gas well described in gas well data and the creation data based on the M shale gas well
The creation data of i-th of shale gas well updates the production of corresponding i-th of the shale gas well of creation data of i-th of shale gas well
Figure and data in curve chart, to continue the update of production curve chart.
When terminal device is judged as YES, then the production curve chart of all shale gas wells of M shale gas well is illustrated
Update.And then terminal device is also accordingly realized automatically to the update of data.
In the present embodiment, after execution of step S100, terminal device can also be according to the need for obtaining M shale gas well
Newer shale gas well data are wanted, are obtained from the newer shale gas well data of the needs of the M shale gas well each
Data in the data summary table of shale gas well obtain the data summary table of M shale gas well altogether.
It also extracts to obtain the number of each shale gas well according to the same sequence with aforementioned sequence of extraction in extraction process
According to summary sheet, tired state is not done herein.
At this point, when needing to extract the data summary table of i-th of shale gas well of acquisition, terminal device is united according to layer position is walked
Meter table i-th of shale gas well of extraction walks data, terminal device according to drilling well base data table i-th of shale gas well of extraction
AB targets vertical depth is with tiltedly deep, terminal device according to the gas testing test result that i-th of shale gas well is extracted from one point method result of calculation table
Data, terminal device according to the daily paper of i-th shale gas well extract i-th of shale gas well yield data, terminal device according to
The daily production report of i-th of shale gas well extracts table set, skill set, remarks of i-th of shale gas well etc., terminal device is joined according to pressure break
The pressing crack construction data and terminal device of number summary sheet i-th of shale gas well of extraction are returned row's summary sheet according to pressure break gas testing and are carried
Take i-th shale gas well returns number of rows evidence.
In the present embodiment, the chart number of multiple charts of each shale gas well has with the well of shale gas well number
One correspondence, for example, the number of i-th of shale gas well is 100, then each schemes in multiple charts of i-th of shale gas well
The label of table is 100.Terminal device can be examined according to all charts corresponding to the correspondence M shale gas well of relation pair
It surveys.When there is shale gas well to increase or decrease, then terminal device is by detection, the real-time update when shale gas well increases or decreases
The well number of shale gas well and the corresponding label of number.For example, when the 99th shale gas well is deleted, then terminal device
The number of shale gas well each after the 99th shale gas well deleted and corresponding label are subtracted 1 accordingly.
In the present embodiment, the reference format of a chart has been preset in terminal device, therefore terminal device is based on the chart
Each chart corresponding to each shale gas well can be modulated to preset reference format and matched by reference format.Specifically, root
According to the preset reference format, terminal device can adjust can track walk graph title, the font of Strata Comparison table title and position.
Terminal device can adjust stratum contrast table Header font, row height, cell content font, table position.Terminal device can adjust
Result of log interpretation parameter list Header font and position, each row height, each column width, cell content font, table position.Eventually
End equipment can adjust fracturing parameter table Header font and position, each row height, each column width, cell content font, table
Case is put.Terminal device can adjust hydraulic fracture operating curve graph title font and Pictures location.Terminal device can adjust hour test
Curve graph Header font and Pictures location.Terminal device can adjust oil testing result table row height, col width, cell content font, table
Case is put.Terminal device can adjust oil testing result table row height, col width, cell content font, table position.Terminal device may be used also
It adjusts production curve graph title font, picture size and position, summarize character script.
In the present embodiment, terminal device can also obtain the shale gas-bearing layer well log interpretation basic data of operating personnel's offer
Table.According to the shale gas-bearing layer well log interpretation base data table, terminal device can also be to shale gas well each in M shale gas well
Well log interpretation achievement parameter list be updated.
It also extracts to obtain the number of each shale gas well according to the same sequence with aforementioned update sequence at no point in the update process
According to summary sheet, tired state is not done herein.
