CN108222937A - Secondary top board structure quantitative analysis and its evaluation method based on inclined seam exploitation - Google Patents

Secondary top board structure quantitative analysis and its evaluation method based on inclined seam exploitation Download PDF

Info

Publication number
CN108222937A
CN108222937A CN201810087055.9A CN201810087055A CN108222937A CN 108222937 A CN108222937 A CN 108222937A CN 201810087055 A CN201810087055 A CN 201810087055A CN 108222937 A CN108222937 A CN 108222937A
Authority
CN
China
Prior art keywords
rock
stress
formula
zone
country
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810087055.9A
Other languages
Chinese (zh)
Other versions
CN108222937B (en
Inventor
邢鲁义
杨永杰
薛彦超
吕嘉锟
宁杉
张琰岽
纪海玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201810087055.9A priority Critical patent/CN108222937B/en
Publication of CN108222937A publication Critical patent/CN108222937A/en
Application granted granted Critical
Publication of CN108222937B publication Critical patent/CN108222937B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of secondary top board structure quantitative analysis based on inclined seam exploitation and its evaluation methods, belong to coal mine coal seam production technique field.Which solve many production problems faced in inclined seam recovery process in the prior art.Evaluation method of the present invention includes:It determines that superjacent adopts the extent of the destruction to bottom plate first, then determines that the extent of the destruction to top plate is adopted in lower section, i.e. the destruction height to top plate is adopted in lower section, using Exploring Loose Rock Country in Tunnels theory come deployment analysis etc.;Then Exploring Loose Rock Country in Tunnels surveyed, analyzed, country rock is divided into small relaxation zone, middle relaxation zone and big relaxation zone according further to the size of relaxation zone;Finally, the secondary top board structure classification indicators of dynamic pressure are determined by the dual influence synthesis adopted.The present invention is for closely efficiently production has extremely important directive significance for inclined seam roadway surrounding rock control, guarantee mine safety under goaf.

