CN108200395A CN201810011894.2A CN201810011894A CN108200395A CN 108200395 A CN108200395 A CN 108200395A CN 201810011894 A CN201810011894 A CN 201810011894A CN 108200395 A CN108200395 A CN 108200395A
Authority
CN
China
Prior art keywords
video
image
data
sewage disposal
pumping plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810011894.2A
Other languages
Chinese (zh)
Inventor
刘才校
杨再礼
王志松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Far Automatic Control Technology Co Ltd
Original Assignee
Guizhou Far Automatic Control Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Far Automatic Control Technology Co Ltd filed Critical Guizhou Far Automatic Control Technology Co Ltd
Priority to CN201810011894.2A priority Critical patent/CN108200395A/en
Publication of CN108200395A publication Critical patent/CN108200395A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
    • H04N7/181Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast for receiving images from a plurality of remote sources

Landscapes

  • Engineering & Computer Science (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Selective Calling Equipment (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The invention discloses a kind of unattended Sewage Disposals based on the processing of equipment operation image video, multigroup for corresponding to the acquisition of the image/video at the sewage disposal scene at pumping plant including image/video camera unit, and are sent to corresponding scene PCL control units;Live PCL control units, the image/video gathered data for receiving the transmission of image/video camera unit carry out coded treatment, send data transfer unit to;And the control signal of data transfer unit transmission is received, control being turned on or off for current pumping plant;Remote control center for receiving the image/video gathered data after coded treatment, and carries out decoding process, and exports control signal to data transfer unit;Also send the terminal phone that short message prompt is used to Sewage Disposal administrative staff;The present invention's realizes long-range unattended purpose, and intelligence degree is high, has a good application prospect.

Description

Unattended Sewage Disposal based on the processing of equipment operation image video
Technical field
The present invention relates to automatic monitoring technology fields, and in particular to it is a kind of based on equipment operation image video processing nobody Sewage Disposal on duty.
Background technology
Sewage Disposal is the dirt discharged from pollution sources(It is useless)Water, it is higher because containing the total amount of pollutant or concentration, row is not achieved Standard requirement or capacity requirement like a fish out of water are put, during so as to reduce quality of water environment and functional objective, it is necessary to by artificial strong Change the place of processing.For the needs of environmental protection, Sewage Disposal is widely used.At present, Sewage Disposal on the market, It also needs to artificial on duty, carries out switch Sewage Disposal as needed, it is still, artificial on duty to prevent the waste of the energy, it needs A large amount of manpower financial capacity is put into, it is time-consuming and laborious, it is inconvenient, how to detect image/video, remote network control and sewage Treating stations are combined, and are realized automation control, are current problems to be solved.
Invention content
Technical problem solved by the invention is to overcome existing Sewage Disposal, artificial on duty, needs input a large amount of Manpower financial capacity, it is time-consuming and laborious, the problem of being inconvenient.The unattended dirt based on the processing of equipment operation image video of the present invention Water treatment station, by the image/video camera unit at scene, at the coding sent by multimode fibre to live PCL control units Image/video gathered data Long Distant Transmit after reason is realized remote monitoring, and increase encryption message, is protected to remote control center The reliability of data transmission is demonstrate,proved, the unique ID code that will correspond to pumping plant is subjected to data encapsulation, the image/video acquisition after encapsulation The coding standard of data fit H265 video flowings, the positioning convenient for transmission and to pumping plant realize long-range unattended purpose, Intelligence degree is high, has a good application prospect.
In order to solve the above-mentioned technical problem, the technical solution adopted in the present invention is:
A kind of unattended Sewage Disposal based on the processing of equipment operation image video, it is characterised in that:Including
Image/video camera unit using optical zoom video camera, and is multigroup sewage disposal scene being used to correspond at pumping plant Image/video acquisition, and be sent to corresponding scene PCL control units;
Live PCL control units, the image/video gathered data for receiving the transmission of image/video camera unit are carried out at coding Reason, sends data transfer unit to;And receive data transfer unit transmission control signal, control current pumping plant unlatching or It closes;
Data transfer unit, the image/video acquisition after the coded treatment sent using multimode fibre to live PCL control units Data Long Distant Transmit is to remote control center, and the control signal for receiving remote control center is sent to live PCL controls list Member;
Remote control center for receiving the image/video gathered data after coded treatment, and carries out decoding process, and exports control Signal processed is to data transfer unit;Also send the terminal phone that short message prompt is used to Sewage Disposal administrative staff;
Terminal phone receives short message prompt for Sewage Disposal administrative staff, when breaking down, carries out artificial treatment.
The aforementioned unattended Sewage Disposal based on the processing of equipment operation image video, live PCL control units are used Coded treatment is carried out in the image/video gathered data for receiving the transmission of image/video camera unit, is included the following steps,
(A1), the unique ID code of corresponding pumping plant is subjected to data encapsulation, the image/video gathered data after encapsulation meets H265 The coding standard of video flowing;
(A2), encryption message is added to H265 video flowings, coal addition position is regarded after H265 code stream I frame data, to complete image The coded treatment for the image/video gathered data that frequency camera unit is sent.
The aforementioned unattended Sewage Disposal based on the processing of equipment operation image video, the PCL control units, also It is driven including PLC controller, fiber interface module, fault detection module, image/video AM access module, sound and light alarm module and pump machine Dynamic model block, the fiber interface module, fault detection module, image/video AM access module, sound and light alarm module and pump machine driving Module is connected respectively with PLC controller, and described image VAM Video Access Module is also connected with image/video camera unit, described Fiber interface module is connected with data transfer unit.
The aforementioned unattended Sewage Disposal based on the processing of equipment operation image video,(A1), by corresponding pumping plant Unique ID code carries out data encapsulation, and the image/video gathered data after encapsulation meets the coding standard of H265 video flowings, specifically Process is,
(A11)The data header of the unique ID code of pumping plant is increased to the first flag bit of fixed hexadecimal data;
(A12)The unique ID code of pumping plant is added to first flag bit rear portion;
(A13)The data length of the unique ID code of pumping plant is calculated, and data length position is increased to the unique ID code of pumping plant Rear portion;
(A14)Increase the tail flag bit of fixed hexadecimal data behind data length position.
The aforementioned unattended Sewage Disposal based on the processing of equipment operation image video, the remote control center, Including one-to-two video distributor, DLP data large-size screen monitors, host, database server are decoded,
The multimode fibre of the one-to-two video distributor external data transmission unit, the one-to-two video distributor are also distinguished It is connected with database server, decoding host, the database server, for storing the initial data received;The solution Code host is used to decode the image/video gathered data after coded treatment, and be sent to DLP data large-size screen monitors real-time displays.
The aforementioned unattended Sewage Disposal based on the processing of equipment operation image video,(A2), encryption message is added Enter to H265 video flowings, encryption message is symmetric cryptography mode.
The aforementioned unattended Sewage Disposal based on the processing of equipment operation image video, the remote control center, Gsm communication module is further included, the decoding host is connected by gsm communication module with terminal phone.
The beneficial effects of the invention are as follows:The unattended sewage disposal based on the processing of equipment operation image video of the present invention It stands, by the image/video camera unit at scene, after the coded treatment sent by multimode fibre to live PCL control units Image/video gathered data Long Distant Transmit realizes remote monitoring, and increase encryption message, ensures data to remote control center The unique ID code that pumping plant will be corresponded to is carried out data encapsulation by the reliability of transmission, the image/video gathered data symbol after encapsulation The coding standard of H265 video flowings is closed, the positioning convenient for transmission and to pumping plant realizes long-range unattended purpose, intelligent Degree is high, has a good application prospect.
Description of the drawings
Fig. 1 is the system block diagram of the unattended Sewage Disposal handled based on equipment operation image video of the present invention;
Fig. 2 is the system block diagram of the live PCL control units of the present invention;
Fig. 3 is the system block diagram of the remote control center of the present invention.
Specific embodiment
Below in conjunction with Figure of description, the present invention is further illustrated.
As shown in Figure 1, the unattended Sewage Disposal based on the processing of equipment operation image video of the present invention, including
Image/video camera unit using optical zoom video camera, and is multigroup sewage disposal scene being used to correspond at pumping plant Image/video acquisition, and be sent to corresponding scene PCL control units;
Live PCL control units, the image/video gathered data for receiving the transmission of image/video camera unit are carried out at coding Reason, sends data transfer unit to;And receive data transfer unit transmission control signal, control current pumping plant unlatching or It closes;
Data transfer unit, the image/video acquisition after the coded treatment sent using multimode fibre to live PCL control units Data Long Distant Transmit is to remote control center, and the control signal for receiving remote control center is sent to live PCL controls list Member;
Remote control center for receiving the image/video gathered data after coded treatment, and carries out decoding process, and exports control Signal processed is to data transfer unit;Also send the terminal phone that short message prompt is used to Sewage Disposal administrative staff;
Terminal phone receives short message prompt for Sewage Disposal administrative staff, when breaking down, carries out artificial treatment.
Preferably, live PCL control units, for receiving the image/video gathered data of image/video camera unit transmission Coded treatment is carried out, is included the following steps,
(A1), the unique ID code of corresponding pumping plant is subjected to data encapsulation, the image/video gathered data after encapsulation meets H265 The coding standard of video flowing, detailed process be,
(A11)The data header of the unique ID code of pumping plant is increased to the first flag bit of fixed hexadecimal data;
(A12)The unique ID code of pumping plant is added to first flag bit rear portion;
(A13)The data length of the unique ID code of pumping plant is calculated, and data length position is increased to the unique ID code of pumping plant Rear portion;
(A14)Increase the tail flag bit of fixed hexadecimal data behind data length position;
(A2), encryption message is added to H265 video flowings, coal addition position is regarded after H265 code stream I frame data, to complete image The coded treatment for the image/video gathered data that frequency camera unit is sent, encryption message are symmetric cryptography mode.
As shown in Fig. 2, the PCL control units, further include PLC controller, fiber interface module, fault detection module, Image/video AM access module, sound and light alarm module and pump machine drive module, the fiber interface module, fault detection module, figure As VAM Video Access Module, sound and light alarm module and pump machine drive module are connected respectively with PLC controller, described image video connects Enter module also with image/video camera unit to be connected, the fiber interface module is connected with data transfer unit.
As shown in figure 3, the remote control center, including one-to-two video distributor, DLP data large-size screen monitors, decoding master Machine, database server,
The multimode fibre of the one-to-two video distributor external data transmission unit, the one-to-two video distributor are also distinguished It is connected with database server, decoding host, the database server, for storing the initial data received;The solution Code host is used to decode the image/video gathered data after coded treatment, and be sent to DLP data large-size screen monitors real-time displays.
The remote control center, further includes gsm communication module, and the decoding host passes through gsm communication module and terminal Mobile phone is connected, and when pumping plant breaks down, the administrative staff of Sewage Disposal are reminded by short message, carry out artificial treatment.
In conclusion the unattended Sewage Disposal based on the processing of equipment operation image video of the present invention, by existing Image/video camera unit, the image/video after the coded treatment sent by multimode fibre to live PCL control units Gathered data Long Distant Transmit realizes remote monitoring to remote control center, can be with fault alarm, and increases encryption message, Ensure the reliability of data transmission, the unique ID code that will correspond to pumping plant is subjected to data encapsulation, the image/video after encapsulation is adopted Collect the coding standard of data fit H265 video flowings, the positioning convenient for transmission and to pumping plant realizes long-range unattended mesh , intelligence degree is high, has a good application prospect.
Basic principle, the main features and advantages of the present invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe the originals of the present invention Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle It is fixed.

Claims (7)

1. the unattended Sewage Disposal based on the processing of equipment operation image video, it is characterised in that:Including
Image/video camera unit using optical zoom video camera, and is multigroup sewage disposal scene being used to correspond at pumping plant Image/video acquisition, and be sent to corresponding scene PCL control units;
Live PCL control units, the image/video gathered data for receiving the transmission of image/video camera unit are carried out at coding Reason, sends data transfer unit to;And receive data transfer unit transmission control signal, control current pumping plant unlatching or It closes;
Data transfer unit, the image/video acquisition after the coded treatment sent using multimode fibre to live PCL control units Data Long Distant Transmit is to remote control center, and the control signal for receiving remote control center is sent to live PCL controls list Member;
Remote control center for receiving the image/video gathered data after coded treatment, and carries out decoding process, and exports control Signal processed is to data transfer unit;Also send the terminal phone that short message prompt is used to Sewage Disposal administrative staff;
Terminal phone receives short message prompt for Sewage Disposal administrative staff, when breaking down, carries out artificial treatment.
2. the unattended Sewage Disposal according to claim 1 based on the processing of equipment operation image video, feature It is:Live PCL control units, the image/video gathered data for receiving the transmission of image/video camera unit are carried out at coding Reason, includes the following steps,
(A1), the unique ID code of corresponding pumping plant is subjected to data encapsulation, the image/video gathered data after encapsulation meets H265 The coding standard of video flowing;
(A2), encryption message is added to H265 video flowings, coal addition position is regarded after H265 code stream I frame data, to complete image The coded treatment for the image/video gathered data that frequency camera unit is sent.
3. the unattended Sewage Disposal according to claim 1 based on the processing of equipment operation image video, feature It is:The PCL control units further include PLC controller, fiber interface module, fault detection module, image/video access mould Block, sound and light alarm module and pump machine drive module, the fiber interface module, fault detection module, image/video AM access module, Sound and light alarm module and pump machine drive module are connected respectively with PLC controller, described image VAM Video Access Module also with image Video image pickup unit is connected, and the fiber interface module is connected with data transfer unit.
4. the unattended Sewage Disposal according to claim 2 based on the processing of equipment operation image video, feature It is:(A1), the unique ID code of corresponding pumping plant is subjected to data encapsulation, the image/video gathered data after encapsulation meets H265 The coding standard of video flowing, detailed process be,
(A11)The data header of the unique ID code of pumping plant is increased to the first flag bit of fixed hexadecimal data;
(A12)The unique ID code of pumping plant is added to first flag bit rear portion;
(A13)The data length of the unique ID code of pumping plant is calculated, and data length position is increased to the unique ID code of pumping plant Rear portion;
(A14)Increase the tail flag bit of fixed hexadecimal data behind data length position.
5. the unattended Sewage Disposal according to claim 1 based on the processing of equipment operation image video, feature It is:The remote control center, including one-to-two video distributor, DLP data large-size screen monitors, decoding host, database service Device,
The multimode fibre of the one-to-two video distributor external data transmission unit, the one-to-two video distributor are also distinguished It is connected with database server, decoding host, the database server, for storing the initial data received;The solution Code host is used to decode the image/video gathered data after coded treatment, and be sent to DLP data large-size screen monitors real-time displays.
6. the unattended Sewage Disposal according to claim 2 based on the processing of equipment operation image video, feature It is:(A2), encryption message is added to H265 video flowings, encryption message is symmetric cryptography mode.
7. the unattended Sewage Disposal according to claim 5 based on the processing of equipment operation image video, feature It is:The remote control center, further includes gsm communication module, and the decoding host passes through gsm communication module and terminal hand Machine is connected.
CN201810011894.2A 2018-01-05 2018-01-05 Unattended Sewage Disposal based on the processing of equipment operation image video Pending CN108200395A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810011894.2A CN108200395A (en) 2018-01-05 2018-01-05 Unattended Sewage Disposal based on the processing of equipment operation image video

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810011894.2A CN108200395A (en) 2018-01-05 2018-01-05 Unattended Sewage Disposal based on the processing of equipment operation image video

Publications (1)

Publication Number Publication Date
CN108200395A true CN108200395A (en) 2018-06-22

Family

ID=62587920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810011894.2A Pending CN108200395A (en) 2018-01-05 2018-01-05 Unattended Sewage Disposal based on the processing of equipment operation image video

Country Status (1)

Country Link
CN (1) CN108200395A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101710981A (en) * 2009-12-01 2010-05-19 中国电信股份有限公司 Method and system for acquiring monitoring and surveying result in real time
CN102572386A (en) * 2011-05-20 2012-07-11 广东迅通科技股份有限公司 Multi-device cooperation alarm analysis processing system
CN103576635A (en) * 2012-08-08 2014-02-12 青岛鑫源环保设备工程有限公司 Unattended control system in water plant
CN104159116A (en) * 2014-08-26 2014-11-19 江苏瑞奥风软件科技有限公司 Method of adding face recognition information into H264 video stream
CN107422697A (en) * 2015-08-26 2017-12-01 天津光彩世纪科技有限公司 A kind of water conservancy unattended integral monitoring system
WO2018048218A1 (en) * 2016-09-08 2018-03-15 진이진 System and method for monitoring plant facilities using active black box

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101710981A (en) * 2009-12-01 2010-05-19 中国电信股份有限公司 Method and system for acquiring monitoring and surveying result in real time
CN102572386A (en) * 2011-05-20 2012-07-11 广东迅通科技股份有限公司 Multi-device cooperation alarm analysis processing system
CN103576635A (en) * 2012-08-08 2014-02-12 青岛鑫源环保设备工程有限公司 Unattended control system in water plant
CN104159116A (en) * 2014-08-26 2014-11-19 江苏瑞奥风软件科技有限公司 Method of adding face recognition information into H264 video stream
CN107422697A (en) * 2015-08-26 2017-12-01 天津光彩世纪科技有限公司 A kind of water conservancy unattended integral monitoring system
WO2018048218A1 (en) * 2016-09-08 2018-03-15 진이진 System and method for monitoring plant facilities using active black box

Similar Documents

Publication Publication Date Title
CN103065448B (en) Remote water meter reading method and system
CN101448072A (en) Video viewing method and system of Internet video monitoring system
CN202422418U (en) Traffic information monitoring device
CN206021060U (en) Urban Drainage Pumping Stations intelligent linkage control system
CN111258261A (en) Remote control and joint scheduling system for pump station and scheduling method thereof
CN104298194A (en) Method for compressing acquisition and transmission data in elevator remote monitoring system
CN101710981B (en) Method and system for acquiring monitoring and surveying result in real time
CN1569657A (en) Management system for remotely monitoring purified water and its implementing method
CN109036221A (en) A kind of garbage classification Digital Display system
CN102438126A (en) Long-distance wireless intelligent monitoring system
CN108200395A (en) Unattended Sewage Disposal based on the processing of equipment operation image video
CN201540568U (en) Double CPU system platform with coprocessing function
CN105516682A (en) Intelligent high definition video monitoring system
CN102842151A (en) Automatic fare collection system for highway based on optical communication technique
CN202565362U (en) Power line inspection handheld device having static image transmission function
CN204013921U (en) Video monitoring equipment alarming protection and monitoring system
CN115174859A (en) Early warning device and method for operation monitoring of urban domestic sewage treatment plant
CN205139674U (en) Wire arrangement type intelligent home integrated control device based on cloud service platform
CN103607559A (en) Communication method of video file, monitoring terminal, monitoring server and video monitoring system
CN102917209A (en) Public network video monitoring system based on TD-LTE (Time Division-Long Term Evolution) network
CN102082949B (en) Device integrating various back-end functions of high-definition video monitoring system
CN201017235Y (en) Communication device used for industrial enterprise
CN102256127A (en) Real-time video transmission system for multimode wireless communication network
CN106078806B (en) Intelligent Mobile Robot monitoring system and method based on Centralized Monitoring
CN104378602A (en) Video transmission method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180622