Also when needing to update the well log interpretation achievement parameter list of i-th of shale gas well of acquisition, according to i-th of shale gas well
Number the well log interpretation achievement parameter list of i-th of shale gas well is determined from multiple charts, and then terminal device is again from page
The density of each engineering section, TOC, porosity, matrix permeability, gassiness are extracted in rock gas-bearing layer well log interpretation base data table
The data such as amount, brittleness index, and the data extracted are successively filled to the well log interpretation achievement parameter list of i-th of shale gas well
In.Later, terminal device also judges whether i-th of shale gas well is M, if then stopping and completing update, if it is not, then continuing
The numerical value of extraction i is gone to add the well log interpretation achievement parameter list of next shale gas well after 1.
Second embodiment
Referring to Fig. 3, an embodiment of the present invention provides a kind of shale gas well data acquisition device 100, the shale gas well number
Include according to harvester 100:
Module 110 is obtained, for obtaining the newer shale gas well data of the needs of M shale gas well, M is more than or equal to 1
Integer.
Data extraction module 120, for newer shale gas well extracting data being needed to go out the M shale gas from described
The creation data of each shale gas well, the creation data of common M shale gas well in well.
Data update module 130, for based on the newer shale gas well data of the needs and the M shale gas well
Creation data updates the figure in the production curve chart of shale gas well corresponding with the creation data of each shale gas well
And data.
Referring to Fig. 4, in a kind of shale gas well data acquisition device 100 provided in an embodiment of the present invention, data extraction
Module 120 includes:
Extraction unit 121, for from the morning newspaper file and i-th of shale gas needed in newer shale gas well data
The daily paper file of well extracts the creation data of i-th of shale gas well, and i is integer, and 0 < i≤M, i is currently extracted extremely for characterizing
I-th of shale gas well.
First judging unit 122, for judging currently to extract to extracted corresponding to i-th of the shale gas well
Whether shale gas well quantity i is M.
First execution unit 123, for when to be, obtaining and storing each shale described in the M shale gas well
The creation data for storing up the M shale gas well coexists in the creation data of gas well;When being no, add 1 by 1, return and perform step:
It is extracted i-th from the daily paper file of the morning newspaper file needed in newer shale gas well data and i-th of shale gas well
The creation data of shale gas well.
Referring to Fig. 5, in a kind of shale gas well data acquisition device 100 provided in an embodiment of the present invention, data update
Module 130 includes:
Obtaining unit 131, for obtaining multiple charts corresponding to i-th of the shale gas well, wherein, described i-th
Multiple charts of shale gas well include:The well log interpretation achievement of the data summary table of i-th of shale gas well, i-th shale gas well
The production curve chart of parameter list, i-th of shale gas well fracturing parameter table and i-th of shale gas well.
Determination unit 132, for determining i-th of shale gas from multiple charts of i-th of the shale gas well
The production curve chart of well.
Updating unit 133, for based on the day for needing i-th of shale gas well described in newer shale gas well data
The creation data of i-th of shale gas well described in message part and creation data based on the M shale gas well, update i-th
Figure and data in the production curve chart of corresponding i-th of the shale gas well of creation data of a shale gas well, i are integer, 0
< i≤M, i are currently updated to i-th of shale gas well for characterizing.
Second judgment unit 134, it is newer corresponding to i-th of the shale gas well for judging currently to be updated to
Whether shale gas well quantity i is M.
Second execution unit 135, the production curve chart for when to be, judging each shale gas well have updated
Into;When being no, by i plus 1, return and perform step:I-th of shale described in newer shale gas well data is needed based on described
The production number of i-th of shale gas well described in the daily paper file of gas well and creation data based on the M shale gas well
According to the figure sum number in the production curve chart for corresponding i-th of the shale gas well of creation data for updating i-th of shale gas well
According to.
Referring to Fig. 6, in a kind of shale gas well data acquisition device 100 provided in an embodiment of the present invention, shale gas well
Data acquisition device 100 further includes:
Acquisition module 140, it is every for being obtained from the newer shale gas well data of the needs of the M shale gas well
Data in the data summary table of a shale gas well obtain the data in the data summary table of M shale gas well altogether, wherein, institute
It states the data in the data summary table of M shale gas well obtained in the data summary table of i-th of shale gas well and includes i-th page
Rock gas well:Walk data, AB targets vertical depth and oblique depth, gas testing test result data, yield data, pressing crack construction data and the row of returning
Data.
It should be noted that due to it is apparent to those skilled in the art that, convenience and letter for description
Clean, the specific work process of the system of foregoing description, device and unit can refer to corresponding in preceding method embodiment
Journey, details are not described herein.
The computer-readable of non-volatile program code that the progress processor that the embodiment of the present invention is provided can perform is deposited
The computer program product of storage media, the computer readable storage medium including storing program code, said program code packet
The instruction included can be used for performing the method described in previous methods embodiment, and specific implementation can be found in embodiment of the method, herein not
It repeats again.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description,
The specific work process of device and unit can refer to the corresponding process in preceding method embodiment, and details are not described herein.
In several embodiments provided herein, it should be understood that disclosed systems, devices and methods, it can be with
It realizes by another way.The apparatus embodiments described above are merely exemplary, for example, the division of the unit,
Only a kind of division of logic function, can there is other dividing mode in actual implementation, in another example, multiple units or component can
To combine or be desirably integrated into another system or some features can be ignored or does not perform.Another point, it is shown or beg for
The mutual coupling, direct-coupling or communication connection of opinion can be by some communication interfaces, device or unit it is indirect
Coupling or communication connection can be electrical, machinery or other forms.
The unit illustrated as separating component may or may not be physically separate, be shown as unit
The component shown may or may not be physical unit, you can be located at a place or can also be distributed to multiple
In network element.Some or all of unit therein can be selected according to the actual needs to realize the mesh of this embodiment scheme
's.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it can also
That each unit is individually physically present, can also two or more units integrate in a unit.
If the function is realized in the form of SFU software functional unit and is independent product sale or in use, can be with
It is stored in a computer read/write memory medium.Based on such understanding, technical scheme of the present invention is substantially in other words
The part contribute to the prior art or the part of the technical solution can be embodied in the form of software product, the meter
Calculation machine software product is stored in a storage medium, is used including some instructions so that a computer equipment (can be
People's computer, server or network equipment etc.) perform all or part of the steps of the method according to each embodiment of the present invention.
And aforementioned storage medium includes:USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited
The various media that can store program code such as reservoir (RAM, Random Access Memory), magnetic disc or CD.
In conclusion an embodiment of the present invention provides a kind of shale gas well collecting method and devices.Method includes:It obtains
The newer shale gas well data of needs of M shale gas well are obtained, M is the integer more than or equal to 1;From the newer shale gas well of needs
Extracting data goes out the creation data of each shale gas well in M shale gas well, the creation data of common M shale gas well;It is based on
Need the creation data of newer shale gas well data and M shale gas well, update and the creation data pair of each shale gas well
Figure and data in the production curve chart for the shale gas well answered.
The newer shale gas well data of needs of M shale gas well of the terminal device based on acquisition, and then from needing to update
Shale gas well extracting data go out the creation data of each shale gas well in M shale gas well.Further, terminal device
Based on the creation data for needing newer shale gas well data and M shale gas well, then update and each shale gas well are removed automatically
The corresponding shale gas well of creation data production curve chart in figure and data.Therefore, by terminal device to data
Automatically analyze, handle and extract, the data for automatically updating shale gas well are realized, without artificial bothersome laborious.
It these are only the preferred embodiment of the present invention, be not intended to restrict the invention, for those skilled in the art
For member, the invention may be variously modified and varied.Any modification for all within the spirits and principles of the present invention, being made,
Equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.It should be noted that:Similar label and letter are under
Similar terms are represented in the attached drawing in face, therefore, once being defined in a certain Xiang Yi attached drawing, are not then needed in subsequent attached drawing
It is further defined and explained.
More than, only specific embodiment of the invention, but protection scope of the present invention is not limited thereto is any to be familiar with
Those skilled in the art in the technical scope disclosed by the present invention, can readily occur in change or replacement, should all cover
Within protection scope of the present invention.Therefore, protection scope of the present invention should be subject to the protection scope in claims.