Description

Secondary top board structure quantitative analysis and its evaluation method based on inclined seam exploitation
Technical field
The present invention relates to coal mine coal seam production technique fields, and in particular to a kind of secondary top plate based on inclined seam exploitation Structure quantitative analysis and its evaluation method.
Background technology
During contiguous seams working from top down, underlying seam tunnel forms dynamic pressure under the dramatic impact of repeated mining The secondary top board structure that goaf spoil is formed behind tunnel and superjacent exploitation.Compared with single coal bed is exploited, top plate Apparent change has occurred in sand coated iron mold and mechanical mechanism.It is embodied in:Roadway surrounding rock deformation amount increases, and deformation is apparent, encloses Rock cranny development, plastic zone range expand, and ore deposit pressure shows acutely or even induction tunnel overall collapse is caving or bump. The production problem faced in inclined seam recovery process is necessarily more.
Invention content
Based on many problems that above-mentioned inclined seam in the prior art is faced in recovery process, the present invention proposes one Kind of the secondary top board structure quantitative analysis exploited based on inclined seam and its evaluation method, this method under goaf closely Inclined seam roadway surrounding rock control ensures that efficiently production has extremely important directive significance to mine safety.
Required technical problems to be solved are to achieve the above object:
For many technical barriers brought during closely inclined seam working from top down, it is put forward for the first time underlying seam One kind " secondary top board structure " that tunnel is formed under the influence of repeated mining.How selective analysis back is away from top goaf Interlamellar spacing and the secondary top board structure of dynamic pressure between inner link;How to realize to the quantitative forecast of secondary top board structure and sentence Disconnected, how the secondary top board structure criterion of dynamic pressure determines.
In order to solve the above technical problems, the present invention proposes following technical scheme:
Secondary top board structure quantitative analysis and its evaluation method based on inclined seam exploitation, which is characterized in that wrap successively Include following steps:
A, determine that superjacent adopts the extent of the destruction to bottom plate, i.e. gob floor rock stratum maximum plastic failure depth hmax, calculated by formula (1):
In formula (1), M-mining height, m;K-the factor of stress concentration, k=2;γ-overlying rock volume-weighted average, kN/m3;H— Coal seam buried depth, m;C-coal seam cohesive force, MPa;φ-coal seam internal friction angle, °;F-coal seam and roof and floor friction coefficient,ξ-triaxial stress coefficient,φf- floor strata internal friction angle, °;
B, determine that the extent of the destruction to top plate is adopted in lower section, i.e. the destruction height to top plate is adopted in lower section, is enclosed using tunnel Rock Supporting Theory of Broken Rock Zone determines, is divided into following sub-step:
B1, the country rock after roadway excavation is divided into relaxation zone, plastic zone and elastic region;
B2, the theory analysis for carrying out Exploring Loose Rock Country in Tunnels:
Rock mass is after excavating stress redistribution so that the stress distribution feature that secondary stress elastoplasticity occurs and deposits.For Simplified theory analysis, it is believed that circular tunnel digging is P in continuous, homogeneous, isotropism, in the stress of primary rock0Uniformly should In the field of force, when the secondary stress of hole wall exceeds the yield stress of rock mass, then wall rock mass in hole generates plastic zone, and plastic zone is a kind of pole Equilibrium state is limited, according to Elasticity, the balance differential equation that each point stress is met is as shown in Equation 2:
In formula (2), σθ- circumference stress, kg/cm2;σr- radial stress, kg/cm2;That is investigated in r-plastic zone appoints It anticipates the radius of a bit, cm;
B3, in plastic zone, since rock mass just starts to destroy, in state of limit equilibrium, each point stress should all meet not That-Coulomb strength criterion, as shown in formula (3):
In formula:The cohesive force of c-country rock, kg/cm2- internal friction angle, °;σθ- circumference stress, kg/cm2;σr- radially Stress, kg/cm2;The radius at any point investigated in r-plastic zone, cm.
Formula (3) is substituted into formula (2) to obtain shown in equation general solution such as formula (4):
c1For undetermined constant, determined according to boundary condition:On tunnel-surrounding, r=r0, σr=Pi;PiIt is stent to enclosing The counter-force of rock;
By r0And PiSubstitution formula (4) obtains formula (5):
B4, formula (5) substitution formula (3), (4) are obtained shown in plastic zone stress such as formula (6):
B5, formula (6) is substituted into the condition σ that elastic stress meetsrθ=2P0Obtain formula (7):
C, Exploring Loose Rock Country in Tunnels surveyed, analyzed, country rock is divided into little Song according further to the size L of relaxation zone Moving-coil, middle relaxation zone and big relaxation zone;
The small relaxation zone refers to 0≤L≤40cm;The middle relaxation zone refers to 40 < L≤150cm, and described is big Relaxation zone refers to L > 150cm.
D, it is adopted and the lower section described in the extent of the destruction of bottom plate and step b is adopted pair based on the superjacent described in step a The extent of the destruction of top plate determines the secondary top board structure classification indicators H of dynamic pressure by the dual influence synthesis adoptedG, basis Formula (8), which calculates, to be obtained:
HG=hmax+L (8);
I.e. as coal seam spacing hc≤HGWhen, back is considered as secondary top plate mechanical structure;Work as hc> HGWhen, then it is considered as original Raw top plate mechanical structure.
As the preferred embodiment of the present invention, superjacent adopts the destruction to bottom plate, is in master by passive stressed zone Move what is formed to goaf under the action of dynamic stress area and unfair stress area.
Preferably, when country rock is small relaxation zone, using shotcrete support or nude;When country rock is middle relaxation zone, Using the supporting of spray-up part or the part supporting of spray-up metal mesh;When country rock is big relaxation zone, locally propped up using spray-up metal mesh Shield or comprehensive treatment.
Advantageous effects caused by the present invention:
(1) it for the technical barrier that closely inclined seam working from top down is brought, has been put forward for the first time a kind of for multiple seam The quantitative analysis of the secondary roof overburden structure of exploitation and evaluation method;
(2) it based on Exploring Loose Rock Country in Tunnels theory, detects the plastic zone range of workings subject to dy namic pressure country rock and is classified to it, The overall stability in objective evaluation tunnel provides theoretical direction and scientific basis for Surrounding Rock Control, supporting optimum etc..
Description of the drawings
The present invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the secondary top plate mechanical structure figure of workings subject to dy namic pressure of the present invention;
Fig. 2 is the Mechanical Form figure adopted to Seam Floor Failure;
Fig. 3 is Exploring Loose Rock Country in Tunnels schematic diagram;
Fig. 4 is tunnel ambient stress distribution figure;
Fig. 5 is mechanical model figure.
In figure, 1, superjacent top plate, 2, superjacent goaf, 3, isolation rock stratum, 4, underlying seam, 5, relaxation zone, 6th, plastic zone, 7, elastic region.
In Fig. 1, the distance between l, workings subject to dy namic pressure and secondary top plate;The inclination angle of α, two layers coal;hc, coal seam spacing.
Specific embodiment
The present invention proposes a kind of secondary top board structure quantitative analysis exploited based on inclined seam and its evaluation method, is Make advantages of the present invention, technical solution clearer, clear and definite, elaborate to the present invention with reference to specific embodiment.
For many technical barriers brought during closely inclined seam working from top down, it is put forward for the first time underlying seam One kind " secondary top board structure " that tunnel is formed under the influence of repeated mining.Based on this, the analysis secondary top plate of workings subject to dy namic pressure is to enclosing The adverse effect of rock stability, and then choose rational supporting scheme for science and sufficient technological guidance and theoretical foundation are provided.
First, as shown in Figure 1, the inclination angle of two layers of coal is α, spacing hc, secondary top board structure refers to one above workings subject to dy namic pressure Set a distance l causes the rock beam superjacent top plate 1 broken to form after being exploited there are superjacent and the superjacent left is adopted Dead zone 2, the presence in superjacent goaf 2 show lower section strata behavior analysis of roadway influence greatly.It is mainly characterized by superjacent and adopts In small distance between 4 back of dead zone 2 and underlying seam, rock stratum 3 is isolated between the two to be influenced by dual adopt, and joint is split Gap is more developed, and isolation rock stratum 3 is substantially at mecystasis;In addition the presence in goaf causes the integrality of rock stratum, horizontal force Potentiality and natural equilibrium structure of transmission etc. are seriously damaged, spoil, part base object model rock beam and coal in the goaf of top Column, which shows lower section strata behavior analysis of roadway, to be influenced more violent, and the stability in tunnel is poor, general that apparent deformation occurs, and easily loses It is steady to destroy.
2nd, the secondary top board structure criterion " H of dynamic pressureG" determine
Top board structure classification indicators " HG" it is destruction to bottom plate to be adopted based on top and (pick lane) is adopted to top plate in lower section Extent of the destruction, i.e., integrated and determined by the dual influence adopted.
(1) superjacent adopts the destruction to bottom plate
According to existing research:In recovery process, floor rock under the action of branch bearing capacity, according to present position, Loading characteristic and mobile route form three areas, and I is main dynamic stress area, and II is unfair stress area, and III is passive stressed zone, is such as schemed Shown in 2.Passive stressed zone moves under the action of active stressed zone and unfair stress area to goaf, forms floor strata and breaks It is bad.
Gob floor rock stratum maximum plastic failure depth hmaxFor:
In formula:M-mining height, m;K-the factor of stress concentration, k=2;γ-overlying rock volume-weighted average, kN/m3;H-coal Layer buried depth, m;C-coal seam cohesive force, MPa;φ-coal seam internal friction angle, °;F-coal seam and roof and floor friction coefficient,ξ-triaxial stress coefficient,φf- floor strata internal friction angle, °.
(2) destruction of (pick lane) to top plate is adopted in lower section
Closely inclined seam back rock stratum by it is dual adopt influenced it is bigger, rock strength reduce, joint is split Gap development is serious, therefore can be approximately ravelly ground.(pick lane) is adopted in lower section can utilize roadway surrounding rock pine to the destruction height of top plate Moving-coil theory is determined.
Wall rock loosening ring is the important evidence for carrying out improving stability of surrounding rocks in roadway evaluation and carrying out Rational Support Design.It encloses in tunnel Rock relaxation zone support theory proposes after being furtherd investigate by China Mining University professor Dong Fangting to roadway surrounding rock state. The study found that the presence of wall rock loosening ring is the intrinsic characteristic in tunnel, its range (thickness value L) is at present using borehole imaging The instruments such as instrument (Detector for Wall Rock Crack), sonic apparatus or multipoint displacement meter are measured.The main object of roadway support is country rock The bulking deformation power generated during relaxation zone Emergence and Development, the source that anchor pole bears pulling force are the generation of relaxation zone, hair Exhibition;And according to the size of wall rock loosening ring thickness value L, be classified as it is small, in, big 3 class, and then obtain corresponding supporting mechanism and Prioritization scheme.
1. the stress state after roadway excavation
Before roadway excavation, rock mass is in virgin state of stress, causes rock mass internal stress again after roadway excavation Distribution, force-bearing of surrounding rock mass from three-dimensional become two to and pure stress, rock strength is caused different degrees of reduction occur, is broken Original original stress equilibrium state is broken, and generates stress concentration.If country rock concentrated stress value is less than the rock characterization after declining Intensity, then country rock is in elastic-plastic behavior, adjoining rock stability, otherwise country rock will destroy, and this destruction is gradually extended to deep, Until the three-dimensional stress equilibrium state for reaching new, occurs a loose zone of fracture in country rock at this time, this due to answering The relaxation zone of fracture that power effect generates is known as wall rock loosening ring, and mechanical characteristics show as stress reduction.Enclosing after roadway excavation Rock can be divided into loose rupture zone (relaxation zone 5), plastic zone 6 and elastic region 7, as shown in Figure 3.
Relaxation zone is bigger, and surrounding rock failure is more serious, and supporting is more difficult, and the factor for influencing Exploring Loose Rock Country in Tunnels size is main Have:Surrouding rock stress, rock strength, geological structure, tunnel span, roadway shape, digging time, groundwater effect, construction method, Support pattern and supporting intensity etc., relaxation zone are an overall targets under above-mentioned various factors collective effect.Rationally really The size of Exploring Loose Rock Country in Tunnels is determined for evaluation improving stability of surrounding rocks in roadway and supporting effect, optimization drift support type and supporting Parameter ensures that roadway support safety etc. has great importance.
2. the theory analysis of Exploring Loose Rock Country in Tunnels
Rock mass is after excavating stress redistribution so that the stress distribution feature that secondary stress elastoplasticity occurs and deposits.For Simplified theory analysis, be approximately considered circular tunnel digging in continuous, homogeneous, isotropism, in the stress of primary rock be P0It is equal In even stress field, mechanical model is as shown in Figure 4, Figure 5.
When the secondary stress of hole wall exceeds the yield stress of rock mass, then wall rock mass in hole generates plastic zone, and plastic zone is a kind of State of limit equilibrium, according to Elasticity, the balance differential equation that each point stress is met is:
In plastic zone, since rock mass just starts to destroy, in state of limit equilibrium, each point stress should all meet More- Coulomb strength criterion:
In formula:The cohesive force of c-country rock, kg/cm2- internal friction angle, °;σθ- circumference stress, kg/cm2;σr- radially Stress, kg/cm2;The radius at any point investigated in r-plastic zone, cm.
