CN108197239A - A kind of method and device for generating point of interest network topological diagram - Google Patents
A kind of method and device for generating point of interest network topological diagram Download PDFInfo
- Publication number
- CN108197239A CN108197239A CN201711478084.XA CN201711478084A CN108197239A CN 108197239 A CN108197239 A CN 108197239A CN 201711478084 A CN201711478084 A CN 201711478084A CN 108197239 A CN108197239 A CN 108197239A
- Authority
- CN
- China
- Prior art keywords
- resource file
- correlation
- degree
- resource
- video
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/10—File systems; File servers
- G06F16/16—File or folder operations, e.g. details of user interfaces specifically adapted to file systems
- G06F16/168—Details of user interfaces specifically adapted to file systems, e.g. browsing and visualisation, 2d or 3d GUIs
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/10—File systems; File servers
- G06F16/16—File or folder operations, e.g. details of user interfaces specifically adapted to file systems
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/90—Details of database functions independent of the retrieved data types
- G06F16/904—Browsing; Visualisation therefor
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Databases & Information Systems (AREA)
- Data Mining & Analysis (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Human Computer Interaction (AREA)
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
- Information Transfer Between Computers (AREA)
Abstract
In the embodiment of the present invention, a kind of method for generating point of interest network topological diagram is proposed, including:The degree of correlation of any two resource file in N number of resource file is calculated, and is associated with any two resource file according to the degree of correlation, the N is the integer more than 1;After each resource file in N number of resource file is completed association, point of interest network topological diagram is established;In this scenario, the degree of correlation between computing resource file, and pass through the degree of correlation and associate resource file, not by manually resource file is associated, this improves the accuracy for sorting out resource file, and then improve the accuracy that user searches resource file.
Description
Technical field
The present invention relates to Internet technical field more particularly to a kind of methods and dress for generating point of interest network topological diagram
It puts.
Background technology
With the development of internet and popularizing for intelligent terminal, a large amount of application program is come into being.In order to meet people
Demand, the resource in application program is also increasingly abundanter, for example, picture resource, audio resource, video resource etc., video money
A large amount of short video resource is further included in source, as second beats application program, it is beautiful clap application program and it is micro- regarding uploads such as application programs
Resource.
Since resource is extremely abundant, during application program is used, generally require to take a substantial amount of time from dim eyesight
Interested resource is searched in confused resource, there are it is less efficient the defects of, and then influence user experience.
In order to which user is allowed to find interested resource as early as possible, various resources can generally be sorted out at present, Ran Houyong
Interested resource is searched in family according to classification, although the above method can improve the effect of user's lookup to a certain extent
Rate, but be usually manual operation since resource being sorted out, then resource may be mismatched with corresponding classification, in this way, can make
Be not interested resource into the resource found, there are accuracy it is relatively low the defects of.
Invention content
In view of the above problems, it is proposed that the present invention overcomes the above problem in order to provide one kind or solves at least partly
The method and device of a kind of generation point of interest network topological diagram of the above problem, for solving resource text in the prior art
The corresponding classification of part mismatch and user according to the resource file accuracy that classification is found it is relatively low the defects of.
According to the present invention in a first aspect, provide it is a kind of generate point of interest network topological diagram method, including:Calculate N
The degree of correlation of any two resource file in a resource file, and according to the degree of correlation by any two resource file
Association, the N are the integer more than 1;After each resource file in N number of resource file is completed association, establish
Point of interest network topological diagram.
Second aspect according to the present invention provides a kind of device for generating point of interest network topological diagram, including:It calculates single
Member, for calculating the degree of correlation of any two resource file in N number of resource file, the N is the integer more than 1;Association table
Member, for being associated with any two resource file according to the degree of correlation;Unit is established, for N number of resource is literary
After each resource file in part completes association, point of interest network topological diagram is established.
In the embodiment of the present invention, a kind of method for generating point of interest network topological diagram is proposed, including:Calculate N number of resource text
The degree of correlation of any two resource file in part, and be associated with any two resource file according to the degree of correlation, institute
It is the integer more than 1 to state N;After each resource file in N number of resource file is completed association, point of interest net is established
Network topological diagram;In this scenario, the degree of correlation between computing resource file, and pass through the degree of correlation and associate resource file,
Not by manually resource file is associated, this improves the accuracy for sorting out resource file, and then improve and use
Search the accuracy of resource file in family.
Above description is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention,
And it can be implemented in accordance with the contents of the specification, and in order to allow above and other objects of the present invention, feature and advantage can
It is clearer and more comprehensible, below the special specific embodiment for lifting the present invention.
Description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this field
Technical staff will become clear.Attached drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention
Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the method flow diagram of generation point of interest network topological diagram proposed according to an embodiment of the invention;
Fig. 2A is a kind of schematic diagram of the point of interest network topological diagram proposed according to an embodiment of the invention;
Fig. 2 B are another schematic diagrames of the point of interest network topological diagram proposed according to an embodiment of the invention;
Fig. 3 is the schematic diagram of the device of generation point of interest network topological diagram proposed according to an embodiment of the invention.
Specific embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although the disclosure is shown in attached drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here
It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure
Completely it is communicated to those skilled in the art.
Fig. 1 schematically shows the stream of the method 10 of the generation point of interest network topological diagram according to embodiment of the present invention
Journey schematic diagram.As shown in Figure 1, this method 10 can include step 100,110.
Step 100:The degree of correlation of any two resource file in N number of resource file is calculated, and according to the degree of correlation
Any two resource file is associated with, the N is the integer more than 1;
Step 110:After each resource file in N number of resource file is completed association, point of interest net is established
Network topological diagram.
For example, there are 5 videos:Video 1, video 2, video 3, video 4, video 5 calculate any two in 5 videos
The degree of correlation between video, such as the degree of correlation 1 between video 1, video 2, the degree of correlation 2 between video 1, video 3, video 1 regards
Frequently the degree of correlation 3 between 4, the degree of correlation 4 between video 1, video 5, the degree of correlation 5 between video 2, video 3, video 2, video
The degree of correlation 6 between 4, the degree of correlation 7 between video 2, video 5, the degree of correlation 8 between video 3, video 4, video 3, video 5
Between the degree of correlation 9, video 1, video 2 be associated with, according to correlation by the degree of correlation 10 between video 4, video 5 according to the degree of correlation 1
Video 1, video 32 are associated with by degree, are associated video 1,4 according to the degree of correlation 3, and so on, according to the degree of correlation 10 by video 4,
Video 5 is associated, ultimately produces point of interest network topological diagram as shown in Figure 2 A.
In the embodiment of the present invention, there are many sides when calculating the degree of correlation of any two resource file in N number of resource file
Formula, it is alternatively possible in the following way:
The initial degree of correlation of any two resource file is calculated, using the initial degree of correlation as any two
The degree of correlation of resource file;Or
The initial degree of correlation of any two resource file is calculated, the initial degree of correlation is optimized to obtain described
The target degree of correlation, using the target degree of correlation as the degree of correlation of any two resource file.
It that is, can be according to the initial degree of correlation correlated resources file of resource file or can also be according to resource
The target degree of correlation correlated resources file of file.If degree of correlation difference, the distance between video difference, the degree of correlation is bigger, depending on
The distance between frequency is smaller, and the degree of correlation is smaller, and the distance between video is bigger.For example, it is assumed that each video shown in Fig. 2A
Between be associated according to the initial degree of correlation, if the initial degree of correlation between each video is optimized to obtain the target degree of correlation,
Each video is associated with according to the target degree of correlation and obtains point of interest network topological diagram as shown in Figure 2 B.
It is optional when calculating the initial degree of correlation of any two resource file in N number of resource file in the embodiment of the present invention
Following manner may be used in ground:
The first probability for operating continuously any two resource file is calculated, using first probability as described initial
The degree of correlation, the continuous operation refer to not operate other resources text in the time interval for operating any two resource file
Part.
Wherein, for different types of resource file, corresponding mode of operation also differs, for audio or video,
Operation can refer to broadcasting;For picture or writing text, operation can refer to browsing, certainly, above-mentioned only to illustrate, but not
It is defined in this.
For example, when calculating the initial degree of correlation of video 1, video 2, the continuous probability for playing video 1 and video 2 can be made
For the initial degree of correlation of video 1 and video 2, it is continuous play video 1 and the finger of video 2 play video 1 directly play video 2 or
Person, which refers to play, directly plays video 1 after video 2, and centre does not play other videos.
In the embodiment of the present invention, calculate the mode for the first probability for operating continuously any two resource file have it is more
Kind, it is alternatively possible in the following way:
Determine first number of the continuous operation any two resource file;
Determine second number of each resource file in individually operated N number of resource file, and by described second
The sum of number is used as third number;
Using the ratio of first number and the third number as first probability.
For example, share 5 videos, when calculating the first probability of video 1 and video 2, it is thus necessary to determine that continuous to play 1 He of video
First number of video 2, such as 500 times, then determine individually to play second number 1 of video 1, such as 1000 times, individually play video 2
Second number 2, such as 2000 times, individually play second number 3 of video 3, such as 3000 times, individually play the second of video 4
Number 4, such as 4000 times individually play second number 5 of video 5, such as 5000 times, wherein, second number, 1, second number 2, second
The sum of 3, second numbers 4 of number and second number 5 are third number, are 15000, by the ratio work of first number and third number
For the first probability, for such as 500 and 15000 ratio as the first probability, i.e. the first probability is 0.033.
It should be noted that first number can be to play video 1 directly to play the number of video 2 and play video
2 directly play the sum of number of video 1.
In the embodiment of the present invention, when calculating the first probability for operating continuously any two resource file, it can also adopt
Use following manner:
Determine the first number of users of the operation any two resource file;
Determine the second user quantity and Secondary resource of the first resource file in the operation any two resource file
The third number of users of file;
Using the ratio of the sum of first number of users and the second user quantity and the third number of users as
First probability.
For example, share 5 videos, when calculating the first probability of video 1 and video 2, it is thus necessary to determine that continuous to play 1 He of video
First number of users of video 2, such as 500 users, then determine individually to play the second user quantity 1 of video 1, such as 2000 use
Family individually plays the second user quantity 2 of video 2, such as 8000 times, wherein, the sum of second user quantity 1, second user quantity 2
For 10000 users, using the ratio of the sum of the first number of users and second user quantity 1 and second user quantity 2 as first
Probability, for such as 500 and 10000 ratio as the first probability, i.e. the first probability is 0.05.
Wherein, the first number of users can be the continuous quantity for playing video 1 and video 2 with continuously playing video 2 and regarding
Frequently the sum of 1 quantity.
It, optionally, can when the initial degree of correlation is optimized to obtain the target degree of correlation in the embodiment of the present invention
With in the following way:
Respectively after the first resource file in any two resource file described in calculating operation, interval 1,2 ..., N number of money
Source file operates the probability of the Secondary resource file in any two resource file again, obtains multiple second probability;
According to the target degree of correlation described in the multiple second probability and the initial relatedness computation.
For example, share 5 videos:Video 1, video 2, video 3, video 4 and video 5, between video 1 and video 2
When the initial degree of correlation optimizes, other than the initial degree of correlation between video 1 to be calculated and video 2, broadcasting is also calculated
At least one of video 3, video 4 and video 5 video playing video 2 is spaced after complete video 1, after such as playing video 1, is broadcast
Video 3 is put, then plays the second probability 1 of video 2, after playing video 1, plays video 4, then play the second probability of video 2
2, after playing video 1, video 5 is played, then play the second probability 3 of video 2, after playing video 1, play video 3, video
4, then the second probability 4 of video 2 is played, after playing video 1, video 3, video 5 are played, then play the second probability of video 2
5, after playing video 1, video 4, video 5 are played, then play the second probability 6 of video 2, after playing video 1, play video
3rd, video 4, video 5, then the second probability 7 of video 2 is played, and according to the second probability 1, the second probability 2, the second probability 3, second
Probability 4, the second probability 5, the second probability 6, the second probability 7 optimize the initial degree of correlation to obtain the target degree of correlation.
In the embodiment of the present invention, when the initial degree of correlation is optimized to obtain the target degree of correlation, it can also adopt
Use following manner:
For the first resource file in any two resource file, determine in any two resource file
Secondary resource file continuous operation first group of multimedia resource and with third multimedia resource continuous operation more than second group
Media resource, the third multimedia resource are the text in addition to any two resource file in N number of resource file
Part, and operated continuously with the first resource file;
According to first group of multimedia resource and the registration of second group of multimedia resource, to the initial correlation
Degree optimizes to obtain the target degree of correlation.
For example, when the initial degree of correlation between video 1 and video 2 optimizes to obtain the target degree of correlation, for video 1, really
First group of video that fixed and video 2 continuously plays, such as first group of video include video 3, video 4 and video 5, and determining and video
The 3 second group of video continuously played, such as second group of video include video 2, video 4 and video 5, wherein, video 3 connects with video 1
Continued broadcasting is put, and calculates the registration of first group of video and second group of video, and according to registration to the initial phase of video 1 and video 2
Guan Du is optimized, and obtains the target degree of correlation.
Above-mentioned example is illustrated for only having video 3 continuously to be played with video 1 in video 3, video 4 and video 5,
Possible video 5 is also continuously played with video 1 in certain practical application, is had multiple second group of video at this time, is such as continuously broadcast with video 3
The second group of video 1 put and the second group of video 2 continuously played with video 5, at this point, according to first group of video and second group
The registration 1 of video 1 and the registration 2 of first group of video and second group of video 2 carry out the initial degree of correlation excellent
Change obtains the target degree of correlation.
Certainly there is likely to be second group of more multigroup video, but principle is same as described above, no longer carries out herein
It is described in detail.
In the scheme proposed in the embodiment of the present invention, the degree of correlation between computing resource file, and pass through the degree of correlation by money
Source file associates, and not by manually resource file is associated, this improves the standards for sorting out resource file
Exactness, and then improve the accuracy that user searches resource file.
As shown in fig.3, in the embodiment of the present invention, it is also proposed that a kind of device 30 for generating point of interest network topological diagram, packet
It includes:
Computing unit 300, for calculating the degree of correlation of any two resource file in N number of resource file, the N is big
In 1 integer;
Associative cell 310, for being associated with any two resource file according to the degree of correlation;
Unit 320 is established, after each resource file in N number of resource file is completed association, is established
Point of interest network topological diagram.
For example, there are 5 videos:Video 1, video 2, video 3, video 4, video 5 calculate any two in 5 videos
The degree of correlation between video, such as the degree of correlation 1 between video 1, video 2, the degree of correlation 2 between video 1, video 3, video 1 regards
Frequently the degree of correlation 3 between 4, the degree of correlation 4 between video 1, video 5, the degree of correlation 5 between video 2, video 3, video 2, video
The degree of correlation 6 between 4, the degree of correlation 7 between video 2, video 5, the degree of correlation 8 between video 3, video 4, video 3, video 5
Between the degree of correlation 9, video 1, video 2 be associated with, according to correlation by the degree of correlation 10 between video 4, video 5 according to the degree of correlation 1
Video 1, video 32 are associated with by degree, are associated video 1,4 according to the degree of correlation 3, and so on, according to the degree of correlation 10 by video 4,
Video 5 is associated, ultimately produces point of interest network topological diagram as shown in Figure 2 A.
In the embodiment of the present invention, the computing unit 300 calculates the phase of any two resource file in N number of resource file
When pass is spent, it is alternatively possible in the following way:
The initial degree of correlation of any two resource file is calculated, using the initial degree of correlation as any two
The degree of correlation of resource file;Or
The initial degree of correlation of any two resource file is calculated, the initial degree of correlation is optimized to obtain described
The target degree of correlation, using the target degree of correlation as the degree of correlation of any two resource file.
It that is, can be according to the initial degree of correlation correlated resources file of resource file or can also be according to resource
The target degree of correlation correlated resources file of file.If degree of correlation difference, the distance between video difference, the degree of correlation is bigger, depending on
The distance between frequency is smaller, and the degree of correlation is smaller, and the distance between video is bigger.For example, it is assumed that each video shown in Fig. 2A
Between be associated according to the initial degree of correlation, if the initial degree of correlation between each video is optimized to obtain the target degree of correlation,
Each video is associated with according to the target degree of correlation and obtains point of interest network topological diagram as shown in Figure 2 B.
In the embodiment of the present invention, the computing unit 300 calculates the first of any two resource file in N number of resource file
During the beginning degree of correlation, it is alternatively possible in the following way:
The first probability for operating continuously any two resource file is calculated, using first probability as described initial
The degree of correlation, the continuous operation refer to not operate other resources text in the time interval for operating any two resource file
Part.
Wherein, for different types of resource file, corresponding mode of operation also differs, for audio or video,
Operation can refer to broadcasting;For picture or writing text, operation can refer to browsing, certainly, above-mentioned only to illustrate, but not
It is defined in this.
In the embodiment of the present invention, the computing unit 300, which calculates, operates continuously the first of any two resource file
During probability, it is alternatively possible in the following way:
Determine first number of the continuous operation any two resource file;
Determine second number of each resource file in individually operated N number of resource file, and by all second
The sum of number is used as third number;
Using the ratio of first number and the third number as first probability.
In the embodiment of the present invention, the computing unit 300, which calculates, operates continuously the first of any two resource file
During probability, it is alternatively possible in the following way:
Determine the first number of users of the operation any two resource file;
Determine the second user quantity and Secondary resource of the first resource file in the operation any two resource file
The third number of users of file;
Using the ratio of the sum of first number of users and the second user quantity and the third number of users as
First probability.
In the embodiment of the present invention, the computing unit 300 optimizes the initial degree of correlation to obtain the target phase
When pass is spent, it is alternatively possible in the following way:
Respectively after the first resource file in any two resource file described in calculating operation, interval 1,2 ..., N number of money
Source file operates the probability of the Secondary resource file in any two resource file again, obtains multiple second probability;
The initial degree of correlation is optimized according to the multiple second probability to obtain the target degree of correlation.
In the embodiment of the present invention, the computing unit 300 optimizes the initial degree of correlation to obtain the target phase
When pass is spent, it is alternatively possible in the following way:
For the first resource file in any two resource file, determine in any two resource file
Secondary resource file continuous operation first group of multimedia resource and with third multimedia resource continuous operation more than second group
Media resource, the third multimedia resource are the text in addition to any two resource file in N number of resource file
Part, and operated continuously with the first resource file;
According to first group of multimedia resource and the registration of second group of multimedia resource, to the initial correlation
Degree optimizes to obtain the target degree of correlation.
In the scheme proposed in embodiments of the present invention, the degree of correlation between computing resource file, and will by the degree of correlation
Resource file associates, and not by manually resource file is associated, this improves sort out resource file
Accuracy, and then improve the accuracy that user searches resource file.
A1, a kind of method for generating point of interest network topological diagram, including:
The degree of correlation of any two resource file in N number of resource file is calculated, and described will be appointed according to the degree of correlation
Two resource file associations of meaning, the N is the integer more than 1;
After each resource file in N number of resource file is completed association, point of interest network topological diagram is established.
A2, the method as described in A1 calculate the degree of correlation of any two resource file in N number of resource file, including:
The initial degree of correlation of any two resource file is calculated, using the initial degree of correlation as any two
The degree of correlation of resource file;Or
The initial degree of correlation of any two resource file is calculated, the initial degree of correlation is optimized to obtain described
The target degree of correlation, using the target degree of correlation as the degree of correlation of any two resource file.
A3, the method as described in A2 calculate the initial degree of correlation of any two resource file in N number of resource file, packet
It includes:
The first probability for operating continuously any two resource file is calculated, using first probability as described initial
The degree of correlation, the continuous operation refer to not operate other resources text in the time interval for operating any two resource file
Part.
A4, the method as described in A3 calculate the first probability for operating continuously any two resource file, including:
Determine first number of the continuous operation any two resource file;
Determine second number of each resource file in individually operated N number of resource file, and by all second
The sum of number is used as third number;
Using the ratio of first number and the third number as first probability.
A5, the method as described in A3 calculate the first probability for operating continuously any two resource file, including:
Determine the first number of users of the operation any two resource file;
Determine the second user quantity and Secondary resource of the first resource file in the operation any two resource file
The third number of users of file;
Using the ratio of the sum of first number of users and the second user quantity and the third number of users as
First probability.
A6, such as A2-A5 any one of them methods optimize the initial degree of correlation to obtain the target correlation
Degree, including:
Respectively after the first resource file in any two resource file described in calculating operation, interval 1,2 ..., N number of money
Source file operates the probability of the Secondary resource file in any two resource file again, obtains multiple second probability;
The initial degree of correlation is optimized according to the multiple second probability to obtain the target degree of correlation.
A7, such as A2-A5 any one of them methods optimize the initial degree of correlation to obtain the target correlation
Degree, including:
For the first resource file in any two resource file, determine in any two resource file
Secondary resource file continuous operation first group of multimedia resource and with third multimedia resource continuous operation more than second group
Media resource, the third multimedia resource are the text in addition to any two resource file in N number of resource file
Part, and operated continuously with the first resource file;
According to first group of multimedia resource and the registration of second group of multimedia resource, to the initial correlation
Degree optimizes to obtain the target degree of correlation.
A8, a kind of device for generating point of interest network topological diagram, including:
Computing unit, for calculating the degree of correlation of any two resource file in N number of resource file, the N is more than 1
Integer;
Associative cell, for being associated with any two resource file according to the degree of correlation;
Unit is established, after each resource file in N number of resource file is completed association, establishes interest
Spot net topological diagram.
A9, the device as described in A8, the computing unit calculate the phase of any two resource file in N number of resource file
Guan Du, including:
The initial degree of correlation of any two resource file is calculated, using the initial degree of correlation as any two
The degree of correlation of resource file;Or
The initial degree of correlation of any two resource file is calculated, the initial degree of correlation is optimized to obtain described
The target degree of correlation, using the target degree of correlation as the degree of correlation of any two resource file.
A10, the device as described in A9, the computing unit calculate any two resource file in N number of resource file
The initial degree of correlation, including:
The first probability for operating continuously any two resource file is calculated, using first probability as described initial
The degree of correlation, the continuous operation refer to not operate other resources text in the time interval for operating any two resource file
Part.
A11, the device as described in A10, the computing unit, which calculates, operates continuously the of any two resource file
One probability, including:
Determine first number of the continuous operation any two resource file;
Determine second number of each resource file in individually operated N number of resource file, and by all second
The sum of number is used as third number;
Using the ratio of first number and the third number as first probability.
A12, the device as described in A10, the computing unit, which calculates, operates continuously the of any two resource file
One probability, including:
Determine the first number of users of the operation any two resource file;
Determine the second user quantity and Secondary resource of the first resource file in the operation any two resource file
The third number of users of file;
Using the ratio of the sum of first number of users and the second user quantity and the third number of users as
First probability.
The initial degree of correlation is optimized to obtain by A13, such as A9-A12 any one of them devices, the computing unit
The target degree of correlation, including:
Respectively after the first resource file in any two resource file described in calculating operation, interval 1,2 ..., N number of money
Source file operates the probability of the Secondary resource file in any two resource file again, obtains multiple second probability;
The initial degree of correlation is optimized according to the multiple second probability to obtain the target degree of correlation.
The initial degree of correlation is optimized to obtain by A14, such as A9-A12 any one of them devices, the computing unit
The target degree of correlation, including:
For the first resource file in any two resource file, determine in any two resource file
Secondary resource file continuous operation first group of multimedia resource and with third multimedia resource continuous operation more than second group
Media resource, the third multimedia resource are the text in addition to any two resource file in N number of resource file
Part, and operated continuously with the first resource file;
According to first group of multimedia resource and the registration of second group of multimedia resource, to the initial correlation
Degree optimizes to obtain the target degree of correlation.
A15, a kind of device for generating point of interest network topological diagram, including:
One or more processor;
Memory;
The program being stored in the memory, when being performed by one or more of processors, described program makes
The processor performs the method as described in any one in A1-A7.
A16, a kind of computer readable storage medium, the computer-readable recording medium storage have program, when the journey
When sequence is executed by processor so that the processor performs the method as described in any one in A1-A7.
Method and apparatus are not inherently related to any certain computer, virtual system or miscellaneous equipment provided herein.
Various general-purpose systems can also be used together with teaching based on this.As described above, required by constructing this kind of device
Structure be obvious.In addition, the present invention is not also directed to any certain programmed language.It should be understood that it can utilize various
Programming language realizes the content of invention described herein, and the description done above to language-specific is to disclose this hair
Bright preferred forms.
In the specification provided in this place, numerous specific details are set forth.It is to be appreciated, however, that the implementation of the present invention
Example can be put into practice without these specific details.In some instances, well known method, structure is not been shown in detail
And technology, so as not to obscure the understanding of this description.
Similarly, it should be understood that in order to simplify the disclosure and help to understand one or more of each inventive aspect,
Above in the description of exemplary embodiment of the present invention, each feature of the invention is grouped together into single implementation sometimes
In example, figure or descriptions thereof.However, the method for the disclosure should be construed to reflect following intention:I.e. required guarantor
Shield the present invention claims the more features of feature than being expressly recited in each claim.More precisely, such as right
As claim reflects, inventive aspect is all features less than single embodiment disclosed above.Therefore, it then follows tool
Thus claims of body embodiment are expressly incorporated in the specific embodiment, wherein the conduct of each claim in itself
The separate embodiments of the present invention.
Those skilled in the art, which are appreciated that, to carry out adaptively the module in the device in embodiment
Change and they are arranged in one or more devices different from the embodiment.It can be several modules in embodiment
It is combined into a module or unit or component and multiple submodule or subelement or sub-component can be divided into addition.
Other than such feature and/or at least some of process or module exclude each other, any combinations pair may be used
All features and so disclosed any method disclosed in this specification (including adjoint claim, abstract and attached drawing)
Or all processes or unit of equipment are combined.Unless expressly stated otherwise, this specification (will including adjoint right
Ask, make a summary and attached drawing) disclosed in each feature can be replaced by providing identical, equivalent or similar purpose alternative features.
In addition, it will be appreciated by those of skill in the art that although some embodiments described herein include other embodiments
In included certain features rather than other feature, but the combination of the feature of different embodiments means in of the invention
Within the scope of and form different embodiments.For example, in detail in the claims, embodiment claimed it is one of arbitrary
It mode can use in any combination.
Each device embodiment of the present invention can be with hardware realization or to be run on one or more processor
Software module realize or realized with combination thereof.It will be understood by those of skill in the art that it can use in practice
Microprocessor or digital signal processor (DSP) realize some or all moulds in device according to embodiments of the present invention
The some or all functions of block.The present invention is also implemented as the part or complete for performing method as described herein
The program of device (for example, computer program and computer program product) in portion.Such program for realizing the present invention can store
It on a computer-readable medium or can the form with one or more signal.Such signal can be from internet
It is downloaded on website and obtains either providing on carrier signal or providing in the form of any other.
It should be noted that the present invention will be described rather than limits the invention, and ability for above-described embodiment
Field technique personnel can design alternative embodiment without departing from the scope of the appended claims.In the claims,
Any reference mark between bracket should not be configured to limitations on claims.Word "comprising" does not exclude the presence of not
Element or step listed in the claims.Word "a" or "an" before element does not exclude the presence of multiple such
Element.The present invention can be by means of including the hardware of several different elements and being come by means of properly programmed computer real
It is existing.If in the unit claim for listing equipment for drying, several in these devices can be by same hardware branch
To embody.The use of word first, second, and third does not indicate that any sequence.These words can be explained and run after fame
Claim.
Claims (10)
1. a kind of method for generating point of interest network topological diagram, including:
Calculate the degree of correlation of any two resource file in N number of resource file, and according to the degree of correlation by described arbitrary two
A resource file association, the N are the integer more than 1;
After each resource file in N number of resource file is completed association, point of interest network topological diagram is established.
2. the method as described in claim 1 calculates the degree of correlation of any two resource file in N number of resource file, including:
The initial degree of correlation of any two resource file is calculated, using the initial degree of correlation as any two resource
The degree of correlation of file;Or
The initial degree of correlation of any two resource file is calculated, the initial degree of correlation is optimized to obtain the target
The degree of correlation, using the target degree of correlation as the degree of correlation of any two resource file.
3. method as claimed in claim 2 calculates the initial degree of correlation of any two resource file in N number of resource file,
Including:
The first probability for operating continuously any two resource file is calculated, using first probability as the initial correlation
Degree, the continuous operation refer to not operate other resource files in the time interval for operating any two resource file.
4. method as claimed in claim 3 calculates the first probability for operating continuously any two resource file, including:
Determine first number of the continuous operation any two resource file;
Determine second number of each resource file in individually operated N number of resource file, and by all second numbers
The sum of be used as third number;
Using the ratio of first number and the third number as first probability.
5. method as claimed in claim 3 calculates the first probability for operating continuously any two resource file, including:
Determine the first number of users of the operation any two resource file;
Determine the second user quantity of first resource file and Secondary resource file in the operation any two resource file
Third number of users;
Using the ratio of the sum of first number of users and the second user quantity and the third number of users as described in
First probability.
6. such as claim 2-5 any one of them methods, the initial degree of correlation is optimized to obtain the target correlation
Degree, including:
Respectively after the first resource file in any two resource file described in calculating operation, interval 1,2 ..., N number of resource text
Part operates the probability of the Secondary resource file in any two resource file again, obtains multiple second probability;
The initial degree of correlation is optimized according to the multiple second probability to obtain the target degree of correlation.
7. such as claim 2-5 any one of them methods, the initial degree of correlation is optimized to obtain the target correlation
Degree, including:
For the first resource file in any two resource file, determine and the in any two resource file
First group of multimedia resource of two resource files continuous operation and second group of multimedia with the continuous operation of third multimedia resource
Resource, the third multimedia resource are the file in addition to any two resource file in N number of resource file, and
It is operated continuously with the first resource file;
According to first group of multimedia resource and the registration of second group of multimedia resource, to the initial degree of correlation into
Row optimization obtains the target degree of correlation.
8. a kind of device for generating point of interest network topological diagram, including:
Computing unit, for calculating the degree of correlation of any two resource file in N number of resource file, the N is whole more than 1
Number;
Associative cell, for being associated with any two resource file according to the degree of correlation;
Unit is established, after each resource file in N number of resource file is completed association, establishes point of interest net
Network topological diagram.
9. a kind of device for generating point of interest network topological diagram, including:
One or more processor;
Memory;
The program being stored in the memory, when being performed by one or more of processors, described program makes described
Processor performs the method as described in any one in claim 1-7.
10. a kind of computer readable storage medium, the computer-readable recording medium storage has program, when described program is located
When managing device execution so that the processor performs the method as described in any one in claim 1-7.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711478084.XA CN108197239B (en) | 2017-12-29 | 2017-12-29 | Method and device for generating point of interest network topological graph |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711478084.XA CN108197239B (en) | 2017-12-29 | 2017-12-29 | Method and device for generating point of interest network topological graph |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108197239A true CN108197239A (en) | 2018-06-22 |
CN108197239B CN108197239B (en) | 2021-08-24 |
Family
ID=62586564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711478084.XA Active CN108197239B (en) | 2017-12-29 | 2017-12-29 | Method and device for generating point of interest network topological graph |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108197239B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110646000A (en) * | 2018-06-26 | 2020-01-03 | 百度在线网络技术(北京)有限公司 | Navigation method, navigation device and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101984424A (en) * | 2010-10-26 | 2011-03-09 | 浙江工商大学 | Mass inter-media index method |
WO2013159176A1 (en) * | 2012-04-27 | 2013-10-31 | Research In Motion Limited | Systems and methods for establishing and using a personal linking graph |
CN104008180A (en) * | 2014-06-09 | 2014-08-27 | 北京奇虎科技有限公司 | Association method of structural data with picture, association device thereof |
WO2017147396A1 (en) * | 2016-02-24 | 2017-08-31 | Data2Discovery | Object oriented system and method having semantic substructures for machine learning |
-
2017
- 2017-12-29 CN CN201711478084.XA patent/CN108197239B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101984424A (en) * | 2010-10-26 | 2011-03-09 | 浙江工商大学 | Mass inter-media index method |
WO2013159176A1 (en) * | 2012-04-27 | 2013-10-31 | Research In Motion Limited | Systems and methods for establishing and using a personal linking graph |
CN104008180A (en) * | 2014-06-09 | 2014-08-27 | 北京奇虎科技有限公司 | Association method of structural data with picture, association device thereof |
WO2017147396A1 (en) * | 2016-02-24 | 2017-08-31 | Data2Discovery | Object oriented system and method having semantic substructures for machine learning |
Non-Patent Citations (1)
Title |
---|
张昌利等: "社会化标签系统语义相关度的拓扑图法计算", 《西安电子科技大学学报(自然科学版)》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110646000A (en) * | 2018-06-26 | 2020-01-03 | 百度在线网络技术(北京)有限公司 | Navigation method, navigation device and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN108197239B (en) | 2021-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10381022B1 (en) | Audio classifier | |
US11349680B2 (en) | Method and apparatus for pushing information based on artificial intelligence | |
CN108228758B (en) | Text classification method and device | |
US10885107B2 (en) | Music recommendation method and apparatus | |
WO2015032353A1 (en) | Video recommendation method and device | |
CN106096050A (en) | A kind of method and apparatus of video contents search | |
CN107918657B (en) | Data source matching method and device | |
WO2019201511A8 (en) | Method and data processing apparatus | |
CN109688428B (en) | Video comment generation method and device | |
CN105956148A (en) | Resource information recommendation method and apparatus | |
WO2013177213A3 (en) | Enabling natural language processing | |
CN107807957A (en) | entity library generating method and device | |
CN111209477B (en) | Information recommendation method and device, electronic equipment and storage medium | |
CN103942264B (en) | The method and apparatus for pushing the webpage comprising news information | |
WO2018084910A1 (en) | Systems and methods for interrelating text transcript information with video and/or audio information | |
CN110046278B (en) | Video classification method and device, terminal equipment and storage medium | |
CN104809223A (en) | Method and device for supplying application content search result in application | |
CN105184616A (en) | Method and device for targeted delivery of business object | |
US20190138617A1 (en) | Automation Of Media Content Tag Selection | |
CN105117383A (en) | Search result providing method and apparatus | |
CN107679186A (en) | The method and device of entity search is carried out based on entity storehouse | |
CN108540860B (en) | Video recall method and device | |
JP2018511115A5 (en) | ||
GB2552598A (en) | Images for query answers | |
CN108628886B (en) | Audio file recommendation method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |