CN108193044A - A kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine - Google Patents

A kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine Download PDF

Info

Publication number
CN108193044A
CN108193044A CN201810133434.7A CN201810133434A CN108193044A CN 108193044 A CN108193044 A CN 108193044A CN 201810133434 A CN201810133434 A CN 201810133434A CN 108193044 A CN108193044 A CN 108193044A
Authority
CN
China
Prior art keywords
membrane wall
heat
treatment furnace
furnace body
preheating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810133434.7A
Other languages
Chinese (zh)
Inventor
丁晓明
李绍迎
刘坤明
许小继
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Amec Forster Wheeler Power Machinery Co Ltd
Original Assignee
Amec Forster Wheeler Power Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Amec Forster Wheeler Power Machinery Co Ltd filed Critical Amec Forster Wheeler Power Machinery Co Ltd
Priority to CN201810133434.7A priority Critical patent/CN108193044A/en
Publication of CN108193044A publication Critical patent/CN108193044A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/50Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for welded joints
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D11/00Process control or regulation for heat treatments
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/08Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for tubular bodies or pipes

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Optics & Photonics (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses a kind of membrane wall pipe row welding in line preheating and rear heat-treating machine, including preheating box heat treatment furnace, rear hot box formula heat-treatment furnace, membrane wall welding equipment, membrane wall pipe is arranged, the preheating box heat treatment furnace with working height is equipped on front side of described two membrane wall welding equipments side by side, the rear hot box formula heat-treatment furnace with working height is equipped on rear side of two membrane wall welding equipments side by side, the preheating box heat treatment furnace, drive wheel group is respectively equipped on rear hot box formula heat-treatment furnace, box heat treatment furnace is preheated for driving, membrane wall pipe row on rear hot box formula heat-treatment furnace, the preheating box heat treatment furnace, heating element is respectively equipped in rear hot box formula heat-treatment furnace, temperature-detecting device.Its structure design is simple, by increasing preheating and rear hot-treatment heating equipment, on-line checking temperature and on-line tuning temperature respectively before and after existing membrane wall welding equipment, is then handled, easy to operate, efficient, processing quality is good, reduces the labor intensity of worker.

Description

A kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine
Technical field
The invention belongs to pipeline processing technical fields, and in particular to a kind of membrane wall pipe row welding is at line preheating and rear heat Reason machine.
Background technology
The membrane wall pipe row of boiler, the technological requirement of wherein alloy material pipe need the pre-heat treatment before welding.Often Rule membrane wall pipe row's welding equipment is heat-treated function, therefore the alloy for having preheating and rear heat treatment requirements without preheating and afterwards Steel material pipe cannot carry out automatic welding.
Invention content
The purpose of the present invention is to propose to a kind of membrane wall pipe rows to weld in line preheating and rear heat-treating machine, overcomes existing skill The above-mentioned deficiency of art, structure design is simple, by increasing respectively before and after existing membrane wall welding equipment at preheating and rear heat Heating equipment, on-line checking temperature and on-line tuning temperature are managed, is then handled, easy to operate, efficient, processing quality It is good, reduce the labor intensity of worker.
In order to reach above-mentioned purpose of design, the technical solution adopted by the present invention is as follows:
A kind of membrane wall pipe row is welded in line preheating and rear heat-treating machine, including preheating box heat treatment furnace, rear hot box formula Heat-treatment furnace, membrane wall welding equipment, membrane wall pipe row, described two membrane wall welding equipment front sides side by side are equipped with high with processing The preheating box heat treatment furnace of degree, two membrane wall welding equipment rear sides side by side are equipped with the rear hot box formula heat treatment with working height Stove, the preheating box heat treatment furnace are respectively equipped with drive wheel group on rear hot box formula heat-treatment furnace, and box heat is preheated for driving Membrane wall pipe in treatment furnace, rear hot box formula heat-treatment furnace is arranged, in the preheating box heat treatment furnace, rear hot box formula heat-treatment furnace Heating element, temperature-detecting device are respectively equipped with, for the temperature in control preheating box heat treatment furnace, rear hot box formula heat-treatment furnace Degree, and then the temperature that the membrane wall pipe in it is controlled to arrange.
The preheating box heat treatment furnace, rear hot box formula heat-treatment furnace include upper furnace body, lower furnace body, upper furnace body, lower stove Body is U-shaped structure, and upper furnace body, lower furnace body, which seal against each other, to be snapped together.
The upper furnace body, lower furnace body inside bottom are respectively equipped with heating element, and membrane wall pipe row is arranged on upper and lower both sides Between heating element.
The heating element side is arranged on upper furnace body, the temperature-detecting device in lower furnace body, for detecting upper stove Temperature in body, lower furnace body.
The upper furnace body, lower furnace body side are respectively equipped with binding post, and power supply is connected for heating element.
The upper furnace body, lower furnace body both sides are respectively equipped with sealing plate.
Partition board is equipped between the adjacent heating element of the upper furnace body inside bottom.
Partition board is equipped between the adjacent heating element of the lower furnace body inside bottom.
Membrane wall pipe row welding of the present invention is preheated in line and rear heat-treating machine advantageous effect is:The letter of its structure design Single, by increasing preheating and rear hot-treatment heating equipment respectively before and after existing membrane wall welding equipment, on-line checking temperature is simultaneously On-line tuning temperature, is then handled, easy to operate, efficient, and processing quality is good, reduces the labor intensity of worker.
Its advantage specifically further includes:
1st, it avoids carrying out weld job under the pre- Warm status that worker arranges in membrane wall pipe, eliminates what is worked under high temperature environment Security risk.
2nd, preheating temperature requires before meeting welding, promotes welding quality.
3rd, meet the rear hot soaking time requirement after welding, reduce the wind that weld defect is generated due to postwelding temperature plunges Danger.
4th, because Full-automatic welding can be carried out using equipment, manual welding is avoided, reduces labor intensity.
5th, equipment can be with on-line checking and control preheating and postheat temperature during the row's welding of membrane wall pipe, can be certainly Dynamic metaplasia production, it is high-quality, it is efficient.
Description of the drawings
Fig. 1 is membrane wall pipe row welding of the present invention in line preheating and the schematic diagram of rear heat-treating machine;
Fig. 2 is membrane wall pipe row welding of the present invention in line preheating and the box heat treatment of preheating of rear heat-treating machine The sectional view of stove/rear hot box formula heat-treatment furnace;
Fig. 3 is membrane wall pipe row welding of the present invention in line preheating and the box heat treatment of preheating of rear heat-treating machine The schematic internal view of stove/rear hot box formula heat-treatment furnace;
Fig. 4 is membrane wall pipe row welding of the present invention in line preheating and the box heat treatment of preheating of rear heat-treating machine The computer heating control schematic diagram of stove/rear hot box formula heat-treatment furnace.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes.
Concrete structure as shown in Figs. 1-3, the membrane wall pipe row welding line preheating and rear heat-treating machine, including preheating Box heat treatment furnace 1, rear hot box formula heat-treatment furnace 2, membrane wall welding equipment 3, membrane wall pipe row 4, described two membrane types side by side 3 front side of wall welding equipment is equipped with the preheating box heat treatment furnace 1 with working height, two 3 rear sides of membrane wall welding equipment side by side Rear hot box formula heat-treatment furnace 2 equipped with same working height, the preheating box heat treatment furnace 1, on rear hot box formula heat-treatment furnace 2 point Not She You drive wheel group 5, for driving preheating box heat treatment furnace 1, the membrane wall pipe row 4 on rear hot box formula heat-treatment furnace 2, institute It states preheating box heat treatment furnace 1, be respectively equipped with heating element 10, temperature-detecting device 6 in rear hot box formula heat-treatment furnace 2, be used for Temperature in control preheating box heat treatment furnace 1, rear hot box formula heat-treatment furnace 2, and then control the temperature of the membrane wall pipe row 4 in it Degree.
It is described preheating box heat treatment furnace 1, rear hot box formula heat-treatment furnace 2 include upper furnace body 7, lower furnace body 8, upper furnace body 7, Lower furnace body 8 is the U-shaped structure for keeping the temperature material, and upper furnace body 7, lower furnace body 8 are sealed against each other and snapped together.
The upper furnace body 7,8 inside bottom of lower furnace body are respectively equipped with multiple heating elements 10 arranged side by side, membrane wall pipe Row 4 is arranged between the heating element 10 of upper and lower both sides.
10 side of heating element is arranged on upper furnace body 7, the temperature-detecting device 6 in lower furnace body 8, for detecting Temperature in upper furnace body 7, lower furnace body 8.
The upper furnace body 7,8 side of lower furnace body are respectively equipped with binding post 9, and power supply is connected for heating element 10.
The upper furnace body 7,8 both sides of lower furnace body are respectively equipped with sealing plate 12, and sealing plate 12 is locked by screw, replaceable, are applicable in In different dimension workpieces, scatter and disappear for reducing heat.
Partition board 11 is equipped between the adjacent heating element 10 of 7 inside bottom of upper furnace body, for fixing and being isolated electric heating Element 10.
Partition board 11 is equipped between the adjacent heating element 10 of 8 inside bottom of lower furnace body, for fixing and being isolated electric heating Element 10.
In use, increase preheating box heat treatment furnace 1 and rear hot box formula heat respectively before and after existing membrane wall welding equipment 3 Treatment furnace 2, when drive wheel group 5 conveys membrane wall pipe row 4 into membrane wall pipe row's welding equipment 3, temperature-detecting device 6 detects work Part temperature, and the power of adjust automatically heating element 10 make the temperature of membrane wall pipe row 4 meet what is welded preheating and be heat-treated afterwards Temperature requirement.
The model of the membrane wall welding equipment 3:NZMS1600X20.
As shown in figure 4,
Element table
It is powered:After major loop main circuit breaker QF1 closes, then control loop circuit breaker Q F2 is closed, secondary circuit obtains electric, presses To SB3 start buttons, main contactor C1 is attracted, and major loop obtains electric.
Temperature controls:Required temperature and time is set on temperature controller, and temperature controller will be infrared according to IR1 The actual temperature that line thermal detector detects carries out internal arithmetic with set temperature and time, and operation result is defeated by 4-20ma signals It is sent to cycle control instrument, cycle control instrument controls FH to heat according to the size of signal come the folding frequency for controlling SCR silicon-controlled The heating speed of device so that the heating speed of heater with it is preset consistent.Mode of heating is automatic or manual, in temperature Degree controller or cycle control instrument can artificially be set.
The above content is specific preferred embodiment is combined to the further description of the invention done, convenient for the skill The technical staff in art field is understood that and with the application of the invention, the specific implementation of the invention is not to be limited to these illustrations. For those of ordinary skill in the art to which the present invention belongs, it can also make without departing from the inventive concept of the premise Several simple deduction or replace, without having to go through creative labor.Therefore, those skilled in the art are according to the present invention takes off Show, the simple modifications made to the present invention all should be within protection scope of the present invention.

Claims (8)

1. a kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine, it is characterised in that:Including preheating box heat treatment furnace, Rear hot box formula heat-treatment furnace, membrane wall welding equipment, membrane wall pipe row, described two membrane wall welding equipment front sides side by side are equipped with With the preheating box heat treatment furnace of working height, the rear hot box with working height is equipped on rear side of two membrane wall welding equipments side by side Formula heat-treatment furnace, the preheating box heat treatment furnace are respectively equipped with drive wheel group on rear hot box formula heat-treatment furnace, pre- for driving Membrane wall pipe row on hot box heat treatment furnace, rear hot box formula heat-treatment furnace, the preheating box heat treatment furnace, rear hot box formula heat Heating element, temperature-detecting device are respectively equipped in treatment furnace, for controlling preheating box heat treatment furnace, the heat treatment of rear hot box formula Temperature in stove, and then the temperature that the membrane wall pipe in it is controlled to arrange.
2. membrane wall pipe row welding according to claim 1 is in line preheating and rear heat-treating machine, it is characterised in that:It is described pre- Hot box heat treatment furnace, rear hot box formula heat-treatment furnace include upper furnace body, lower furnace body, and upper furnace body, lower furnace body are U-shaped structure, on Furnace body, lower furnace body, which seal against each other, to be snapped together.
3. membrane wall pipe row welding according to claim 2 is in line preheating and rear heat-treating machine, it is characterised in that:On described Furnace body, lower furnace body inside bottom are respectively equipped with heating element, and membrane wall pipe row is arranged between the heating element of upper and lower both sides.
4. membrane wall pipe row welding according to claim 3 is in line preheating and rear heat-treating machine, it is characterised in that:The electricity Thermal element side is arranged on upper furnace body, the temperature-detecting device in lower furnace body, for detecting upper furnace body, the temperature in lower furnace body Degree.
5. membrane wall pipe row welding according to claim 4 is in line preheating and rear heat-treating machine, it is characterised in that:On described Furnace body, lower furnace body side are respectively equipped with binding post, and power supply is connected for heating element.
6. membrane wall pipe row welding according to claim 5 is in line preheating and rear heat-treating machine, it is characterised in that:On described Furnace body, lower furnace body both sides are respectively equipped with sealing plate.
7. membrane wall pipe row welding according to claim 5 is in line preheating and rear heat-treating machine, it is characterised in that:On described Partition board is equipped between the adjacent heating element of furnace body inside bottom.
8. membrane wall pipe row welding according to claim 5 is in line preheating and rear heat-treating machine, it is characterised in that:Under described Partition board is equipped between the adjacent heating element of furnace body inside bottom.
CN201810133434.7A 2018-02-09 2018-02-09 A kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine Pending CN108193044A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810133434.7A CN108193044A (en) 2018-02-09 2018-02-09 A kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810133434.7A CN108193044A (en) 2018-02-09 2018-02-09 A kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine

Publications (1)

Publication Number Publication Date
CN108193044A true CN108193044A (en) 2018-06-22

Family

ID=62593605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810133434.7A Pending CN108193044A (en) 2018-02-09 2018-02-09 A kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine

Country Status (1)

Country Link
CN (1) CN108193044A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109465559A (en) * 2018-10-31 2019-03-15 中国电建集团山东电力建设第工程有限公司 The long piece welding of heat-resistant high alloy steel tube panel and post weld heat treatment technique
CN109483106A (en) * 2018-12-24 2019-03-19 威信广厦模块住宅工业有限公司 A kind of prefabricated building module preheating insulation case
CN114406554A (en) * 2022-03-21 2022-04-29 重庆科技学院 Device for welding X80 pipeline steel welded pipe and eliminating weld stress

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55131129A (en) * 1979-03-30 1980-10-11 Sumitomo Metal Ind Ltd Skelp heating furnace provided with jet preheating furnace
CN101905948A (en) * 2010-08-06 2010-12-08 杭州精工机械有限公司 Radiation heating furnace with external circulating device
CN103157930A (en) * 2013-03-20 2013-06-19 上海锅炉厂有限公司 Pre-heating device of tube bank
CN106141511A (en) * 2015-04-23 2016-11-23 江苏绿叶锅炉有限公司 A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process
CN106346255A (en) * 2015-07-15 2017-01-25 武汉凯奇特种焊接设备有限责任公司 Laser welding machine provided with on-line continuous heat-treatment for welding seam
CN207904327U (en) * 2018-02-09 2018-09-25 阿美科福斯特惠勒动力机械有限公司 A kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55131129A (en) * 1979-03-30 1980-10-11 Sumitomo Metal Ind Ltd Skelp heating furnace provided with jet preheating furnace
CN101905948A (en) * 2010-08-06 2010-12-08 杭州精工机械有限公司 Radiation heating furnace with external circulating device
CN103157930A (en) * 2013-03-20 2013-06-19 上海锅炉厂有限公司 Pre-heating device of tube bank
CN106141511A (en) * 2015-04-23 2016-11-23 江苏绿叶锅炉有限公司 A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process
CN106346255A (en) * 2015-07-15 2017-01-25 武汉凯奇特种焊接设备有限责任公司 Laser welding machine provided with on-line continuous heat-treatment for welding seam
CN207904327U (en) * 2018-02-09 2018-09-25 阿美科福斯特惠勒动力机械有限公司 A kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109465559A (en) * 2018-10-31 2019-03-15 中国电建集团山东电力建设第工程有限公司 The long piece welding of heat-resistant high alloy steel tube panel and post weld heat treatment technique
CN109465559B (en) * 2018-10-31 2021-05-04 中国电建集团山东电力建设第一工程有限公司 Long-abutted seam welding and postweld heat treatment process for high-alloy heat-resistant steel tube panel
CN109483106A (en) * 2018-12-24 2019-03-19 威信广厦模块住宅工业有限公司 A kind of prefabricated building module preheating insulation case
CN114406554A (en) * 2022-03-21 2022-04-29 重庆科技学院 Device for welding X80 pipeline steel welded pipe and eliminating weld stress
CN114406554B (en) * 2022-03-21 2023-04-18 重庆科技学院 Device for welding X80 pipeline steel welded pipe and eliminating weld joint stress

Similar Documents

Publication Publication Date Title
CN207904327U (en) A kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine
CN108193044A (en) A kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine
CN104070287B (en) A kind of softening method of high strength alumin ium alloy friction stir welding and device of suppressing
CN208913319U (en) Soldering oven based on controlled atmosphere
CN104390459A (en) Whole honeycomb thermal storage type simple nozzle symmetrically-burning type gas kiln
CN204539506U (en) A kind of HF induction heating apparatus that can automatically control
CN103781213B (en) A kind of hand-held electromagnetic heater
CN104032250A (en) Segmented precise control type heat treatment process of hot-galvanized strip steels and alloying furnace thereof
CN102534128A (en) Chamber-type protective atmosphere annealing furnace
CN206469667U (en) A kind of energy-conserving and environment-protective mineral hot furnace for being easy to feed
CN201534869U (en) Continuous heating furnace for wheel mould
CN103725866B (en) The heating system of a kind of soaking pit and heat supply method
CN206169161U (en) Furnace temperature automatic regulating system's forge furnace
CN208066938U (en) Strip on-line heating device when a kind of magnesium alloy rolling
CN203968423U (en) A kind of hand-held electromagnetic heater
CN213778617U (en) Premixing type heating furnace
CN211005489U (en) Boat pushing type tempering heating furnace for gas heating front shaft tempering production line
CN205884285U (en) Novel milk processing is with preheating device
CN211248308U (en) Multifunctional full-automatic roaster
CN107378314A (en) A kind of large-scale i-beam structure anti-deformation welding and forming device
CN209412260U (en) A kind of heat-treatment furnace
CN207006854U (en) A kind of gas-fired heater and heating system
CN206122953U (en) Temperature control frock between pressure vessel weld layer
CN209477281U (en) Tundish dry material loose tool
CN205099728U (en) Heating furnace nozzle control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180622

RJ01 Rejection of invention patent application after publication