Formula (2) substitution formula (1) is obtained equation general solution is:
c1For undetermined constant, can be determined according to boundary condition:On tunnel-surrounding, r=r0, σr=Pi(PiIt is stent pair The counter-force of country rock).By r0And PiSubstitution formula (3):
Wushu (4) substitutes into formula (2), formula (3) obtains plastic zone stress and is:
Intersection (r=R in elastic region and plastic zone0), stress is continuous, so σrAnd σθBoth it should meet elastic region Stress distribution law, and the stress distribution law of plastic zone should be met, usually by the distance of this elastic separation to hole axis Referred to as plastic circle radius r.(5) formula is substituted into the condition σ of elastic stress satisfactionrθ=2P0
It can be obtained by formula (6), the stress of primary rock at the place of tunnel is bigger, and inelastic deformation is just bigger;Stent is to enclosing The counter-force of rock is bigger, and the radius of inelastic deformation is just smaller, does not have to stent such as, then the radius of inelastic deformation is maximum Value;Rock strength is smaller, and inelastic deformation is just bigger;Reflect on the area of tunnel to be exactly that tunnel radius is bigger, non-resilient change Shape area is also bigger.Illustrate Exploring Loose Rock Country in Tunnels and Surrounding Rock Strength, stress size and supporting situation are closely related.
3. the actual measurement and analysis of Exploring Loose Rock Country in Tunnels
This test records country rock in real time using CXK6 type Mine-used I. S borehole imagings instrument (using for reference the prior art) Image is ruptured to determine the size of workings subject to dy namic pressure wall rock loosening ring.CXK6 type Mine-used I. S borehole imagings instrument is suitable for coal mine All kinds of drillings detection under lower mal-condition, such as observation anchor shaft anchor cable hole, drawing-off gas hole, forward probe hole, coal seam rock stratum are surveyed Inspecting hole, geological prospecting hole and wall rock loosening ring etc. can accurately disclose underground engineering wall rock state, can be compared with reference to related analysis software Accurately speculate the attitude of rocks, cranny development spread scenarios and loose damage range etc., result of detection can be used for coal mine work area Roof delamination collapse emit, roadway surrounding rock rupture unstability, the disaster forewarning on engineering failure forecast of the undergrounds such as pitshaft failure by rupture;It can also be used for The parameter designings such as underground engineering suspension roof support, wall rock grouting reinforcing, roadway repair and underground engineering construction quality, supporting scheme are commented Estimate analysis etc., reliable, authentic and valid field data and analysis are provided for coal mine and geotechnical engineering.
4. Exploring Loose Rock Country in Tunnels is classified
1 Exploring Loose Rock Country in Tunnels classification chart of table
The purpose of rocvk classification is correctly to evaluate supporting difficulty, distinguishes main Supporting Object, propped up so as to reasonably determining Parameter and construction technology are protected, foundation is provided for similar roadway support design.Wall rock loosening ring size had both included influencing adjoining rock stability The factors of property, and reflect the interaction result of factors, it is a comprehensive classification indicators.Use wall rock loosening Circle classification country rock has following outstanding advantages:
A. the difficult problems such as the stress of primary rock, Surrounding Rock Strength, structure surface properties measure have been bypassed, but have caught them emphatically Influence as a result, i.e. relaxation zone is an overall target for including multifactor impact;
B. obtained by relaxation zone system field measurement, any hypothesis is not made in importance;
C. after relaxation zone size is by surveying acquisition, intuitively simple during supporting parameter, field application convenience is determined;
D. single integrated index classification is used, repeatability, the reliability of classification be not different with the experience of people difference;
E. the theory of relaxation zone sorting technique and practical basis are more solid, and technology system is formd with Design of bolt support Row.
With reference to bolt-spary supports mechanism, according to Roadway Support Theory Based On Broken Rock Zone, the size L according to relaxation zone divides country rock 150) and big relaxation zone for small relaxation zone (0~40cm, including endpoint value), middle relaxation zone (40~150cm, not including 40, including (being more than 150cm) six groups of three categories, are shown in Table 1.
In summary analysis is it is found that the prediction standard of secondary roof overburden structure is HG=hmax+L.I.e. as coal seam spacing hc ≤HGWhen, back is considered as secondary top plate mechanical structure;Work as hc> HGWhen, then it is considered as primary top plate mechanical structure.
It should be noted that:The simple replacement that those skilled in the art do these terms under the enlightenment of the present invention, It should all be within protection scope of the present invention.

