CN108197771A - It is a kind of using problem as be oriented to the safe operation management method of grid equipment - Google Patents

It is a kind of using problem as be oriented to the safe operation management method of grid equipment Download PDF

Info

Publication number
CN108197771A
CN108197771A CN201711273084.6A CN201711273084A CN108197771A CN 108197771 A CN108197771 A CN 108197771A CN 201711273084 A CN201711273084 A CN 201711273084A CN 108197771 A CN108197771 A CN 108197771A
Authority
CN
China
Prior art keywords
unit
defect
stage treatment
source
danger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711273084.6A
Other languages
Chinese (zh)
Inventor
杨杰
徐正宏
吴奇
殷明
王克照
高伟
顾荣巨
黄小红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taixing Power Supply Company State Grid Jiangsu Electric Power Co
State Grid Corp of China SGCC
Taizhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Taixing Power Supply Company State Grid Jiangsu Electric Power Co
State Grid Corp of China SGCC
Taizhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taixing Power Supply Company State Grid Jiangsu Electric Power Co, State Grid Corp of China SGCC, Taizhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd filed Critical Taixing Power Supply Company State Grid Jiangsu Electric Power Co
Priority to CN201711273084.6A priority Critical patent/CN108197771A/en
Publication of CN108197771A publication Critical patent/CN108197771A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of using problem as the safe operation management method of grid equipment being oriented to, it includes the following steps:One, initially set up safe operation management system;Two, the defects of the grid equipment that O&M, service personnel will be seen that, hidden danger, danger source and abnormal conditions are by data entry element typing memory, coagulation unit extracts data from memory and handles data automatic flow to coagulation unit;Two, after coagulation unit receives the defects of pending, hidden danger, danger source or abnormal conditions, description it is clear then according to the defects of different brackets, hidden danger, danger source or abnormal conditions take corresponding disposal method, carry out in-situ processing, it scene will be after defect defect elimination, amended record system submits two stage treatment unit to check and accept by the photo upload system after in-situ processing, and by flow;Three, two stage treatment unit is received wait check and accept the defects of, after hidden danger, danger source or abnormal conditions, is not handled again by then rejecting coagulation unit.

Description

It is a kind of using problem as be oriented to the safe operation management method of grid equipment
Technical field
The present invention relates to a kind of using problem as the safe operation management method of grid equipment being oriented to.
Background technology
At present the defects of grid equipment, hidden danger, dangerous source control are there are the characteristics of heavy workload, task weight, using tradition Equipment deficiency, hidden danger, the method for dangerous source control, the defects of investigating out, hidden danger, dangerous source control data are relatively scrappy, do not have Classification is summarized, and practicable and defect, hidden danger, the developing state of danger source of defect elimination measure do not track subsequently, cannot slap in time It holds, while is not also adapted to the needs of new model development.
Invention content
The present invention provides it is a kind of using problem as be oriented to the safe operation management method of grid equipment, it entire defect, Hidden danger, danger source management during, realize digitization, standardization and informationization, be distinctly claimed with data, specification, self-criticism, and Computer technology can be relied on to solve process flow, methodization etc., high-speed computation, mass memory, the accurate execution of computer Three big features, will greatly promote the efficiency of management.
Present invention employs following technical schemes:It is a kind of using problem as be oriented to the safe operation management method of grid equipment, It is characterized in that it includes the following steps:Step 1, initially sets up safe operation management system, and safe operation management system includes number According to typing unit, memory, CPU processor and receiving unit, the output terminal of data entry element and the input terminal of memory connect It connects, the output terminal of memory and the input terminal of CPU processor connect, and the output terminal of CPU processor is connect with receiving unit, CPU Processor is divided into coagulation unit and two stage treatment unit, and coagulation unit is base treatment unit, two stage treatment unit For high-rise processing unit, coagulation unit and two stage treatment unit mutually concatenate;Step 2, O&M, service personnel will be seen that Grid equipment the defects of, hidden danger, danger source and abnormal conditions by data entry element typing memory, should be detailed in typing It carefully writes equipment, place, field condition, scene photograph exactly and proposes preliminary treatment opinion, coagulation unit is carried from memory Access evidence is simultaneously handled data automatic flow to coagulation unit;Step 3, coagulation unit receive pending After defect, hidden danger, danger source or abnormal conditions, first judge whether defect, hidden danger, danger source or abnormal live description are clear, if It is unintelligible, it rejects discovery personnel and re-types, description is clear then according to the defects of different brackets, hidden danger, danger source or abnormal feelings Condition takes corresponding disposal method, carries out in-situ processing, and scene is by after defect defect elimination, and amended record system is by the photo after in-situ processing Uploading system, and two stage treatment unit is submitted to check and accept flow;Step 4, two stage treatment unit receive the defects of to be checked and accepted, hidden Suffer from, after danger source or abnormal conditions, judge whether that defect elimination is completed according to scene photograph before and after the processing, the flow if examination passes through Receiving unit is sent to after closed loop, is not handled again by then rejecting coagulation unit.
The defects of described grid equipment management process is:The first step, account query, account can be according to common retrievals Condition is screened, and the condition of retrieval includes counter arrange item, line facility, period;Second step, defect processing flow, defect pipe Reason forms closed-loop process in systems according to the flow of discovery-assessment-input system-improvement control-examination;A, staff is led to Cross after the processes such as tour, operation find defect, the defects of will be seen that by staff analyze it is qualitative after after typing memory Be sent to coagulation unit, coagulation unit should in system relationship line facility, and classification of tracing to the source in detail, defect source, Defect rank, place, field condition, scene photograph simultaneously propose preliminary treatment opinion, and are sent to the audit of two stage treatment unit;B、 Two stage treatment unit audits defect, fills in handling suggestion, sends coagulation cell processing;C, coagulation unit will Defect is maked an inspection tour in record or photo upload to system, after defect processing, is sent to two stage treatment unit by teams and groups personnel and is checked and accepted;D、 The defect elimination closed loop of defect is completed after two stage treatment unit acceptance(check) in system;Step 3, defect statistics, defect can be by lists The search conditions such as position, period, classification of tracing to the source, line facility are counted.
The dangerous source control process of the grid equipment is:Step 1, account query account can be according to common inspections Rope condition is screened, the condition line facility of retrieval, period, step 2, danger source process flow, dangerous source control according to It was found that the flow of-assessment-input system-improvement control-examination forms closed-loop process in systems;A, staff is by patrolling After finding danger source depending on processes such as, operations, the danger source that will be seen that by staff analyze it is qualitative after in typing memory By coagulation unit in system relationship line facility, and it is source category dangerous in detail, danger source grade, place, field condition, existing Field photo simultaneously proposes preliminary treatment opinion, and is sent to the audit of two stage treatment unit;B, two stage treatment unit carry out danger source Handling suggestion is filled in audit, sends related teams and groups' processing;C makes an inspection tour danger source in record or photo upload to system, dangerous After the processing of source, it is sent to two stage treatment unit by teams and groups personnel and checks and accepts;D is completed after two stage treatment unit acceptance(check) in system The elimination closed loop of danger source;Step 3, danger source can be counted by search conditions such as unit, period, line facilities.
The hidden danger management process of the grid equipment is:Step 1, account query, account can be according to common retrievals Condition is screened, and search condition is line facility, the period;Step 2, hidden danger process flow, hidden danger management according to find- The flow of assessment-input system-improvement control-examination forms closed-loop process in systems;A, staff is by making an inspection tour, operating Etc. after processes scent a hidden danger, the hidden danger that will be seen that by staff analyze it is qualitative after in typing memory by coagulation list Member in system relationship line facility, and in detail hidden danger source, evaluation grade, professional classification, exhaustive division, place, field condition, Scene photograph simultaneously proposes preliminary treatment opinion, and is sent to the audit of two stage treatment unit;B, two stage treatment unit carry out hidden danger Handling suggestion is filled in audit, sends coagulation unit;Hidden danger is maked an inspection tour record or photo upload to being by C, coagulation unit In system, after hidden danger processing, it is sent to two stage treatment unit by teams and groups personnel and checks and accepts;D is being after two stage treatment unit acceptance(check) System completes the elimination closed loop of hidden danger;Step 3, hidden danger statistics, hidden danger can by unit, the period, line facility search condition into Row statistics.
The fault management process of the grid equipment is:Step 1, account query, account can be according to common retrievals Condition is screened, and search condition is line facility and period;Step 2, troubleshooting process, fault management according to find- The flow of assessment-input system-improvement control-examination forms closed-loop process in systems;A, staff is by making an inspection tour, operating Etc. after processes find failure, the failure that will be seen that by staff analyze it is qualitative after in typing memory by coagulation list Member in system relationship line facility, and in detail the source of failure, failure modes, causality classification, fault time, place, field condition, Scene photograph simultaneously proposes preliminary treatment opinion, and is sent to the audit of two stage treatment unit;B, two stage treatment unit carry out failure Handling suggestion is filled in audit, sends coagulation cell processing;C, coagulation unit by fault inspection record or photo upload Into system, after troubleshooting, two stage treatment unit is sent to by coagulation unit and is checked and accepted;D, two stage treatment unit, which is checked and accepted, to be closed The elimination closed loop of failure is completed after lattice in system;Step 3, fault statistics, failure can be by unit, period, line facilities Search condition is counted.
The counter of the grid equipment arranges the management process to be:Counter to arrange in typing managing and control system, O&M, service personnel are according to anti- It arranges and periodically carries out investigation, it is found that input system establishes account, and is carried out at circulation in system according to defect processing flow Reason;Step 1, addition, transport inspection department door periodically arrange state's net, province, the counter of company of city in typing managing and control system;Step 2, editor, The personnel for possessing editing authority can arrange item to carry out edit segment information the counter of input system;Step 3 is deleted, is possessed The personnel for deleting permission can arrange item to carry out delete operation the counter of input system;Step 4, inquiry, O&M, maintenance people It is browsable issued counter to arrange item, and periodically development is arranged to investigate according to counter after member's login system;Step 5 adds defect, fortune Dimension, service personnel can arrange counter in item, and addition identifies defects of that input system establishes account, and exists according to defect processing flow System carries out circulation processing.
The invention has the advantages that:After employing above technical scheme, the present invention can have found defect, hidden in time Suffer from, danger source, O&M, service personnel are noted abnormalities and defect, hidden danger, danger source by the processes such as making an inspection tour, operating, should in time by Defect, hidden danger, danger source situation typing managing and control system circulate, processing defect, hidden danger, danger source.Safe regular meeting class weekly Group should carry out the distribution to defect, hidden danger, danger source processing unit, by defect elimination unit in system completion after the completion of in-situ processing Manage flow.Check and accept defect.The regular look-up system of first owner, to it is processed the defects of, hidden danger, danger source confirmed and tested It receives, and closed loop is completed in system.Defect, hidden danger, danger source and abnormal conditions are grasped in time;Statistic of classification is more convenient;Have It traces to the source function of calling to account;It is horizontal to improve electric power netting safe running.
Description of the drawings
Fig. 1 is the flow chart of the present invention.
Specific embodiment
In Fig. 1;The invention discloses a kind of using problem as the safe operation management method of grid equipment being oriented to, feature It is that it includes the following steps:
Step 1, initially sets up safe operation management system, safe operation management system include data entry element, memory, The input terminal of CPU processor and receiving unit, the output terminal of data entry element and memory connects, the output terminal of memory with The input terminal connection of CPU processor, the output terminal of CPU processor are connect with receiving unit, and CPU processor is divided into coagulation list Member and two stage treatment unit, coagulation unit are base treatment unit, and two stage treatment unit is high-rise processing unit, at level-one Reason unit and two stage treatment unit mutually concatenate;
The defects of step 2, the grid equipment that O&M, service personnel will be seen that, hidden danger, danger source and abnormal conditions are recorded by data Enter in unit typing memory, equipment, place, field condition, scene photograph should be write exactly in detail in typing and propose preliminary place Opinion is managed, coagulation unit extracts data from memory and handles data automatic flow to coagulation unit;
Step 2 after coagulation unit receives the defects of pending, hidden danger, danger source or abnormal conditions, first judges defect, hidden Whether trouble, danger source or abnormal live description are clear, and discovery personnel are rejected if unintelligible and are re-typed, describe clear basis The defects of different brackets, hidden danger, danger source or abnormal conditions take corresponding disposal method, carry out in-situ processing, and scene will lack After falling into defect elimination, amended record system submits two stage treatment unit to check and accept by the photo upload system after in-situ processing, and by flow;
Step 3, two stage treatment unit is received wait check and accept the defects of, after hidden danger, danger source or abnormal conditions, according to before and after the processing Scene photograph judge whether that defect elimination is completed, if check and accept pass through if be sent to receiving unit after flow closed loop, not by rejecting Coagulation unit is handled again.
The defects of described grid equipment management process is:
The first step, account query, account can be screened according to common search condition, the condition of retrieval include it is counter arrange item, Line facility, period;
Second step, defect processing flow, defect management exist according to the flow of discovery-assessment-input system-improvement control-examination Closed-loop process is formed in system;
A, after staff has found defect by the processes such as making an inspection tour, operate, it is fixed that the defects of will be seen that by staff, analyze Coagulation unit is sent to after typing memory after property, coagulation unit should be in system relationship line facility, and traces back in detail Source classification, defect source, defect rank, place, field condition, scene photograph simultaneously propose preliminary treatment opinion, and be sent to two Grade processing unit audit;
B, two stage treatment unit audits defect, fills in handling suggestion, sends coagulation cell processing;
C, coagulation unit makes an inspection tour defect in record or photo upload to system, after defect processing, is sent by teams and groups personnel It is checked and accepted to two stage treatment unit;
D, after the acceptance(check) of two stage treatment unit the defect elimination closed loop of defect is completed in system;
Step 3, defect statistics, defect can unite by the search conditions such as unit, period, classification of tracing to the source, line facility Meter.
The dangerous source control process of the grid equipment is:
