CN108221785A - A kind of geological disaster roadblock cleaning equipment - Google Patents

A kind of geological disaster roadblock cleaning equipment Download PDF

Info

Publication number
CN108221785A
CN108221785A CN201711461078.3A CN201711461078A CN108221785A CN 108221785 A CN108221785 A CN 108221785A CN 201711461078 A CN201711461078 A CN 201711461078A CN 108221785 A CN108221785 A CN 108221785A
Authority
CN
China
Prior art keywords
shaft
sliding
gear
plate
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711461078.3A
Other languages
Chinese (zh)
Other versions
CN108221785B (en
Inventor
李孝发
吴紫燕
邹俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI NUCLEAR INDUSTRIAL ENGINEERING INVESTIGATION INSTITUTE CO., LTD.
Original Assignee
Nanchang Shounuo Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanchang Shounuo Technology Co Ltd filed Critical Nanchang Shounuo Technology Co Ltd
Priority to CN201711461078.3A priority Critical patent/CN108221785B/en
Publication of CN108221785A publication Critical patent/CN108221785A/en
Application granted granted Critical
Publication of CN108221785B publication Critical patent/CN108221785B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H1/00Removing undesirable matter from roads or like surfaces, with or without moistening of the surface
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H1/00Removing undesirable matter from roads or like surfaces, with or without moistening of the surface
    • E01H1/005Mobile installations, particularly for upkeeping in situ road or railway furniture, for instance road barricades, traffic signs; Mobile installations particularly for upkeeping tunnel walls
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H1/00Removing undesirable matter from roads or like surfaces, with or without moistening of the surface
    • E01H1/02Brushing apparatus, e.g. with auxiliary instruments for mechanically loosening dirt
    • E01H1/04Brushing apparatus, e.g. with auxiliary instruments for mechanically loosening dirt taking- up the sweepings, e.g. for collecting, for loading
    • E01H1/047Collecting apparatus characterised by the hopper or by means for unloading the hopper

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Handcart (AREA)

Abstract

The present invention relates to a kind of roadblock cleaning equipment more particularly to a kind of geological disaster roadblock cleaning equipments.The technical problem to be solved in the present invention is to provide it is a kind of save the time, operating personnel are not easy geological disaster roadblock cleaning equipment injured, that cleaning efficiency is higher.The present invention provides such a geological disaster roadblock cleaning equipments, include cart etc.;It is equipped at the top of the sweep of cart and moves left and right device, move left and right at the top of the moving parts of device that left is vertically-mounted support plate, support plate top horizontal is equipped with top plate, support plate right side top is equipped with prizing device, top plate right is provided with opening, pushing meanss are equipped in opening, pushing meanss coordinate with prizing device.The present invention is by moving left and right device, moving left and right device drives prizing device and pushing meanss to be moved toward right, prizing device agitates roadblock, pushing meanss push the roadblock agitated, so as to achieve the effect that save the time, operating personnel be not easy that injured, cleaning efficiency is higher.