Claims (3)

1. a kind of secondary top board structure quantitative analysis and its evaluation method based on inclined seam exploitation, which is characterized in that successively Include the following steps:
A, determine that superjacent adopts the extent of the destruction to bottom plate, i.e. gob floor rock stratum maximum plastic failure depth hmax, lead to Cross formula (1) calculating:
In formula (1), M-mining height, m;K-the factor of stress concentration, k=2;γ-overlying rock volume-weighted average, kN/m3;H-coal seam Buried depth, m;C-coal seam cohesive force, MPa;φ-coal seam internal friction angle, °;F-coal seam and roof and floor friction coefficient, ξ-triaxial stress coefficient,φf- floor strata internal friction angle, °;
B, determine that the extent of the destruction to top plate is adopted in lower section, i.e. the destruction height to top plate is adopted in lower section, utilizes roadway surrounding rock pine Moving-coil theory determines, is divided into following sub-step:
B1, the country rock after roadway excavation is divided into relaxation zone, plastic zone and elastic region;
B2, the theory analysis for carrying out Exploring Loose Rock Country in Tunnels:
Rock mass is after excavating stress redistribution so that the stress distribution feature that secondary stress elastoplasticity occurs and deposits, for letter Change theory analysis, it is believed that circular tunnel digging is P in continuous, homogeneous, isotropism, in the stress of primary rock0Uniform stress field In, when the secondary stress of hole wall exceeds the yield stress of rock mass, then wall rock mass in hole generates plastic zone, and plastic zone is that a kind of limit is put down Weighing apparatus state, according to Elasticity, shown in the balance differential equation such as formula (2) that each point stress is met:
In formula (2), σθ- circumference stress, kg/cm2;σr- radial stress, kg/cm2;Any point investigated in r-plastic zone Radius, cm;
B3, in plastic zone, since rock mass just starts to destroy, in state of limit equilibrium, each point stress should all meet More- Coulomb strength criterion, as shown in formula (3):
In formula:The cohesive force of c-country rock, kg/cm2- internal friction angle, °;σθ- circumference stress, kg/cm2;σr- radially should Power, kg/cm2;The radius at any point investigated in r-plastic zone, cm;
Formula (3) is substituted into formula (2) to obtain shown in equation general solution such as formula (4):
c1For undetermined constant, determined according to boundary condition:On tunnel-surrounding, r=r0, σr=Pi;PiIt is stent to country rock Counter-force;
By r0And PiSubstitution formula (4) obtains formula (5):
B4, formula (5) substitution formula (3), (4) are obtained shown in plastic zone stress such as formula (6):
B5, formula (6) is substituted into the condition σ that elastic stress meetsrθ=2P0Obtain formula (7):
C, Exploring Loose Rock Country in Tunnels surveyed, analyzed, country rock is divided into small loosening according further to the size L of relaxation zone Circle, middle relaxation zone and big relaxation zone;
The small relaxation zone refers to 0≤L≤40cm;The middle relaxation zone refers to 40 < L≤150cm, the big loosening Circle refers to L > 150cm;
D, it is adopted based on the superjacent described in step a and the lower section described in the extent of the destruction of bottom plate and step b is adopted to top plate Extent of the destruction, that is, pass through the dual influence synthesis adopted and determine dynamic pressure secondary top board structure classification indicators HG, according to formula (8) It calculates and obtains:
HG=hmax+L (8);
I.e. as coal seam spacing hc≤HGWhen, back is considered as secondary top plate mechanical structure;Work as hc> HGWhen, then it is considered as primary top plate Mechanical structure.
2. secondary top board structure quantitative analysis and its evaluation method according to claim 1 based on inclined seam exploitation, It is characterized in that:Superjacent adopts the destruction to bottom plate, is in active stressed zone and unfair stress area by passive stressed zone Move what is formed to goaf under effect.
3. secondary top board structure quantitative analysis and its evaluation method according to claim 1 based on inclined seam exploitation, It is characterized in that:When country rock is small relaxation zone, using shotcrete support or nude;When country rock is middle relaxation zone, use The supporting of spray-up part or the part supporting of spray-up metal mesh;When country rock is big relaxation zone, using the part supporting of spray-up metal mesh or Comprehensive treatment.
CN201810087055.9A 2018-01-30 2018-01-30 Secondary top board structure quantitative analysis and its evaluation method based on inclined seam exploitation Active CN108222937B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810087055.9A CN108222937B (en) 2018-01-30 2018-01-30 Secondary top board structure quantitative analysis and its evaluation method based on inclined seam exploitation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810087055.9A CN108222937B (en) 2018-01-30 2018-01-30 Secondary top board structure quantitative analysis and its evaluation method based on inclined seam exploitation

