CN108194135A - A kind of constructing metro tunnel prevents top drainage pipeline leaking substance and construction method - Google Patents

A kind of constructing metro tunnel prevents top drainage pipeline leaking substance and construction method Download PDF

Info

Publication number
CN108194135A
CN108194135A CN201711401076.5A CN201711401076A CN108194135A CN 108194135 A CN108194135 A CN 108194135A CN 201711401076 A CN201711401076 A CN 201711401076A CN 108194135 A CN108194135 A CN 108194135A
Authority
CN
China
Prior art keywords
water pipe
drainage pipeline
flexible water
flexible
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711401076.5A
Other languages
Chinese (zh)
Inventor
张双双
周冠南
付军恩
汪本刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd, Third Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201711401076.5A priority Critical patent/CN108194135A/en
Publication of CN108194135A publication Critical patent/CN108194135A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of constructing metro tunnel prevents top drainage pipeline leaking substance, one Flexible water pipe of arrangement ensures the tightness of drainage pipeline specially inside drainage pipeline, flow is made to be flowed through from Flexible water pipe, water is avoided to cause seepage flow from the crack of pipeline or the leakage of connector breakage, the liner steel ring that two outer diameters are less than Flexible water pipe internal diameter is embedded in Flexible water pipe both ends.Construction method:Flexible water pipe as drainage pipeline liner, apply in the construction that the existing drainage pipeline leakage in top is prevented in constructing tunnel field by the method for increasing the tightness of drainage pipeline;The both ends of Flexible water pipe are embedded in as liner steel ring using two steel cylinders, it is ensured that Flexible water pipe intake-outlet is in open configuration, convenient for water delivery;Advantages of the present invention:The present invention can ensure the tightness of drainage pipeline with extremely economic cheap cost, prevent to occur to leak during the constructing tunnel that underlies in drainage pipeline to cause construction safety hidden danger, keep normal water delivery, do not leak.

Description

A kind of constructing metro tunnel prevents top drainage pipeline leaking substance and construction method
Technical field
The present invention relates to constructing metro tunnel field, a kind of more particularly to constructing metro tunnel prevents top drainage pipeline Leaking substance and construction method.
Background technology
Constructing metro tunnel is commonly encountered down the situation for wearing existing drainage pipeline.Existing drainage pipeline long neglected and in disrepair may be deposited The crack and damaged joint the problems such as, constructing tunnel causes the differential settlement on stratum that may also can destroy the complete of drainage pipeline Whole property.These drainage pipelines leakage causes seepage flow that can significantly reduce the stability of tunnel surrounding, serious or even can cause vault Or the accidents such as face landslide, threaten the life security of construction personnel.Therefore it adopts an effective measure during avoiding constructing tunnel Top drainage pipeline leakage is of great significance.
Invention content
The purpose of the invention is to overcome the above problem, having provided a kind of constructing metro tunnel prevents top drainpipe Road leaking substance and construction method.
The present invention provides a kind of constructing metro tunnels to prevent top drainage pipeline leaking substance, it is characterised in that:Subway Constructing tunnel prevents top drainage pipeline leaking substance, and one Flexible water pipe of arrangement ensures drainage pipeline specially inside drainage pipeline Tightness, flow is made to be flowed through from Flexible water pipe, avoid water from the crack of pipeline or connector breakage leakage cause seepage flow, in tunnel Road construction field prevents overlying pipe leakage, it is ensured that still for for the first time in the measure of tunnel safety construction.
The liner steel ring that two outer diameters are less than Flexible water pipe internal diameter is embedded in Flexible water pipe both ends;Effect one, liner steel ring struts Two end interfaces of Flexible water pipe, it is ensured that the inlet and outlet open configuration at Flexible water pipe both ends therefrom flows in and out convenient for water. Effect two, liner steel ring support Flexible water pipe, under rubber fastening band and expansion water-stop glue booster action, it is ensured that Flexible water pipe and draining Inner wall of the pipe is more closely bonded, and gap of the flow between Flexible water pipe and drainage pipeline inner wall is avoided to flow through.Liner aperture has Corrosion protective layer, it is ensured that the rigidity for keeping enough is used for a long time in water.
Using the gap between rubber fastening band and expansion water-stop glue auxiliary seal Flexible water pipe and drainage pipeline.Rubber stops Water band and expansion water-stop glue meet water volume and expand to reach filling gap, block up the purpose of reality leakage passage.Rubber fastening band Water volume expansion, under the supporting role of inner lining steel circle, tight padding and compacting drainage pipeline inner wall and defeated are met with expansion water-stop glue Gap between water band ensures that flow flows through inside Flexible water pipe completely, avoids leaking.
A kind of constructing metro tunnel prevents the construction method of top drainage pipeline leaking substance, it is characterised in that:Flexible water pipe As drainage pipeline liner, the method for increasing the tightness of drainage pipeline is applied the existing draining in top is prevented in constructing tunnel field In the construction of pipe leakage;The both ends of Flexible water pipe are embedded in as liner steel ring using two steel cylinders, it is ensured that Flexible water pipe Inlet and outlet water Mouth is in open configuration, convenient for water delivery;Using rubber fastening band and expansion water-stop glue filling Flexible water pipe and drainage pipeline inner wall it Between gap, rubber fastening band and expansion water-stop glue, which meet water volume intumescent filler gap, ensures that water may not flow into Flexible water pipe and draining It is leaked between pipeline and then from the crack of drainage pipeline or connector breakage;
The internal diameter of investigation drainage pipeline is needed before construction, the length of pipeline between adjacent two inspection shaft.It is had made to order according to investigation Flexible water pipe, Flexible water pipe have certain flexibility and draftability.Liner steel ring select outer diameter be less than Flexible water pipe internal diameter steel cylinder be Preferably, the height of steel cylinder is about.Steel cylinder barrel need to be by certain thickness, and being subject to has enough rigidity support Flexible water pipes.Liner Steel ring has certain corrosion protective layer.
Constructing operation place is around two inspection shafts:
Step 1:First using particular device by conductor rope through drainage pipeline, an inspection shaft is nearby by conductor rope wherein Firmly tie up to the end of Flexible water pipe;
Step 2:It draws conductor rope and Flexible water pipe is run through into entire drainage pipeline.If pipe diameter is sufficiently large to meet operation The disengaging demand of personnel can artificial traction Flexible water pipe.
Step 3:This operating procedure is intended to Flexible water pipe both ends being fixed on the both ends of drainage pipeline, makes water from Flexible water pipe In flow through, it is impossible to the channel between Flexible water pipe and pipeline flows through, and prevents leak.Inner ring steel ring is embedded in Flexible water pipe In, liner steel ring props up Flexible water pipe, and Flexible water pipe is made more closely to be bonded with drainage pipeline.
Step 4:This operating procedure is intended to the clearance seal between Flexible water pipe and drainage pipeline wall, it is ensured that inspection shaft In water will not be between Flexible water pipe and drainage pipeline wall gap flow into.Specific leak-proof measure is to be filled using rubber water-proof with Gap between Flexible water pipe and drainage pipeline, and it is appropriate be aided with expansion water-stop glue, length and liner steel ring length are filled in longitudinal direction It is identical.
After more than constructing operation, Flexible water pipe both ends are bonded under inner lining steel circle supporting role with drainage pipeline wall, rubber Waterstop and expansion water-stop glue ensure drainage pipeline wall and the close gapless of water delivery interband, it is ensured that the water in inspection shaft is completely from defeated It circulates in water band, will not flow through from the gap of Flexible water pipe and drainage pipeline, be leaked when drainage pipeline destroys.
Advantages of the present invention:
The present invention can ensure the tightness of drainage pipeline with extremely economic cheap cost, prevent in drainage pipeline under Leakage occurs during volt constructing tunnel to cause construction safety hidden danger or even cause stratum differential settlement in constructing tunnel, arranges In the case that waterpipe loses destruction, Flexible water pipe bears larger deformation enough, keeps normal water delivery, does not ooze Leakage.Construction cost is cheap.Since cheap Flexible water pipe, steel cylinder, rubber fastening band and expansion water-stop glue etc. are only used in construction, And construction technology is simple, operability is strong, be compared to pipeline change move it is required link up to related property right unit, change to move and set The operation such as meter, construction has significant advantage on time cost and financial cost.Waterproof effect is lasting.Flexible water pipe in construction material There is preferable durability with the liner steel ring Jing Guo anti-corrosion treatment, permanent performance work(still is able in water immersion Effect.The permanent tightness for ensuring drainage pipeline still is able to after the completion of constructing tunnel, prevents to leak.
Description of the drawings
Below in conjunction with the accompanying drawings and embodiment the present invention is described in further detail:
Fig. 1 is one schematic diagram of operating procedure;
Fig. 2 is two schematic diagram of operating procedure;
Fig. 3 is three schematic diagram of operating procedure;
Fig. 4 is four schematic diagram of operating procedure;
Fig. 5 is five schematic diagram of operating procedure;
In figure, 1 is Flexible water pipe, and 2 be conductor rope, and 3 be existing flowing line, and 4 be inspection shaft, and 5 be the tunnel that will be constructed, 6 For rubber fastening band.
Specific embodiment
Embodiment 1
The present invention provides a kind of constructing metro tunnels to prevent top drainage pipeline leaking substance, it is characterised in that:Subway Constructing tunnel prevents top drainage pipeline leaking substance, and one Flexible water pipe of arrangement ensures drainage pipeline specially inside drainage pipeline Tightness, flow is made to be flowed through from Flexible water pipe, avoid water from the crack of pipeline or connector breakage leakage cause seepage flow, in tunnel Road construction field prevents overlying pipe leakage, it is ensured that still for for the first time in the measure of tunnel safety construction.
The liner steel ring that two outer diameters are less than Flexible water pipe internal diameter is embedded in Flexible water pipe both ends;Effect one, liner steel ring struts Two end interfaces of Flexible water pipe, it is ensured that the inlet and outlet open configuration at Flexible water pipe both ends therefrom flows in and out convenient for water. Effect two, liner steel ring support Flexible water pipe, under rubber fastening band and expansion water-stop glue booster action, it is ensured that Flexible water pipe and draining Inner wall of the pipe is more closely bonded, and gap of the flow between Flexible water pipe and drainage pipeline inner wall is avoided to flow through.Liner aperture has Corrosion protective layer, it is ensured that the rigidity for keeping enough is used for a long time in water.
Using the gap between rubber fastening band and expansion water-stop glue auxiliary seal Flexible water pipe and drainage pipeline.Rubber stops Water band and expansion water-stop glue meet water volume and expand to reach filling gap, block up the purpose of reality leakage passage.Rubber fastening band Water volume expansion, under the supporting role of inner lining steel circle, tight padding and compacting drainage pipeline inner wall and defeated are met with expansion water-stop glue Gap between water band ensures that flow flows through inside Flexible water pipe completely, avoids leaking.
A kind of constructing metro tunnel prevents the construction method of top drainage pipeline leaking substance, it is characterised in that:Flexible water pipe As drainage pipeline liner, the method for increasing the tightness of drainage pipeline is applied the existing draining in top is prevented in constructing tunnel field In the construction of pipe leakage;The both ends of Flexible water pipe are embedded in as liner steel ring using two steel cylinders, it is ensured that Flexible water pipe Inlet and outlet water Mouth is in open configuration, convenient for water delivery;Using rubber fastening band and expansion water-stop glue filling Flexible water pipe and drainage pipeline inner wall it Between gap, rubber fastening band and expansion water-stop glue, which meet water volume intumescent filler gap, ensures that water may not flow into Flexible water pipe and draining It is leaked between pipeline and then from the crack of drainage pipeline or connector breakage;
The internal diameter of investigation drainage pipeline is needed before construction, the length of pipeline between adjacent two inspection shaft.It is had made to order according to investigation Flexible water pipe, Flexible water pipe have certain flexibility and draftability.Liner steel ring select outer diameter be less than Flexible water pipe internal diameter steel cylinder be Preferably, the height of steel cylinder is about.Steel cylinder barrel need to be by certain thickness, and being subject to has enough rigidity support Flexible water pipes.Liner Steel ring has certain corrosion protective layer.
Constructing operation place is around two inspection shafts:
Step 1:First using particular device by conductor rope through drainage pipeline, an inspection shaft is nearby by conductor rope wherein Firmly tie up to the end of Flexible water pipe;
Step 2:It draws conductor rope and Flexible water pipe is run through into entire drainage pipeline.If pipe diameter is sufficiently large to meet operation The disengaging demand of personnel can artificial traction Flexible water pipe.
Step 3:This operating procedure is intended to Flexible water pipe both ends being fixed on the both ends of drainage pipeline, makes water from Flexible water pipe In flow through, it is impossible to the channel between Flexible water pipe and pipeline flows through, and prevents leak.Inner ring steel ring is embedded in Flexible water pipe In, liner steel ring props up Flexible water pipe, and Flexible water pipe is made more closely to be bonded with drainage pipeline.
Step 4:This operating procedure is intended to the clearance seal between Flexible water pipe and drainage pipeline wall, it is ensured that inspection shaft In water will not be between Flexible water pipe and drainage pipeline wall gap flow into.Specific leak-proof measure is to be filled using rubber water-proof with Gap between Flexible water pipe and drainage pipeline, and it is appropriate be aided with expansion water-stop glue, length and liner steel ring length are filled in longitudinal direction It is identical.
After more than constructing operation, Flexible water pipe both ends are bonded under inner lining steel circle supporting role with drainage pipeline wall, rubber Waterstop and expansion water-stop glue ensure drainage pipeline wall and the close gapless of water delivery interband, it is ensured that the water in inspection shaft is completely from defeated It circulates in water band, will not flow through from the gap of Flexible water pipe and drainage pipeline, be leaked when drainage pipeline destroys.

Claims (3)

1. a kind of constructing metro tunnel prevents top drainage pipeline leaking substance, it is characterised in that:Constructing metro tunnel prevents One Flexible water pipe of arrangement ensures the tightness of drainage pipeline inside square drainage pipeline leaking substance, specially drainage pipeline, makes water Stream is flowed through from Flexible water pipe, and water is avoided to cause seepage flow from the crack of pipeline or the leakage of connector breakage, and two outer diameters are less than water delivery Liner steel ring with internal diameter is embedded in Flexible water pipe both ends;Using rubber fastening band and expansion water-stop glue auxiliary seal Flexible water pipe and row Gap between waterpipe;Rubber fastening band and expansion water-stop glue meet water volume and expand to reach filling gap, block up real Leakage passage;Rubber fastening band and expansion water-stop glue meet water volume expansion, under the supporting role of inner lining steel circle, tight filling pressure Gap between real drainage pipeline inner wall and Flexible water pipe ensures that flow flows through inside Flexible water pipe completely, avoids leaking.
2. a kind of constructing metro tunnel prevents the construction method of top drainage pipeline leaking substance, it is characterised in that:Flexible water pipe is made For drainage pipeline liner, the method for increasing the tightness of drainage pipeline is applied the existing drainpipe in top is prevented in constructing tunnel field In the construction of road leakage;The both ends of Flexible water pipe are embedded in as liner steel ring using two steel cylinders, it is ensured that Flexible water pipe intake-outlet In open configuration, convenient for water delivery;Using between rubber fastening band and expansion water-stop glue filling Flexible water pipe and drainage pipeline inner wall Gap, rubber fastening band and expansion water-stop glue, which meet water volume intumescent filler gap, ensures that water may not flow into Flexible water pipe and drainpipe It is leaked between road and then from the crack of drainage pipeline or connector breakage;
The internal diameter of investigation drainage pipeline is needed before construction, the length of pipeline between adjacent two inspection shaft.Water delivery is had made to order according to investigation Band, Flexible water pipe have certain flexibility and draftability, and the steel cylinder that liner steel ring selects outer diameter to be less than Flexible water pipe internal diameter is advisable, steel Cylinder height be about;Steel cylinder barrel need to be by certain thickness, and being subject to has enough rigidity support Flexible water pipes, liner steel ring tool There is certain corrosion protective layer.
3. constructing metro tunnel described in accordance with the claim 2 prevents the construction method of top drainage pipeline leaking substance, special Sign is:
Constructing operation place is around two inspection shafts:
Step 1:First using particular device by conductor rope through drainage pipeline, wherein an inspection shaft nearby by conductor rope firmly Tie up to the end of Flexible water pipe;
Step 2:It draws conductor rope and Flexible water pipe is run through into entire drainage pipeline;If pipe diameter is sufficiently large to meet operating personnel Disengaging demand can artificial traction Flexible water pipe;
Step 3:This operating procedure is intended to Flexible water pipe both ends being fixed on the both ends of drainage pipeline, and water is made to be flowed from Flexible water pipe It crosses, it is impossible to which the channel between Flexible water pipe and pipeline flows through, and prevents leak;Inner ring steel ring is embedded in Flexible water pipe, it is interior Lined steel circle props up Flexible water pipe, and Flexible water pipe is made more closely to be bonded with drainage pipeline;
Step 4:This operating procedure is intended to the clearance seal between Flexible water pipe and drainage pipeline wall, it is ensured that in inspection shaft Water will not be between Flexible water pipe and drainage pipeline wall gap flow into;Specific leak-proof measure is to fill water delivery using rubber water-proof with Gap between band and drainage pipeline, and it is appropriate be aided with expansion water-stop glue, it is identical with liner steel ring length that length is filled in longitudinal direction;
After more than constructing operation, Flexible water pipe both ends are bonded under inner lining steel circle supporting role with drainage pipeline wall, rubber water-proof Band and expansion water-stop glue ensure drainage pipeline wall and the close gapless of water delivery interband, it is ensured that the water in inspection shaft is completely from Flexible water pipe Middle circulation will not be flowed through from the gap of Flexible water pipe and drainage pipeline, be leaked when drainage pipeline destroys.
CN201711401076.5A 2017-12-22 2017-12-22 A kind of constructing metro tunnel prevents top drainage pipeline leaking substance and construction method Pending CN108194135A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711401076.5A CN108194135A (en) 2017-12-22 2017-12-22 A kind of constructing metro tunnel prevents top drainage pipeline leaking substance and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711401076.5A CN108194135A (en) 2017-12-22 2017-12-22 A kind of constructing metro tunnel prevents top drainage pipeline leaking substance and construction method

Publications (1)

Publication Number Publication Date
CN108194135A true CN108194135A (en) 2018-06-22

Family

ID=62583617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711401076.5A Pending CN108194135A (en) 2017-12-22 2017-12-22 A kind of constructing metro tunnel prevents top drainage pipeline leaking substance and construction method

Country Status (1)

Country Link
CN (1) CN108194135A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113531284A (en) * 2021-07-12 2021-10-22 中国一冶集团有限公司 Underground drainage pipeline repairing method and special climbing frame thereof

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2062001U (en) * 1988-09-16 1990-09-12 张子龙 Flexible water pipe
CN2602246Y (en) * 2002-08-23 2004-02-04 于荷茂 Water delivery belt joint converter
JP2004060203A (en) * 2002-07-26 2004-02-26 Kureha Elastomer Co Ltd Water leakage preventive structure of tunnel, its construction method and columnar packing
CN2721714Y (en) * 2004-08-17 2005-08-31 长江水利委员会长江勘测规划设计研究院 Orifice device of basic weep hole
CN103741695A (en) * 2013-11-29 2014-04-23 中交第二航务工程局有限公司 Embedded grouting pipe installed on waterstop and grouting method
CN204254058U (en) * 2014-10-15 2015-04-08 中国十七冶集团有限公司 Perforate water string mould after basement
CN104964121A (en) * 2015-07-28 2015-10-07 中建八局第四建设有限公司 Blockage method for leakage water in sleeve pipe
CN105402500A (en) * 2014-09-04 2016-03-16 罗铭 Water swelling rubber leakage-proof ring
CN205558966U (en) * 2016-04-22 2016-09-07 杜尧 A one -way drainer of dual stagnant water for tunnel lining
CN106013199A (en) * 2016-06-29 2016-10-12 山东省水利科学研究院 Double wing type plastic soft belt type one-way automatic drainer
CN206320464U (en) * 2016-12-08 2017-07-11 新疆昌源水务科学研究院(有限公司) Repairing applied to PCCP pipe fittings connects section

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2062001U (en) * 1988-09-16 1990-09-12 张子龙 Flexible water pipe
JP2004060203A (en) * 2002-07-26 2004-02-26 Kureha Elastomer Co Ltd Water leakage preventive structure of tunnel, its construction method and columnar packing
CN2602246Y (en) * 2002-08-23 2004-02-04 于荷茂 Water delivery belt joint converter
CN2721714Y (en) * 2004-08-17 2005-08-31 长江水利委员会长江勘测规划设计研究院 Orifice device of basic weep hole
CN103741695A (en) * 2013-11-29 2014-04-23 中交第二航务工程局有限公司 Embedded grouting pipe installed on waterstop and grouting method
CN105402500A (en) * 2014-09-04 2016-03-16 罗铭 Water swelling rubber leakage-proof ring
CN204254058U (en) * 2014-10-15 2015-04-08 中国十七冶集团有限公司 Perforate water string mould after basement
CN104964121A (en) * 2015-07-28 2015-10-07 中建八局第四建设有限公司 Blockage method for leakage water in sleeve pipe
CN205558966U (en) * 2016-04-22 2016-09-07 杜尧 A one -way drainer of dual stagnant water for tunnel lining
CN106013199A (en) * 2016-06-29 2016-10-12 山东省水利科学研究院 Double wing type plastic soft belt type one-way automatic drainer
CN206320464U (en) * 2016-12-08 2017-07-11 新疆昌源水务科学研究院(有限公司) Repairing applied to PCCP pipe fittings connects section

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113531284A (en) * 2021-07-12 2021-10-22 中国一冶集团有限公司 Underground drainage pipeline repairing method and special climbing frame thereof

Similar Documents

Publication Publication Date Title
EP0126648B1 (en) Apparatus for sealing joints and leaks
CN107489435B (en) Replaceable inflatable water stop for mine tunnel
US9738798B2 (en) Method of repairing leakage in pipelines
CN102817382A (en) Repair constructing method of basement deformation joint leakage
EP1278981A4 (en) Sewer system pipe repairs
CN108679358A (en) A kind of gas pipeline no-dig technique liner repairing construction technique
CN110778333A (en) Tunnel leakage repairing method
CN114636047B (en) Stainless steel lining repairing method for heating pipeline
CN108194135A (en) A kind of constructing metro tunnel prevents top drainage pipeline leaking substance and construction method
Wang et al. Newly developed pressure adaptable concrete lining for high pressure hydraulic tunnels
CN208011156U (en) A kind of municipal pipeline plugging device based on liquid nitrogen
KR100749550B1 (en) Method for mending of water leakage interception in water main and structure the same
RU2374551C2 (en) Method for repair of pipeline defects
US6024515A (en) Live service pipe insertion apparatus and method
US1925538A (en) Method of sealing conduits
CN105672373B (en) Immersed tube tunnel watertight door leakage detection apparatus
KR101254464B1 (en) Non-digging sewerage mending apparatus and its manufacturing method
CN218970182U (en) Combined lining repairing structure for seepage of well and pool
CN213541663U (en) Blocking structure for pipeline breakage
CN112240451A (en) Blocking structure for pipeline fracture and disposal method
CN113737803B (en) Grouting construction method for post grouting of cast-in-place pile
JP7459351B1 (en) Watertightness Test Method
CN218116517U (en) Bag type series connection plugging device
CN207421540U (en) A kind of connection structure of hydraulic mixing bell-and-spigot pipe through walls
Vidmar et al. Insights gained from October 2006 failure of the Homestake pipeline

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180622