CN106141511A - A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process - Google Patents

A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process Download PDF

Info

Publication number
CN106141511A
CN106141511A CN201510194903.2A CN201510194903A CN106141511A CN 106141511 A CN106141511 A CN 106141511A CN 201510194903 A CN201510194903 A CN 201510194903A CN 106141511 A CN106141511 A CN 106141511A
Authority
CN
China
Prior art keywords
tubes
welding
membrane wall
bank
composing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510194903.2A
Other languages
Chinese (zh)
Inventor
周昊
周新良
马文俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU GREENLEAVES BOILER CO Ltd
Original Assignee
JIANGSU GREENLEAVES BOILER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU GREENLEAVES BOILER CO Ltd filed Critical JIANGSU GREENLEAVES BOILER CO Ltd
Priority to CN201510194903.2A priority Critical patent/CN106141511A/en
Publication of CN106141511A publication Critical patent/CN106141511A/en
Pending legal-status Critical Current

Links

Landscapes

  • Arc Welding In General (AREA)

Abstract

The manufacturing process of a kind of ultra supercritical large-sized boiler steel pipe membrane wall, comprises the following steps: 1), the choosing of welding material of composing and laying out: 2), the choosing of welding conditions of composing and laying out;3), membrane wall perforate assembles;4), engineer testing.The present invention, bank of tubes carries out heat treatment before Panel Bending, it is ensured that the adnexa such as welding equipment Kong Guan after the quality bank of tubes Panel Bending of rows of bending tubes, then carries out finished heat treatment.Tested by bank of tubes manufacture, made sufficient preparation for manufacturing the membrane wall of super (super-) critical boiler.SA213-T22 and SA213-T23 pipe is as Mayari, and it is relatively big that material has certain hardenability and leg of composing and laying out to connect weld stress, for avoiding welding cold crack, uses preheating temperature 150 DEG C before weldering;For ensureing Panel Bending quality, postwelding uses 720 ± 10 DEG C of temper.

Description

A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process
Technical field
The present invention relates to the manufacturing process of a kind of ultra supercritical large-sized boiler steel pipe membrane wall, belong to large thermal power plant and run control technical field.
Background technology
Along with station boiler is to Large Copacity, high parameter development trend, the carbon steel pipe of routine, 1Cr-0.5Mo steel pipe can not meet the requirement of film-type tube bank operating temperature, and replacing will be 2.25Cr-1Mo (SA213-T22) steel pipe and 2.25Cr-1.6W-Nb-V (SA213-T23) steel pipe.My company have accumulated the welding experience of the film-type tube bank that SA213-T22 steel pipe (U.S.'s CFB boiler) and SA213-T23 steel pipe (Kingsoft CFB boiler) use Lincoln weld to be welded from the ASME boiler product of subpackage.But the bank of tubes that this bi-material is welded is flat raft, without bank of tubes open-celled structure, also without Panel Bending structure, for adapting to the needs of station boiler manufacture development, exploitation is needed to manufacture and design the new technology that super (super-) critical seamless steel tube for boiler membrane wall manufactures.
Summary of the invention
For problem above, it is an object of the invention to provide a kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process, it is to use SA213-T22 pipe, its nominal composition is 2.25Cr-1Mo, and SA213-T23 pipe is to reduce phosphorus content on the basis of SA213-T22, add the alloying elements such as B, W, V to improve its comprehensive mechanical performance, make SA213-T23 pipe have good plasticity and impact property in the condition of high temperature.
The technical scheme is that and be accomplished by: the manufacturing process of a kind of ultra supercritical large-sized boiler steel pipe membrane wall, comprise the following steps:
1 ),Composing and laying out the choosing of welding material: according to chemical composition and the mechanical performance of SA213-T22 and SA213-T23 pipe, the chemical composition of the welding material that SA213-T22 and SA213-T23 pipe is composed and laid out with SA387Gr22 band steel is shown in Table 1:
Chemical composition (%) table 1 of welding material
2), the choosing of welding conditions of composing and laying out: SA213-T22 and SA213-T23 pipe is as Mayari, and it is relatively big that material has certain hardenability and leg of composing and laying out to connect weld stress, for avoiding welding cold crack, uses preheating temperature 150 DEG C before weldering;For ensureing Panel Bending quality, postwelding uses 720 ± 10 DEG C of temper;Welding conditions φ 2.0 welding wire routinely;
3), membrane wall perforate assembles: the process that membrane wall perforate assembles routinely is carried out;
4), engineer testing: molecular membrane wall is managed for SA213-T23, if bank of tubes become drained after need to carry out perforate, welding equipment hole pipe, then bank of tubes must carry out twice heat treatment: i.e. bank of tubes carries out heat treatment before Panel Bending, it is ensured that the quality of rows of bending tubes;After bank of tubes Panel Bending, the adnexa such as welding equipment Kong Guan, then carries out finished heat treatment.
The present invention, SA213-T23 manages molecular membrane wall, and bank of tubes carries out heat treatment before Panel Bending, it is ensured that the adnexa such as welding equipment Kong Guan after the quality bank of tubes Panel Bending of rows of bending tubes, then carries out finished heat treatment.Tested by bank of tubes manufacture, made sufficient preparation for manufacturing the membrane wall of super (super-) critical boiler.SA213-T22 and SA213-T23 pipe is as Mayari, and it is relatively big that material has certain hardenability and leg of composing and laying out to connect weld stress, for avoiding welding cold crack, uses preheating temperature 150 DEG C before weldering;For ensureing Panel Bending quality, postwelding uses 720 ± 10 DEG C of temper.
Detailed description of the invention
The manufacturing process of a kind of ultra supercritical large-sized boiler steel pipe membrane wall, comprises the following steps:
1 Composing and laying out the choosing of welding material: according to chemical composition and the mechanical performance of SA213-T22 and SA213-T23 pipe, the chemical composition of the welding material that SA213-T22 and SA213-T23 pipe is composed and laid out with SA387Gr22 band steel is shown in Table 1:
Chemical composition (%) table 1 of welding material
2, choosing of welding conditions of composing and laying out: SA213-T22 and SA213-T23 pipe is as Mayari, and it is relatively big that material has certain hardenability and leg of composing and laying out to connect weld stress, for avoiding welding cold crack, uses preheating temperature 150 DEG C before weldering;For ensureing Panel Bending quality, postwelding uses 720 ± 10 DEG C of temper;Welding conditions φ 2.0 welding wire routinely;
3, membrane wall perforate assembles: the process that membrane wall perforate assembles routinely is carried out;
4, engineer testing: molecular membrane wall is managed for SA213-T23, if bank of tubes become drained after need to carry out perforate, welding equipment hole pipe, then bank of tubes must carry out twice heat treatment: i.e. bank of tubes carries out heat treatment before Panel Bending, it is ensured that the quality of rows of bending tubes;After bank of tubes Panel Bending, the adnexa such as welding equipment Kong Guan, then carries out finished heat treatment.

Claims (1)

1. a manufacturing process for ultra supercritical large-sized boiler steel pipe membrane wall, comprises the following steps:
1), the choosing of welding material of composing and laying out: according to chemical composition and the mechanical performance of SA213-T22 and SA213-T23 pipe, the chemical composition of the welding material that SA213-T22 and SA213-T23 pipe is composed and laid out with SA387Gr22 band steel is shown in Table 1:
Chemical composition (%) table 1 of welding material
2), the choosing of welding conditions of composing and laying out: SA213-T22 and SA213-T23 pipe is as Mayari, and it is relatively big that material has certain hardenability and leg of composing and laying out to connect weld stress, for avoiding welding cold crack, uses preheating temperature 150 DEG C before weldering;For ensureing Panel Bending quality, postwelding uses 720 ± 10 DEG C of temper;Welding conditions φ 2.0 welding wire routinely;
3), membrane wall perforate assembles: the process that membrane wall perforate assembles routinely is carried out;
4), engineer testing: molecular membrane wall is managed for SA213-T23, if bank of tubes become drained after need to carry out perforate, welding equipment hole pipe, then bank of tubes must carry out twice heat treatment: i.e. bank of tubes carries out heat treatment before Panel Bending, it is ensured that the quality of rows of bending tubes;After bank of tubes Panel Bending, the adnexa such as welding equipment Kong Guan, then carries out finished heat treatment.
CN201510194903.2A 2015-04-23 2015-04-23 A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process Pending CN106141511A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510194903.2A CN106141511A (en) 2015-04-23 2015-04-23 A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510194903.2A CN106141511A (en) 2015-04-23 2015-04-23 A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process

Publications (1)

Publication Number Publication Date
CN106141511A true CN106141511A (en) 2016-11-23

Family

ID=57346321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510194903.2A Pending CN106141511A (en) 2015-04-23 2015-04-23 A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process

Country Status (1)

Country Link
CN (1) CN106141511A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106378517A (en) * 2016-11-30 2017-02-08 东方电气集团东方锅炉股份有限公司 Welding technology of flat steel fillet welds of membrane wall tube panel different steel joint position
CN107738039A (en) * 2017-10-16 2018-02-27 山东电力建设第工程公司 A kind of steel film mode tube screen seal weld method
CN108193044A (en) * 2018-02-09 2018-06-22 阿美科福斯特惠勒动力机械有限公司 A kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine
CN110202035A (en) * 2019-07-16 2019-09-06 江苏汇能锅炉有限公司 A kind of ultra-supercritical boiler heating surface tube panel Panel Bending plumber's skill
CN115365766A (en) * 2022-08-20 2022-11-22 欧萨斯能源环境设备(南京)有限公司 Manufacturing process of waste heat boiler wall and tube panel

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106378517A (en) * 2016-11-30 2017-02-08 东方电气集团东方锅炉股份有限公司 Welding technology of flat steel fillet welds of membrane wall tube panel different steel joint position
CN107738039A (en) * 2017-10-16 2018-02-27 山东电力建设第工程公司 A kind of steel film mode tube screen seal weld method
CN107738039B (en) * 2017-10-16 2020-08-14 山东电力建设第一工程公司 Steel membrane type tube panel sealing welding method
CN108193044A (en) * 2018-02-09 2018-06-22 阿美科福斯特惠勒动力机械有限公司 A kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine
CN110202035A (en) * 2019-07-16 2019-09-06 江苏汇能锅炉有限公司 A kind of ultra-supercritical boiler heating surface tube panel Panel Bending plumber's skill
CN115365766A (en) * 2022-08-20 2022-11-22 欧萨斯能源环境设备(南京)有限公司 Manufacturing process of waste heat boiler wall and tube panel
CN115365766B (en) * 2022-08-20 2024-05-07 欧萨斯能源环境设备(南京)有限公司 Waste heat boiler wall and tube panel manufacturing process

Similar Documents

Publication Publication Date Title
CN106141511A (en) A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process
CN102189158B (en) Process for bending X100 steel grade large-caliber bent pipe through intermediate frequency induction heating
CN103331327B (en) A kind of composite bimetal pipe welding method of girth weld
US20130316191A1 (en) Welding structure and welding method
CN102589002B (en) Boiler water cooled wall
CN105290554B (en) A kind of vacuum brazing technique of niobium tungsten alloy and stainless steel ring-shaped work pieces
CN104174683B (en) A kind of nickel base superalloy hot extrusion tubulation induction heating temperature control method
JP2013174350A (en) Method of manufacturing steel pipe for oil well having excellent expandability
CN104070271B (en) 15Cr1Mo1V valve body and WB36 pipe arrangement different steel weld method
CN105018699A (en) Heat treatment technology for stainless steel
CN105755239A (en) Method for improving low-temperature impact toughness of large-diameter large-wall-thickness high-strength hot-bent pipe
CN201483165U (en) 2.25 Cr-1Mo steel butt-joint welding structure with low welding residual stress
CN101450356A (en) Manufacture method of high-intensity hot bend pipe
CN104607821B (en) A387 Gr11 CL2 steel welding materials and its application method
CN101537542B (en) 2.25Cr-1Mo steel butt joint welding structure with low welding residual stress
CN103406680A (en) Process for special-shaped steel butt welding of F22 valve body and P91 matching pipe
CN104357760A (en) Heat-resistant stainless steel seamless steel pipe for high-pressure boiler
CN106566947A (en) Preparation method for titanium alloy material used for corrugated pipes
CN206112893U (en) 620 collection case of DEG C steam condition ultra supercritical unit boiler
CN105063304A (en) Galvanized steel heat treatment process
CN101109271A (en) Application of low-temperature structural steel in design and manufacture of oil-well rig headframe
CN105689925A (en) Weld preheating process
CN105081003A (en) Method for machining seamless steel pipe for pipeline used based on acid service condition
CN103981458B (en) A kind of pipe line steel of transport gas of anticorrosion stress-resistant cracking and manufacturing process thereof
CN205174324U (en) Support frame of improvement type over heater

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161123