CN106141511A - A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process - Google Patents
A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process Download PDFInfo
- Publication number
- CN106141511A CN106141511A CN201510194903.2A CN201510194903A CN106141511A CN 106141511 A CN106141511 A CN 106141511A CN 201510194903 A CN201510194903 A CN 201510194903A CN 106141511 A CN106141511 A CN 106141511A
- Authority
- CN
- China
- Prior art keywords
- tubes
- welding
- membrane wall
- bank
- composing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Arc Welding In General (AREA)
Abstract
The manufacturing process of a kind of ultra supercritical large-sized boiler steel pipe membrane wall, comprises the following steps: 1), the choosing of welding material of composing and laying out: 2), the choosing of welding conditions of composing and laying out;3), membrane wall perforate assembles;4), engineer testing.The present invention, bank of tubes carries out heat treatment before Panel Bending, it is ensured that the adnexa such as welding equipment Kong Guan after the quality bank of tubes Panel Bending of rows of bending tubes, then carries out finished heat treatment.Tested by bank of tubes manufacture, made sufficient preparation for manufacturing the membrane wall of super (super-) critical boiler.SA213-T22 and SA213-T23 pipe is as Mayari, and it is relatively big that material has certain hardenability and leg of composing and laying out to connect weld stress, for avoiding welding cold crack, uses preheating temperature 150 DEG C before weldering;For ensureing Panel Bending quality, postwelding uses 720 ± 10 DEG C of temper.
Description
Technical field
The present invention relates to the manufacturing process of a kind of ultra supercritical large-sized boiler steel pipe membrane wall, belong to large thermal power plant and run control technical field.
Background technology
Along with station boiler is to Large Copacity, high parameter development trend, the carbon steel pipe of routine, 1Cr-0.5Mo steel pipe can not meet the requirement of film-type tube bank operating temperature, and replacing will be 2.25Cr-1Mo (SA213-T22) steel pipe and 2.25Cr-1.6W-Nb-V (SA213-T23) steel pipe.My company have accumulated the welding experience of the film-type tube bank that SA213-T22 steel pipe (U.S.'s CFB boiler) and SA213-T23 steel pipe (Kingsoft CFB boiler) use Lincoln weld to be welded from the ASME boiler product of subpackage.But the bank of tubes that this bi-material is welded is flat raft, without bank of tubes open-celled structure, also without Panel Bending structure, for adapting to the needs of station boiler manufacture development, exploitation is needed to manufacture and design the new technology that super (super-) critical seamless steel tube for boiler membrane wall manufactures.
Summary of the invention
For problem above, it is an object of the invention to provide a kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process, it is to use SA213-T22 pipe, its nominal composition is 2.25Cr-1Mo, and SA213-T23 pipe is to reduce phosphorus content on the basis of SA213-T22, add the alloying elements such as B, W, V to improve its comprehensive mechanical performance, make SA213-T23 pipe have good plasticity and impact property in the condition of high temperature.
The technical scheme is that and be accomplished by: the manufacturing process of a kind of ultra supercritical large-sized boiler steel pipe membrane wall, comprise the following steps:
1 ),Composing and laying out the choosing of welding material: according to chemical composition and the mechanical performance of SA213-T22 and SA213-T23 pipe, the chemical composition of the welding material that SA213-T22 and SA213-T23 pipe is composed and laid out with SA387Gr22 band steel is shown in Table 1:
Chemical composition (%) table 1 of welding material
2), the choosing of welding conditions of composing and laying out: SA213-T22 and SA213-T23 pipe is as Mayari, and it is relatively big that material has certain hardenability and leg of composing and laying out to connect weld stress, for avoiding welding cold crack, uses preheating temperature 150 DEG C before weldering;For ensureing Panel Bending quality, postwelding uses 720 ± 10 DEG C of temper;Welding conditions φ 2.0 welding wire routinely;
3), membrane wall perforate assembles: the process that membrane wall perforate assembles routinely is carried out;
4), engineer testing: molecular membrane wall is managed for SA213-T23, if bank of tubes become drained after need to carry out perforate, welding equipment hole pipe, then bank of tubes must carry out twice heat treatment: i.e. bank of tubes carries out heat treatment before Panel Bending, it is ensured that the quality of rows of bending tubes;After bank of tubes Panel Bending, the adnexa such as welding equipment Kong Guan, then carries out finished heat treatment.