Step 1, account query account can be screened according to common search condition, the condition line facility of retrieval, time Section,
Step 2, danger source process flow, dangerous source control according to discovery-assessment-input system-improvement control-examination stream Journey forms closed-loop process in systems;
A after staff has found danger source by the processes such as making an inspection tour, operate, is divided by the danger source that staff will be seen that It analyses in qualitative rear typing memory by coagulation unit in system relationship line facility, and source category dangerous in detail, danger source Grade, place, field condition, scene photograph simultaneously propose preliminary treatment opinion, and are sent to the audit of two stage treatment unit;
B, two stage treatment unit audit danger source, fill in handling suggestion, send related teams and groups' processing;
C makes an inspection tour danger source in record or photo upload to system, and after danger source processing, two level is sent to by teams and groups personnel Unit is managed to check and accept;
D completes the elimination closed loop of danger source in system after two stage treatment unit acceptance(check);
Step 3, danger source can be counted by search conditions such as unit, period, line facilities.
The hidden danger management process of the grid equipment is:
Step 1, account query, account can be screened according to common search condition, search condition for line facility, when Between section;
Step 2, hidden danger process flow, hidden danger management exist according to the flow of discovery-assessment-input system-improvement control-examination Closed-loop process is formed in system;
A, after staff is scented a hidden danger by the processes such as making an inspection tour, operate, it is fixed that the hidden danger that will be seen that by staff analyze Property after in typing memory by coagulation unit in system relationship line facility, and hidden danger source, evaluation grade, profession in detail Classification, exhaustive division, place, field condition, scene photograph simultaneously propose preliminary treatment opinion, and are sent to two stage treatment unit and examine Core;
B, two stage treatment unit audit hidden danger, fill in handling suggestion, send coagulation unit;
C, coagulation unit make an inspection tour hidden danger in record or photo upload to system, after hidden danger processing, are sent by teams and groups personnel It is checked and accepted to two stage treatment unit;
D completes the elimination closed loop of hidden danger in system after two stage treatment unit acceptance(check);
Step 3, hidden danger statistics, hidden danger can be counted by unit, period, line facility search condition.
The fault management process of the grid equipment is:
Step 1, account query, account can be screened according to common search condition, search condition for line facility and when Between section;
Step 2, troubleshooting process, fault management exist according to the flow of discovery-assessment-input system-improvement control-examination Closed-loop process is formed in system;
A, after staff has found failure by the processes such as making an inspection tour, operate, it is fixed that the failure that will be seen that by staff analyze Property after in typing memory by coagulation unit in system relationship line facility, and the source of failure, failure modes, reason in detail Classification, fault time, place, field condition, scene photograph simultaneously propose preliminary treatment opinion, and are sent to two stage treatment unit and examine Core;
B, two stage treatment unit audit failure, fill in handling suggestion, send coagulation cell processing;
C, coagulation unit by fault inspection record or photo upload to system in, after troubleshooting, by coagulation unit It is sent to the examination of two stage treatment unit;
D completes the elimination closed loop of failure in system after two stage treatment unit acceptance(check);
Step 3, fault statistics, failure can be counted by the search condition of unit, period, line facility.
The counter of the grid equipment arranges the management process to be:Counter to arrange in typing managing and control system, O&M, service personnel are according to anti- It arranges and periodically carries out investigation, it is found that input system establishes account, and is carried out at circulation in system according to defect processing flow Reason;
Step 1, addition, transport inspection department door periodically arrange state's net, province, the counter of company of city in typing managing and control system;
Step 2, editor, the personnel for possessing editing authority can arrange item to carry out edit segment information the counter of input system;
Step 3 is deleted, and the personnel for possessing deletion permission can arrange item to carry out delete operation the counter of input system;
Step 4, inquiry are browsable issued counter to arrange item, and arrange calmly according to counter after O&M, service personnel's login system Phase carries out investigation;
Step 5, adds defect, and O&M, service personnel can arrange in item counter, add and identify defects of that input system establishes platform Account, and according to defect processing flow circulation processing is carried out in system.

Claims (6)

1. it is a kind of using problem as the safe operation management method of grid equipment being oriented to, it is characterized in that it includes the following steps:
Step 1, initially sets up safe operation management system, safe operation management system include data entry element, memory, The input terminal of CPU processor and receiving unit, the output terminal of data entry element and memory connects, the output terminal of memory with The input terminal connection of CPU processor, the output terminal of CPU processor are connect with receiving unit, and CPU processor is divided into coagulation list Member and two stage treatment unit, coagulation unit are base treatment unit, and two stage treatment unit is high-rise processing unit, at level-one Reason unit and two stage treatment unit mutually concatenate;
The defects of step 2, the grid equipment that O&M, service personnel will be seen that, hidden danger, danger source and abnormal conditions are recorded by data Enter in unit typing memory, equipment, place, field condition, scene photograph should be write exactly in detail in typing and propose preliminary place Opinion is managed, coagulation unit extracts data from memory and handles data automatic flow to coagulation unit;
Step 2 after coagulation unit receives the defects of pending, hidden danger, danger source or abnormal conditions, first judges defect, hidden Whether trouble, danger source or abnormal live description are clear, and discovery personnel are rejected if unintelligible and are re-typed, describe clear basis The defects of different brackets, hidden danger, danger source or abnormal conditions take corresponding disposal method, carry out in-situ processing, and scene will lack After falling into defect elimination, amended record system submits two stage treatment unit to check and accept by the photo upload system after in-situ processing, and by flow;
Step 3, two stage treatment unit is received wait check and accept the defects of, after hidden danger, danger source or abnormal conditions, according to before and after the processing Scene photograph judge whether that defect elimination is completed, if check and accept pass through if be sent to receiving unit after flow closed loop, not by rejecting Coagulation unit is handled again.
2. it is according to claim 1 using problem as the safe operation management method of grid equipment being oriented to, it is characterized in that described Grid equipment the defects of management process be:
The first step, account query, account can be screened according to common search condition, the condition of retrieval include it is counter arrange item, Line facility, period;
Second step, defect processing flow, defect management exist according to the flow of discovery-assessment-input system-improvement control-examination Closed-loop process is formed in system;
A, after staff has found defect by the processes such as making an inspection tour, operate, it is fixed that the defects of will be seen that by staff, analyze Coagulation unit is sent to after typing memory after property, coagulation unit should be in system relationship line facility, and traces back in detail Source classification, defect source, defect rank, place, field condition, scene photograph simultaneously propose preliminary treatment opinion, and be sent to two Grade processing unit audit;
B, two stage treatment unit audits defect, fills in handling suggestion, sends coagulation cell processing;
C, coagulation unit makes an inspection tour defect in record or photo upload to system, after defect processing, is sent by teams and groups personnel It is checked and accepted to two stage treatment unit;
D, after the acceptance(check) of two stage treatment unit the defect elimination closed loop of defect is completed in system;
Step 3, defect statistics, defect can unite by the search conditions such as unit, period, classification of tracing to the source, line facility Meter.
3. it is according to claim 1 using problem as the safe operation management method of grid equipment being oriented to, it is characterized in that described The dangerous source control process of grid equipment be:
Step 1, account query account can be screened according to common search condition, the condition line facility of retrieval, time Section,
Step 2, danger source process flow, dangerous source control according to discovery-assessment-input system-improvement control-examination stream Journey forms closed-loop process in systems;
A after staff has found danger source by the processes such as making an inspection tour, operate, is divided by the danger source that staff will be seen that It analyses in qualitative rear typing memory by coagulation unit in system relationship line facility, and source category dangerous in detail, danger source Grade, place, field condition, scene photograph simultaneously propose preliminary treatment opinion, and are sent to the audit of two stage treatment unit;
B, two stage treatment unit audit danger source, fill in handling suggestion, send related teams and groups' processing;
C makes an inspection tour danger source in record or photo upload to system, and after danger source processing, two level is sent to by teams and groups personnel Unit is managed to check and accept;
D completes the elimination closed loop of danger source in system after two stage treatment unit acceptance(check);
Step 3, danger source can be counted by search conditions such as unit, period, line facilities.
4. it is according to claim 1 using problem as the safe operation management method of grid equipment being oriented to, it is characterized in that described The hidden danger management process of grid equipment be:
Step 1, account query, account can be screened according to common search condition, search condition for line facility, when Between section;
Step 2, hidden danger process flow, hidden danger management exist according to the flow of discovery-assessment-input system-improvement control-examination Closed-loop process is formed in system;
A, after staff is scented a hidden danger by the processes such as making an inspection tour, operate, it is fixed that the hidden danger that will be seen that by staff analyze Property after in typing memory by coagulation unit in system relationship line facility, and hidden danger source, evaluation grade, profession in detail Classification, exhaustive division, place, field condition, scene photograph simultaneously propose preliminary treatment opinion, and are sent to two stage treatment unit and examine Core;
B, two stage treatment unit audit hidden danger, fill in handling suggestion, send coagulation unit;
C, coagulation unit make an inspection tour hidden danger in record or photo upload to system, after hidden danger processing, are sent by teams and groups personnel It is checked and accepted to two stage treatment unit;
D completes the elimination closed loop of hidden danger in system after two stage treatment unit acceptance(check);
Step 3, hidden danger statistics, hidden danger can be counted by unit, period, line facility search condition.
5. it is according to claim 1 using problem as the safe operation management method of grid equipment being oriented to, it is characterized in that described The fault management process of grid equipment be:
Step 1, account query, account can be screened according to common search condition, search condition for line facility and when Between section;
Step 2, troubleshooting process, fault management exist according to the flow of discovery-assessment-input system-improvement control-examination Closed-loop process is formed in system;
A, after staff has found failure by the processes such as making an inspection tour, operate, it is fixed that the failure that will be seen that by staff analyze Property after in typing memory by coagulation unit in system relationship line facility, and the source of failure, failure modes, reason in detail Classification, fault time, place, field condition, scene photograph simultaneously propose preliminary treatment opinion, and are sent to two stage treatment unit and examine Core;
B, two stage treatment unit audit failure, fill in handling suggestion, send coagulation cell processing;
C, coagulation unit by fault inspection record or photo upload to system in, after troubleshooting, by coagulation unit It is sent to the examination of two stage treatment unit;
D completes the elimination closed loop of failure in system after two stage treatment unit acceptance(check);
Step 3, fault statistics, failure can be counted by the search condition of unit, period, line facility.
6. it is according to claim 1 using problem as the safe operation management method of grid equipment being oriented to, it is characterized in that described The counter of grid equipment arrange the management process to be:Counter to arrange in typing managing and control system, O&M, service personnel periodically carry out row according to counter arrange It looks into, it is found that input system establishes account, and carries out circulation processing in system according to defect processing flow;
Step 1, addition, transport inspection department door periodically arrange state's net, province, the counter of company of city in typing managing and control system;
Step 2, editor, the personnel for possessing editing authority can arrange item to carry out edit segment information the counter of input system;
Step 3 is deleted, and the personnel for possessing deletion permission can arrange item to carry out delete operation the counter of input system;
Step 4, inquiry are browsable issued counter to arrange item, and arrange calmly according to counter after O&M, service personnel's login system Phase carries out investigation;
Step 5, adds defect, and O&M, service personnel can arrange in item counter, add and identify defects of that input system establishes platform Account, and according to defect processing flow circulation processing is carried out in system.
CN201711273084.6A 2017-12-06 2017-12-06 It is a kind of using problem as be oriented to the safe operation management method of grid equipment Pending CN108197771A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711273084.6A CN108197771A (en) 2017-12-06 2017-12-06 It is a kind of using problem as be oriented to the safe operation management method of grid equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711273084.6A CN108197771A (en) 2017-12-06 2017-12-06 It is a kind of using problem as be oriented to the safe operation management method of grid equipment

Publications (1)

Publication Number Publication Date
CN108197771A true CN108197771A (en) 2018-06-22

Family

ID=62573786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711273084.6A Pending CN108197771A (en) 2017-12-06 2017-12-06 It is a kind of using problem as be oriented to the safe operation management method of grid equipment

Country Status (1)

Country Link
CN (1) CN108197771A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108921442A (en) * 2018-07-11 2018-11-30 北京中飞艾维航空科技有限公司 The picture examination method and device of grid equipment
CN108985470A (en) * 2018-07-16 2018-12-11 国网福建省电力有限公司 A kind of defect process initiating method based on terminal control application
CN109034676A (en) * 2018-10-22 2018-12-18 西南交通大学 Distribution network failure recovery scheme Interval evaluation method under incomplete index weights information
CN113505903A (en) * 2021-07-29 2021-10-15 广东电网有限责任公司 Defect management method, device, equipment and storage medium for field equipment of transformer substation
CN114140005A (en) * 2021-12-08 2022-03-04 山东中烟工业有限责任公司 Cigarette quality defect closed-loop processing system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104008458A (en) * 2014-06-10 2014-08-27 深圳市企安网科技有限公司 Hidden danger checking and treatment method and system and server
CN104361419A (en) * 2014-09-10 2015-02-18 国家电网公司 Electric transmission and transformation equipment state monitoring defect management system and method based on regulation and control integration
JP2017055606A (en) * 2015-09-11 2017-03-16 パナソニックIpマネジメント株式会社 Power management system, information device and program
CN106845834A (en) * 2017-01-22 2017-06-13 山东智洋电气股份有限公司 Transmission line of electricity hidden danger management method and system based on mobile phone A PP

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104008458A (en) * 2014-06-10 2014-08-27 深圳市企安网科技有限公司 Hidden danger checking and treatment method and system and server
CN104361419A (en) * 2014-09-10 2015-02-18 国家电网公司 Electric transmission and transformation equipment state monitoring defect management system and method based on regulation and control integration
JP2017055606A (en) * 2015-09-11 2017-03-16 パナソニックIpマネジメント株式会社 Power management system, information device and program
CN106845834A (en) * 2017-01-22 2017-06-13 山东智洋电气股份有限公司 Transmission line of electricity hidden danger management method and system based on mobile phone A PP

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
耿艳等: "基于调度应用管理系统的集中监控缺陷闭环管理", 《华北电力技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108921442A (en) * 2018-07-11 2018-11-30 北京中飞艾维航空科技有限公司 The picture examination method and device of grid equipment
CN108985470A (en) * 2018-07-16 2018-12-11 国网福建省电力有限公司 A kind of defect process initiating method based on terminal control application
CN109034676A (en) * 2018-10-22 2018-12-18 西南交通大学 Distribution network failure recovery scheme Interval evaluation method under incomplete index weights information
CN109034676B (en) * 2018-10-22 2022-01-14 西南交通大学 Power distribution network fault recovery scheme interval evaluation method under incomplete index weight information
CN113505903A (en) * 2021-07-29 2021-10-15 广东电网有限责任公司 Defect management method, device, equipment and storage medium for field equipment of transformer substation
CN114140005A (en) * 2021-12-08 2022-03-04 山东中烟工业有限责任公司 Cigarette quality defect closed-loop processing system and method

Similar Documents

Publication Publication Date Title
CN108197771A (en) It is a kind of using problem as be oriented to the safe operation management method of grid equipment
CN108846585A (en) A kind of hidden danger of coal mine processing management system
CN108763957A (en) A kind of safety auditing system of database, method and server
CN109784759A (en) A kind of Internal Audit system based on block chain technology
CN105989443A (en) Intelligent-mobile-terminal-based communication line inspection system
CN103226743B (en) Aircraft equipment technology maturity based on TRL assesses information processing method
CN107066500B (en) Power grid mass data quality verification method based on PMS model
CN108830503A (en) A kind of whole process engineering consulting method of servicing and system
CN109710660A (en) A kind of scenic spot data management system and method
CN107862049A (en) A kind of data amended record method and device
CN106897779A (en) A kind of processing method of data center's operational system event
CN109801416A (en) A kind of total dimension computer lab management method of building together based on big data analysis
CN111930726B (en) Off-line form-based grade protection evaluation data acquisition and analysis method and system
CN107592503A (en) Audio-video collection management system of enforcing the law and management method
CN115269589A (en) Data asset checking method
CN112184072B (en) Machine room equipment management method and device
CN117640203A (en) Power grid information safety protection method and system
CN110415136B (en) Service capability evaluation system and method for power dispatching automation system
CN103812676A (en) Apparatus and method for realizing log data real-time association
CN110287390A (en) Wechat public's account management system and method
CN113469584B (en) Risk management method and device for business service operation
CN113344393B (en) Resource construction method based on V model product development process
CN109858829A (en) Hidden danger accident early warning method based on block chain
CN115994746A (en) Information real-time auditing method, system, electronic equipment and storage medium
CN115174193A (en) Method, device and equipment for detecting data security intrusion based on GA algorithm

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180622

WD01 Invention patent application deemed withdrawn after publication