CN108193701A - Stratum pile foundation construction method based on BIM models - Google Patents
Stratum pile foundation construction method based on BIM models Download PDFInfo
- Publication number
- CN108193701A CN108193701A CN201711488567.8A CN201711488567A CN108193701A CN 108193701 A CN108193701 A CN 108193701A CN 201711488567 A CN201711488567 A CN 201711488567A CN 108193701 A CN108193701 A CN 108193701A
- Authority
- CN
- China
- Prior art keywords
- stratum
- pile foundation
- soil layer
- threedimensional model
- interface
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The invention discloses a kind of bad ground pile foundation construction method based on BIM technology, step is:(1) acquisition geology exploratory hole and soil layer interface crosspoint information;(2) geological prospecting hole and soil layer interface the crosspoint Three Dimensional Interface between the setting-out of BIM buildings models forms soil layer;(3) overlying soil interface forms block mold;(4) stratum pile foundation threedimensional model is established according to design drawing;(5) pile foundation threedimensional model in stratum is imported in the threedimensional model that geological prospecting hole is formed with soil layer interface crosspoint;(6) longitudinal section method checks Different Strata stake axis view respectively.Stratum pile foundation threedimensional model is made using BIM technology, design stratum pile foundation model is imported in entire place threedimensional model, by section method, can check each stratum pile body length of designed stratum pile foundation whether reasonable design, optimize stratum Design of Foundation figure in the construction stage.
Description
Technical field
The invention belongs to architecture construction, more particularly to a kind of method based on BIM models construction bad ground pile foundation.
Background technology
Building is widely used frequently with stratum pile foundation form, this kind of base form in weak soil property area.Building
The design of stratum pile foundation, the detailed geological mapping report of Main Basiss, but detailed geological mapping reports reflected geology
Information is more scattered.Exploratory spot is generally selected, each soil thickness information under selected exploratory spot is checked in drilling downward vertically, usually will
Exploratory spot thickness information in same vertical section is represented in a figure, by shape after the following soil layer interface point fitting of each exploratory spot
Into the cutting plane entirety clay distribution situation, which is, soil layer interface point in sectional view is fitted, by
Then two-dimensional space is fitted, then the soil layer information that sectional view used is reflected is more scattered, it is impossible to represent entire construction on-site
The continuously distributed situation of three dimensions of same soil layer.
When carrying out stratum Design of Foundation, generally use is exactly detailed exploration report, stratum Design of Foundation foundation
Two-dimensional space clay distribution situation designs, so in the design process, secure context is more conservative, and often pile body length in stratum is set
That counts is long, buries relatively deep, and safety is preferable but economy is poor, causes a degree of waste of resource, so carrying out ground
During layer pile foundation construction, it is necessary to carry out reasonable argument and analysis to the economy of stratum pile foundation used.
1st, such as Fig. 1, general geological information are showed by sectional view, on 1 surface of place ground, beat geological prospecting hole 2,
As geological prospecting hole 2 vertically the more is beaten the more deep, geological prospecting hole 2 may pass through various different soils, geological prospecting hole 2 and soil layer circle
Face intersects to form crosspoint 3, can be substantially by geological prospecting hole and the soil layer interface crosspoint 3 drawn up a contract on a soil layer face
Cutting plane 4 between soil layer interface is fitted, when carrying out stratum Design of Foundation, surveys different geology exploratory holes in report in detail
Interface cutting line 4 is two-dimensional signal between the soil layer reflected between 2, fails to reflect each soil layer distributed in three dimensions situation, so
When causing stratum Design of Foundation, pile length design in stratum is more conservative, causes the wasting of resources.
2nd, as shown in Fig. 2, general stratum pile foundation generally comprises two parts, soil is squeezed into cushion cap 5 and stratum stake 6, stratum stake 6
In, the load that upper building transmits is supported by stratum stake 6 side frictions and stratum stake end reaction, is actually carrying out ground
It during layer pile foundation construction, proposes to optimize bad ground pile foundation using BIM, avoids stratum stake long long as possible, avoid resource mistake
Degree waste, energy conservation and environmental protection.
Invention content
In order to solve defect of the existing technology, the purpose of the present invention is to provide a kind of stratum pile length reasonable designs
To avoid the stratum pile foundation construction method based on BIM models of construction waste.
The present invention realize above-mentioned purpose the technical solution adopted is that:A kind of bad ground pile foundation based on BIM technology is applied
Work method, it is characterised in that step is:(1) acquisition geology exploratory hole and soil layer interface crosspoint information;(2) geological prospecting hole with
Soil layer interface crosspoint Three Dimensional Interface between the setting-out of BIM buildings models forms soil layer;(3) overlying soil interface forms whole mould
Type;(4) stratum pile foundation threedimensional model is established according to design drawing;(5) pile foundation threedimensional model in stratum imports geological prospecting hole
In the threedimensional model formed with soil layer interface crosspoint;(6) longitudinal section method checks Different Strata stake axis view respectively;
(7) bearing stratum depth is inserted at stake end in observation stratum, and is analyzed and judged that each stratum stake embedded depth situation is in sectional view
It is no reasonable.
Implement technical solution of the present invention, according to the reasonability that design stratum pile body length proportioning is checked in the construction stage, carry
Go out the bad ground pile foundation optimized construction method based on BIM technology, using the entire soil layer information of Building Information Model technology, set
Count stratum stake long message, the exploratory spot data three-dimensional visual that exploration report is obtained forms the whole three-dimensional boundary of same soil layer
Face figure forms entire site soil layers distribution situation.Stratum pile foundation threedimensional model is made using BIM technology, by the stake of design stratum
Basic model is imported in entire place threedimensional model, by section method, can check each stratum stake of designed stratum pile foundation
Body length whether reasonable design, the construction stage optimize stratum Design of Foundation figure.
Description of the drawings
Fig. 1 is formation information sectional view.
Fig. 2 is BIM model schematic three dimensional views.
Fig. 3 is BIM models section schematic diagram.
In figure:1- places ground, 2- geological prospectings hole, 3- geological prospectings hole and soil layer interface crosspoint, between 4- soil layers
Interface cutting line, 5- cushion caps, the stake of 6- stratum, Three Dimensional Interface between 7- soil layers.
Specific embodiment
As shown in figure 3, the stratum pile foundation construction method based on BIM models is:
1st, the detailed geologic information in place is obtained;
2nd, acquisition geology exploratory hole 2 and 3 information of soil layer interface crosspoint;
3rd, geological prospecting hole 2 and soil layer interface crosspoint 3 Three Dimensional Interface 7 between the setting-out of BIM buildings models forms soil layer;
4th, overlying soil interface forms block mold;
5th, stratum pile foundation threedimensional model is established according to design drawing;
6th, pile foundation threedimensional model in stratum is imported in the threedimensional model that geological prospecting hole is formed with soil layer interface crosspoint 3;
7th, longitudinal section method checks Different Strata stake axis view respectively;
8th, bearing stratum depth is inserted at stake end in observation stratum, and analyzes each stratum stake embedded depth situation in sectional view;
9th, judge whether stake 6 insertion bearing stratum depth situation in stratum is reasonable, and then optimization design drawing in design drawing,
Construction stage to stake 6 length careful designs in stratum in design drawing, avoids the excess waste of resource.
Claims (1)
1. a kind of bad ground pile foundation construction method based on BIM technology, it is characterised in that step is:
(1) acquisition geology exploratory hole and soil layer interface crosspoint information;
(2) geological prospecting hole and soil layer interface the crosspoint Three Dimensional Interface between the setting-out of BIM buildings models forms soil layer;
(3) overlying soil interface forms block mold;
(4) stratum pile foundation threedimensional model is established according to design drawing;
(5) pile foundation threedimensional model in stratum is imported in the threedimensional model that geological prospecting hole is formed with soil layer interface crosspoint 3;
(6) longitudinal section method checks Different Strata stake axis view respectively;
(7) bearing stratum depth is inserted at stake end in observation stratum, and is analyzed and judged each stratum stake embedded depth feelings in sectional view
Whether condition is reasonable.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711488567.8A CN108193701A (en) | 2017-12-29 | 2017-12-29 | Stratum pile foundation construction method based on BIM models |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711488567.8A CN108193701A (en) | 2017-12-29 | 2017-12-29 | Stratum pile foundation construction method based on BIM models |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108193701A true CN108193701A (en) | 2018-06-22 |
Family
ID=62587209
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711488567.8A Pending CN108193701A (en) | 2017-12-29 | 2017-12-29 | Stratum pile foundation construction method based on BIM models |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108193701A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108729478A (en) * | 2018-07-18 | 2018-11-02 | 中铁十六局集团第三工程有限公司 | A kind of simulation three-dimensional surface determines the long construction method of CFG stakes |
CN113378257A (en) * | 2021-03-17 | 2021-09-10 | 广西建工第一建筑工程集团有限公司 | Pile foundation length optimization method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106682364A (en) * | 2017-01-22 | 2017-05-17 | 深圳泛华工程集团有限公司 | Method and system for determining the depth of each pile driven into rock layer |
CN106815415A (en) * | 2016-12-30 | 2017-06-09 | 中建三局第建设工程有限责任公司 | Construction of Engineering Pile method based on BIM |
-
2017
- 2017-12-29 CN CN201711488567.8A patent/CN108193701A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106815415A (en) * | 2016-12-30 | 2017-06-09 | 中建三局第建设工程有限责任公司 | Construction of Engineering Pile method based on BIM |
CN106682364A (en) * | 2017-01-22 | 2017-05-17 | 深圳泛华工程集团有限公司 | Method and system for determining the depth of each pile driven into rock layer |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108729478A (en) * | 2018-07-18 | 2018-11-02 | 中铁十六局集团第三工程有限公司 | A kind of simulation three-dimensional surface determines the long construction method of CFG stakes |
CN113378257A (en) * | 2021-03-17 | 2021-09-10 | 广西建工第一建筑工程集团有限公司 | Pile foundation length optimization method |
CN113378257B (en) * | 2021-03-17 | 2023-03-14 | 广西建工第一建筑工程集团有限公司 | Pile foundation length optimization method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104992468A (en) | Fracture-cavern type carbonate hydrocarbon reservoir three-dimensional geological modeling method | |
CN108468538A (en) | A kind of shale hydraulic fracture extension prediction technique | |
CN106097445B (en) | A kind of method for drafting of three-dimensional formation curved surface | |
CN106285646A (en) | Drilling well loss horizon recognition methods based on Multi-information acquisition | |
CN106950070A (en) | Experimental rig for rectangular top pipe jacking construction Whole Process Simulation | |
CN104196012B (en) | A kind of karst cave treatment method based on BIM | |
CN105089595A (en) | Oil reservoir numerical simulation method and device under the action of horizontal fracturing fracture diversion | |
CN107515423A (en) | A kind of new 3 D geological model construction method of high-dip structure | |
CN108193701A (en) | Stratum pile foundation construction method based on BIM models | |
CN103233453B (en) | A kind of original position soil body surveying method | |
CN105386474A (en) | Method for determining influences of leakage of waterproof curtain above foundation pit excavation face on surrounding environment | |
CN101845815A (en) | Method for calculating and processing uprush plastic failures of confined water foundation pits of soft soil strata | |
CN106780740B (en) | Dam foundation rock mass dominant penetration channel identification method based on GOCAD software | |
CN105389451A (en) | Timely accurate modeling method for unmanned mining working face | |
CN108804780A (en) | A kind of method of three dimensional analysis pile-base supporting layer | |
CN106372295A (en) | Method for determining safe horizontal distance between shield and karst cave in sand karst stratum | |
CN110516407A (en) | More cluster fracturing fracture complexity calculating methods in a kind of fracture-type reservoir net horizontal section | |
CN212405086U (en) | Disposal and detection structure for karst cave under rock-socketed pile base | |
CN104252551B (en) | Irregular oil-water interface modeling implementation method | |
CN108643894A (en) | Three-dimensional oil reservoir physical model tomography setting method | |
CN116956420A (en) | Tunnel structure integrated analysis method based on three-dimensional geological model | |
CN204492660U (en) | A kind of ground-connecting-wall construction rectangular impact drill bit | |
CN110211232A (en) | A kind of triangular prism composition model method and system based on borehole data | |
CN106054255A (en) | Shale gas reservoir compressibility evaluation method based on micro-seismic characteristic | |
CN201250397Y (en) | Concrete anti-seepage wall with quality inspection coring pipes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180622 |