The present invention, SA213-T23 manages molecular membrane wall, and bank of tubes carries out heat treatment before Panel Bending, it is ensured that the adnexa such as welding equipment Kong Guan after the quality bank of tubes Panel Bending of rows of bending tubes, then carries out finished heat treatment.Tested by bank of tubes manufacture, made sufficient preparation for manufacturing the membrane wall of super (super-) critical boiler.SA213-T22 and SA213-T23 pipe is as Mayari, and it is relatively big that material has certain hardenability and leg of composing and laying out to connect weld stress, for avoiding welding cold crack, uses preheating temperature 150 DEG C before weldering;For ensureing Panel Bending quality, postwelding uses 720 ± 10 DEG C of temper.
Detailed description of the invention
The manufacturing process of a kind of ultra supercritical large-sized boiler steel pipe membrane wall, comprises the following steps:
1 、Composing and laying out the choosing of welding material: according to chemical composition and the mechanical performance of SA213-T22 and SA213-T23 pipe, the chemical composition of the welding material that SA213-T22 and SA213-T23 pipe is composed and laid out with SA387Gr22 band steel is shown in Table 1:
Chemical composition (%) table 1 of welding material
2, choosing of welding conditions of composing and laying out: SA213-T22 and SA213-T23 pipe is as Mayari, and it is relatively big that material has certain hardenability and leg of composing and laying out to connect weld stress, for avoiding welding cold crack, uses preheating temperature 150 DEG C before weldering;For ensureing Panel Bending quality, postwelding uses 720 ± 10 DEG C of temper;Welding conditions φ 2.0 welding wire routinely;
3, membrane wall perforate assembles: the process that membrane wall perforate assembles routinely is carried out;
4, engineer testing: molecular membrane wall is managed for SA213-T23, if bank of tubes become drained after need to carry out perforate, welding equipment hole pipe, then bank of tubes must carry out twice heat treatment: i.e. bank of tubes carries out heat treatment before Panel Bending, it is ensured that the quality of rows of bending tubes;After bank of tubes Panel Bending, the adnexa such as welding equipment Kong Guan, then carries out finished heat treatment.
Claims (1)
1. a manufacturing process for ultra supercritical large-sized boiler steel pipe membrane wall, comprises the following steps:
1), the choosing of welding material of composing and laying out: according to chemical composition and the mechanical performance of SA213-T22 and SA213-T23 pipe, the chemical composition of the welding material that SA213-T22 and SA213-T23 pipe is composed and laid out with SA387Gr22 band steel is shown in Table 1:
Chemical composition (%) table 1 of welding material
2), the choosing of welding conditions of composing and laying out: SA213-T22 and SA213-T23 pipe is as Mayari, and it is relatively big that material has certain hardenability and leg of composing and laying out to connect weld stress, for avoiding welding cold crack, uses preheating temperature 150 DEG C before weldering;For ensureing Panel Bending quality, postwelding uses 720 ± 10 DEG C of temper;Welding conditions φ 2.0 welding wire routinely;
3), membrane wall perforate assembles: the process that membrane wall perforate assembles routinely is carried out;
4), engineer testing: molecular membrane wall is managed for SA213-T23, if bank of tubes become drained after need to carry out perforate, welding equipment hole pipe, then bank of tubes must carry out twice heat treatment: i.e. bank of tubes carries out heat treatment before Panel Bending, it is ensured that the quality of rows of bending tubes;After bank of tubes Panel Bending, the adnexa such as welding equipment Kong Guan, then carries out finished heat treatment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510194903.2A CN106141511A (en) | 2015-04-23 | 2015-04-23 | A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510194903.2A CN106141511A (en) | 2015-04-23 | 2015-04-23 | A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106141511A true CN106141511A (en) | 2016-11-23 |
Family
ID=57346321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510194903.2A Pending CN106141511A (en) | 2015-04-23 | 2015-04-23 | A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106141511A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106378517A (en) * | 2016-11-30 | 2017-02-08 | 东方电气集团东方锅炉股份有限公司 | Welding technology of flat steel fillet welds of membrane wall tube panel different steel joint position |
CN107738039A (en) * | 2017-10-16 | 2018-02-27 | 山东电力建设第工程公司 | A kind of steel film mode tube screen seal weld method |
CN108193044A (en) * | 2018-02-09 | 2018-06-22 | 阿美科福斯特惠勒动力机械有限公司 | A kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine |
CN110202035A (en) * | 2019-07-16 | 2019-09-06 | 江苏汇能锅炉有限公司 | A kind of ultra-supercritical boiler heating surface tube panel Panel Bending plumber's skill |
CN115365766A (en) * | 2022-08-20 | 2022-11-22 | 欧萨斯能源环境设备(南京)有限公司 | Manufacturing process of waste heat boiler wall and tube panel |
-
2015
- 2015-04-23 CN CN201510194903.2A patent/CN106141511A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106378517A (en) * | 2016-11-30 | 2017-02-08 | 东方电气集团东方锅炉股份有限公司 | Welding technology of flat steel fillet welds of membrane wall tube panel different steel joint position |
CN107738039A (en) * | 2017-10-16 | 2018-02-27 | 山东电力建设第工程公司 | A kind of steel film mode tube screen seal weld method |
CN107738039B (en) * | 2017-10-16 | 2020-08-14 | 山东电力建设第一工程公司 | Steel membrane type tube panel sealing welding method |
CN108193044A (en) * | 2018-02-09 | 2018-06-22 | 阿美科福斯特惠勒动力机械有限公司 | A kind of membrane wall pipe row welding is in line preheating and rear heat-treating machine |
CN110202035A (en) * | 2019-07-16 | 2019-09-06 | 江苏汇能锅炉有限公司 | A kind of ultra-supercritical boiler heating surface tube panel Panel Bending plumber's skill |
CN115365766A (en) * | 2022-08-20 | 2022-11-22 | 欧萨斯能源环境设备(南京)有限公司 | Manufacturing process of waste heat boiler wall and tube panel |
CN115365766B (en) * | 2022-08-20 | 2024-05-07 | 欧萨斯能源环境设备(南京)有限公司 | Waste heat boiler wall and tube panel manufacturing process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106141511A (en) | A kind of ultra supercritical large-sized boiler steel pipe membrane wall manufacturing process | |
CN102189158B (en) | Process for bending X100 steel grade large-caliber bent pipe through intermediate frequency induction heating | |
CN103331327B (en) | A kind of composite bimetal pipe welding method of girth weld | |
US20130316191A1 (en) | Welding structure and welding method | |
CN102589002B (en) | Boiler water cooled wall | |
CN105290554B (en) | A kind of vacuum brazing technique of niobium tungsten alloy and stainless steel ring-shaped work pieces | |
CN104174683B (en) | A kind of nickel base superalloy hot extrusion tubulation induction heating temperature control method | |
JP2013174350A (en) | Method of manufacturing steel pipe for oil well having excellent expandability | |
CN104070271B (en) | 15Cr1Mo1V valve body and WB36 pipe arrangement different steel weld method | |
CN105018699A (en) | Heat treatment technology for stainless steel | |
CN105755239A (en) | Method for improving low-temperature impact toughness of large-diameter large-wall-thickness high-strength hot-bent pipe | |
CN201483165U (en) | 2.25 Cr-1Mo steel butt-joint welding structure with low welding residual stress | |
CN101450356A (en) | Manufacture method of high-intensity hot bend pipe | |
CN104607821B (en) | A387 Gr11 CL2 steel welding materials and its application method | |
CN101537542B (en) | 2.25Cr-1Mo steel butt joint welding structure with low welding residual stress | |
CN103406680A (en) | Process for special-shaped steel butt welding of F22 valve body and P91 matching pipe | |
CN104357760A (en) | Heat-resistant stainless steel seamless steel pipe for high-pressure boiler | |
CN106566947A (en) | Preparation method for titanium alloy material used for corrugated pipes | |
CN206112893U (en) | 620 collection case of DEG C steam condition ultra supercritical unit boiler | |
CN105063304A (en) | Galvanized steel heat treatment process | |
CN101109271A (en) | Application of low-temperature structural steel in design and manufacture of oil-well rig headframe | |
CN105689925A (en) | Weld preheating process | |
CN105081003A (en) | Method for machining seamless steel pipe for pipeline used based on acid service condition | |
CN103981458B (en) | A kind of pipe line steel of transport gas of anticorrosion stress-resistant cracking and manufacturing process thereof | |
CN205174324U (en) | Support frame of improvement type over heater |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |