CN108194094B - The construction technology of Tunnel Passing gas stratomere - Google Patents

The construction technology of Tunnel Passing gas stratomere Download PDF

Info

Publication number
CN108194094B
CN108194094B CN201711469254.8A CN201711469254A CN108194094B CN 108194094 B CN108194094 B CN 108194094B CN 201711469254 A CN201711469254 A CN 201711469254A CN 108194094 B CN108194094 B CN 108194094B
Authority
CN
China
Prior art keywords
gas
coal
less
hole
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711469254.8A
Other languages
Chinese (zh)
Other versions
CN108194094A (en
Inventor
弯晓林
张松
苏影
李飞
赵忠洋
成赫
胡二强
焦文艺
邹谏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201711469254.8A priority Critical patent/CN108194094B/en
Publication of CN108194094A publication Critical patent/CN108194094A/en
Application granted granted Critical
Publication of CN108194094B publication Critical patent/CN108194094B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of construction technologies for passing through gas stratomere tunnel.Mainly solve the problems, such as that existing construction technology will lead to a large amount of gas intrusion tunnel normal operation space and generate security risk even accident and invent.Advance geologic prediction and the detection of advanced inspecting hole, carry out gas concentration monitoring in hole using Portable Methane Detection Alarm;Combined bolting and shotcrete is carried out after excavation in time, closing country rock, blocking rock gap prevent gas from continuing to escape;Adhere to Advance Drilling when excavation, detonating repeatedly after gas tunnel Blasting Excavation, carries out setting up steelframe and shotcrete support in time, guarantees the safety and stability of excavation section;Tunnel inside lining is constructed using monolithic concrete lining trolley, arch wall one-pass molding, and tunnel loopful closing when necessary simultaneously uses moisture separation device in longitudinal blind pipe, so as to gas discharge.Advantage is to can avoid gas to assemble behind in lining cutting, can guarantee the operation security in tunnel.

Description

The construction technology of Tunnel Passing gas stratomere
Technical field:
The present invention relates to constructing tunnel fields, are specifically related to a kind of construction technology for passing through gas stratomere tunnel.
Background technique:
Current railway construction rapid development, gas tunnel are more and more.Gas is that one kind is insoluble in water, colourless, tasteless Gas, relative density 0.554, penetrating power is 1.6 times of air, and main component is alkane, wherein methane account for absolutely mostly Number when reaching a certain concentration, can occur to burn or explode.So-called gas tunnel namely across the tunnel on gas stratum, therefore During the construction and operation of gas tunnel, if management and prevent and treat it is improper, it is easy to cause considerable safety thing
Therefore safety problem very severe.
Tunnel mainly carries out gas preventing and control by the way of stifled at present, and existing construction technology will lead to a large amount of gas and exist Lining cutting is assembled behind, and lining cutting behind hydraulic pressure and gas pressure is caused to go up, and intrusion tunnel normal operation space generates security risk Even accident.
Summary of the invention:
Technical problem to be solved by the invention is to provide a kind of construction technologies of Tunnel Passing gas stratomere, can keep away Exempt from gas to assemble behind in lining cutting, guarantees tunnel operation security.
Above-mentioned purpose is achieved in that
Advance geologic prediction and the detection of advanced inspecting hole:
Geological Advanced Prediction is carried out using three kinds of conventional mapping, elastic wave reflex method TSP, Advance Drilling methods;
Coal-bearing strata carries out front roch layer interface forecast and drillhole validation, at least three φ using physical prospectings means such as seismic waves 89 ㎜ drill (at least one 75 ㎜ of φ of service gallery drilling), and simultaneously coring is verified for horizontal protruded drill hole;
In order to grasp front of tunnel heading geological state, verifies whether front crosses coal seam and general location, cross coal seam section and add 89 millimeters of φ, the advanced inspecting hole that length is 30m, each section set 6 holes, recycle every 25m mono-;
When encountering coal seam, when excavated surface is away from speculating that coal seam position is hung down away from 10m, it is necessary to grasp layer position, inclination angle, thickness The ocurrences of coal seam situations such as degree, top (bottom) slate column, geological structure, provide reliably basic data for safe coal-openning, work as tunnel digging At least five gas inspecting hole is beaten when proceeding to coal measure strata, aperture is 89 millimeters of φ (service gallery is 75 millimeters of φ), it is necessary to penetrate coal Layer is complete thick, and enters floor strata and be not less than 0.5m, and borehole bottom location should control 5m or so outside excavation contour line;
Coal seam thickness is less than 30cm, when gas pressure is smaller, can not take outburst prevention measures, cooperate safety prevention measure, directly It connects with Vibration shot exposed coal;
Gas concentration monitoring in hole is carried out using Portable Methane Detection Alarm;
Gas emphasis check point: excavated surface is distinguished and admirable, return, explosion place is nearby in distinguished and admirable in 20m and office At portion's collapse and cave-in;The total return air in tunnel it is distinguished and admirable in;Nearby 20m is distinguished and admirable for portable blower and electric switch;Various Mobile workbenchs and machinery In neighbouring 20m it is distinguished and admirable in;Near motor and switch;In tunnel cavern, such as the easy habitat of refuge chamber gas;Seam is close Geology is crushed area;
Excavation face is tunneled to when having positioned roof and hanging down away from 5m, and top bar must beat at least two hole, and to penetrate coal seam entirely thick Predicting Gas hole, 50 millimeters of aperture φ, get out of a predicament or an embarrassing situation be excavated to away from roof hang down away from 5m at, beat at least one pre- gaging hole, it is right Coal seam and gas bearing condition, prominent possibility are predicted;
Face driving distance gas accumulates position and is less than at 3m, stops driving, has a fling at discharge orifice near hole gushing out, into Row drawing-off gas, 90 ㎜ of discharge orifice diameter phi, discharge hole site according to Gas position, outburst amount, gush out pressure etc. and determine;
When seam inclination is small, coal seam is thick, primary emission drilling is too long, the angle of depression is excessive, segmentation branch can be used and repeatedly arrange It puts, but the coal depth of wearing of bleeder off hole cannot be less than 1.0m for the first time;
Reinforce discharge working face and the supporting of excavation section before discharge orifice construction, prevents from collapsing and cause to protrude;
Pay attention to observing various abnormal conditions and dynamic phenomenon in discharge orifice work progress, when dynamic phenomenon is tight in the construction of certain hole Weight can suspend hole construction, mend again after other holes have been constructed and bore the hole;
The hole gas density is detected after being often drilled a hole, carries out twice, grasping emission effect and amendment row daily later Put the time;
Guarantee there is enough air quantity and wind speed in hole, the wind speed minimum of construction period continuous ventilating, gas location is not less than 1m/s, maximum are no more than 6.0m/s, when present low gas work area any place gas density is more than 0.5%, Ying Jiaqiang ventilation monitoring;
When distinguished and admirable middle gas density reaches 1% within 20m near the bursting work face, it is necessary to stop bore operation;When watt When this concentration reaches 1.5%, it is necessary to stop all operations, withdraw from staff, cut off the power, takes measures to be handled, watt This concentration reaches 3%, it is necessary to finish in 24 hours inner sealings;
When distinguished and admirable middle gas density reaches 1.5% within 20m near motor, it is necessary to shut down, withdraw from personnel, cut off Power supply is handled;
When O.5m methane accumulation is greater than3/ min when concentration is greater than 2%, must stop working in neighbouring 20 m, withdraw from people Member, cuts off the power and is handled;
The electrical equipment cut off the power due to permissible value as defined in gas density is more than, it is necessary to drop to l% in gas density When following, machine can be started;Use the excavated surface of gas automatic detection warning breaker device, it is necessary to artificial telegram in reply;
Combined bolting and shotcrete is carried out after excavation in time, closing country rock, blocking rock gap prevent gas from continuing to escape;
After explosion, construction supporting applies in time, and lining cutting is perfused according to design by corrosion resistant concrete, impervious to be not less than P10, Excavation face is closely followed in lining cutting, to close gas evolution in time;
When section enters exposed coal on tunnel, compressed-air self-help system should be set, first group of compressed-air self-help system is general away from working face For 30-50m, one group is set every 50m later;
Blower spraying device should be arranged in coal seam location driving face, and float coal should water and be timely transported outside hole, prevent coal Dust explosion;
Gas density is more than specified value, and the abundant discharge of Yao Jinhang gas, injects air quantity and ventilation time is intended to be protected Card, it is ensured that gas others smooth discharge.
Concrete construction method:
It excavates:
When excavation, Advance Drilling, detonating repeatedly are adhered to, supporting at any time guarantees safe principle, and quick-fried operation is bored in gas work area It should meet the following requirements:
Methane accumulation is avoided using smooth Surface Blasting Technology;Wet boring must be used;
The bursting work of gas work area must use permitted explosive for coal mine, and meet the following requirements:
1. present low gas work area rock stratum is tunneled, the permitted explosive for coal mine of level-one is not less than using security level;
2. present low gas work area exposed coal and coal seam, half coal seam driving, fried not less than the allowed for use in coal mines of second level using security level Medicine;
3. the explosion of high methane work area is not less than the permitted explosive for coal mine of three-level using security level;
4. there is the location explosion of coal and gas prominent danger, it is aqueous not less than the allowed for use in coal mines of three-level fried using security level Medicine;
5. being forbidden to use black powder and freezing, nitroglycerine explosive semi-frozen, same working face does not use two kinds not With the explosive of kind;
6. the explosion of gas work area should use allowed for use in coal mines instant electric detonator or allowed for use in coal mines millisecond delay electric detonator, and use The detonation of explosion-proof type exploder.Forbid using blasting cap, when using allowed for use in coal mines millisecond delay electric detonator, when the extension of final stage Between must not exceed 130 ms;
7. the explosion of gas work area must use stemming to clog blasthole, choke material clay or non-automatic incombustible material.Blasthole Powder charge and filling should be met the following requirements;
A, coal (rock) powder in blasthole is removed before powder charge;
B, when blast hole depth is less than 0.6 m, not charge explosion;In special circumstances, it is necessary to take safety measures and expire envelope big gun Mud;
C, when blast hole depth is 0.6~1m, sealing clay length is no less than the 1/2 of blasthole length;Blast hole depth is greater than 1 m When, sealing clay length is no less than 0.5m;When blast hole depth is greater than 2.5 m, sealing clay length is no less than 1 m;When photoface exploision, week Blasthole application stemming envelope in side is real, and sealing clay length is not less than 0.3m;
D, when working face has 2 or 2 or more the scope of freedoms, minimum burden cannot be less than 0.5m in coal seam, in rock stratum In cannot be less than 0.3m;When the big sillar of shallow eye charge explosion, O.3m minimum burden and sealing clay length cannot be less than;
E, when blasthole is blocked with water stemming material, remaining blasthole certain applications clay stemming envelope is real outside water stemming material, and length is not Less than 0.3m;
F, checked there is a period of time of following situations not charge explosion before powder charge:
1. finding the rapid height of different shape, temperature is suddenly low, has significant gas evolution, coal petrography loosening etc. in blasthole;
2. plant, rock ballast, material for stacking in away from explosion place 20m etc. block 1/3 or more tunnel section;
3. face air volume is insufficient;
Before explosion, shot firing cable must twist together into short circuit, and coat insulating layer;
Supporting:
After gas tunnel Blasting Excavation, it should carry out setting up steelframe and shotcrete support in time, guarantee the peace of excavation section It is complete to stablize;
Lining cutting:
Tunnel inside lining is constructed using monolithic concrete lining trolley, arch wall one-pass molding, and tunnel loopful seals when necessary It closes and after the completion of tunnel cutting supporting, is respectively surveyed through construction monitoring using moisture separation device so as to gas discharge in longitudinal blind pipe Transport ratio shown by examination project obviously slows down and basicly stable;The every displacement generated has reached estimated displacement 80%~90%;Horizontal convergence (near arch springing) rate, which is less than after 0.2mm/d or vault sinking rate are less than 0.15mm/d, carries out side Wall and Arch lining construction.
Assemble behind the invention has the advantages that can avoid gas in lining cutting, can guarantee the operation security in tunnel, construction technology Simply.
Specific embodiment:
Advance geologic prediction and the detection of advanced inspecting hole:
Geological Advanced Prediction is carried out using three kinds of conventional mapping, elastic wave reflex method TSP, Advance Drilling methods;
Coal-bearing strata carries out front roch layer interface forecast and drillhole validation, at least three φ using physical prospectings means such as seismic waves 89 ㎜ drill (at least one 75 ㎜ of φ of service gallery drilling), and simultaneously coring is verified for horizontal protruded drill hole;
In order to grasp front of tunnel heading geological state, verifies whether front crosses coal seam and general location, cross coal seam section and add 89 millimeters of φ, the advanced inspecting hole that length is 30m, each section set 6 holes, recycle every 25m mono-;
When encountering coal seam, when excavated surface is away from speculating that coal seam position is hung down away from 10m, it is necessary to grasp layer position, inclination angle, thickness The ocurrences of coal seam situations such as degree, top (bottom) slate column, geological structure, provide reliably basic data for safe coal-openning, work as tunnel digging At least five gas inspecting hole is beaten when proceeding to coal measure strata, aperture is 89 millimeters of φ (service gallery is 75 millimeters of φ), it is necessary to penetrate coal Layer is complete thick, and enters floor strata and be not less than 0.5m, and borehole bottom location should control 5m or so outside excavation contour line;
Coal seam thickness is less than 30cm, when gas pressure is smaller, can not take outburst prevention measures, cooperate safety prevention measure, directly It connects with Vibration shot exposed coal;
Gas concentration monitoring in hole is carried out using Portable Methane Detection Alarm;
Gas emphasis check point: excavated surface is distinguished and admirable, return, explosion place is nearby in distinguished and admirable in 20m and office At portion's collapse and cave-in;The total return air in tunnel it is distinguished and admirable in;Nearby 20m is distinguished and admirable for portable blower and electric switch;Various Mobile workbenchs and machinery In neighbouring 20m it is distinguished and admirable in;Near motor and switch;In tunnel cavern, such as the easy habitat of refuge chamber gas;Seam is close Geology is crushed area;
Excavation face is tunneled to when having positioned roof and hanging down away from 5m, and top bar must beat at least two hole, and to penetrate coal seam entirely thick Predicting Gas hole, 50 millimeters of aperture φ, get out of a predicament or an embarrassing situation be excavated to away from roof hang down away from 5m at, beat at least one pre- gaging hole, it is right Coal seam and gas bearing condition, prominent possibility are predicted;
Face driving distance gas accumulates position and is less than at 3m, stops driving, has a fling at discharge orifice near hole gushing out, into Row drawing-off gas, 90 ㎜ of discharge orifice diameter phi, discharge hole site according to Gas position, outburst amount, gush out pressure etc. and determine;
When seam inclination is small, coal seam is thick, primary emission drilling is too long, the angle of depression is excessive, segmentation branch can be used and repeatedly arrange It puts, but the coal depth of wearing of bleeder off hole cannot be less than 1.0m for the first time;
Reinforce discharge working face and the supporting of excavation section before discharge orifice construction, prevents from collapsing and cause to protrude;
Pay attention to observing various abnormal conditions and dynamic phenomenon in discharge orifice work progress, when dynamic phenomenon is tight in the construction of certain hole Weight can suspend hole construction, mend again after other holes have been constructed and bore the hole;
The hole gas density is detected after being often drilled a hole, carries out twice, grasping emission effect and amendment row daily later Put the time;
Guarantee there is enough air quantity and wind speed in hole, the wind speed minimum of construction period continuous ventilating, gas location is not less than 1m/s, maximum are no more than 6.0m/s, when present low gas work area any place gas density is more than 0.5%, Ying Jiaqiang ventilation monitoring;
When distinguished and admirable middle gas density reaches 1% within 20m near the bursting work face, it is necessary to stop bore operation;When watt When this concentration reaches 1.5%, it is necessary to stop all operations, withdraw from staff, cut off the power, takes measures to be handled, watt This concentration reaches 3%, it is necessary to finish in 24 hours inner sealings;
When distinguished and admirable middle gas density reaches 1.5% within 20m near motor, it is necessary to shut down, withdraw from personnel, cut off Power supply is handled;
When O.5m methane accumulation is greater than3/ min when concentration is greater than 2%, must stop working in neighbouring 20 m, withdraw from people Member, cuts off the power and is handled;
The electrical equipment cut off the power due to permissible value as defined in gas density is more than, it is necessary to drop to l% in gas density When following, machine can be started;Use the excavated surface of gas automatic detection warning breaker device, it is necessary to artificial telegram in reply;
Combined bolting and shotcrete is carried out after excavation in time, closing country rock, blocking rock gap prevent gas from continuing to escape;
After explosion, construction supporting applies in time, and lining cutting is perfused according to design by corrosion resistant concrete, impervious to be not less than P10, Excavation face is closely followed in lining cutting, to close gas evolution in time;
When section enters exposed coal on tunnel, compressed-air self-help system should be set, first group of compressed-air self-help system is general away from working face For 30-50m, one group is set every 50m later;
Blower spraying device should be arranged in coal seam location driving face, and float coal should water and be timely transported outside hole, prevent coal Dust explosion;
Gas density is more than specified value, and the abundant discharge of Yao Jinhang gas, injects air quantity and ventilation time is intended to be protected Card, it is ensured that gas others smooth discharge.
Concrete construction method:
It excavates:
When excavation, Advance Drilling, detonating repeatedly are adhered to, supporting at any time guarantees safe principle, and quick-fried operation is bored in gas work area It should meet the following requirements:
Methane accumulation is avoided using smooth Surface Blasting Technology;Wet boring must be used;
The bursting work of gas work area must use permitted explosive for coal mine, and meet the following requirements:
1. present low gas work area rock stratum is tunneled, the permitted explosive for coal mine of level-one is not less than using security level;
2. present low gas work area exposed coal and coal seam, half coal seam driving, fried not less than the allowed for use in coal mines of second level using security level Medicine;
3. the explosion of high methane work area is not less than the permitted explosive for coal mine of three-level using security level;
4. there is the location explosion of coal and gas prominent danger, it is aqueous not less than the allowed for use in coal mines of three-level fried using security level Medicine;
5. being forbidden to use black powder and freezing, nitroglycerine explosive semi-frozen, same working face does not use two kinds not With the explosive of kind;
6. the explosion of gas work area should use allowed for use in coal mines instant electric detonator or allowed for use in coal mines millisecond delay electric detonator, and use The detonation of explosion-proof type exploder.Forbid using blasting cap, when using allowed for use in coal mines millisecond delay electric detonator, when the extension of final stage Between must not exceed 130 ms;
7. the explosion of gas work area must use stemming to clog blasthole, choke material clay or non-automatic incombustible material.Blasthole Powder charge and filling should be met the following requirements;
A, coal (rock) powder in blasthole is removed before powder charge;
B, when blast hole depth is less than 0.6 m, not charge explosion;In special circumstances, it is necessary to take safety measures and expire envelope big gun Mud;
C, when blast hole depth is 0.6~1m, sealing clay length is no less than the 1/2 of blasthole length;Blast hole depth is greater than 1 m When, sealing clay length is no less than 0.5m;When blast hole depth is greater than 2.5 m, sealing clay length is no less than 1 m;When photoface exploision, week Blasthole application stemming envelope in side is real, and sealing clay length is not less than 0.3m;
D, when working face has 2 or 2 or more the scope of freedoms, minimum burden cannot be less than 0.5m in coal seam, in rock stratum In cannot be less than 0.3m;When the big sillar of shallow eye charge explosion, O.3m minimum burden and sealing clay length cannot be less than;
E, when blasthole is blocked with water stemming material, remaining blasthole certain applications clay stemming envelope is real outside water stemming material, and length is not Less than 0.3m;
F, checked there is a period of time of following situations not charge explosion before powder charge:
1. finding the rapid height of different shape, temperature is suddenly low, has significant gas evolution, coal petrography loosening etc. in blasthole;
2. plant, rock ballast, material for stacking in away from explosion place 20m etc. block 1/3 or more tunnel section;
3. face air volume is insufficient;
Before explosion, shot firing cable must twist together into short circuit, and coat insulating layer;
Supporting:
After gas tunnel Blasting Excavation, it should carry out setting up steelframe and shotcrete support in time, guarantee the peace of excavation section It is complete to stablize;
Lining cutting:
Tunnel inside lining is constructed using monolithic concrete lining trolley, arch wall one-pass molding, and tunnel loopful seals when necessary It closes and after the completion of tunnel cutting supporting, is respectively surveyed through construction monitoring using moisture separation device so as to gas discharge in longitudinal blind pipe Transport ratio shown by examination project obviously slows down and basicly stable;The every displacement generated has reached estimated displacement 80%~90%;Horizontal convergence (near arch springing) rate, which is less than after 0.2mm/d or vault sinking rate are less than 0.15mm/d, carries out side Wall and Arch lining construction.

Claims (1)

1. the construction technology of Tunnel Passing gas stratomere, it is characterized in that:
Advance geologic prediction and the detection of advanced inspecting hole:
Geological Advanced Prediction is carried out using three kinds of conventional mapping, elastic wave reflex method TSP, Advance Drilling methods;
Coal-bearing strata carries out front roch layer interface forecast using seismic wave physical prospecting means and drillhole validation, 89 ㎜ of at least three φ are bored Hole, at least one 75 ㎜ of φ of service gallery drilling, simultaneously coring is verified for horizontal protruded drill hole;
In order to grasp front of tunnel heading geological state, verifies whether front crosses coal seam and general location, cross coal seam section and add φ 89 Millimeter, the advanced inspecting hole that length is 30m, each section set 6 holes, recycle every 25m mono-;
When encountering coal seam, when excavated surface is away from speculating that coal seam position is hung down away from 10m, it is necessary to grasp layer position, inclination angle, thickness, top Slate column, geological structure ocurrence of coal seam situation, provide reliably basic data for safe coal-openning, when tunnel piercing to coal measure strata When beat at least five gas inspecting hole, aperture is 89 millimeters of φ, it is necessary to it is entirely thick to penetrate coal seam, and is not less than into floor strata 0.5m, borehole bottom location should control the 5m outside excavation contour line;
Coal seam thickness is less than 30cm, when gas pressure is smaller, does not take outburst prevention measures, cooperates safety prevention measure, directly with shake It is dynamic to blow out exposed coal;
Gas concentration monitoring in hole is carried out using Portable Methane Detection Alarm;
Gas emphasis check point: excavated surface is distinguished and admirable, return, nearby in distinguished and admirable in 20m and part is collapsed in explosion place At Fang Maoding;The total return air in tunnel it is distinguished and admirable in;Nearby 20m is distinguished and admirable for portable blower and electric switch;Near various Mobile workbenchs and machinery In 20m it is distinguished and admirable in;Near motor and switch;In tunnel cavern, such as the easy habitat of refuge chamber gas;Seam is broken close to geology Broken area;
Excavation face is tunneled to when having positioned roof and hanging down away from 5m, and top bar must beat at least two hole and penetrate complete thick watt in coal seam This pre- gaging hole, gets out of a predicament or an embarrassing situation to be excavated to and hang down at away from 5m away from roof, at least one pre- gaging hole is beaten, to coal seam by 50 millimeters of aperture φ And gas bearing condition, prominent possibility are predicted;
Face driving distance gas accumulates position and is less than at 3m, stops driving, has a fling at discharge orifice near hole gushing out, progress watt This discharge, 90 ㎜ of discharge orifice diameter phi, discharge hole site according to Gas position, outburst amount, gush out pressure and determine;
When seam inclination is small, coal seam is thick, primary emission drilling is too long, the angle of depression is excessive, using segmentation, branch is repeatedly discharged, but first The coal depth of wearing of secondary bleeder off hole cannot be less than 1.0m;
Reinforce discharge working face and the supporting of excavation section before discharge orifice construction, prevents from collapsing and cause to protrude;
Pay attention to observing various abnormal conditions and dynamic phenomenon in discharge orifice work progress, when dynamic phenomenon is serious in the construction of certain hole, Hole construction can be suspended, mended again after other holes have been constructed and bore the hole;
The hole gas density is detected after being often drilled a hole, is carried out daily later twice, when grasping emission effect and amendment discharge Between;
Guaranteeing there is enough air quantity and wind speed in hole, the wind speed minimum of construction period continuous ventilating, gas location is not less than 1m/s, Maximum is no more than 6.0m/s, when present low gas work area any place gas density is more than 0.5%, Ying Jiaqiang ventilation monitoring;
When distinguished and admirable middle gas density reaches 1% within 20m near the bursting work face, it is necessary to stop bore operation;When gas is dense When degree reaches 1.5%, it is necessary to stop all operations, withdraw from staff, cut off the power, take measures to be handled, gas is dense Degree reaches 3%, it is necessary to finish in 24 hours inner sealings;
When distinguished and admirable middle gas density reaches 1.5% within 20m near motor, it is necessary to shut down, withdraw from personnel, cut off the power It is handled;
When methane accumulation is greater than 0.5m3/ min when concentration is greater than 2%, must stop working in neighbouring 20m, withdraw from personnel, cut off Power supply is handled;
The electrical equipment cut off the power due to permissible value as defined in gas density is more than, it is necessary to drop to l% or less in gas density When, machine can be started;Use the excavated surface of gas automatic detection warning breaker device, it is necessary to artificial telegram in reply;
Combined bolting and shotcrete is carried out after excavation in time, closing country rock, blocking rock gap prevent gas from continuing to escape;
After explosion, construction supporting applies in time, and lining cutting is perfused according to design by corrosion resistant concrete, impervious to be not less than P10, lining cutting Immediately following excavation face, to close gas evolution in time;
When section enters exposed coal on tunnel, compressed-air self-help system should be set, first group of compressed-air self-help system is 30-50m away from working face, One group is set every 50m later;
Blower spraying device should be arranged in coal seam location driving face, and float coal should water and be timely transported outside hole, prevent coal dust quick-fried It is fried;
Gas density is more than specified value, and the abundant discharge of Yao Jinhang gas, injects air quantity and ventilation time is intended to be guaranteed, really Protect gas others smooth discharge;
Concrete construction method:
It excavates:
When excavation, Advance Drilling, detonating repeatedly are adhered to, supporting at any time guarantees safe principle, and gas work area is bored quick-fried operation and should be accorded with Close following regulation:
Methane accumulation is avoided using smooth Surface Blasting Technology;Wet boring must be used;
The bursting work of gas work area must use permitted explosive for coal mine, and meet the following requirements:
1. present low gas work area rock stratum is tunneled, the permitted explosive for coal mine of level-one is not less than using security level;
2. present low gas work area exposed coal and coal seam, half coal seam driving, the permitted explosive for coal mine of second level is not less than using security level;
3. the explosion of high methane work area is not less than the permitted explosive for coal mine of three-level using security level;
4. there is the location explosion of coal and gas prominent danger, the allowed for use in coal mines water-based explosive of three-level is not less than using security level;
5. being forbidden to use black powder and freezing, nitroglycerine explosive semi-frozen, same working face is without using two kinds of different product The explosive of kind;
6. the explosion of gas work area should use allowed for use in coal mines instant electric detonator or allowed for use in coal mines millisecond delay electric detonator, and using explosion-proof The detonation of type exploder;Forbid using blasting cap, when using allowed for use in coal mines millisecond delay electric detonator, the extension time of final stage is not It obtains more than 130ms;
7. the explosion of gas work area must use stemming to clog blasthole, choke material clay or non-automatic incombustible material;The powder charge of blasthole And filling should be met the following requirements;
A, the coal dust in blasthole is removed before powder charge;
B, when blast hole depth is less than 0.6m, not charge explosion;In special circumstances, it is necessary to take safety measures and expire envelope stemming;
C, when blast hole depth is 0.6~1m, sealing clay length is no less than the 1/2 of blasthole length;When blast hole depth is greater than 1m, sealing clay Length is no less than 0.5m;When blast hole depth is greater than 2.5m, sealing clay length is no less than 1m;When photoface exploision, periphery blasthole is answered It is sealed in fact with stemming, and sealing clay length is not less than 0.3m;
D, when working face has 2 or more the scope of freedoms, minimum burden cannot be less than 0.5m in coal seam, cannot be less than in rock stratum 0.3m;When the big sillar of shallow eye charge explosion, minimum burden and sealing clay length cannot be less than 0.3m;
E, when blasthole is blocked with water stemming material, remaining blasthole certain applications clay stemming envelope is real outside water stemming material, and length is not less than 0.3m;
F, checked there is a period of time of following situations not charge explosion before powder charge:
1. the rapid height of the different shape of discovery, temperature is suddenly low in blasthole, has significant gas evolution, coal petrography to loosen;
2. the plant stacked in away from explosion place 20m, rock ballast, material block 1/3 or more tunnel section;
3. face air volume is insufficient;
Before explosion, shot firing cable must twist together into short circuit, and coat insulating layer;
Supporting:
It after gas tunnel Blasting Excavation, should carry out setting up steelframe and shotcrete support in time, guarantee that the safety of excavation section is steady It is fixed;
Lining cutting:
Tunnel inside lining is constructed using monolithic concrete lining trolley, arch wall one-pass molding, and tunnel loopful is closed and in longitudinal direction Blind pipe uses moisture separation device, so as to gas discharge, after the completion of tunnel cutting supporting, shows through each test item of construction monitoring The transport ratio shown obviously slows down and basicly stable;The every displacement generated has reached the 80%~90% of estimated displacement; Horizontal convergence rate is less than 0.2mm/d or vault sinking rate is less than progress abutment wall and Arch lining construction after 0.15mm/d.
CN201711469254.8A 2017-12-29 2017-12-29 The construction technology of Tunnel Passing gas stratomere Active CN108194094B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711469254.8A CN108194094B (en) 2017-12-29 2017-12-29 The construction technology of Tunnel Passing gas stratomere

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711469254.8A CN108194094B (en) 2017-12-29 2017-12-29 The construction technology of Tunnel Passing gas stratomere

Publications (2)

Publication Number Publication Date
CN108194094A CN108194094A (en) 2018-06-22
CN108194094B true CN108194094B (en) 2019-10-25

Family

ID=62585865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711469254.8A Active CN108194094B (en) 2017-12-29 2017-12-29 The construction technology of Tunnel Passing gas stratomere

Country Status (1)

Country Link
CN (1) CN108194094B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109236353B (en) * 2018-09-21 2020-04-03 中铁十六局集团有限公司 Coal uncovering outburst prevention construction method for high gas tunnel to penetrate through coal seam
CN110043307B (en) * 2019-03-20 2020-12-08 中铁四局集团有限公司 Tidal basin biogas release method
CN110306987B (en) * 2019-06-24 2021-05-25 中铁十二局集团有限公司 Drainage tunnel coal uncovering and outburst prevention construction method
CN111119983B (en) * 2019-12-30 2021-07-02 中铁六局集团天津铁路建设有限公司 Gas spraying and burning treatment method in tunnel excavation process
CN112377243B (en) * 2020-11-26 2022-12-02 中铁十九局集团第二工程有限公司 Outburst prevention construction method for coal and gas outburst tunnel
CN114739248A (en) * 2022-04-14 2022-07-12 中钢集团马鞍山矿山研究总院股份有限公司 Charging method for horizontal hole in underground mine fractured rock mass

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493805B (en) * 2011-11-14 2014-12-24 山西晋城无烟煤矿业集团有限责任公司 Method for efficient shaft coal uncovering in high gas mine
CN103696806B (en) * 2013-12-19 2015-11-11 中铁八局集团有限公司 Gas tunnel prevention and controls and system thereof
CN104790949B (en) * 2015-03-11 2016-08-17 中国矿业大学(北京) Huge thick tight roof high methane high seam Roof Control and method and the drilling machine improving gas drainage under suction efficiency
CN105065000A (en) * 2015-07-17 2015-11-18 中铁四局集团第四工程有限公司 Rapid coal uncovering process and outburst prevention method of large-section tunnel
CN107035403B (en) * 2016-12-13 2019-06-04 中铁隧道集团有限公司 A kind of high methane and the non-explosion-proof flexible transport method in Gas Outburst tunnel
CN106980006A (en) * 2017-03-23 2017-07-25 中铁五局集团成都工程有限责任公司 The method of tunneling Measuring System of Gas and forward probe oil gas gas overflowing amount
CN107083973B (en) * 2017-05-05 2019-07-09 中铁十六局集团第四工程有限公司 The gas prevention method of region slip casting combination antiseepage supporting is carried out when Tunnel Passing coal seam

Also Published As

Publication number Publication date
CN108194094A (en) 2018-06-22

Similar Documents

Publication Publication Date Title
CN108194094B (en) The construction technology of Tunnel Passing gas stratomere
US10989051B2 (en) Multi-section non-pillar staggered protected roadway for deep inclined thick coal seam and method for coal pillar filling between sections
CN101328809B (en) Non-bottom pillar deep hole falling-back type mining method
CN102808622B (en) Method for recovering ore pillar by medium-length hole and deep hole combined blasting technology
CN103306679B (en) " ︱ type " scope of freedom slotting simultaneous shaft sin king technique
CN111335892A (en) Strong-impact coal seam pressure relief prevention and control method
CN112179228B (en) Deep hole subsection blasting joint cutting control top plate overall collapse method
CN103123247A (en) Damping blasting method for steep dip small crossing angle layered surrounding rock small-distance tunnel excavation
CN112196532A (en) Method for reducing stress of coal pillar by pre-splitting roof rock stratum through large-diameter deep-hole spherical explosive package
CN107269220A (en) The method that a kind of outstanding top of high-dipping fully-mechanized mining working upper corner is administered
CN104847351B (en) A kind of severe inclined thick coal seam longwall top coal caving controls top method with three-dimensional
CN107339920B (en) The method of superdeep holes presplit blasting
CN108625855A (en) Safe and efficient mining methods under a kind of obturation
CN106437711A (en) Coal seam impact type mine earthquake prevention and control method
CN106247876A (en) High working face cuts greatly a blasting method for fully-mechanized mining working tight roof overhead caving
CN113187486A (en) Gob-side entry driving method for deep well without coal pillar and formed entry
CN105953671A (en) Construction method for excavating siliceous slate stone side slope
CN212154765U (en) Deep hole pre-splitting structure for fully mechanized mining face waste rock area
CN115183639B (en) Three-face upper-breaking single-roadway down-cutting blasting construction method for roof-cutting retained roadway
CN111780633A (en) Step-by-step rapid excavation method for IV-V-level surrounding rock lower step of double-track tunnel
CN108590651B (en) A kind of method of more drilling chamber recycling ore pillars
CN114935290B (en) Pre-splitting blasting method for cutting single roadway and cutting deep hole on two sides of top-cutting retained roadway
CN110359910A (en) High seam band is comprehensive under colliery railway puts high-order filling mining method
CN109025999A (en) A kind of one three top coal method for weakening
CN113107583A (en) Thick and hard roof high-gas coal seam gas extraction system and extraction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant