CN108193765A - A kind of sewer flase floor dredger of municipal works - Google Patents

A kind of sewer flase floor dredger of municipal works Download PDF

Info

Publication number
CN108193765A
CN108193765A CN201810173892.3A CN201810173892A CN108193765A CN 108193765 A CN108193765 A CN 108193765A CN 201810173892 A CN201810173892 A CN 201810173892A CN 108193765 A CN108193765 A CN 108193765A
Authority
CN
China
Prior art keywords
big
stent
cam
pedestal
positioning screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810173892.3A
Other languages
Chinese (zh)
Inventor
肖灵芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810173892.3A priority Critical patent/CN108193765A/en
Publication of CN108193765A publication Critical patent/CN108193765A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/06Gully gratings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/30Cleaning by methods involving the use of tools by movement of cleaning members over a surface
    • B08B1/32Cleaning by methods involving the use of tools by movement of cleaning members over a surface using rotary cleaning members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/02Cleaning by the force of jets or sprays
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F7/00Other installations or implements for operating sewer systems, e.g. for preventing or indicating stoppage; Emptying cesspools
    • E03F7/10Wheeled apparatus for emptying sewers or cesspools

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Crushing And Pulverization Processes (AREA)

Abstract

The present invention relates to a kind of dredger of municipal works more particularly to a kind of sewer flase floor dredgers of municipal works.Convenient, small, time saving and energy saving, clean hygiene the municipal works of labor intensity sewer flase floor dredgers are cleared up the technical problem to be solved in the present invention is to provide a kind of.The present invention provides the sewer flase floor dredgers of such a municipal works, include pedestal, the first idler wheel, universal wheel, the first big stent, big fixed plate etc.;The first idler wheel is connected on the right side of base bottom, universal wheel is connected on the left of base bottom, the first big stent is connected on the right side of base top.A kind of sewer flase floor dredger of municipal works provided by the present invention, crushing and clearing can be carried out to the rubbish incidental being deposited on the sewer flase floor of municipal works, cleaning is convenient, labor intensity is small, time saving and energy saving, clean hygiene is simple in structure, repair easy to maintain, maintenance and repair are at low cost.

Description

A kind of sewer flase floor dredger of municipal works
Technical field
The present invention relates to a kind of dredger of municipal works more particularly to a kind of sewer grids of municipal works Plate dredger.
Background technology
Before the 1980s, urban public utilities are often referred to as " municipal facilities " by China, are referred mainly to by political affairs Urban road, water supply and the draining of mansion investment construction, should be with city in relation to studying that the expert of urban issues proposes after reform and opening-up The call of infrastructure substitution " municipal facilities ", and obtain the universal accreditation of various circles of society.Municipal works are usually to belong to The infrastructure of country, refers to various public transit facilities, feedwater, draining, combustion gas, urban flood defence, the environment in urban construction The infrastructure constructions such as health and illumination, are the essential material bases of city survival and development, are to improve people's lives water The primary condition of gentle opening.In China, urban operating mechanism refers to set in the range of metropolitan district, town township planning construction, be based on Government responsibility and obligation provide various buildings, structures, equipment of paid or free public product and service etc., city for resident Life mating various public infrastructure developments in city's belong to municipal works scope, and municipal administration refers to urban road, bridge, discharge The urban public utilities engineering such as water, sewage disposal, urban flood defence, gardens, roadside greening, street lamp, environmental sanitation, national economy society It can develop and urbanization is faced with stern challenge, one side town and country and Regional disparity further expand, big city, especially greatly The center in city is extremely bustling, and metropolis Edge Cities and rural area stagnate and decline;On the other hand urbanization under bright and new Process also creates traffic congestion, environmental pollution, poor unemployment, acute housing shortage, health hazard, City Disasters, safety reduction etc. Diversified urban disease.
Existing is all that manually the rubbish incidental being deposited on the sewer flase floor of municipal works is crushed Cleaning, so as to be dredged to the sewer flase floor of blocking, not only cleaning bothers, and labor intensity is big, time-consuming and laborious, Er Qieren Hand is contacted with rubbish incidental, unclean unhygienic, therefore a kind of cleaning is convenient, labor intensity is small, time saving and energy saving, dry there is an urgent need for researching and developing The sewer flase floor dredger of the municipal works of net health.
Invention content
(1)Technical problems to be solved
The present invention is manually miscellaneous to the rubbish being deposited on the sewer flase floor of municipal works to overcome existing Object carries out crushing and clearing, and so as to be dredged to the sewer flase floor of blocking, not only cleaning bothers, and labor intensity is big, time-consuming Arduously, and human hand is contacted with rubbish incidental, and unclean antihygienic shortcoming, the technical problem to be solved in the present invention is to provide one Kind clears up convenient, small, time saving and energy saving, clean hygiene the municipal works of labor intensity sewer flase floor dredgers.
(2)Technical solution
Sewer flase floor in order to solve the above technical problem, the present invention provides such a municipal works dredges dress It puts, includes pedestal, the first idler wheel, universal wheel, the first big stent, big fixed plate, second largest stent, clutch shaft bearing, big rotation Axis, rotating wheel, first sleeve, the first cam, the first positioning screw, the second cam, the second casing, the second positioning screw, second Bearing, the first contact plate, the first guide rod, the first spring, perching knife, cutter, the second guide rod, second spring and the second contact Plate is connected with the first idler wheel on the right side of base bottom, and universal wheel, the right side connection of base top are connected on the left of base bottom There is the first big stent, the left side wall of the first big stent is connected with the right side wall of big fixed plate, is connected on the left of base top Second largest stent, the right side wall of second largest stent are connected with the left side wall of big fixed plate, are provided in the middle part of pedestal and run through up and down Big groove, for big groove between the first big stent and second largest stent, big fixed plate is located at the surface of big groove, big solid The right part of fixed board is provided with perforative first pilot hole up and down, and the left part of big fixed plate is provided with perforative second pilot hole up and down, the One bearing is embedded on the top of the first big stent, and big rotary shaft is connect with clutch shaft bearing interference, and the right end of big rotary shaft is connected with Rotating wheel, the bottom of big rotary shaft are provided with the first little groove and the second little groove, and the first little groove is located at the right side of the second little groove Side, first sleeve rotary type are sleeved in big rotary shaft, and first sleeve is located at the left side of the first big stent, and the first cam fixing sleeve exists In first sleeve, the bottom of first sleeve is provided with the first positioning screw, and the first positioning screw is set as screw thread with first sleeve Connection, the first positioning screw are located at the left side of the first cam, and the upper end of the first positioning screw is located in the first little groove, and first is fixed Position screw rod be in contact with big rotary shaft, the second cam is located at the left side of the first cam, the second cam fixing sleeve on the second casing, Second casing rotary type is sleeved in big rotary shaft, and the second casing is located at the right side of second largest stent, the bottom setting of the second casing There is the second positioning screw, the second positioning screw is set as being threadedly coupled with the second casing, and the second positioning screw is located at the second cam Right side, the upper end of the second positioning screw is located in the second little groove, and the second positioning screw is in contact with big rotary shaft, the second axis It holds and is connect with big rotary shaft interference, second bearing is embedded on the top of second largest stent, and the first contact plate is located at the first cam Lower section, the first contact plate are in contact with the first cam, and the bottom of the first contact plate is connected with the first guide rod, and the first guide rod is slided Dynamic formula is located in the first pilot hole, and on the first guide rod, the first spring is located at big fixed plate and is contacted with first the first spring pocket Between plate, the lower end of the first guide rod is connected with perching knife, and cutter is located at the left side of perching knife, and cutter is set for front and rear extension, shovel Knife and the equal slidingtype of cutter are located in big groove, and the second guide rod is connected at the top of cutter, and the second guide rod slidingtype is located at In second pilot hole, the upper end of the second guide rod is connected with the second contact plate, and second spring is sleeved on the second guide rod, the second bullet For spring between big fixed plate and the second contact plate, the second contact plate is located at the lower section of the second cam, the second contact plate and second Cam is in contact.
Preferably, rotating disk, T shapes axis pin, lifter plate, connecting rod, piston, pressurized cylinder, the first connecting tube, list have been further included To valve, water vat, the second connecting tube, valve, the first fixed block and nozzle, the left end of big rotary shaft is connected with rotating disk, rotating disk The eccentric position of left side wall is connected with T shape axis pins, and lifter plate is set for front and rear extension, and it is perforative long sliding that lifter plate is provided with left and right Slot, T shape pin slides formula are located in long sliding slot, and the bottom of lifter plate is connected with connecting rod, and the lower end of connecting rod is connected with piston, Piston is located in pressurized cylinder, and piston is set as being slidably matched with pressurized cylinder, is connected at the top of the bottom of pressurized cylinder and pedestal, increases The lower part of cylinder pressure left side wall is connected with the first connecting tube, and check valve is equipped in the first connecting tube, and the left end of the first connecting tube connects Water vat is connected to, is connected at the top of the bottom of water vat and pedestal, the left upper end of the second connecting tube and the lower part of pressurized cylinder right side wall It is connected, the second connecting tube is embedded in pedestal, is equipped with valve in the second connecting tube, and valve is located at the lower section of pedestal, and first Fixed block is located at the right side of valve, and the second connecting tube is embedded in the first fixed block, the top of the first fixed block and the bottom of pedestal Portion is connected, and the first fixed block is located at the left side of big groove, and the bottom righthand side of the second connecting tube is connected with nozzle, and nozzle is located at cutter Left side.
Preferably, the first belt pulley, the second belt pulley, endless belt, connecting shaft, 3rd bearing, the first rotation have been further included Rotating motor and link block, for the first belt pulley fixing sleeve in big rotary shaft, the first belt pulley is located at the first big stent and rotating wheel Between, the second belt pulley is located at the lower section of the first belt pulley, and the second belt pulley is connect with the first belt pulley by endless belt, the Two belt pulley fixing sleeves are in connecting shaft, and the left end interference of connecting shaft is connected with 3rd bearing, and 3rd bearing is embedded big first In the right side wall of stent, the right end of connecting shaft is connected with the left end of the first electric rotating machine output shaft, the bottom of the first electric rotating machine Portion is connected with link block, and the bottom of link block is connected with pedestal.
Preferably, the first small rack, the second small rack and shutter have been further included, is connected at the top of the first big stent One small rack, is connected with the second small rack at the top of second largest stent, and shutter is located at the first small rack and the second small rack Top, the first small rack and the second small rack are connected with shutter.
Preferably, the second fixed block, the second electric rotating machine and the second idler wheel have been further included, the bottom of pedestal is connected with second Fixed block, the bottom of the second fixed block are connected with the second electric rotating machine, and the rear end of the second electric rotating machine output shaft is connected with second Idler wheel, the second idler wheel are located at the left side of the first idler wheel.
Operation principle:Because the present invention includes pedestal, the first idler wheel, universal wheel, the first big stent, big fixed plate, Two big stents, clutch shaft bearing, big rotary shaft, rotating wheel, first sleeve, the first cam, the first positioning screw, the second cam, Two casings, the second positioning screw, second bearing, the first contact plate, the first guide rod, the first spring, perching knife, cutter, second are led To bar, second spring and the second contact plate, so when needing the sundries to being blocked on the sewer flase floor of municipal works When being handled, staff can first pass through the first idler wheel and universal wheel and perching knife and cutter are moved to sewer flase floor Then first positioning screw and the second positioning screw are screwed into the first little groove and the second little groove, so by surface respectively again Staff again rotates rotating wheel afterwards, and rotating wheel drives big rotary shaft to be rotated, and big rotary shaft passes through first at this time Positioning screw and the second positioning screw drive first sleeve and the second casing to be rotated together, and first sleeve is so as to drive first Cam is rotated, the second casing so as to which the second cam be driven to be rotated, the first cam so as to the first contact plate is carried out by Pressure, the first contact plate so as to which the first guide rod and perching knife be driven to be moved, and the first spring elastic force effect under, perching knife Start to repeat to move up and down, sundries shovel of the perching knife so as to be blocked on sewer flase floor is broken, so as to sewer lattice Screen is dredged, while the second cam presses the second contact plate, the second contact plate so as to drive the second guide rod and Cutter is moved, and under the elastic force effect of second spring, cutter starts to repeat to move up and down, and cutter will be so as to block up The sundries shovel filled on sewer flase floor is broken, and so as to be dredged to sewer flase floor, big fixed plate is the first guide rod There is provided with the second guide rod and be oriented to auxiliary, the first spring and second spring are respectively the first contact plate and the second contact plate provide to Upper movement auxiliary.
Because rotating disk, T shapes axis pin, lifter plate, connecting rod, piston, pressurized cylinder, the first connecting tube, unidirectional is further included Valve, water vat, the second connecting tube, valve, the first fixed block and nozzle, so when staff carries out rotary type to big rotary shaft, Big rotary shaft can drive rotating disk to be rotated, and rotating disk drives lifter plate to move up and down by T shapes axis pin, lifter plate So as to be moved up and down in pressurized cylinder by connecting rod band piston, piston will in advance be filled by the first connecting tube in water vat Some water is drawn into pressurized cylinder, and check valve can prevent the aqueous reflux in the first connecting tube, therefore when the piston is moving down, Water in pressurized cylinder can be pressed by the second connecting tube in nozzle, valve is opened in advance at this time, into nozzle Water cutter and perching knife can be sprayed, cutter and perching knife can not only be cleaned, can also be on sewer flase floor Sundries impacted, convenient for being dredged to sewer flase floor.
Because the first belt pulley, the second belt pulley, endless belt, connecting shaft, 3rd bearing, the first electric rotating are further included Machine and link block, the first belt pulley fixing sleeve in big rotary shaft, the first belt pulley between the first big stent and rotating wheel, Second belt pulley is located at the lower section of the first belt pulley, and the second belt pulley is connect with the first belt pulley by endless belt, the second skin Belt wheel fixing sleeve is in connecting shaft, and the left end interference of connecting shaft is connected with 3rd bearing, and 3rd bearing is embedded in the first big stent Right side wall in, the right end of connecting shaft is connected with the left end of the first electric rotating machine output shaft, and the bottom of the first electric rotating machine connects Link block is connected to, the bottom of link block is connected with pedestal, so staff can start the first electric rotating machine and be operated, the One electric rotating machine drives the second belt pulley to be rotated by connecting shaft, and the second belt pulley drives the first belt by endless belt Wheel is rotated, and the first belt pulley replaces manually grasping so as to which big rotary shaft be driven to be rotated, using the first electric rotating machine Make, it is more time saving and energy saving, it is convenient and efficient.
Because having further included the first small rack, the second small rack and shutter, first is connected at the top of the first big stent Small rack, is connected with the second small rack at the top of second largest stent, and shutter is located at the upper of the first small rack and the second small rack Side, the first small rack and the second small rack are connected with shutter, so shutter can provide protection for staff, prevent Only day Sai drenches with rain, and is conducive to improve the comfort level of work.
Because having further included the second fixed block, the second electric rotating machine and the second idler wheel, the bottom of pedestal is connected with second and consolidates Determine block, the bottom of the second fixed block is connected with the second electric rotating machine, and the rear end of the second electric rotating machine output shaft is connected with the second rolling Wheel, the second idler wheel are located at the left side of the first idler wheel, so in the mobile present invention, staff can start the second electric rotating machine Operated, the second electric rotating machine so as to which the second idler wheel be driven to be rotated, the second idler wheel by with the first idler wheel and universal wheel Cooperation, can be the present invention movement great convenience be provided.
(3)Advantageous effect
A kind of sewer flase floor dredger of municipal works provided by the present invention, can be to being deposited in municipal works Rubbish incidental on sewer flase floor carries out crushing and clearing, the sewer flase floor of blocking can be dredged, cleaning side Just, labor intensity is small, time saving and energy saving, and clean hygiene is simple in structure, repair easy to maintain, and maintenance and repair is at low cost.
Description of the drawings
Fig. 1 is the main view schematic diagram of the present invention.
Fig. 2 is the main view schematic diagram of the rotating disk of the present invention.
Fig. 3 is the main view schematic diagram of the first electric rotating machine of the present invention.
Fig. 4 is the main view schematic diagram of the shutter of the present invention.
Fig. 5 is the main view schematic diagram of the second electric rotating machine of the present invention.
Label in attached drawing for:1- pedestals, the first idler wheels of 2-, 3- universal wheels, the first big stents of 4-, the big fixed plates of 5-, 6- Second largest stent, 7- clutch shaft bearings, the big rotary shafts of 8-, 9- rotating wheels, 10- first sleeves, the first cams of 11-, 12- first are positioned Screw rod, the second cams of 13-, the second casings of 14-, the second positioning screws of 15-, 16- second bearings, the first contact plates of 17-, 18- One guide rod, the first springs of 19-, 20- perching knives, 21- cutters, the second guide rods of 22-, 23- second springs, the second contact plates of 24-, 31- rotating disks, 32-T shape axis pins, 33- lifter plates, 34- connecting rods, 35- pistons, 36- pressurized cylinders, the first connecting tubes of 37-, 38- Check valve, 39- water vats, the second connecting tubes of 40-, 41- valves, the first fixed blocks of 42-, 43- nozzles, the first belt pulleys of 51-, 52- Second belt pulley, 53- endless belts, 54- connecting shafts, 55- 3rd bearings, the first electric rotating machines of 56-, 57- link blocks, 61- One small rack, the second small racks of 62-, 63- shutters, the second fixed blocks of 71-, the second electric rotating machines of 72-, the second idler wheels of 73-, 101- big grooves, 331- long sliding slots, the first pilot holes of 501-, the second pilot holes of 502-, the first little grooves of 801-, 802- second are small Groove.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of sewer flase floor dredger of municipal works as shown in Figs. 1-5, includes pedestal 1, the first idler wheel 2, ten thousand To the 3, first big stent 4 of wheel, big fixed plate 5, second largest stent 6, clutch shaft bearing 7, big rotary shaft 8, rotating wheel 9, first sleeve 10th, the first cam 11, the first positioning screw 12, the second cam 13, the second casing 14, the second positioning screw 15, second bearing 16, First contact plate 17, the first guide rod 18, the first spring 19, perching knife 20, cutter 21, the second guide rod 22,23 and of second spring Second contact plate 24 is connected with the first idler wheel 2 on the right side of 1 bottom of pedestal, and pedestal is connected with universal wheel 3, pedestal on the left of 1 bottom The right side at 1 top is connected with the first big stent 4, and the left side wall of the first big stent 4 is connected with the right side wall of big fixed plate 5, bottom The left side at 1 top of seat is connected with second largest stent 6, and the right side wall of second largest stent 6 is connected with the left side wall of big fixed plate 5, The middle part of pedestal 1 be provided with up and down perforative big groove 101, big groove 101 between the first big stent 4 and second largest stent 6, Big fixed plate 5 is located at the surface of big groove 101, and the right part of big fixed plate 5 is provided with perforative first pilot hole 501 up and down, greatly The left part of fixed plate 5 is provided with perforative second pilot hole 502 up and down, and clutch shaft bearing 7 is embedded on the top of the first big stent 4, greatly Rotary shaft 8 is connect with 7 interference of clutch shaft bearing, and the right end of big rotary shaft 8 is connected with rotating wheel 9, and the bottom of big rotary shaft 8 is provided with One little groove 801 and the second little groove 802, the first little groove 801 are located at the right side of the second little groove 802,10 turns of first sleeve Dynamic formula is sleeved in big rotary shaft 8, and first sleeve 10 is located at the left side of the first big stent 4, and 11 fixing sleeve of the first cam is in first set On pipe 10, the bottom of first sleeve 10 is provided with the first positioning screw 12, and the first positioning screw 12 is set as with first sleeve 10 It is threadedly coupled, the first positioning screw 12 is located at the left side of the first cam 11, and the upper end of the first positioning screw 12 is small recessed positioned at first In slot 801, the first positioning screw 12 is in contact with big rotary shaft 8, and the second cam 13 is located at the left side of the first cam 11, and second is convex 13 fixing sleeves are taken turns on the second casing 14,14 rotary type of the second casing is sleeved in big rotary shaft 8, and the second casing 14 is located at second largest The right side of stent 6, the bottom of the second casing 14 are provided with the second positioning screw 15, and the second positioning screw 15 is set with the second casing 14 Threaded connection is set to, the second positioning screw 15 is located at the right side of the second cam 13, and the upper end of the second positioning screw 15 is located at second In little groove 802, the second positioning screw 15 is in contact with big rotary shaft 8, and second bearing 16 is connect with big 8 interference of rotary shaft, the Two bearings 16 are embedded on the top of second largest stent 6, and the first contact plate 17 is located at the lower section of the first cam 11, the first contact plate 17 It is in contact with the first cam 11, the bottom of the first contact plate 17 is connected with the first guide rod 18,18 slidingtype position of the first guide rod In in the first pilot hole 501, the first spring 19 is sleeved on the first guide rod 18, and the first spring 19 is located at big fixed plate 5 and first Between contact plate 17, the lower end of the first guide rod 18 is connected with perching knife 20, and cutter 21 is located at the left side of perching knife 20, before cutter 21 is Extension is set afterwards, and perching knife 20 and 21 equal slidingtype of cutter are located in big groove 101, and the top of cutter 21 is connected with the second guiding Bar 22,22 slidingtype of the second guide rod are located in the second pilot hole 502, and the upper end of the second guide rod 22 is connected with the second contact plate 24, second spring 23 is sleeved on the second guide rod 22, and second spring 23 is between big 5 and second contact plate 24 of fixed plate, and Two contact plates 24 are located at the lower section of the second cam 13, and the second contact plate 24 is in contact with the second cam 13.
Embodiment 2
A kind of sewer flase floor dredger of municipal works as shown in Figs. 1-5, includes pedestal 1, the first idler wheel 2, ten thousand To the 3, first big stent 4 of wheel, big fixed plate 5, second largest stent 6, clutch shaft bearing 7, big rotary shaft 8, rotating wheel 9, first sleeve 10th, the first cam 11, the first positioning screw 12, the second cam 13, the second casing 14, the second positioning screw 15, second bearing 16, First contact plate 17, the first guide rod 18, the first spring 19, perching knife 20, cutter 21, the second guide rod 22,23 and of second spring Second contact plate 24 is connected with the first idler wheel 2 on the right side of 1 bottom of pedestal, and pedestal is connected with universal wheel 3, pedestal on the left of 1 bottom The right side at 1 top is connected with the first big stent 4, and the left side wall of the first big stent 4 is connected with the right side wall of big fixed plate 5, bottom The left side at 1 top of seat is connected with second largest stent 6, and the right side wall of second largest stent 6 is connected with the left side wall of big fixed plate 5, The middle part of pedestal 1 be provided with up and down perforative big groove 101, big groove 101 between the first big stent 4 and second largest stent 6, Big fixed plate 5 is located at the surface of big groove 101, and the right part of big fixed plate 5 is provided with perforative first pilot hole 501 up and down, greatly The left part of fixed plate 5 is provided with perforative second pilot hole 502 up and down, and clutch shaft bearing 7 is embedded on the top of the first big stent 4, greatly Rotary shaft 8 is connect with 7 interference of clutch shaft bearing, and the right end of big rotary shaft 8 is connected with rotating wheel 9, and the bottom of big rotary shaft 8 is provided with One little groove 801 and the second little groove 802, the first little groove 801 are located at the right side of the second little groove 802,10 turns of first sleeve Dynamic formula is sleeved in big rotary shaft 8, and first sleeve 10 is located at the left side of the first big stent 4, and 11 fixing sleeve of the first cam is in first set On pipe 10, the bottom of first sleeve 10 is provided with the first positioning screw 12, and the first positioning screw 12 is set as with first sleeve 10 It is threadedly coupled, the first positioning screw 12 is located at the left side of the first cam 11, and the upper end of the first positioning screw 12 is small recessed positioned at first In slot 801, the first positioning screw 12 is in contact with big rotary shaft 8, and the second cam 13 is located at the left side of the first cam 11, and second is convex 13 fixing sleeves are taken turns on the second casing 14,14 rotary type of the second casing is sleeved in big rotary shaft 8, and the second casing 14 is located at second largest The right side of stent 6, the bottom of the second casing 14 are provided with the second positioning screw 15, and the second positioning screw 15 is set with the second casing 14 Threaded connection is set to, the second positioning screw 15 is located at the right side of the second cam 13, and the upper end of the second positioning screw 15 is located at second In little groove 802, the second positioning screw 15 is in contact with big rotary shaft 8, and second bearing 16 is connect with big 8 interference of rotary shaft, the Two bearings 16 are embedded on the top of second largest stent 6, and the first contact plate 17 is located at the lower section of the first cam 11, the first contact plate 17 It is in contact with the first cam 11, the bottom of the first contact plate 17 is connected with the first guide rod 18,18 slidingtype position of the first guide rod In in the first pilot hole 501, the first spring 19 is sleeved on the first guide rod 18, and the first spring 19 is located at big fixed plate 5 and first Between contact plate 17, the lower end of the first guide rod 18 is connected with perching knife 20, and cutter 21 is located at the left side of perching knife 20, before cutter 21 is Extension is set afterwards, and perching knife 20 and 21 equal slidingtype of cutter are located in big groove 101, and the top of cutter 21 is connected with the second guiding Bar 22,22 slidingtype of the second guide rod are located in the second pilot hole 502, and the upper end of the second guide rod 22 is connected with the second contact plate 24, second spring 23 is sleeved on the second guide rod 22, and second spring 23 is between big 5 and second contact plate 24 of fixed plate, and Two contact plates 24 are located at the lower section of the second cam 13, and the second contact plate 24 is in contact with the second cam 13.
Rotating disk 31, T shapes axis pin 32, lifter plate 33, connecting rod 34, piston 35, pressurized cylinder 36, first has been further included to connect Pipe 37, check valve 38, water vat 39, the second connecting tube 40, valve 41, the first fixed block 42 and nozzle 43, the left end of big rotary shaft 8 Rotating disk 31 is connected with, the eccentric position of 31 left side wall of rotating disk is connected with T shapes axis pin 32, and lifter plate 33 is set for front and rear extension It puts, lifter plate 33 is provided with the perforative long sliding slot 331 in left and right, and 32 slidingtype of T shapes axis pin is located in long sliding slot 331, lifter plate 33 Bottom is connected with connecting rod 34, and the lower end of connecting rod 34 is connected with piston 35, and piston 35 is located in pressurized cylinder 36, and piston 35 is with increasing Cylinder pressure 36 is set as being slidably matched, and the bottom of pressurized cylinder 36 is connected with the top of pedestal 1, and the lower part of 36 left side wall of pressurized cylinder connects The first connecting tube 37 is connected to, check valve 38 is installed in first connecting tube 37, the left end of the first connecting tube 37 is connected with water vat 39, The bottom of water vat 39 is connected with the top of pedestal 1, the lower part phase of the left upper end and 36 right side wall of pressurized cylinder of the second connecting tube 40 Connection, the second connecting tube 40 are embedded in pedestal 1, valve 41 are equipped in the second connecting tube 40, valve 41 is located under pedestal 1 Side, the first fixed block 42 are located at the right side of valve 41, and the second connecting tube 40 is embedded in the first fixed block 42, the first fixed block 42 Top be connected with the bottom of pedestal 1, the first fixed block 42 is located at the left side of big groove 101, the bottom right of the second connecting tube 40 End is connected with nozzle 43, and nozzle 43 is located at the left side of cutter 21.
Embodiment 3
A kind of sewer flase floor dredger of municipal works as shown in Figs. 1-5, includes pedestal 1, the first idler wheel 2, ten thousand To the 3, first big stent 4 of wheel, big fixed plate 5, second largest stent 6, clutch shaft bearing 7, big rotary shaft 8, rotating wheel 9, first sleeve 10th, the first cam 11, the first positioning screw 12, the second cam 13, the second casing 14, the second positioning screw 15, second bearing 16, First contact plate 17, the first guide rod 18, the first spring 19, perching knife 20, cutter 21, the second guide rod 22,23 and of second spring Second contact plate 24 is connected with the first idler wheel 2 on the right side of 1 bottom of pedestal, and pedestal is connected with universal wheel 3, pedestal on the left of 1 bottom The right side at 1 top is connected with the first big stent 4, and the left side wall of the first big stent 4 is connected with the right side wall of big fixed plate 5, bottom The left side at 1 top of seat is connected with second largest stent 6, and the right side wall of second largest stent 6 is connected with the left side wall of big fixed plate 5, The middle part of pedestal 1 be provided with up and down perforative big groove 101, big groove 101 between the first big stent 4 and second largest stent 6, Big fixed plate 5 is located at the surface of big groove 101, and the right part of big fixed plate 5 is provided with perforative first pilot hole 501 up and down, greatly The left part of fixed plate 5 is provided with perforative second pilot hole 502 up and down, and clutch shaft bearing 7 is embedded on the top of the first big stent 4, greatly Rotary shaft 8 is connect with 7 interference of clutch shaft bearing, and the right end of big rotary shaft 8 is connected with rotating wheel 9, and the bottom of big rotary shaft 8 is provided with One little groove 801 and the second little groove 802, the first little groove 801 are located at the right side of the second little groove 802,10 turns of first sleeve Dynamic formula is sleeved in big rotary shaft 8, and first sleeve 10 is located at the left side of the first big stent 4, and 11 fixing sleeve of the first cam is in first set On pipe 10, the bottom of first sleeve 10 is provided with the first positioning screw 12, and the first positioning screw 12 is set as with first sleeve 10 It is threadedly coupled, the first positioning screw 12 is located at the left side of the first cam 11, and the upper end of the first positioning screw 12 is small recessed positioned at first In slot 801, the first positioning screw 12 is in contact with big rotary shaft 8, and the second cam 13 is located at the left side of the first cam 11, and second is convex 13 fixing sleeves are taken turns on the second casing 14,14 rotary type of the second casing is sleeved in big rotary shaft 8, and the second casing 14 is located at second largest The right side of stent 6, the bottom of the second casing 14 are provided with the second positioning screw 15, and the second positioning screw 15 is set with the second casing 14 Threaded connection is set to, the second positioning screw 15 is located at the right side of the second cam 13, and the upper end of the second positioning screw 15 is located at second In little groove 802, the second positioning screw 15 is in contact with big rotary shaft 8, and second bearing 16 is connect with big 8 interference of rotary shaft, the Two bearings 16 are embedded on the top of second largest stent 6, and the first contact plate 17 is located at the lower section of the first cam 11, the first contact plate 17 It is in contact with the first cam 11, the bottom of the first contact plate 17 is connected with the first guide rod 18,18 slidingtype position of the first guide rod In in the first pilot hole 501, the first spring 19 is sleeved on the first guide rod 18, and the first spring 19 is located at big fixed plate 5 and first Between contact plate 17, the lower end of the first guide rod 18 is connected with perching knife 20, and cutter 21 is located at the left side of perching knife 20, before cutter 21 is Extension is set afterwards, and perching knife 20 and 21 equal slidingtype of cutter are located in big groove 101, and the top of cutter 21 is connected with the second guiding Bar 22,22 slidingtype of the second guide rod are located in the second pilot hole 502, and the upper end of the second guide rod 22 is connected with the second contact plate 24, second spring 23 is sleeved on the second guide rod 22, and second spring 23 is between big 5 and second contact plate 24 of fixed plate, and Two contact plates 24 are located at the lower section of the second cam 13, and the second contact plate 24 is in contact with the second cam 13.
Rotating disk 31, T shapes axis pin 32, lifter plate 33, connecting rod 34, piston 35, pressurized cylinder 36, first has been further included to connect Pipe 37, check valve 38, water vat 39, the second connecting tube 40, valve 41, the first fixed block 42 and nozzle 43, the left end of big rotary shaft 8 Rotating disk 31 is connected with, the eccentric position of 31 left side wall of rotating disk is connected with T shapes axis pin 32, and lifter plate 33 is set for front and rear extension It puts, lifter plate 33 is provided with the perforative long sliding slot 331 in left and right, and 32 slidingtype of T shapes axis pin is located in long sliding slot 331, lifter plate 33 Bottom is connected with connecting rod 34, and the lower end of connecting rod 34 is connected with piston 35, and piston 35 is located in pressurized cylinder 36, and piston 35 is with increasing Cylinder pressure 36 is set as being slidably matched, and the bottom of pressurized cylinder 36 is connected with the top of pedestal 1, and the lower part of 36 left side wall of pressurized cylinder connects The first connecting tube 37 is connected to, check valve 38 is installed in first connecting tube 37, the left end of the first connecting tube 37 is connected with water vat 39, The bottom of water vat 39 is connected with the top of pedestal 1, the lower part phase of the left upper end and 36 right side wall of pressurized cylinder of the second connecting tube 40 Connection, the second connecting tube 40 are embedded in pedestal 1, valve 41 are equipped in the second connecting tube 40, valve 41 is located under pedestal 1 Side, the first fixed block 42 are located at the right side of valve 41, and the second connecting tube 40 is embedded in the first fixed block 42, the first fixed block 42 Top be connected with the bottom of pedestal 1, the first fixed block 42 is located at the left side of big groove 101, the bottom right of the second connecting tube 40 End is connected with nozzle 43, and nozzle 43 is located at the left side of cutter 21.
The first belt pulley 51, the second belt pulley 52, endless belt 53, connecting shaft 54,3rd bearing 55, first are further included Electric rotating machine 56 and link block 57, for 51 fixing sleeve of the first belt pulley in big rotary shaft 8, the first belt pulley 51 is located at the first big branch Between frame 4 and rotating wheel 9, the second belt pulley 52 is located at the lower section of the first belt pulley 51, the second belt pulley 52 and the first belt pulley 51 are connected by endless belt 53, and in connecting shaft 54, the left end interference of connecting shaft 54 is connected with 52 fixing sleeve of the second belt pulley 3rd bearing 55,3rd bearing 55 are embedded in the right side wall of the first big stent 4, the right end of connecting shaft 54 and the first electric rotating machine The left end of 56 output shafts is connected, and the bottom of the first electric rotating machine 56 is connected with link block 57, and the bottom of link block 57 is connected with Pedestal 1.
Embodiment 4
A kind of sewer flase floor dredger of municipal works as shown in Figs. 1-5, includes pedestal 1, the first idler wheel 2, ten thousand To the 3, first big stent 4 of wheel, big fixed plate 5, second largest stent 6, clutch shaft bearing 7, big rotary shaft 8, rotating wheel 9, first sleeve 10th, the first cam 11, the first positioning screw 12, the second cam 13, the second casing 14, the second positioning screw 15, second bearing 16, First contact plate 17, the first guide rod 18, the first spring 19, perching knife 20, cutter 21, the second guide rod 22,23 and of second spring Second contact plate 24 is connected with the first idler wheel 2 on the right side of 1 bottom of pedestal, and pedestal is connected with universal wheel 3, pedestal on the left of 1 bottom The right side at 1 top is connected with the first big stent 4, and the left side wall of the first big stent 4 is connected with the right side wall of big fixed plate 5, bottom The left side at 1 top of seat is connected with second largest stent 6, and the right side wall of second largest stent 6 is connected with the left side wall of big fixed plate 5, The middle part of pedestal 1 be provided with up and down perforative big groove 101, big groove 101 between the first big stent 4 and second largest stent 6, Big fixed plate 5 is located at the surface of big groove 101, and the right part of big fixed plate 5 is provided with perforative first pilot hole 501 up and down, greatly The left part of fixed plate 5 is provided with perforative second pilot hole 502 up and down, and clutch shaft bearing 7 is embedded on the top of the first big stent 4, greatly Rotary shaft 8 is connect with 7 interference of clutch shaft bearing, and the right end of big rotary shaft 8 is connected with rotating wheel 9, and the bottom of big rotary shaft 8 is provided with One little groove 801 and the second little groove 802, the first little groove 801 are located at the right side of the second little groove 802,10 turns of first sleeve Dynamic formula is sleeved in big rotary shaft 8, and first sleeve 10 is located at the left side of the first big stent 4, and 11 fixing sleeve of the first cam is in first set On pipe 10, the bottom of first sleeve 10 is provided with the first positioning screw 12, and the first positioning screw 12 is set as with first sleeve 10 It is threadedly coupled, the first positioning screw 12 is located at the left side of the first cam 11, and the upper end of the first positioning screw 12 is small recessed positioned at first In slot 801, the first positioning screw 12 is in contact with big rotary shaft 8, and the second cam 13 is located at the left side of the first cam 11, and second is convex 13 fixing sleeves are taken turns on the second casing 14,14 rotary type of the second casing is sleeved in big rotary shaft 8, and the second casing 14 is located at second largest The right side of stent 6, the bottom of the second casing 14 are provided with the second positioning screw 15, and the second positioning screw 15 is set with the second casing 14 Threaded connection is set to, the second positioning screw 15 is located at the right side of the second cam 13, and the upper end of the second positioning screw 15 is located at second In little groove 802, the second positioning screw 15 is in contact with big rotary shaft 8, and second bearing 16 is connect with big 8 interference of rotary shaft, the Two bearings 16 are embedded on the top of second largest stent 6, and the first contact plate 17 is located at the lower section of the first cam 11, the first contact plate 17 It is in contact with the first cam 11, the bottom of the first contact plate 17 is connected with the first guide rod 18,18 slidingtype position of the first guide rod In in the first pilot hole 501, the first spring 19 is sleeved on the first guide rod 18, and the first spring 19 is located at big fixed plate 5 and first Between contact plate 17, the lower end of the first guide rod 18 is connected with perching knife 20, and cutter 21 is located at the left side of perching knife 20, before cutter 21 is Extension is set afterwards, and perching knife 20 and 21 equal slidingtype of cutter are located in big groove 101, and the top of cutter 21 is connected with the second guiding Bar 22,22 slidingtype of the second guide rod are located in the second pilot hole 502, and the upper end of the second guide rod 22 is connected with the second contact plate 24, second spring 23 is sleeved on the second guide rod 22, and second spring 23 is between big 5 and second contact plate 24 of fixed plate, and Two contact plates 24 are located at the lower section of the second cam 13, and the second contact plate 24 is in contact with the second cam 13.
Rotating disk 31, T shapes axis pin 32, lifter plate 33, connecting rod 34, piston 35, pressurized cylinder 36, first has been further included to connect Pipe 37, check valve 38, water vat 39, the second connecting tube 40, valve 41, the first fixed block 42 and nozzle 43, the left end of big rotary shaft 8 Rotating disk 31 is connected with, the eccentric position of 31 left side wall of rotating disk is connected with T shapes axis pin 32, and lifter plate 33 is set for front and rear extension It puts, lifter plate 33 is provided with the perforative long sliding slot 331 in left and right, and 32 slidingtype of T shapes axis pin is located in long sliding slot 331, lifter plate 33 Bottom is connected with connecting rod 34, and the lower end of connecting rod 34 is connected with piston 35, and piston 35 is located in pressurized cylinder 36, and piston 35 is with increasing Cylinder pressure 36 is set as being slidably matched, and the bottom of pressurized cylinder 36 is connected with the top of pedestal 1, and the lower part of 36 left side wall of pressurized cylinder connects The first connecting tube 37 is connected to, check valve 38 is installed in first connecting tube 37, the left end of the first connecting tube 37 is connected with water vat 39, The bottom of water vat 39 is connected with the top of pedestal 1, the lower part phase of the left upper end and 36 right side wall of pressurized cylinder of the second connecting tube 40 Connection, the second connecting tube 40 are embedded in pedestal 1, valve 41 are equipped in the second connecting tube 40, valve 41 is located under pedestal 1 Side, the first fixed block 42 are located at the right side of valve 41, and the second connecting tube 40 is embedded in the first fixed block 42, the first fixed block 42 Top be connected with the bottom of pedestal 1, the first fixed block 42 is located at the left side of big groove 101, the bottom right of the second connecting tube 40 End is connected with nozzle 43, and nozzle 43 is located at the left side of cutter 21.
The first belt pulley 51, the second belt pulley 52, endless belt 53, connecting shaft 54,3rd bearing 55, first are further included Electric rotating machine 56 and link block 57, for 51 fixing sleeve of the first belt pulley in big rotary shaft 8, the first belt pulley 51 is located at the first big branch Between frame 4 and rotating wheel 9, the second belt pulley 52 is located at the lower section of the first belt pulley 51, the second belt pulley 52 and the first belt pulley 51 are connected by endless belt 53, and in connecting shaft 54, the left end interference of connecting shaft 54 is connected with 52 fixing sleeve of the second belt pulley 3rd bearing 55,3rd bearing 55 are embedded in the right side wall of the first big stent 4, the right end of connecting shaft 54 and the first electric rotating machine The left end of 56 output shafts is connected, and the bottom of the first electric rotating machine 56 is connected with link block 57, and the bottom of link block 57 is connected with Pedestal 1.
The first small rack 61, the second small rack 62 and shutter 63 are further included, the top of the first big stent 4 is connected with One small rack 61, the top of second largest stent 6 are connected with the second small rack 62, and shutter 63 is located at the first small rack 61 and second The top of small rack 62, the first small rack 61 and the second small rack 62 are connected with shutter 63.
It has further included the second fixed block 71, the second electric rotating machine 72 and the second idler wheel 73, the bottom of pedestal 1 and has been connected with second Fixed block 71, the bottom of the second fixed block 71 are connected with the second electric rotating machine 72, and the rear end of 72 output shaft of the second electric rotating machine connects The second idler wheel 73 is connected to, the second idler wheel 73 is located at the left side of the first idler wheel 2.
Operation principle:Because the present invention includes pedestal 1, the first idler wheel 2, universal wheel 3, the first big stent 4, big fixed plate 5th, second largest stent 6, clutch shaft bearing 7, big rotary shaft 8, rotating wheel 9, first sleeve 10, the first cam 11, the first positioning screw 12nd, the second cam 13, the second casing 14, the second positioning screw 15, second bearing 16, the first contact plate 17, the first guide rod 18, First spring 19, perching knife 20, cutter 21, the second guide rod 22,23 and second contact plate 24 of second spring, so when needing to stifled For plug when the sundries on the sewer flase floor of municipal works is handled, staff can first pass through 2 He of the first idler wheel Perching knife 20 and cutter 21 are moved to the surface of sewer flase floor by universal wheel 3, then again by the first positioning screw 12 and Two positioning screws 15 are screwed into respectively in the first little groove 801 and the second little groove 802, then staff again to rotating wheel 9 into Row rotation, rotating wheel 9 drive big rotary shaft 8 to be rotated, and big rotary shaft 8 passes through the first positioning screw 12 and the second positioning at this time Screw rod 15 drives 10 and second casing 14 of first sleeve to be rotated together, and first sleeve 10 is so as to drive the first cam 11 to carry out Rotation, the second casing 14 so as to which the second cam 13 be driven to be rotated, the first cam 11 so as to the first contact plate 17 is carried out by Pressure, the first contact plate 17 are made so as to which the first guide rod 18 and perching knife 20 be driven to be moved in the elastic force of the first spring 19 Under, perching knife 20 starts to repeat to move up and down, and sundries shovel of the perching knife 20 so as to be blocked on sewer flase floor is broken, from And sewer flase floor is dredged, while the second cam 13 presses the second contact plate 24, the second contact plate 24 from And the second guide rod 22 and cutter 21 being driven to be moved, and under the elastic force effect of second spring 23, cutter 21 starts weight It moves up and down again, sundries shovel of the cutter 21 so as to be blocked on sewer flase floor is broken, so as to sewer flase floor It is dredged, big fixed plate 5 provides guiding auxiliary, the first spring 19 and the second bullet for the first guide rod 18 and the second guide rod 22 Spring 23 is respectively that the first contact plate 17 and the offer of the second contact plate 24 move upwards auxiliary.
Because rotating disk 31, T shapes axis pin 32, lifter plate 33, connecting rod 34, piston 35, pressurized cylinder 36, first are further included Connecting tube 37, check valve 38, water vat 39, the second connecting tube 40, valve 41, the first fixed block 42 and nozzle 43, so working as work Personnel carry out rotary type to big rotary shaft 8, and big rotary shaft 8 can drive rotating disk 31 to be rotated, and rotating disk 31 passes through T shape pins Axis 32 drives lifter plate 33 to move up and down, lifter plate 33 so as to by connecting rod 34 with piston 35 in the pressurized cylinder 36 into Row moves up and down, and the water being equipped in advance in water vat 39 is drawn into pressurized cylinder 36 by piston 35 by the first connecting tube 37, unidirectionally Valve 38 can prevent the aqueous reflux in the first connecting tube 37, therefore when piston 35 moves downward, can will be in pressurized cylinder 36 Water is pressed by the second connecting tube 40 in nozzle 43, and valve 41 is opened in advance at this time, the water into nozzle 43 Cutter 21 and perching knife 20 are sprayed, cutter 21 and perching knife 20 can not only be cleaned, it can also be on sewer flase floor Sundries impacted, convenient for being dredged to sewer flase floor.
Because further included the first belt pulley 51, the second belt pulley 52, endless belt 53, connecting shaft 54,3rd bearing 55, First electric rotating machine 56 and link block 57, for 51 fixing sleeve of the first belt pulley in big rotary shaft 8, the first belt pulley 51 is located at first Greatly between stent 4 and rotating wheel 9, the second belt pulley 52 is located at the lower section of the first belt pulley 51, the second belt pulley 52 and the first skin Belt wheel 51 is connected by endless belt 53, and in connecting shaft 54, the left end interference of connecting shaft 54 connects 52 fixing sleeve of the second belt pulley 3rd bearing 55 is connected to, 3rd bearing 55 is embedded in the right side wall of the first big stent 4, the right end of connecting shaft 54 and the first rotation The left end of 56 output shaft of motor is connected, and the bottom of the first electric rotating machine 56 is connected with link block 57, and the bottom of link block 57 connects Pedestal 1 is connected to, so staff can start the first electric rotating machine 56 and be operated, the first electric rotating machine 56 passes through connecting shaft 54 the second belt pulleys 52 of drive are rotated, and the second belt pulley 52 drives 51 turns of the first belt pulley by endless belt 53 Dynamic, the first belt pulley 51 replaces manual hand manipulation so as to which big rotary shaft 8 be driven to be rotated, using the first electric rotating machine 56, It is more time saving and energy saving, it is convenient and efficient.
Because having further included the first small rack 61, the second small rack 62 and shutter 63, the top connection of the first big stent 4 There is the first small rack 61, the top of second largest stent 6 is connected with the second small rack 62, and shutter 63 is located at 61 He of the first small rack The top of second small rack 62, the first small rack 61 and the second small rack 62 are connected with shutter 63, so shutter 63 Protection can be provided for staff, prevent a day Sai from drenching with rain, be conducive to improve the comfort level of work.
Because it further includes the second fixed block 71, the second electric rotating machine 72 and the second idler wheel 73, the bottom of pedestal 1 to be connected with Second fixed block 71, the bottom of the second fixed block 71 are connected with the second electric rotating machine 72, after 72 output shaft of the second electric rotating machine End is connected with the second idler wheel 73, and the second idler wheel 73 is located at the left side of the first idler wheel 2, so in the mobile present invention, staff The second electric rotating machine 72 can be started to be operated, the second electric rotating machine 72 is so as to drive the second idler wheel 73 to be rotated, and second Idler wheel 73 can be that the movement of the present invention provides great convenience by the cooperation with the first idler wheel 2 and universal wheel 3.
Embodiment described above only expresses the preferred embodiment of the present invention, and description is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (5)

1. the sewer flase floor dredger of a kind of municipal works, which is characterized in that include pedestal(1), the first idler wheel (2), universal wheel(3), the first big stent(4), big fixed plate(5), second largest stent(6), clutch shaft bearing(7), big rotary shaft (8), rotating wheel(9), first sleeve(10), the first cam(11), the first positioning screw(12), the second cam(13), second set Pipe(14), the second positioning screw(15), second bearing(16), the first contact plate(17), the first guide rod(18), the first spring (19), perching knife(20), cutter(21), the second guide rod(22), second spring(23)With the second contact plate(24), pedestal(1)Bottom The first idler wheel is connected on the right side of portion(2), pedestal(1)Universal wheel is connected on the left of bottom(3), pedestal(1)The right side at top It is connected with the first big stent(4), the first big stent(4)Left side wall and big fixed plate(5)Right side wall be connected, pedestal(1) Second largest stent is connected on the left of top(6), second largest stent(6)Right side wall and big fixed plate(5)Left side wall be connected It connects, pedestal(1)Middle part be provided with up and down perforative big groove(101), big groove(101)Positioned at the first big stent(4)With second Big stent(6)Between, big fixed plate(5)Positioned at big groove(101)Surface, big fixed plate(5)Right part be provided with up and down pass through The first pilot hole worn(501), big fixed plate(5)Left part be provided with up and down perforative second pilot hole(502), clutch shaft bearing (7)It is embedded in the first big stent(4)Top, big rotary shaft(8)With clutch shaft bearing(7)Interference connects, big rotary shaft(8)The right side End is connected with rotating wheel(9), big rotary shaft(8)Bottom be provided with the first little groove(801)With the second little groove(802), first Little groove(801)Positioned at the second little groove(802)Right side, first sleeve(10)Rotary type is sleeved on big rotary shaft(8)On, first Casing(10)Positioned at the first big stent(4)Left side, the first cam(11)Fixing sleeve is in first sleeve(10)On, first sleeve (10)Bottom be provided with the first positioning screw(12), the first positioning screw(12)With first sleeve(10)It is set as screw thread company It connects, the first positioning screw(12)Positioned at the first cam(11)Left side, the first positioning screw(12)Upper end be located at it is first small recessed Slot(801)It is interior, the first positioning screw(12)With big rotary shaft(8)It is in contact, the second cam(13)Positioned at the first cam(11)'s Left side, the second cam(13)Fixing sleeve is in the second casing(14)On, the second casing(14)Rotary type is sleeved on big rotary shaft(8)On, Second casing(14)Positioned at second largest stent(6)Right side, the second casing(14)Bottom be provided with the second positioning screw(15), Second positioning screw(15)With the second casing(14)It is set as being threadedly coupled, the second positioning screw(15)Positioned at the second cam(13) Right side, the second positioning screw(15)Upper end be located at the second little groove(802)It is interior, the second positioning screw(15)With big rotary shaft (8)It is in contact, second bearing(16)With big rotary shaft(8)Interference connects, second bearing(16)It is embedded in second largest stent(6)'s Top, the first contact plate(17)Positioned at the first cam(11)Lower section, the first contact plate(17)With the first cam(11)It is in contact, First contact plate(17)Bottom be connected with the first guide rod(18), the first guide rod(18)Slidingtype is located at the first pilot hole (501)It is interior, the first spring(19)It is sleeved on the first guide rod(18)On, the first spring(19)Positioned at big fixed plate(5)It is connect with first Touch panel(17)Between, the first guide rod(18)Lower end be connected with perching knife(20), cutter(21)Positioned at perching knife(20)Left side, cut Knife(21)It is set for front and rear extension, perching knife(20)And cutter(21)Equal slidingtype is located at big groove(101)It is interior, cutter(21)'s Top is connected with the second guide rod(22), the second guide rod(22)Slidingtype is located at the second pilot hole(502)It is interior, the second guide rod (22)Upper end be connected with the second contact plate(24), second spring(23)It is sleeved on the second guide rod(22)On, second spring(23) Positioned at big fixed plate(5)With the second contact plate(24)Between, the second contact plate(24)Positioned at the second cam(13)Lower section, second Contact plate(24)With the second cam(13)It is in contact.
2. the sewer flase floor dredger of a kind of municipal works according to claim 1, which is characterized in that also wrap Rotating disk is included(31), T shape axis pins(32), lifter plate(33), connecting rod(34), piston(35), pressurized cylinder(36), first connection Pipe(37), check valve(38), water vat(39), the second connecting tube(40), valve(41), the first fixed block(42)And nozzle(43), Big rotary shaft(8)Left end be connected with rotating disk(31), rotating disk(31)The eccentric position of left side wall is connected with T shape axis pins (32), lifter plate(33)It is set for front and rear extension, lifter plate(33)It is provided with the perforative long sliding slot in left and right(331), T shape axis pins (32)Slidingtype is located at long sliding slot(331)It is interior, lifter plate(33)Bottom be connected with connecting rod(34), connecting rod(34)Lower end It is connected with piston(35), piston(35)Positioned at pressurized cylinder(36)It is interior, piston(35)With pressurized cylinder(36)It is set as being slidably matched, increase Cylinder pressure(36)Bottom and pedestal(1)Top be connected, pressurized cylinder(36)The lower part of left side wall is connected with the first connecting tube (37), the first connecting tube(37)On check valve is installed(38), the first connecting tube(37)Left end be connected with water vat(39), water vat (39)Bottom and pedestal(1)Top be connected, the second connecting tube(40)Left upper end and pressurized cylinder(36)Under right side wall Portion is connected, the second connecting tube(40)It is embedded in pedestal(1)It is interior, the second connecting tube(40)On valve is installed(41), valve (41)Positioned at pedestal(1)Lower section, the first fixed block(42)Positioned at valve(41)Right side, the second connecting tube(40)It is embedded One fixed block(42)It is interior, the first fixed block(42)Top and pedestal(1)Bottom be connected, the first fixed block(42)Positioned at big Groove(101)Left side, the second connecting tube(40)Bottom righthand side be connected with nozzle(43), nozzle(43)Positioned at cutter(21)A left side Side.
3. the sewer flase floor dredger of a kind of municipal works according to claim 2, which is characterized in that also wrap The first belt pulley is included(51), the second belt pulley(52), endless belt(53), connecting shaft(54), 3rd bearing(55), first rotation Rotating motor(56)And link block(57), the first belt pulley(51)Fixing sleeve is in big rotary shaft(8)On, the first belt pulley(51)It is located at First big stent(4)With rotating wheel(9)Between, the second belt pulley(52)Positioned at the first belt pulley(51)Lower section, the second belt Wheel(52)With the first belt pulley(51)Pass through endless belt(53)Connection, the second belt pulley(52)Fixing sleeve is in connecting shaft(54) On, connecting shaft(54)Left end interference be connected with 3rd bearing(55), 3rd bearing(55)It is embedded in the first big stent(4)The right side In side wall, connecting shaft(54)Right end and the first electric rotating machine(56)The left end of output shaft is connected, the first electric rotating machine(56) Bottom be connected with link block(57), link block(57)Bottom be connected with pedestal(1).
4. the sewer flase floor dredger of a kind of municipal works according to claim 3, which is characterized in that also wrap The first small rack is included(61), the second small rack(62)And shutter(63), the first big stent(4)To be connected with first small at top Stent(61), second largest stent(6)Top be connected with the second small rack(62), shutter(63)Positioned at the first small rack(61) With the second small rack(62)Top, the first small rack(61)With the second small rack(62)And shutter(63)It is connected.
5. the sewer flase floor dredger of a kind of municipal works according to claim 4, which is characterized in that also wrap The second fixed block is included(71), the second electric rotating machine(72)With the second idler wheel(73), pedestal(1)Bottom be connected with the second fixation Block(71), the second fixed block(71)Bottom be connected with the second electric rotating machine(72), the second electric rotating machine(72)After output shaft End is connected with the second idler wheel(73), the second idler wheel(73)Positioned at the first idler wheel(2)Left side.
CN201810173892.3A 2018-03-02 2018-03-02 A kind of sewer flase floor dredger of municipal works Pending CN108193765A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810173892.3A CN108193765A (en) 2018-03-02 2018-03-02 A kind of sewer flase floor dredger of municipal works

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810173892.3A CN108193765A (en) 2018-03-02 2018-03-02 A kind of sewer flase floor dredger of municipal works

Publications (1)

Publication Number Publication Date
CN108193765A true CN108193765A (en) 2018-06-22

Family

ID=62594785

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810173892.3A Pending CN108193765A (en) 2018-03-02 2018-03-02 A kind of sewer flase floor dredger of municipal works

Country Status (1)

Country Link
CN (1) CN108193765A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108800114A (en) * 2018-07-09 2018-11-13 杭州启澄科技有限公司 A kind of anti-blocking Wind cap for boiler that power plant field uses
CN110773473A (en) * 2019-11-14 2020-02-11 王改霞 Grid processing device for fiber board composite board
CN110815155A (en) * 2019-12-10 2020-02-21 徐州智路信息科技有限公司 Electric tricycle overhauls uses tool holder
CN110840343A (en) * 2019-11-19 2020-02-28 中船重工(重庆)西南装备研究院有限公司 Thin grid sundry cleaning robot
CN112502270A (en) * 2020-12-23 2021-03-16 成都建工雅安建设有限责任公司 A sewer grid board pull throughs for municipal works
CN112554048A (en) * 2020-11-24 2021-03-26 徐悌 Municipal administration road bridge is with preventing stifled formula drainage equipment
CN112916093A (en) * 2021-02-09 2021-06-08 重庆市庆岩建材有限公司 Quick production line of building stones
CN113756415A (en) * 2021-09-16 2021-12-07 何桂娣 Ditch grating plate pull throughs for environmental protection
CN114351835A (en) * 2021-12-09 2022-04-15 韦显玉 Sewer grid plate pull throughs that municipal works were used

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205711666U (en) * 2016-04-19 2016-11-23 葛国松 A kind of ground cement for building cleaning car
CN205701712U (en) * 2016-04-25 2016-11-23 黄根来 A kind of steel pipe fastener cement block cleaning plant
CN106423370A (en) * 2016-12-18 2017-02-22 赣州科源甬致科技有限公司 Efficient crushing and cleaning device for building cement blocks
CN107268768A (en) * 2017-08-09 2017-10-20 宿州云宏建设安装有限公司 A kind of urban construction three-dimensional cleaning plant of sewer

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205711666U (en) * 2016-04-19 2016-11-23 葛国松 A kind of ground cement for building cleaning car
CN205701712U (en) * 2016-04-25 2016-11-23 黄根来 A kind of steel pipe fastener cement block cleaning plant
CN106423370A (en) * 2016-12-18 2017-02-22 赣州科源甬致科技有限公司 Efficient crushing and cleaning device for building cement blocks
CN107268768A (en) * 2017-08-09 2017-10-20 宿州云宏建设安装有限公司 A kind of urban construction three-dimensional cleaning plant of sewer

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108800114A (en) * 2018-07-09 2018-11-13 杭州启澄科技有限公司 A kind of anti-blocking Wind cap for boiler that power plant field uses
CN108800114B (en) * 2018-07-09 2020-06-12 杭州富纯实业有限公司 Anti-blocking boiler hood used in field of power plant
CN110773473A (en) * 2019-11-14 2020-02-11 王改霞 Grid processing device for fiber board composite board
CN110840343A (en) * 2019-11-19 2020-02-28 中船重工(重庆)西南装备研究院有限公司 Thin grid sundry cleaning robot
CN110840343B (en) * 2019-11-19 2021-09-21 中船重工(重庆)西南装备研究院有限公司 Thin grid sundry cleaning robot
CN110815155A (en) * 2019-12-10 2020-02-21 徐州智路信息科技有限公司 Electric tricycle overhauls uses tool holder
CN112554048A (en) * 2020-11-24 2021-03-26 徐悌 Municipal administration road bridge is with preventing stifled formula drainage equipment
CN112502270A (en) * 2020-12-23 2021-03-16 成都建工雅安建设有限责任公司 A sewer grid board pull throughs for municipal works
CN112916093A (en) * 2021-02-09 2021-06-08 重庆市庆岩建材有限公司 Quick production line of building stones
CN113756415A (en) * 2021-09-16 2021-12-07 何桂娣 Ditch grating plate pull throughs for environmental protection
CN113756415B (en) * 2021-09-16 2023-08-11 江阴市新远见工程有限公司 Environment-friendly ditch grating plate dredging device
CN114351835A (en) * 2021-12-09 2022-04-15 韦显玉 Sewer grid plate pull throughs that municipal works were used
CN114351835B (en) * 2021-12-09 2024-05-31 北京市城捷建设集团有限公司 Sewer grating plate dredging device for municipal engineering

Similar Documents

Publication Publication Date Title
CN108193765A (en) A kind of sewer flase floor dredger of municipal works
CN111980147B (en) Municipal pipeline dredging and maintaining device and implementation method
CN108654871B (en) Epidemic prevention and pesticide spraying equipment for geological disaster earthquake area
CN108756275B (en) Wall skin scraping device for building field
CN205529816U (en) Novel full -automatic cement way making machine
CN108193764A (en) A kind of dredger of sewer flase floor for municipal works
CN108643336A (en) A kind of municipal drainage pipeline inside dredging device
CN208742647U (en) A kind of device for pulverizing rubbish of the municipal administration gardens convenient for discharging
CN107653821A (en) A kind of runway runway cleaning equipment
CN218357873U (en) Sewage drainage pipe for municipal works
CN211394219U (en) River course ecological management device
CN205288548U (en) Civil engineering construction waste processing apparatus
CN213000146U (en) Refuse treatment device for civil engineering
CN209082659U (en) A kind of sponge novel urban rainwater shunting well
CN218011507U (en) Sewage treatment device
CN108221879B (en) Gate device for water conservancy
CN213773124U (en) Multifunctional washing and sweeping vehicle
CN220953815U (en) Pollution discharge well for municipal works
CN110846985A (en) Road roller's mud scraping device for road surface construction
CN215563259U (en) A refuse treatment device for municipal pipe network
CN215888496U (en) Municipal works prevent blockking up and make things convenient for drainage device
CN218132432U (en) Fallen leaf recovery device for garden engineering
CN211399373U (en) A intelligent lighting device for highway construction
CN215105951U (en) Grid plate dredging device for sewer
CN207260043U (en) A kind of environment-friendly clearing apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180622

RJ01 Rejection of invention patent application after publication