Publications (2)

Publication Number Publication Date
CN108222937A true CN108222937A (en) 2018-06-29
CN108222937B CN108222937B (en) 2019-03-12

Family

ID=62669562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810087055.9A Active CN108222937B (en) 2018-01-30 2018-01-30 Secondary top board structure quantitative analysis and its evaluation method based on inclined seam exploitation

Country Status (1)

Country Link
CN (1) CN108222937B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110610043A (en) * 2019-09-10 2019-12-24 辽宁工程技术大学 Method for calculating damage depth of inclined coal seam goaf bottom plate
CN111608707A (en) * 2020-04-29 2020-09-01 临沂矿业集团菏泽煤电有限公司 Rock burst dangerous roadway support method based on double-cylinder protection theory
CN111608663A (en) * 2020-04-29 2020-09-01 临沂矿业集团菏泽煤电有限公司 Omnibearing pressure relief method for rock burst dangerous roadway of thick coal seam working face
CN112267879A (en) * 2020-10-22 2021-01-26 山西工程技术学院 Method for determining grouting pressure of gas drilling and sealing
CN113449414A (en) * 2021-06-07 2021-09-28 西安科技大学 Three-layer structure-based bottom plate slippage failure depth calculation method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU836364A1 (en) * 1979-07-26 1981-06-07 Институт Горной Механики Им. Г.А.Цулукидзе Ah Грузинской Ccp Method of preventing dynamic phenomena at working of coal beds
US8113763B2 (en) * 1999-06-15 2012-02-14 Philippi-Hagenbuch, Inc. Process for three-dimensional modeling and design of off-highway dump bodies
CN103197041A (en) * 2012-01-05 2013-07-10 贵州省煤矿设计研究院 Technology for evaluating close distance coal seam group outburst danger level
CN104181611A (en) * 2014-08-28 2014-12-03 山东科技大学 Mine working face top board and bottom board mining breaking fracture development dynamic monitoring method
CN104794315A (en) * 2015-05-18 2015-07-22 辽宁工程技术大学 Coal seam floor damaged zone depth determination method based on improved rupture mechanical model
CN105160174A (en) * 2015-08-31 2015-12-16 安徽理工大学 Computing method of stope floor damage depth capable of considering artesian pressure action
CN107503795A (en) * 2017-08-29 2017-12-22 西安科技大学 A kind of stope drift active workings coal seam floor failure method of determining range

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU836364A1 (en) * 1979-07-26 1981-06-07 Институт Горной Механики Им. Г.А.Цулукидзе Ah Грузинской Ccp Method of preventing dynamic phenomena at working of coal beds
US8113763B2 (en) * 1999-06-15 2012-02-14 Philippi-Hagenbuch, Inc. Process for three-dimensional modeling and design of off-highway dump bodies
CN103197041A (en) * 2012-01-05 2013-07-10 贵州省煤矿设计研究院 Technology for evaluating close distance coal seam group outburst danger level
CN104181611A (en) * 2014-08-28 2014-12-03 山东科技大学 Mine working face top board and bottom board mining breaking fracture development dynamic monitoring method
CN104794315A (en) * 2015-05-18 2015-07-22 辽宁工程技术大学 Coal seam floor damaged zone depth determination method based on improved rupture mechanical model
CN105160174A (en) * 2015-08-31 2015-12-16 安徽理工大学 Computing method of stope floor damage depth capable of considering artesian pressure action
CN107503795A (en) * 2017-08-29 2017-12-22 西安科技大学 A kind of stope drift active workings coal seam floor failure method of determining range

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘亮: "《上煤层采动影响下煤层底板破坏特征试验研究》", 《煤炭与化工》 *
赵春波: "《采动底板岩体应力分布与破坏特征模拟研究》", 《内蒙古煤炭经济》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110610043A (en) * 2019-09-10 2019-12-24 辽宁工程技术大学 Method for calculating damage depth of inclined coal seam goaf bottom plate
CN111608707A (en) * 2020-04-29 2020-09-01 临沂矿业集团菏泽煤电有限公司 Rock burst dangerous roadway support method based on double-cylinder protection theory
CN111608663A (en) * 2020-04-29 2020-09-01 临沂矿业集团菏泽煤电有限公司 Omnibearing pressure relief method for rock burst dangerous roadway of thick coal seam working face
CN112267879A (en) * 2020-10-22 2021-01-26 山西工程技术学院 Method for determining grouting pressure of gas drilling and sealing
CN113449414A (en) * 2021-06-07 2021-09-28 西安科技大学 Three-layer structure-based bottom plate slippage failure depth calculation method

Also Published As

Publication number Publication date
CN108222937B (en) 2019-03-12

Similar Documents

Publication Publication Date Title
CN108222937B (en) Secondary top board structure quantitative analysis and its evaluation method based on inclined seam exploitation
Xie et al. Study on the mechanical properties and mechanical response of coal mining at 1000 m or deeper
Cheng et al. A zoning model for coal mining-induced strata movement based on microseismic monitoring
Konicek et al. Stress changes and seismicity monitoring of hard coal longwall mining in high rockburst risk areas
Zhang et al. An innovative non-pillar coal-mining technology with automatically formed entry: a case study
Xu et al. Investigation of key techniques on floor roadway support under the impacts of superimposed mining: theoretical analysis and field study
Guo et al. In-situ observations of damage-fracture evolution in surrounding rock upon unloading in 2400-m-deep tunnels
Shang et al. The drainage horizon determination of high directional long borehole and gas control effect analysis
Wu et al. Failure mechanism and stability control of surrounding rock in mining roadway with gentle slope and close distance
Zhen et al. Comparative study on two types of nonpillar mining techniques by roof cutting and by filling artificial materials
Sun et al. Physical model experiment and numerical analysis on innovative gob-side entry retaining with thick and hard roofs
Xingen et al. Research on the design of roof cutting parameters of non coal pillar gob-side entry retaining mining with roof cutting and pressure releasing
Fan et al. Improvement to the calculating model of the pressure arch’s height considering the confining pressure in the excavation of shallow tunnels
Jia et al. Identification of goaf instability under blasting disturbance using microseismic monitoring technology
Hu et al. Presplitting blasting the roof strata to control large deformation in the deep mine roadway
Sun et al. Analysis of roof deformation mechanism and control measures with roof cutting and pressure releasing in gob‐side entry retaining
Guo et al. A three-dimensional supporting technology, optimization and inspiration from a deep coal mine in China
CN112965139B (en) Advanced geological comprehensive forecasting method for tunnel with complex geological condition
Kong et al. The characteristics of roof breaking and the law of ground pressure behavior in fully mechanized top-coal caving face with large mining height
KaigeZheng et al. Evolution and management of thick-hard roof using goaf-based multistage hydraulic fracturing technology—a case study in western Chinese coal field
Wang et al. A roadway in close distance to coal seam in deep mine: location selection and supporting practice based on creep characteristics of surrounding rocks
Xue et al. Numerical investigation on overburden migration behaviors in stope under thick magmatic rocks
Liu et al. Rupture and migration law of disturbed overburden during slicing mining of steeply dipping thick coal seam
Zhang et al. Stability of a roadway below a coal seam under dynamic pressure: a case study of the 11123 floor gas drainage roadway of a mine in huainan, China
Høien et al. Analysis of the stabilising effect of ribs of reinforced sprayed concrete (RRS) in the Løren road tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant