CN108222519A - Reinforcing bar arrangement localization method - Google Patents

Reinforcing bar arrangement localization method Download PDF

Info

Publication number
CN108222519A
CN108222519A CN201711415954.9A CN201711415954A CN108222519A CN 108222519 A CN108222519 A CN 108222519A CN 201711415954 A CN201711415954 A CN 201711415954A CN 108222519 A CN108222519 A CN 108222519A
Authority
CN
China
Prior art keywords
positioning
reinforcing bar
blade
scale
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711415954.9A
Other languages
Chinese (zh)
Inventor
王钱凯
王晓旻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 5 Group Co Ltd filed Critical Shanghai Construction No 5 Group Co Ltd
Priority to CN201711415954.9A priority Critical patent/CN108222519A/en
Publication of CN108222519A publication Critical patent/CN108222519A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention provides a kind of reinforcing bar arrangement localization methods, the spacing of the positioning quick location control reinforcing bar of blade of muscle slot is put by carrying, pass through the elastic height that the height of blade is controlled on scale stent and then control reinforcing bar distance template of bolt of transposing, reduce or remit the unnecessary working time, the configuration of the present invention is simple, simple operation, Applied economy, efficient quick helps steel flxer people to arrange plate muscle spacing and height, reduce process during concrete reinforcement worker's arrangement reinforcing bar, increase accuracy during reinforcing bar arrangement, and then improve the quality and efficiency of reinforcing bar binding construction.

Description

Reinforcing bar arrangement localization method
Technical field
The present invention relates to a kind of reinforcing bar arrangement localization methods.
Background technology
In construction, reinforced bar engineering is the very important important component of entire project.Reinforcing bar binding was molded Journey needs to control the accuracy of the elements such as its fracture length, crotch angle, spacing, just can guarantee the effective bearing capacity of structure and builds The safety built, durability.
In the prior art, when plate muscle in construction site is bound, by worker according to drawing tape measure bar spacing, chalk is used Or other marking pens carried out in template spacing which, such as every 150mm draw a point, thereafter by reinforcing bar one one be positioned over note On number point, after setting bar spacing, then reinforcing bar lifted, concrete pad is placed in reinforcing bar lower part, next banding fixed again Another vertical direction reinforcing bar.
However reinforcing bar minor shifts is inevitably caused to misplace when lifting reinforcing bar, assembling reinforcement, and entire cloth muscle mistake Journey process is more, easy accumulated error.
Invention content
The purpose of the present invention is to provide a kind of reinforcing bar arrange localization method, can solve entire cloth muscle process compared with It is more, the problem of easy accumulated error.
To solve the above problems, the present invention provides a kind of reinforcing bar arrangement localization method, including:
Altitude scale is set on scale stent, the scale stent is set in template;
Muscle slot is put every default spacing with positioning rule, is opened up respectively vertically at the both ends of the positioning blade The limit hole in face direction opens up the positioning hole in parallel ground direction, by the scale branch respectively at the both ends of the positioning blade Frame is inserted into the limit hole, and the both ends of the positioning blade are individually fixed on a scale stent;
Positioning bolt is inserted into the positioning hole, by the positioning bolt and according to the altitude scale, described in adjusting Position height of the blade from the template;
The both ends of reinforcing bar respectively to be arranged are positioned over and regulates the positioning blade of height and puts in muscle slot;
Concrete pad is encased inside under reinforcing bar respectively to be arranged;
The positioning blade is extracted out from the both ends of each reinforcing bar to be arranged.
Further, in the above-mentioned methods, by the positioning bolt and according to the altitude scale, the positioning is adjusted Height of the blade from the template, including:
By the positioning bolt and according to the altitude scale, adjust the height of the positioning blade from template and be less than institute State 1~20 millimeter of the height of the concrete pad under reinforcing bar to be arranged.
Further, in the above-mentioned methods, with positioning rule before default spacing puts muscle slot, including:
The positioning rule is set as wood materials.
Further, in the above-mentioned methods, with positioning rule before default spacing puts muscle slot, including:
The length for setting the positioning blade is 1.5m~2m, and the thickness of the positioning blade is 20mm~30mm, described The height for positioning blade is 15mm~20mm.
Further, in the above-mentioned methods, the limiting in direction perpendicular to the ground is opened up respectively at the both ends of the positioning blade Hole opens up the positioning hole in parallel ground direction respectively at the both ends of the positioning blade, including:
A diameter of 10mm~the 20mm for opening up direction perpendicular to the ground respectively at the both ends of the positioning blade is limit hole;
Open up the positioning hole of a diameter of 10mm~15mm in parallel ground direction respectively at the both ends of the positioning blade.
Further, in the above-mentioned methods, it before positioning bolt being inserted into the positioning hole, further includes:
Preparation material is steel, nut is criss-cross positioning bolt.
Further, in the above-mentioned methods, it before positioning bolt being inserted into the positioning hole, further includes:
Prepare positioning bolt of the length for the half of the width of the positioning blade.
Further, in the above-mentioned methods, it before altitude scale being set on scale stent, further includes:
Prepare the scale stent that material is steel.
Further, in the above-mentioned methods, altitude scale is set on scale stent, the scale stent is set to mould On plate, including:
Prepare vertical scale bar, the setting altitude scale on the vertical scale bar;
Prepare the flat plate pad being positioned in the template, the flat plate pad is connect with the vertical scale bar;
The scale stent is inserted into the limit hole, including:
The vertical scale bar is inserted into the limit hole, the both ends of the positioning blade 1 are individually fixed in one On vertical scale bar.
Further, in the above-mentioned methods, prepare vertical scale bar, including:
Prepare the vertical scale bars of a diameter of 10mm-20mm;
Prepare the flat plate pad being positioned in the template, including:
Prepare the flat plate pad that the thickness being positioned in the template is 3mm-5mm.
Compared with prior art, the present invention puts the spacing of the positioning quick location control reinforcing bar of blade of muscle slot by carrying, The height of blade is controlled on scale stent to control the height of reinforcing bar distance template by the way that bolt of transposing is elastic, deduction and exemption need not The working time is wanted, the configuration of the present invention is simple, simple operation, Applied economy, efficient quick help steel flxer people to arrange plate Muscle spacing and height reduce process during concrete reinforcement worker's arrangement reinforcing bar, increase accuracy during reinforcing bar arrangement, and then improve reinforcing bar Bind the quality and efficiency of construction.
Description of the drawings
Fig. 1 is the structure diagram of the reinforcing bar arrangement positioning rule device of one embodiment of the invention;
Fig. 2 is the side schematic diagram of the reinforcing bar arrangement positioning rule device of one embodiment of the invention;
Fig. 3 is the reinforcing bar arrangement positioning rule device blade trepanning schematic diagram of one embodiment of the invention;
Fig. 4 is the reinforcing bar arrangement positioning rule device scale support schematic diagram of one embodiment of the invention;
In figure:1- positioning blade, 2- scales stent, 3- positioning bolt, 4- put muscle slot, 5- limit holes, 6- positioning holes, 7- and carve Spend the upright bar of stent, the flat plate pad of 8- scale stents.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, it is below in conjunction with the accompanying drawings and specific real Applying mode, the present invention is described in further detail.
As shown in figures 1-4, the present invention provides a kind of reinforcing bar arrangement positioning rule device, including:
Scale stent 2, the scale stent 2 are set in template, and altitude scale is provided on the scale stent 2;
Blade 1 is positioned, the both ends of the positioning blade 1 are individually fixed on a scale stent 2, the positioning blade 1 On be provided with every default spacing and put muscle slot 4, the both ends of the positioning blade 1 offer the limit hole in direction perpendicular to the ground respectively 5, the both ends of the positioning blade 1 offer the positioning hole 6 in parallel ground direction respectively, and the scale stent 2 is inserted into the limit Position hole 5;
Positioning bolt 3, the positioning bolt 3 is inserted into the positioning hole 6, to adjust the positioning according to the altitude scale Height of the blade 1 from the template.
Here, the present invention includes positioning blade 1, scale stent 2, bolt 3 of transposing is provided with and put on the positioning blade 1 Muscle slot 4, described to put muscle slot 4 for placing reinforcing bar, putting 4 spacing of muscle slot can need to customize;1 both ends of blade are square perpendicular to the ground To being provided with limit hole 5;The parallel ground direction in 1 both ends of blade is provided with positioning hole 6;The scale stent 2 is inserted into perpendicular to the ground To fix blade 1 in the limit hole 5 in direction;It is described positioning bolt 3 be inserted into parallel ground direction positioning hole 6, control blade 1 from The height of template.
The present invention puts the spacing of the positioning quick location control reinforcing bar of blade of muscle slot by carrying, elastic by bolt of transposing The height of blade is controlled on scale stent and then controls the height of reinforcing bar distance template, reduces or remits unnecessary working time, this hair Bright simple in structure, simple operation, Applied economy, efficient quick help steel flxer people to arrange plate muscle spacing and height, subtract Process during few concrete reinforcement worker's arrangement reinforcing bar increases accuracy during reinforcing bar arrangement, and then improves the quality that reinforcing bar binding is constructed And efficiency.
In one embodiment of reinforcing bar arrangement positioning rule device of the present invention, the height of the positioning blade 1 from template is less than institute State 1~20 millimeter of the height of the concrete pad under reinforcing bar to be arranged.
It here, can be by after the both ends for the reinforcing bar arranged be positioned over the putting and positioned in muscle slot of positioning blade, then Concrete pad is encased inside in the template of each non-placement positioning blade below reinforcing bar to be arranged, with each from lower support Reinforcing bar to be arranged realizes the compartment that the spacing distance for putting muscle slot is relied on to have good positioning each reinforcing bar to be arranged away from by institute Height of height of the positioning blade from template less than the concrete pad under reinforcing bar to be arranged is stated, after being encased inside concrete pad, The each height of reinforcing bar to be arranged from template can be raised slightly, at this point, convenient extract out from the both ends of each reinforcing bar to be arranged Reinforcing bar arrangement positioning rule device, in order to the recycling of reinforcing bar arrangement positioning rule device.
In one embodiment of reinforcing bar arrangement positioning rule device of the present invention, positioning blade 1 is wooden or other high-strength light materials Material to mitigate the weight of entire reinforcing bar arrangement positioning rule device, uses convenient for staff.
In one embodiment of reinforcing bar arrangement positioning rule device of the present invention, 1 length of the positioning blade is 1.5m~2m.
In one embodiment of reinforcing bar arrangement positioning rule device of the present invention, the thickness of the positioning blade 1 is 20mm~30mm.
In one embodiment of reinforcing bar arrangement positioning rule device of the present invention, a diameter of 10mm~20mm of the limit hole 5.
In one embodiment of reinforcing bar arrangement positioning rule device of the present invention, a diameter of 10mm~15mm of the positioning hole 6.
In one embodiment of reinforcing bar arrangement positioning rule device of the present invention, the height of the positioning blade 1 is 15mm~20mm.
In one embodiment of reinforcing bar arrangement positioning rule device of the present invention, the material of the positioning bolt 3 is steel, to ensure Use intensity, the nut of the positioning bolt is cross, personnel to be facilitated to grasp, with to height of the positioning blade from template into Row positioning.
In one embodiment of reinforcing bar arrangement positioning rule device of the present invention, the length of the positioning bolt 3 is the positioning rule The half of the width of body, to ensure the moderate length of positioning bolt, and ensure to realize positioning blade from form height Reliable adjustment.
In one embodiment of reinforcing bar arrangement positioning rule device of the present invention, 2 material of scale stent is steel, can with guarantee The bearing strength leaned on.
In one embodiment of reinforcing bar arrangement positioning rule device of the present invention, the scale stent 2 includes:
Vertical scale bar 7 is provided with altitude scale, the both ends difference of the positioning blade 1 on the vertical scale bar 7 It is fixed on a vertical scale bar 7, vertical 7 bar of scale is inserted into the limit hole 5;
The flat plate pad 8 being connect with the vertical scale bar 7, the flat plate pad 8 are positioned in the template.
Here, the positioning blade can be reliably fixed, and steady rest is set on ground by vertical scale bar and flat plate pad On.
In one embodiment of reinforcing bar arrangement positioning rule device of the present invention, the diameter of the vertical scale bar of the scale stent 2 For 10mm-20mm, to ensure enough bearing strengths.
In one embodiment of reinforcing bar arrangement positioning rule device of the present invention, the tablet mat thickness of the scale stent 2 is 3mm- 5mm, to ensure enough bearing strengths.
As shown in figures 1-4, it arranges localization method the present invention also provides a kind of reinforcing bar, including:
Step S1 sets altitude scale on scale stent 2, and the scale stent 2 is set in template;
Step S2 puts muscle slot 4 on positioning blade 1 every default spacing, in the both ends difference of the positioning blade 1 The limit hole 5 in direction perpendicular to the ground is opened up, the positioning hole 6 in parallel ground direction is opened up respectively at the both ends of the positioning blade 1, The scale stent 2 is inserted into the limit hole 5, the both ends of the positioning blade 1 are individually fixed in a scale stent 2 On;
Positioning bolt 3 is inserted into the positioning hole 6 by step S3, is carved by the positioning bolt 3 and according to the height Degree adjusts the positioning height of the blade 1 from the template;
The both ends of reinforcing bar respectively to be arranged are positioned over and regulate the positioning blade of height and put in muscle slot 4 by step S4;
Concrete pad is encased inside under reinforcing bar respectively to be arranged by step S5;
It here, can be by after the both ends for the reinforcing bar arranged be positioned over the putting and positioned in muscle slot of positioning blade, then Concrete pad is encased inside in the template of each non-placement positioning blade below reinforcing bar to be arranged, with each from lower support Reinforcing bar to be arranged, realize by the spacing distance for putting muscle slot have good positioning each reinforcing bar to be arranged compartment away from;
Step S6, from the both ends of each reinforcing bar the to be arranged extraction positioning blade 1.
The present invention puts the spacing of the positioning quick location control reinforcing bar of blade of muscle slot by carrying, elastic by bolt of transposing The height of blade is controlled on scale stent and then controls the height of reinforcing bar distance template, reduces or remits unnecessary working time, this hair Bright simple in structure, simple operation, Applied economy, efficient quick help steel flxer people to arrange plate muscle spacing and height, subtract Process during few concrete reinforcement worker's arrangement reinforcing bar increases accuracy during reinforcing bar arrangement, and then improves the quality that reinforcing bar binding is constructed And efficiency.
In reinforcing bar arrangement one embodiment of localization method of the present invention, step S3, by the positioning bolt and according to described Altitude scale adjusts the positioning height of the blade 1 from the template, including:
By the positioning bolt 3 and according to the altitude scale, adjust the positioning height of the blade 1 from template and be less than 1~20 millimeter of the height of concrete pad under the reinforcing bar to be arranged.
It here, can be by after the both ends for the reinforcing bar arranged be positioned over the putting and positioned in muscle slot of positioning blade, then Concrete pad is encased inside in the template of each non-placement positioning blade below reinforcing bar to be arranged, with each from lower support Reinforcing bar to be arranged realizes the compartment that the spacing distance for putting muscle slot is relied on to have good positioning each reinforcing bar to be arranged away from by institute Height of height of the positioning blade from template less than the concrete pad under reinforcing bar to be arranged is stated, after being encased inside concrete pad, The each height of reinforcing bar to be arranged from template can be raised slightly, at this point, convenient extract out from the both ends of each reinforcing bar to be arranged Reinforcing bar arrangement positioning rule device, in order to the recycling of reinforcing bar arrangement positioning rule device.
In reinforcing bar arrangement one embodiment of localization method of the present invention, step S2 is set on positioning blade 1 every default spacing Before putting muscle slot, including:
It is wood materials or other light-weight high-strength materials to set the positioning blade 1, to mitigate entire reinforcing bar arrangement positioning The weight of ruler device uses convenient for staff.
In reinforcing bar arrangement one embodiment of localization method of the present invention, step S2 is set on positioning blade 1 every default spacing Before putting muscle slot, including:
It is 1.5m~2m to set 1 length of the positioning blade, and the thickness of the positioning blade 1 is 20mm~30mm, described The height for positioning blade 1 is 15mm~20mm.
In reinforcing bar arrangement one embodiment of localization method of the present invention, step S2 is opened respectively at the both ends of the positioning blade 1 If the limit hole in direction perpendicular to the ground, the positioning hole in parallel ground direction, packet are opened up respectively at the both ends of the positioning blade 1 It includes:
A diameter of 10mm~the 20mm for opening up direction perpendicular to the ground respectively at the both ends of the positioning blade 1 is limit hole 5;
Open up the positioning hole 6 of a diameter of 10mm~15mm in parallel ground direction respectively at the both ends of the positioning blade 1.
In reinforcing bar arrangement one embodiment of localization method of the present invention, step S3, will positioning bolt be inserted into the positioning hole it Before, it further includes:
Preparation material is steel, nut is criss-cross positioning bolt 3.
Here, the material of the positioning bolt 3 is steel, to ensure use intensity, the nut of the positioning bolt is ten Font, personnel to be facilitated to grasp, to transpose to positioning height of the blade from template.
In reinforcing bar arrangement one embodiment of localization method of the present invention, step S3, will positioning bolt be inserted into the positioning hole it Before, it further includes:
Prepare positioning bolt of the length for the half of the width of the positioning blade 1, to ensure the length of positioning bolt Spend the reliable adjustment from form height that is moderate, and ensureing to realize positioning blade.
The present invention reinforcing bar arrangement one embodiment of localization method in, step S1, on scale stent 2 set altitude scale it Before, it further includes:
Prepare the scale stent 2 that material is steel, to ensure reliable bearing strength.
In reinforcing bar arrangement one embodiment of localization method of the present invention, step S1 sets altitude scale on scale stent, will The scale stent is set in template, including:
Prepare vertical scale bar 7, the setting altitude scale on the vertical scale bar 7;
Prepare the flat plate pad 8 being positioned in the template, the flat plate pad 8 is connect with the vertical scale bar 7;
The scale stent 2 is inserted into the limit hole by step S2, including:
The vertical scale bar 7 is inserted into the limit hole 5, the both ends of the positioning blade 1 are individually fixed in one On a vertical scale bar 7.
Here, the positioning blade can be reliably fixed, and steady rest is set on ground by vertical scale bar and flat plate pad On.
In reinforcing bar arrangement one embodiment of localization method of the present invention, prepare vertical scale bar 7, including:
Prepare the vertical scale bars 7 of a diameter of 10mm-20mm, to ensure enough bearing strengths;
Prepare the flat plate pad 8 being positioned in the template, including:
Prepare the flat plate pad 8 that the thickness being positioned in the template is 3mm-5mm, to ensure enough bearing strengths.
Each embodiment is described by the way of progressive in this specification, the highlights of each of the examples are with other The difference of embodiment, just to refer each other for identical similar portion between each embodiment.
Obviously, those skilled in the art can carry out invention spirit of the various modification and variations without departing from the present invention And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it Interior, then the present invention is also intended to including these modification and variations.

Claims (10)

  1. The localization method 1. a kind of reinforcing bar is arranged, which is characterized in that including:
    Altitude scale is set on scale stent, the scale stent is set in template;
    Muscle slot is put every default spacing with positioning rule, side perpendicular to the ground is opened up respectively at the both ends of the positioning blade To limit hole, open up the positioning hole in parallel ground direction respectively at the both ends of the positioning blade, the scale stent inserted Enter the limit hole, the both ends of the positioning blade are individually fixed on a scale stent;
    Positioning bolt is inserted into the positioning hole, by the positioning bolt and according to the altitude scale, adjusts the positioning Height of the blade from the template;
    The both ends of reinforcing bar respectively to be arranged are positioned over and regulates the positioning blade of height and puts in muscle slot;
    Concrete pad is encased inside under reinforcing bar respectively to be arranged;
    The positioning blade is extracted out from the both ends of each reinforcing bar to be arranged.
  2. The localization method 2. reinforcing bar as described in claim 1 is arranged, which is characterized in that by the positioning bolt and according to described Altitude scale adjusts the positioning height of the blade from the template, including:
    By the positioning bolt and according to the altitude scale, adjust height of the positioning blade from template and treated less than described 1~20 millimeter of the height of concrete pad under the reinforcing bar of arrangement.
  3. The localization method 3. reinforcing bar as described in claim 1 is arranged, which is characterized in that set with positioning rule every default spacing Before putting muscle slot, including:
    The positioning rule is set as wood materials.
  4. The localization method 4. reinforcing bar as described in claim 1 is arranged, which is characterized in that set with positioning rule every default spacing Before putting muscle slot, including:
    The length of the positioning blade is set for 1.5m~2m, the thickness of the positioning blade is 20mm~30mm, the positioning The height of blade is 15mm~20mm.
  5. The localization method 5. reinforcing bar as described in claim 1 is arranged, which is characterized in that opened respectively at the both ends of the positioning blade If the limit hole in direction perpendicular to the ground, the positioning hole in parallel ground direction is opened up respectively at the both ends of the positioning blade, including:
    A diameter of 10mm~the 20mm for opening up direction perpendicular to the ground respectively at the both ends of the positioning blade is limit hole;
    Open up the positioning hole of a diameter of 10mm~15mm in parallel ground direction respectively at the both ends of the positioning blade.
  6. The localization method 6. reinforcing bar as described in claim 1 is arranged, which is characterized in that will positioning bolt be inserted into the positioning hole it Before, it further includes:
    Preparation material is steel, nut is criss-cross positioning bolt.
  7. The localization method 7. reinforcing bar as described in claim 1 is arranged, which is characterized in that will positioning bolt be inserted into the positioning hole it Before, it further includes:
    Prepare positioning bolt of the length for the half of the width of the positioning blade.
  8. The localization method 8. reinforcing bar as described in claim 1 is arranged, which is characterized in that set on scale stent altitude scale it Before, it further includes:
    Prepare the scale stent that material is steel.
  9. The localization method 9. reinforcing bar as described in claim 1 is arranged, which is characterized in that altitude scale is set on scale stent, The scale stent is set in template, including:
    Prepare vertical scale bar, the setting altitude scale on the vertical scale bar;
    Prepare the flat plate pad being positioned in the template, the flat plate pad is connect with the vertical scale bar;
    The scale stent is inserted into the limit hole, including:
    The vertical scale bar is inserted into the limit hole, the both ends of the positioning blade 1 are individually fixed in one vertically On scale bar.
  10. The localization method 10. reinforcing bar as claimed in claim 9 is arranged, which is characterized in that prepare vertical scale bar, including:
    Prepare the vertical scale bars of a diameter of 10mm-20mm;
    Prepare the flat plate pad being positioned in the template, including:
    Prepare the flat plate pad that the thickness being positioned in the template is 3mm-5mm.
CN201711415954.9A 2017-12-25 2017-12-25 Reinforcing bar arrangement localization method Pending CN108222519A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711415954.9A CN108222519A (en) 2017-12-25 2017-12-25 Reinforcing bar arrangement localization method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711415954.9A CN108222519A (en) 2017-12-25 2017-12-25 Reinforcing bar arrangement localization method

Publications (1)

Publication Number Publication Date
CN108222519A true CN108222519A (en) 2018-06-29

Family

ID=62647946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711415954.9A Pending CN108222519A (en) 2017-12-25 2017-12-25 Reinforcing bar arrangement localization method

Country Status (1)

Country Link
CN (1) CN108222519A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235900A (en) * 2018-10-09 2019-01-18 河南中安征信建筑科技有限公司 Reinforcing bar arrangement positioning rule device and application method, integrated positioning ruler
CN109333804A (en) * 2018-11-14 2019-02-15 河南中安征信建筑科技有限公司 The handheld positioning device and application method of energy saving prefabricated component exposed steel bar
CN109520408A (en) * 2019-01-09 2019-03-26 谭斌 Bar spacing detection device and bar spacing measurement method
CN110578386A (en) * 2019-10-11 2019-12-17 河北建设集团股份有限公司 Steel bar positioning device suitable for foundation slab and floor slab

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5408799A (en) * 1992-12-15 1995-04-25 Ron; Eli Members for reinforcing, supporting and tying steel bars for reinforcing concrete
US20070028552A1 (en) * 2002-03-27 2007-02-08 Deloach W M Sr Tilt-up anchor and anchor pocket form
CN203049922U (en) * 2012-12-31 2013-07-10 新乡职业技术学院 Slab reinforcement positioning device
CN204626790U (en) * 2015-04-22 2015-09-09 中国十七冶集团有限公司 Floor bar locating support device
CN205206146U (en) * 2015-12-23 2016-05-04 建华建材(江西)有限公司 Reinforcing bar net fixed position support
CN205804770U (en) * 2016-07-08 2016-12-14 河北建筑工程学院 A kind of height-adjustable U-shaped stirrup
CN205935425U (en) * 2016-08-18 2017-02-08 江苏天启建设有限公司 Thick and concrete protective layer gauge control spare of board
CN106552889A (en) * 2015-09-25 2017-04-05 建研科技股份有限公司 Steel bar positioning device and method for preparing steel bar mesh by adopting same

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5408799A (en) * 1992-12-15 1995-04-25 Ron; Eli Members for reinforcing, supporting and tying steel bars for reinforcing concrete
US20070028552A1 (en) * 2002-03-27 2007-02-08 Deloach W M Sr Tilt-up anchor and anchor pocket form
CN203049922U (en) * 2012-12-31 2013-07-10 新乡职业技术学院 Slab reinforcement positioning device
CN204626790U (en) * 2015-04-22 2015-09-09 中国十七冶集团有限公司 Floor bar locating support device
CN106552889A (en) * 2015-09-25 2017-04-05 建研科技股份有限公司 Steel bar positioning device and method for preparing steel bar mesh by adopting same
CN205206146U (en) * 2015-12-23 2016-05-04 建华建材(江西)有限公司 Reinforcing bar net fixed position support
CN205804770U (en) * 2016-07-08 2016-12-14 河北建筑工程学院 A kind of height-adjustable U-shaped stirrup
CN205935425U (en) * 2016-08-18 2017-02-08 江苏天启建设有限公司 Thick and concrete protective layer gauge control spare of board

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235900A (en) * 2018-10-09 2019-01-18 河南中安征信建筑科技有限公司 Reinforcing bar arrangement positioning rule device and application method, integrated positioning ruler
CN109333804A (en) * 2018-11-14 2019-02-15 河南中安征信建筑科技有限公司 The handheld positioning device and application method of energy saving prefabricated component exposed steel bar
CN109520408A (en) * 2019-01-09 2019-03-26 谭斌 Bar spacing detection device and bar spacing measurement method
CN109520408B (en) * 2019-01-09 2020-10-27 谭斌 Steel bar spacing detection device and steel bar spacing measurement method
CN110578386A (en) * 2019-10-11 2019-12-17 河北建设集团股份有限公司 Steel bar positioning device suitable for foundation slab and floor slab
CN110578386B (en) * 2019-10-11 2024-08-16 河北建设集团股份有限公司 Reinforcing bar positioner suitable for foundation slab and floor

Similar Documents

Publication Publication Date Title
CN108222519A (en) Reinforcing bar arrangement localization method
CN108086692A (en) Reinforcing bar arrangement positioning rule device
CN203947423U (en) First open folding prestressed steel bundle transfer
CN205614824U (en) Prefabricated web reinforcement mould of T roof beam
CN108086305A (en) A kind of instrument and construction method of fixed steel bars cage bar spacing
CN103397711A (en) Multi-tube lattice type buckling restraining support
CN208088848U (en) Reinforcing bar arrangement positioning rule device
CN205607767U (en) Test FRP cloth stress relaxation's device
Kawahara et al. Fatigue crack growth from a surface flaw(in high strength steels)
CN205894677U (en) Jumbo size rhombus reinforcing bar concrete column template reinforcing apparatus
CN202937010U (en) Reinforcing device for construction
CN106988332A (en) A kind of ultra-deep waters aquatic pile foundation construction method
CN205024826U (en) Beam column core area sliding positioning stirrup device
CN204199185U (en) A kind of prestressed stretch-draw support
CN205502056U (en) A pre -buried landing leg split heads structure for tower crane foundation
CN207469234U (en) A kind of tool of fixed steel bars cage bar spacing
CN208282735U (en) A kind of cover to reinforcement detection instrument
Lee et al. Development of Steel Wire-Integrated Deck Plate Applicable to Slab with 180mm Thickness
CN204040485U (en) Bars In Poured Concrete Slab thickness and reinforcement cover control support
CN108789816A (en) A kind of positioning of detachable reinforcing steel and binding device and its construction method
CN205476517U (en) But reuse's floor lid muscle supports split heads
CN209307814U (en) Concrete road surface plastering construction trolley
CN205270663U (en) Curved machining tool of lightning -arrest reinforcing bar " second " word
CN202481643U (en) Dimension stone carrying auxiliary tool
CN209429112U (en) A kind of circulation hangs muscle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180629