Description

A kind of geological disaster roadblock cleaning equipment
Technical field
The present invention relates to a kind of roadblock cleaning equipment more particularly to a kind of geological disaster roadblock cleaning equipments.
Background technology
Geological disaster, geology technical term refer to what is formed under the action of nature or human factor, and the mankind are given birth to The geologic process that life property, environment are damaged and lost(Phenomenon).As avalanche, landslide, mud-rock flow, ground fissure, soil erosion, Desertification and bogginess, the salinization of soil and earthquake, volcano, underground heat evil etc..
Roadblock is the obstacle in showing the way, and influences traffic, the barrier for the upper setting that shows the way.
After general geological disaster, the roadblock on highway there are many meetings, these roadblocks very influence traffic, the prior art In need when clearing up roadblock to take a substantial amount of time, operating personnel are easily injured, cleaning efficiency is low, therefore there is an urgent need for research and development It is a kind of save the time, operating personnel are not easy geological disaster roadblock cleaning equipment injured, that cleaning efficiency is higher.
Invention content
(1)Technical problems to be solved
The present invention needs to take a substantial amount of time when having to overcome and clear up roadblock in technology, operating personnel are easily injured, The shortcomings that cleaning efficiency is low, the technical problem to be solved in the present invention is to provide it is a kind of save the time, operating personnel be not easy it is injured, Cleaning efficiency higher geological disaster roadblock cleaning equipment.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a geological disaster roadblock cleaning equipments, include and push away Vehicle moves left and right device, prizing device, support plate, top plate and pushing meanss, is equipped at the top of the sweep of cart and moves left and right device, Move left and right that left at the top of the moving parts of device is vertically-mounted a support plate, support plate top horizontal is equipped with top plate, on the right side of support plate Face top is equipped with prizing device, and top plate right is provided with opening, is equipped with pushing meanss in opening, pushing meanss are matched with prizing device It closes.
Preferably, it moves left and right device and includes the first sliding block, installing plate, the first spring, electronic reel and bracing wire, push away Sliding slot is provided at the top of the sweep of vehicle, is equipped with the first sliding block in sliding slot, the first sliding block and sliding slot horizontally slip cooperation, the first sliding block top Portion is equipped with installing plate, is connected with the first spring between left in the first sliding block right side and sliding slot, left is equipped in sliding slot Electronic reel is wound with bracing wire on electronic reel, and end of pulling is connect with the first sliding block left side.
Preferably, prizing device include the first mounting blocks, the first motor, first rotating shaft, first gear, the first sliding rail, Second sliding block, connecting rod, rack, the second mounting blocks, wraping plate, second spring and link block, top plate bottom left are equipped with first Mounting blocks are symmetrically equipped with the first motor before and after the first mounting blocks, are connected on the output shaft of the first motor by shaft coupling Have first rotating shaft, be mounted on first gear in first rotating shaft, before and after support plate right side it is symmetrical it is vertically-mounted have the first sliding rail, First sliding rail right side is equipped with the second sliding block, and the second sliding block and the first sliding rail slide up and down cooperation, and the second sliding block right side is equal Connecting rod is installed, connecting rod right side is mounted on rack, first through hole is symmetrically provided with before and after top plate left, and rack passes through First through hole, rack are located at first gear left, and rack is engaged with first gear, and installing plate crown center is equipped with the second installation Block, is connected with wraping plate at the top of the second mounting blocks by way of axis pin connection, at the top of wraping plate left before and after the symmetrical company of being equipped with Block is connect, is connect by way of articulated connection with rack bottom at the top of link block, wraping plate bottom left and left at the top of installing plate Between be connected with second spring.
Preferably, pushing meanss include first bearing seat, the second shaft, roller, plectrum, the first belt pulley, the second skin Belt wheel and flat belt, installing plate right are provided with opening, in opening it is front and rear it is symmetrical it is Embedded first bearing seat is installed, first Bearing in bearing block is connected with the second shaft, and roller, the evenly spaced connection of roller lateral surface are equipped in the middle part of the second shaft There is plectrum, the second shaft rear and front end both passes through top plate, and the second shaft rear and front end is mounted on the first belt pulley, first rotating shaft Outer end is mounted on the second belt pulley, and the first belt pulley is connect by flat belt with the second belt pulley.
Preferably, further included collection device, collection device include montant, motion bar, collection frame, contact block, transverse slat, Contact wheel and third spring, the sweep bottom right of cart are equipped with montant, and montant bottom end is connected by way of articulated connection There is collection frame, the sweep right side to the front of cart is provided with the first guide hole, is equipped with motion bar vertically in the first guide hole, motion bar is located at In front of first spring, motion bar bottom end is connect by way of articulated connection with side to the front among collection frame inner top, installing plate Bottom left is equipped with contact block, and motion bar top is equipped with transverse slat, contact wheel, contact wheel and contact block are equipped at the top of transverse slat Cooperation, is connected with third spring between transverse slat bottom and sliding slot inner top.
Preferably, clearing apparatus has been further included, clearing apparatus includes the second motor, second gear, second bearing seat, Three shafts, third gear and hairbrush, are equipped with the second motor among the sweep bottom left of cart, on the output shaft of the second motor Second gear is installed, the sweep bottom left front and rear sides of cart are mounted on second bearing seat, and second bearing seat is located at the Two motor front and rear sides, the bearing in second bearing seat are connected with third shaft, third gear are mounted in the middle part of third shaft, Third gear is engaged with second gear, and third shaft bottom end is mounted on hairbrush.
Preferably, sliding bar, wheel and the 4th spring have been further included, collection frame outer bottom left is provided with the second guide hole, the Sliding bar is equipped in two guide holes vertically, sliding bar and the second guide hole slide up and down cooperation, and sliding bar top in the second guide hole with pushing up The 4th spring is connected between portion, sliding bar bottom end is equipped with wheel.
Operation principle:During using the present invention, operating personnel first pass through cart and push away the present invention toward the place specified, and restart Device is moved left and right, device is moved left and right and prizing device and pushing meanss is driven to be moved toward right, treats prizing device and push to fill It puts after turning right and being moved to suitable position, operating personnel close and move left and right device, and that treats prizing device agitates component and roadblock After contact, operating personnel start prizing device, and prizing device agitates roadblock, at the same prizing device driving pushing meanss to roadblock into Row pushes, and so as to clear up roadblock, after roadblock cleans out, operating personnel close prizing device, restart and move left and right device, Moving left and right device drives prizing device and pushing meanss to be moved toward left, treats that prizing device and pushing meanss are moved to toward left Behind suitable position, operating personnel close and move left and right device.
Because moving left and right device includes the first sliding block, installing plate, the first spring, electronic reel and bracing wire, cart Sweep at the top of be provided with sliding slot, be equipped with the first sliding block in sliding slot, the first sliding block and sliding slot horizontally slip cooperation, the first slider top Installing plate is installed, is connected with the first spring between left in the first sliding block right side and sliding slot, left is equipped with electricity in sliding slot Reel is moved, is wound with bracing wire on electronic reel, end of pulling is connect with the first sliding block left side.So operating personnel start electricity Dynamic reel puts bracing wire, and under the action of the first spring, for the first sliding block toward moving right, the first sliding block drives installing plate is past to move to right It is dynamic, so as to which prizing device and pushing meanss be driven to be moved toward right;Operating personnel start electronic reel and reel line, and bracing wire pulls For first sliding block toward moving left, while the first spring stretches therewith, the first sliding block drives installing plate is past to move left.
Because prizing device includes the first mounting blocks, the first motor, first rotating shaft, first gear, the first sliding rail, second Sliding block, connecting rod, rack, the second mounting blocks, wraping plate, second spring and link block, top plate bottom left are equipped with the first installation Block is symmetrically equipped with the first motor before and after the first mounting blocks, is connected with by shaft coupling on the output shaft of the first motor One shaft, is mounted on first gear in first rotating shaft, before and after support plate right side it is symmetrical it is vertically-mounted have the first sliding rail, first Sliding rail right side is equipped with the second sliding block, and the second sliding block and the first sliding rail slide up and down cooperation, and the second sliding block right side is respectively mounted There is connecting rod, connecting rod right side is mounted on rack, and first through hole is symmetrically provided with before and after top plate left, and rack passes through first Through-hole, rack are located at first gear left, and rack is engaged with first gear, and installing plate crown center is equipped with the second mounting blocks, Wraping plate is connected at the top of second mounting blocks by way of axis pin connection, wraping plate left is symmetrically equipped with connection before and after top Block connect by way of articulated connection with rack bottom at the top of link block, wraping plate bottom left and installing plate top left it Between be connected with second spring.So operating personnel cause wraping plate to be contacted with roadblock, restart the first motor reversal, the first electricity Machine drives first rotating shaft reversion, and first rotating shaft drives first gear reversion, and first gear band carry-over bar moves down, the first sliding rail It play the guiding role with the second sliding block, rack drives wraping plate left moves down, and second spring is compressed therewith, and wraping plate right is past therewith Upper movement, from roadblock is agitated, after roadblock is agitated, operating personnel control the first motor to rotate forward, and the first motor drives first turn Axis rotates forward, and first rotating shaft drives first gear to rotate forward, and first gear band carry-over bar up moves, under the action of second spring, Wraping plate can remain the state of right low left high, so that the present invention uses enhanced convenience, after roadblock cleans out, Operating personnel close the first motor.
Because pushing meanss include first bearing seat, the second shaft, roller, plectrum, the first belt pulley, the second belt pulley And flat belt, installing plate right are provided with opening, it is front and rear in opening symmetrical Embedded first bearing seat, clutch shaft bearing to be installed Bearing in seat is connected with the second shaft, and roller is equipped in the middle part of the second shaft, and evenly spaced be connected with of roller lateral surface is dialled Piece, the second shaft rear and front end both pass through top plate, and the second shaft rear and front end is mounted on the first belt pulley, first rotating shaft outer end The second belt pulley is mounted on, the first belt pulley is connect by flat belt with the second belt pulley.So first rotating shaft reversion drives Second belt pulley inverts, and the second belt pulley drives the first belt pulley to invert by flat belt, and the first belt pulley drives the second shaft Reversion, the reversion of the second shaft drive roller reversion, and roller drives plectrum reversion, so as to which the roadblock that wraping plate sticks up be dialled toward right It is dynamic, so that the effect of roadblock cleaning is more preferable.
Because having further included collection device, collection device includes montant, motion bar, collection frame, contact block, transverse slat, connects Wheel trolley and third spring, the sweep bottom right of cart are equipped with montant, and montant bottom end is connected with by way of articulated connection Collection frame, the sweep right side to the front of cart are provided with the first guide hole, are equipped with motion bar in the first guide hole vertically, and motion bar is located at the In front of one spring, motion bar bottom end is connect by way of articulated connection with side to the front among collection frame inner top, installing plate bottom Portion left is equipped with contact block, and motion bar top is equipped with transverse slat, is equipped with contact wheel at the top of transverse slat, contact wheel is matched with contact block It closes, third spring is connected between transverse slat bottom and sliding slot inner top.So when installing plate is toward when moving right, installing plate drive connects Contact block is toward moving right, and after contact block is contacted with contact wheel, contact wheel drives motion bar to move down, and motion bar drives collection frame Right moves down, and third spring compresses therewith, and after collection frame right is contacted with ground, the rubble on ground will cart therewith It moves and is collected into collection frame, after the rubble collection in collection frame has been expired, operating personnel can take out rubble, when After contact block leaves contact wheel, under the action of third spring, motion bar can be moved up, and motion bar drives collection frame right past Upper movement, you can so that collection frame resets.
Because having further included clearing apparatus, clearing apparatus includes the second motor, second gear, second bearing seat, third Shaft, third gear and hairbrush are equipped with the second motor among the sweep bottom left of cart, pacify on the output shaft of the second motor Equipped with second gear, the sweep bottom left front and rear sides of cart are mounted on second bearing seat, and second bearing seat is located at second Motor front and rear sides, the bearing in second bearing seat are connected with third shaft, third gear are mounted in the middle part of third shaft, the Three gears are engaged with second gear, and third shaft bottom end is mounted on hairbrush.So operating personnel start the rotation of the second motor, the Two motors drive second gear rotation, and second gear drives the rotation of third gear, and third gear drives the rotation of third shaft, third Shaft band electric brush rotates, so that hairbrush clears up the sand on ground, after for clearance, operating personnel close Second motor.
Because having further included sliding bar, wheel and the 4th spring, collection frame outer bottom left is provided with the second guide hole, and second leads Be equipped with sliding bar in hole vertically, sliding bar and the second guide hole slide up and down cooperation, sliding bar top and the second guide hole inner top it Between be connected with the 4th spring, sliding bar bottom end is equipped with wheel.So under the action of wheel, collection frame when moving will not be by Abrasion, under the action of sliding bar and the 4th spring, wheel can be contacted with ground always.
(3)Advantageous effect
The present invention moves left and right device and prizing device and pushing meanss is driven to be moved toward right, agitate by moving left and right device Device agitates roadblock, and pushing meanss push the roadblock agitated, and time, operator are saved so as to reach Member is not easy effect injured, that cleaning efficiency is higher.
Description of the drawings
Fig. 1 is the schematic cross-sectional view of the first front view of the present invention.
Fig. 2 is the structure diagram of prizing device of the present invention and the bottom view of pushing meanss.
Fig. 3 is the schematic cross-sectional view of second of front view of the present invention.
Fig. 4 is the schematic cross-sectional view of the first front view of collection device of the present invention.
Fig. 5 is the schematic cross-sectional view of the third front view of the present invention.
Fig. 6 is the schematic cross-sectional view of the right view of clearing apparatus of the present invention.
Fig. 7 is the schematic cross-sectional view of second of front view of collection device of the present invention.
Label in attached drawing for:1- carts, 2- move left and right device, 3- prizing devices, 4- support plates, 5- top plates, 6- promotions Device, the first sliding blocks of 21-, 22- installing plates, the first springs of 23-, the electronic reels of 24-, 25- bracing wires, the first mounting blocks of 31-, The first motors of 32-, 33- first rotating shafts, 34- first gears, the first sliding rails of 35-, the second sliding blocks of 36-, 37- connecting rods, 38- teeth Item, the second mounting blocks of 39-, 310- wraping plates, 311- second springs, 312- link blocks, 61- first bearing seats, the second shafts of 62-, 63- rollers, 64- plectrums, the first belt pulleys of 65-, the second belt pulleys of 66-, 67- flat belts, 7- collection devices, 71- montants, 72- Motion bar, 73- collection frames, 74- contact blocks, 75- transverse slats, 76- contact wheels, 77- third springs, 8- clearing apparatus, the second electricity of 81- Machine, 82- second gears, 83- second bearing seats, 84- third shafts, 85- third gears, 86- hairbrush, 9- sliding bars, 10- wheels Son, the 4th springs of 11-.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of geological disaster roadblock cleaning equipment as shown in figs. 1-7, includes cart 1, moves left and right device 2, prizing device 3rd, support plate 4, top plate 5 and pushing meanss 6, the sweep top of cart 1, which is equipped with, moves left and right device 2, moves left and right the movement of device 2 Component top left is vertically-mounted support plate 4, and 4 top horizontal of support plate is equipped with top plate 5, and 4 right side top of support plate is equipped with and agitates Device 3,5 right of top plate are provided with opening, are equipped with pushing meanss 6 in opening, pushing meanss 6 coordinate with prizing device 3.
Embodiment 2
A kind of geological disaster roadblock cleaning equipment as shown in figs. 1-7, includes cart 1, moves left and right device 2, prizing device 3rd, support plate 4, top plate 5 and pushing meanss 6, the sweep top of cart 1, which is equipped with, moves left and right device 2, moves left and right the movement of device 2 Component top left is vertically-mounted support plate 4, and 4 top horizontal of support plate is equipped with top plate 5, and 4 right side top of support plate is equipped with and agitates Device 3,5 right of top plate are provided with opening, are equipped with pushing meanss 6 in opening, pushing meanss 6 coordinate with prizing device 3.
It moves left and right device 2 and includes the first sliding block 21, installing plate 22, the first spring 23, electronic reel 24 and bracing wire 25, sliding slot is provided at the top of the sweep of cart 1, is equipped with the first sliding block 21 in sliding slot, the first sliding block 21 and sliding slot horizontally slip cooperation, The top of first sliding block 21 is equipped with installing plate 22, and the first spring is connected between left in 21 right side of the first sliding block and sliding slot 23, left is equipped with electronic reel 24 in sliding slot, and bracing wire 25,25 end of bracing wire and the first sliding block are wound on electronic reel 24 21 left sides connect.
Embodiment 3
A kind of geological disaster roadblock cleaning equipment as shown in figs. 1-7, includes cart 1, moves left and right device 2, prizing device 3rd, support plate 4, top plate 5 and pushing meanss 6, the sweep top of cart 1, which is equipped with, moves left and right device 2, moves left and right the movement of device 2 Component top left is vertically-mounted support plate 4, and 4 top horizontal of support plate is equipped with top plate 5, and 4 right side top of support plate is equipped with and agitates Device 3,5 right of top plate are provided with opening, are equipped with pushing meanss 6 in opening, pushing meanss 6 coordinate with prizing device 3.
It moves left and right device 2 and includes the first sliding block 21, installing plate 22, the first spring 23, electronic reel 24 and bracing wire 25, sliding slot is provided at the top of the sweep of cart 1, is equipped with the first sliding block 21 in sliding slot, the first sliding block 21 and sliding slot horizontally slip cooperation, The top of first sliding block 21 is equipped with installing plate 22, and the first spring is connected between left in 21 right side of the first sliding block and sliding slot 23, left is equipped with electronic reel 24 in sliding slot, and bracing wire 25,25 end of bracing wire and the first sliding block are wound on electronic reel 24 21 left sides connect.
Prizing device 3 includes the first mounting blocks 31, the first motor 32, first rotating shaft 33, first gear 34, the first sliding rail 35th, the second sliding block 36, connecting rod 37, rack 38, the second mounting blocks 39, wraping plate 310, second spring 311 and link block 312, top 5 bottom left of plate is equipped with the first mounting blocks 31, and the first motor 32, the first motor are symmetrically equipped with before and after the first mounting blocks 31 First rotating shaft 33 is connected with by shaft coupling on 32 output shaft, first gear 34, support plate 4 are mounted in first rotating shaft 33 Symmetrically vertically-mounted before and after right side to have the first sliding rail 35,35 right side of the first sliding rail is equipped with the second sliding block 36, and second slides 36 and first sliding rail 35 of block slides up and down cooperation, and 36 right side of the second sliding block is mounted on connecting rod 37,37 right side of connecting rod Rack 38 is mounted on, first through hole is symmetrically provided with before and after 5 left of top plate, rack 38 passes through first through hole, and rack 38 is located at 34 left of first gear, rack 38 are engaged with first gear 34, and 22 crown center of installing plate is equipped with the second mounting blocks 39, and second The top of mounting blocks 39 is connected with wraping plate 310 by way of axis pin connection, at the top of 310 left of wraping plate before and after the symmetrical company of being equipped with Block 312 is connect, 312 top of link block is connect by way of articulated connection with 38 bottom of rack, 310 bottom left of wraping plate and installation Plate is connected with second spring 311 between 22 top left.
Embodiment 4
A kind of geological disaster roadblock cleaning equipment as shown in figs. 1-7, includes cart 1, moves left and right device 2, prizing device 3rd, support plate 4, top plate 5 and pushing meanss 6, the sweep top of cart 1, which is equipped with, moves left and right device 2, moves left and right the movement of device 2 Component top left is vertically-mounted support plate 4, and 4 top horizontal of support plate is equipped with top plate 5, and 4 right side top of support plate is equipped with and agitates Device 3,5 right of top plate are provided with opening, are equipped with pushing meanss 6 in opening, pushing meanss 6 coordinate with prizing device 3.
It moves left and right device 2 and includes the first sliding block 21, installing plate 22, the first spring 23, electronic reel 24 and bracing wire 25, sliding slot is provided at the top of the sweep of cart 1, is equipped with the first sliding block 21 in sliding slot, the first sliding block 21 and sliding slot horizontally slip cooperation, The top of first sliding block 21 is equipped with installing plate 22, and the first spring is connected between left in 21 right side of the first sliding block and sliding slot 23, left is equipped with electronic reel 24 in sliding slot, and bracing wire 25,25 end of bracing wire and the first sliding block are wound on electronic reel 24 21 left sides connect.
Prizing device 3 includes the first mounting blocks 31, the first motor 32, first rotating shaft 33, first gear 34, the first sliding rail 35th, the second sliding block 36, connecting rod 37, rack 38, the second mounting blocks 39, wraping plate 310, second spring 311 and link block 312, top 5 bottom left of plate is equipped with the first mounting blocks 31, and the first motor 32, the first motor are symmetrically equipped with before and after the first mounting blocks 31 First rotating shaft 33 is connected with by shaft coupling on 32 output shaft, first gear 34, support plate 4 are mounted in first rotating shaft 33 Symmetrically vertically-mounted before and after right side to have the first sliding rail 35,35 right side of the first sliding rail is equipped with the second sliding block 36, and second slides 36 and first sliding rail 35 of block slides up and down cooperation, and 36 right side of the second sliding block is mounted on connecting rod 37,37 right side of connecting rod Rack 38 is mounted on, first through hole is symmetrically provided with before and after 5 left of top plate, rack 38 passes through first through hole, and rack 38 is located at 34 left of first gear, rack 38 are engaged with first gear 34, and 22 crown center of installing plate is equipped with the second mounting blocks 39, and second The top of mounting blocks 39 is connected with wraping plate 310 by way of axis pin connection, at the top of 310 left of wraping plate before and after the symmetrical company of being equipped with Block 312 is connect, 312 top of link block is connect by way of articulated connection with 38 bottom of rack, 310 bottom left of wraping plate and installation Plate is connected with second spring 311 between 22 top left.
Pushing meanss 6 include first bearing seat 61, the second shaft 62, roller 63, plectrum 64, the first belt pulley 65, Two belt pulleys 66 and flat belt 67,22 right of installing plate are provided with opening, front and rear in opening symmetrical Embedded to be equipped with first Bearing block 61, the bearing in first bearing seat 61 are connected with the second shaft 62, and 62 middle part of the second shaft is equipped with roller 63, roller 63 lateral surfaces are evenly spaced to be connected with plectrum 64, and 62 rear and front end of the second shaft both passes through top plate 5, two before and after the second shaft 62 End is mounted on the first belt pulley 65, and 33 outer end of first rotating shaft is mounted on the second belt pulley 66, and the first belt pulley 65 passes through flat Belt 67 is connect with the second belt pulley 66.
Collection device 7 is further included, collection device 7 includes montant 71, motion bar 72, collection frame 73, contact block 74, horizontal stroke Plate 75, contact wheel 76 and third spring 77, the sweep bottom right of cart 1 are equipped with montant 71, and 71 bottom end of montant passes through hinged The mode of connection is connected with collection frame 73, and the sweep right side to the front of cart 1 is provided with the first guide hole, is equipped with vertically in the first guide hole Motion bar 72, motion bar 72 are located at the front of the first spring 23,72 bottom end of motion bar by way of articulated connection with collection frame 73 The side connection to the front of inner top centre, 22 bottom left of installing plate are equipped with contact block 74, and 72 top of motion bar is equipped with transverse slat 75, 75 top of transverse slat is equipped with contact wheel 76, and contact wheel 76 coordinates with contact block 74, connects between 75 bottom of transverse slat and sliding slot inner top It is connected to third spring 77.
Further included clearing apparatus 8, clearing apparatus 8 include the second motor 81, second gear 82, second bearing seat 83, Third shaft 84, third gear 85 and hairbrush 86 are equipped with the second motor 81, the second electricity among the sweep bottom left of cart 1 Second gear 82 is installed, the sweep bottom left front and rear sides of cart 1 are mounted on second bearing seat on the output shaft of machine 81 83, second bearing seat 83 is located at 81 front and rear sides of the second motor, and the bearing in second bearing seat 83 is connected with third shaft 84, and Three shafts, 84 middle part is mounted on third gear 85, and third gear 85 is engaged with second gear 82, and 84 bottom end of third shaft is pacified Equipped with hairbrush 86.
Sliding bar 9,10 and the 4th spring 11 of wheel have been further included, 73 outer bottom left of collection frame is provided with the second guide hole, the Sliding bar 9 is equipped in two guide holes vertically, 9 and second guide hole of sliding bar slides up and down cooperation, in 9 top of sliding bar and the second guide hole The 4th spring 11 is connected between top, 9 bottom end of sliding bar is equipped with wheel 10.
Operation principle:During using the present invention, operating personnel first pass through cart 1 and push away the present invention toward the place specified, then open It is dynamic to move left and right device 2, it moves left and right device 2 and prizing device 3 and pushing meanss 6 is driven to be moved toward right, treat 3 He of prizing device Pushing meanss 6 are turned right be moved to suitable position after, operating personnel close move left and right device 2, that treats prizing device 3 agitates portion After part is contacted with roadblock, operating personnel start prizing device 3, and prizing device 3 agitates roadblock, while the driving of prizing device 3 pushes Device 6 pushes roadblock, and so as to clear up roadblock, after roadblock cleans out, operating personnel close prizing device 3, then open It is dynamic to move left and right device 2, it moves left and right device 2 and prizing device 3 and pushing meanss 6 is driven to be moved toward left, treat 3 He of prizing device After pushing meanss 6 are moved to suitable position toward left, operating personnel close and move left and right device 2.
Because moving left and right device 2 includes the first sliding block 21, installing plate 22, the first spring 23,24 and of electronic reel Bracing wire 25, the sweep top of cart 1 are provided with sliding slot, are equipped with the first sliding block 21 in sliding slot, the first sliding block 21 horizontally slips with sliding slot Cooperation, the top of the first sliding block 21 are equipped with installing plate 22, and first is connected between left in 21 right side of the first sliding block and sliding slot Spring 23, left is equipped with electronic reel 24 in sliding slot, and bracing wire 25,25 end of bracing wire and first are wound on electronic reel 24 21 left side of sliding block connects.So operating personnel start electronic reel 24 and put bracing wire 25, under the action of the first spring 23, the One sliding block 21 is toward moving right, and the first sliding block 21 drives installing plate 22 toward moving right, so as to drive prizing device 3 and pushing meanss 6 It is moved toward right;Operating personnel start electronic reel 24 and reel line 25, and bracing wire 25 pulls the first sliding block 21 toward moving left, simultaneously First spring 23 stretches therewith, and the first sliding block 21 drives installing plate 22 is past to move left.
Because prizing device 3 includes the first mounting blocks 31, the first motor 32, first rotating shaft 33, first gear 34, first Sliding rail 35, the second sliding block 36, connecting rod 37, rack 38, the second mounting blocks 39, wraping plate 310, second spring 311 and link block 312,5 bottom left of top plate is equipped with the first mounting blocks 31, and the first motor 32 is symmetrically equipped with before and after the first mounting blocks 31, the First rotating shaft 33 is connected with by shaft coupling on the output shaft of one motor 32, first gear is mounted in first rotating shaft 33 34, before and after 4 right side of support plate it is symmetrical it is vertically-mounted have the first sliding rail 35,35 right side of the first sliding rail is equipped with the second sliding block 36, the second sliding block 36 and the first sliding rail 35 slide up and down cooperation, and 36 right side of the second sliding block is mounted on connecting rod 37, connecting rod 37 right sides are mounted on rack 38, and first through hole is symmetrically provided with before and after 5 left of top plate, and rack 38 passes through first through hole, tooth Item 38 is located at 34 left of first gear, and rack 38 is engaged with first gear 34, and 22 crown center of installing plate is equipped with the second installation Block 39, the top of the second mounting blocks 39 are connected with wraping plate 310 by way of axis pin connection, at the top of 310 left of wraping plate before and after it is symmetrical Link block 312 is installed, 312 top of link block is connect by way of articulated connection with 38 bottom of rack, 310 bottom of wraping plate Left and installing plate are connected with second spring 311 between 22 top left.So operating personnel cause wraping plate 310 to be carried out with roadblock Contact, restarts the first motor 32 and inverts, and the first motor 32 drives first rotating shaft 33 to invert, and first rotating shaft 33 drives first gear 34 reversions, first gear 34 move down with carry-over bar 38, and the first sliding rail 35 and the second sliding block 36 play the guiding role, 38 band of rack Dynamic 310 left of wraping plate moves down, and second spring 311 is compressed therewith, and 310 right of wraping plate is up moved therewith, from agitating roadblock, After roadblock is agitated, operating personnel control the first motor 32 to rotate forward, and the first motor 32 drives first rotating shaft 33 to rotate forward, first turn Axis 33 drives first gear 34 to rotate forward, and first gear 34 is up moved with carry-over bar 38, under the action of second spring 311, is stuck up Plate 310 can remain the state of right low left high, so that the present invention treats that roadblock cleans out using enhanced convenience Afterwards, operating personnel close the first motor 32.
Because pushing meanss 6 include first bearing seat 61, the second shaft 62, roller 63, plectrum 64, the first belt pulley 65th, the second belt pulley 66 and flat belt 67,22 right of installing plate are provided with opening, front and rear in opening symmetrical Embedded to be equipped with First bearing seat 61, the bearing in first bearing seat 61 are connected with the second shaft 62, and 62 middle part of the second shaft is equipped with roller 63, 63 lateral surface of roller is evenly spaced to be connected with plectrum 64, and 62 rear and front end of the second shaft both passes through top plate 5, before the second shaft 62 Both ends are mounted on the first belt pulley 65 afterwards, and 33 outer end of first rotating shaft is mounted on the second belt pulley 66, and the first belt pulley 65 is logical Flat belt 67 is crossed to connect with the second belt pulley 66.So the reversion of first rotating shaft 33 drives the second belt pulley 66 to invert, the second belt Wheel 66 drives the first belt pulley 65 to invert by flat belt 67, and the first belt pulley 65 drives the second shaft 62 to invert, the second shaft 62 reversions drive roller 63 to invert, and roller 63 drives plectrum 64 to invert, so as to which the roadblock that wraping plate 310 sticks up be dialled toward right It is dynamic, so that the effect of roadblock cleaning is more preferable.
Because having further included collection device 7, collection device 7 includes montant 71, motion bar 72, collection frame 73, contact block 74th, transverse slat 75, contact wheel 76 and third spring 77, the sweep bottom right of cart 1 are equipped with montant 71, and 71 bottom end of montant passes through The mode of articulated connection is connected with collection frame 73, and the sweep right side to the front of cart 1 is provided with the first guide hole, vertical in the first guide hole Equipped with motion bar 72, motion bar 72 is located at the front of the first spring 23, and 72 bottom end of motion bar is by way of articulated connection and collection The side connection to the front of 73 inner top of frame centre, 22 bottom left of installing plate are equipped with contact block 74, and 72 top of motion bar is equipped with horizontal stroke Plate 75, the top of transverse slat 75 are equipped with contact wheel 76, and contact wheel 76 coordinates with contact block 74,75 bottom of transverse slat and sliding slot inner top it Between be connected with third spring 77.So when installing plate 22 is toward when moving right, installing plate 22 drives contact block 74 toward moving right, when connecing After contact block 74 is contacted with contact wheel 76, contact wheel 76 drives motion bar 72 to move down, and motion bar 72 drives 73 right of collection frame It moves down, third spring 77 compresses therewith, and after 73 right of collection frame is contacted with ground, the rubble on ground will cart 1 therewith Move and be collected into collection frame 73, when in collection frame 73 rubble collection expired after, operating personnel can be by rubble It takes out, after contact block 74 leaves contact wheel 76, under the action of third spring 77, motion bar 72 can be moved up, motion bar It up moves 72 73 rights of drive collection frame, you can so that collection frame 73 resets.
Because having further included clearing apparatus 8, clearing apparatus 8 includes the second motor 81, second gear 82, second bearing seat 83rd, third shaft 84, third gear 85 and hairbrush 86, are equipped with the second motor 81 among the sweep bottom left of cart 1, and second Second gear 82 is installed, the sweep bottom left front and rear sides of cart 1 are mounted on second bearing on the output shaft of motor 81 Seat 83, second bearing seat 83 are located at 81 front and rear sides of the second motor, and the bearing in second bearing seat 83 is connected with third shaft 84, 84 middle part of third shaft is mounted on third gear 85, and third gear 85 is engaged with second gear 82, and 84 bottom end of third shaft is equal Hairbrush 86 is installed.So operating personnel start the second motor 81 and rotate, the second motor 81 drives second gear 82 to rotate, second Gear 82 drives third gear 85 to rotate, and third gear 85 drives third shaft 84 to rotate, and third shaft 84 is revolved with electric brush 86 Turn, so that hairbrush 86 clears up the sand on ground, after for clearance, operating personnel close the second motor 81 and are It can.
Because having further included sliding bar 9,10 and the 4th spring 11 of wheel, 73 outer bottom left of collection frame is provided with second and leads Hole, sliding bar 9 is equipped in the second guide hole vertically, and 9 and second guide hole of sliding bar slides up and down cooperation, 9 top of sliding bar and second The 4th spring 11 is connected between guide hole inner top, 9 bottom end of sliding bar is equipped with wheel 10.So under the action of wheel 10, Collection frame 73 will not be worn when moving, under the action of 9 and the 4th spring 11 of sliding bar, wheel 10 can always with ground into Row contact.
Embodiment described above only expresses the preferred embodiment of the present invention, and description is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (7)

1. a kind of geological disaster roadblock cleaning equipment, which is characterized in that include cart(1), move left and right device(2), sled Dynamic device(3), support plate(4), top plate(5)And pushing meanss(6), cart(1)Sweep at the top of be equipped with move left and right device(2), Move left and right device(2)Moving parts at the top of left is vertically-mounted support plate(4), support plate(4)Top horizontal is equipped with top plate (5), support plate(4)Right side top is equipped with prizing device(3), top plate(5)Right is provided with opening, and pushing meanss are equipped in opening (6), pushing meanss(6)With prizing device(3)Cooperation.
2. a kind of geological disaster roadblock cleaning equipment according to claim 1, which is characterized in that move left and right device (2)Include the first sliding block(21), installing plate(22), the first spring(23), electronic reel(24)And bracing wire(25), cart (1)Sweep at the top of be provided with sliding slot, the first sliding block is equipped in sliding slot(21), the first sliding block(21)It horizontally slips cooperation with sliding slot, First sliding block(21)Top is equipped with installing plate(22), the first sliding block(21)In right side and sliding slot first is connected between left Spring(23), left is equipped with electronic reel in sliding slot(24), electronic reel(24)On be wound with bracing wire(25), bracing wire(25) End and the first sliding block(21)Left side connects.
A kind of 3. geological disaster roadblock cleaning equipment according to claim 2, which is characterized in that prizing device(3)Packet The first mounting blocks are included(31), the first motor(32), first rotating shaft(33), first gear(34), the first sliding rail(35), second slide Block(36), connecting rod(37), rack(38), the second mounting blocks(39), wraping plate(310), second spring(311)And link block (312), top plate(5)Bottom left is equipped with the first mounting blocks(31), the first mounting blocks(31)It is front and rear to be symmetrically equipped with first Motor(32), the first motor(32)Output shaft on first rotating shaft is connected with by shaft coupling(33), first rotating shaft(33)On It is mounted on first gear(34), support plate(4)It is symmetrically vertically-mounted before and after right side to have the first sliding rail(35), the first sliding rail (35)Right side is equipped with the second sliding block(36), the second sliding block(36)With the first sliding rail(35)Slide up and down cooperation, the second sliding block (36)Right side is mounted on connecting rod(37), connecting rod(37)Right side is mounted on rack(38), top plate(5)Before and after left Symmetrically it is provided with first through hole, rack(38)Across first through hole, rack(38)Positioned at first gear(34)Left, rack(38) With first gear(34)Engagement, installing plate(22)Crown center is equipped with the second mounting blocks(39), the second mounting blocks(39)Top Wraping plate is connected with by way of axis pin connection(310), wraping plate(310)Link block is symmetrically installed before and after at the top of left (312), link block(312)Top is by way of articulated connection and rack(38)Bottom connects, wraping plate(310)Bottom left with Installing plate(22)Top is connected with second spring between left(311).
A kind of 4. geological disaster roadblock cleaning equipment according to claim 3, which is characterized in that pushing meanss(6)Packet First bearing seat is included(61), the second shaft(62), roller(63), plectrum(64), the first belt pulley(65), the second belt pulley (66)And flat belt(67), installing plate(22)Right is provided with opening, front and rear in opening symmetrical Embedded to be equipped with first axle Bearing(61), first bearing seat(61)Interior bearing is connected with the second shaft(62), the second shaft(62)Middle part is equipped with roller (63), roller(63)Lateral surface is evenly spaced to be connected with plectrum(64), the second shaft(62)Rear and front end both passes through top plate (5), the second shaft(62)Rear and front end is mounted on the first belt pulley(65), first rotating shaft(33)Outer end is mounted on the second skin Belt wheel(66), the first belt pulley(65)Pass through flat belt(67)With the second belt pulley(66)Connection.
5. a kind of geological disaster roadblock cleaning equipment according to claim 4, which is characterized in that further included collection dress It puts(7), collection device(7)Include montant(71), motion bar(72), collection frame(73), contact block(74), transverse slat(75), connect Wheel trolley(76)With third spring(77), cart(1)Sweep bottom right montant is installed(71), montant(71)Bottom end passes through hinge The mode connect in succession is connected with collection frame(73), cart(1)Sweep right side to the front be provided with the first guide hole, erected in the first guide hole Directly it is equipped with motion bar(72), motion bar(72)Positioned at the first spring(23)Front, motion bar(72)Bottom end passes through articulated connection Mode and collection frame(73)The side connection to the front of inner top centre, installing plate(22)Bottom left is equipped with contact block(74), activity Bar(72)Top is equipped with transverse slat(75), transverse slat(75)Top is equipped with contact wheel(76), contact wheel(76)With contact block(74) Cooperation, transverse slat(75)Third spring is connected between bottom and sliding slot inner top(77).
6. a kind of geological disaster roadblock cleaning equipment according to claim 5, which is characterized in that further included cleaning dress It puts(8), clearing apparatus(8)Include the second motor(81), second gear(82), second bearing seat(83), third shaft(84)、 Third gear(85)And hairbrush(86), cart(1)Sweep bottom left among the second motor is installed(81), the second motor (81)Output shaft on second gear is installed(82), cart(1)Sweep bottom left front and rear sides be mounted on the second axis Bearing(83), second bearing seat(83)Positioned at the second motor(81)Front and rear sides, second bearing seat(83)Interior bearing is connected with Third shaft(84), third shaft(84)Middle part is mounted on third gear(85), third gear(85)With second gear(82) Engagement, third shaft(84)Bottom end is mounted on hairbrush(86).
7. a kind of geological disaster roadblock cleaning equipment according to claim 6, which is characterized in that further included sliding bar (9), wheel(10)With the 4th spring(11), collection frame(73)Outer bottom left is provided with the second guide hole, is set vertically in the second guide hole There is sliding bar(9), sliding bar(9)Cooperation, sliding bar are slided up and down with the second guide hole(9)Between top and the second guide hole inner top It is connected with the 4th spring(11), sliding bar(9)Bottom end is equipped with wheel(10).
CN201711461078.3A 2017-12-28 2017-12-28 A kind of geological disaster roadblock cleaning equipment Active CN108221785B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711461078.3A CN108221785B (en) 2017-12-28 2017-12-28 A kind of geological disaster roadblock cleaning equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711461078.3A CN108221785B (en) 2017-12-28 2017-12-28 A kind of geological disaster roadblock cleaning equipment

Publications (2)

Publication Number Publication Date
CN108221785A true CN108221785A (en) 2018-06-29
CN108221785B CN108221785B (en) 2019-06-21

Family

ID=62645574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711461078.3A Active CN108221785B (en) 2017-12-28 2017-12-28 A kind of geological disaster roadblock cleaning equipment

Country Status (1)

Country Link
CN (1) CN108221785B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111631628A (en) * 2020-05-18 2020-09-08 罗文兵 Belt cleaning device that paediatrics nursing was used

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1031661A2 (en) * 1999-02-24 2000-08-30 Honda Giken Kogyo Kabushiki Kaisha Snow removing vehicle
CN2470400Y (en) * 2001-03-20 2002-01-09 沈阳大学 Snow removing machine
US20130074376A1 (en) * 2011-09-22 2013-03-28 Viv Engineering Inc. Snow-plowing apparatus
CN205711947U (en) * 2016-04-20 2016-11-23 洪勇军 A kind of efficient snow-removing device of highway
CN107217624A (en) * 2017-05-09 2017-09-29 芜湖思科生产力促进中心有限公司 One kind fallen leaves cleaning car
CN206614831U (en) * 2017-02-28 2017-11-07 象山艾尔沃特智能科技有限公司 A kind of construction site recycles car with discarded irony leftover pieces

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1031661A2 (en) * 1999-02-24 2000-08-30 Honda Giken Kogyo Kabushiki Kaisha Snow removing vehicle
CN2470400Y (en) * 2001-03-20 2002-01-09 沈阳大学 Snow removing machine
US20130074376A1 (en) * 2011-09-22 2013-03-28 Viv Engineering Inc. Snow-plowing apparatus
CN205711947U (en) * 2016-04-20 2016-11-23 洪勇军 A kind of efficient snow-removing device of highway
CN206614831U (en) * 2017-02-28 2017-11-07 象山艾尔沃特智能科技有限公司 A kind of construction site recycles car with discarded irony leftover pieces
CN107217624A (en) * 2017-05-09 2017-09-29 芜湖思科生产力促进中心有限公司 One kind fallen leaves cleaning car

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111631628A (en) * 2020-05-18 2020-09-08 罗文兵 Belt cleaning device that paediatrics nursing was used
CN111631628B (en) * 2020-05-18 2022-02-22 济南市儿童医院 Belt cleaning device that paediatrics nursing was used

Also Published As

Publication number Publication date
CN108221785B (en) 2019-06-21

Similar Documents

Publication Publication Date Title
CN206405096U (en) A kind of windshield wiper joint making cleaning equipment
CN106733754A (en) A kind of big data LED display surface dust cleaning apparatus
CN204544426U (en) A kind of slag deironing apparatus
CN107470129B (en) Sand screening equipment for building
CN107497673A (en) A kind of rare earth screening plant
CN107583720A (en) One kind building removal portable type rubbish mashing device
CN108118660A (en) A kind of wooden bridge beam removes accumulated snow equipment
CN106582978A (en) Efficient rare earth crushing device for rare earth waste recycling
CN107127008A (en) A kind of mining industry ore quick crashing device
CN107866423A (en) A kind of rectangular pipe fittings inwall deashing device
CN108221785A (en) A kind of geological disaster roadblock cleaning equipment
CN109172141A (en) A kind of wear-type double auditory canal cleaner
CN109078878A (en) A kind of reciprocal wiping clearing apparatus
CN106944190A (en) Talcum powder producing device is used in a kind of household water filter production
CN108185918A (en) A kind of teaching fitter training iron chips cleaning device
CN111594187A (en) Road tunnel engineering construction method
CN108560697A (en) A kind of construction water ditch various articles collecting apparatus
CN106890784A (en) A kind of traffic route asphalt concrete pavement surface building stones knot screen
CN102613101B (en) Automatic feeding equipment
CN111576363A (en) Trash rack cleaning system
CN206015766U (en) Double directive wheel mechanical types for power station soil-shifting door machine are removed contamination slusher
CN211070428U (en) Screen cloth of four-axis shredder
CN108341320A (en) A kind of cleaning device between elevator door and sill
CN208824040U (en) A kind of anticlogging hydraulic engineering water filter device
CN206843979U (en) A kind of efficient vehicle stopping device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190425

Address after: 230000 B-1512, west of Ganquan Road, Shushan District, Hefei, Anhui.

Applicant after: Anhui Eagle Dragon Industrial Design Co., Ltd.

Address before: 330000 West Side of Second Floor, No. 899, Torch Five Road, Nanchang High-tech Industrial Development Zone, Nanchang City, Jiangxi Province

Applicant before: Nanchang shounuo Technology Co. Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190522

Address after: 710054 No. 301 Xiying Road, Yanta District, Xi'an City, Shaanxi Province

Applicant after: SHAANXI NUCLEAR INDUSTRIAL ENGINEERING INVESTIGATION INSTITUTE CO., LTD.

Address before: 230000 B-1512, west of Ganquan Road, Shushan District, Hefei, Anhui.

Applicant before: Anhui Eagle Dragon Industrial Design Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant